Records from 2016 to 2022. Most recent: inspection, 9 March 2022.
Inspection history · 5
9 March 2022
Drydock Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7408852
8 February 2017
MTSA/ISPS Verification · Deficiency Check · COI Inspection · DAPI Audit
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6084698
2 December 2016
Hull Examination · Examination of Repairs
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6050730
15 April 2016
Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5855061
17 February 2016
DAPI Audit · COI Inspection · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5816446
Fire Fighting › Fire Bucket › Availability
Issued 8 February 2017
Resolved
privide 3 fire buckets with lanyards
Action required: 705 - Other - as specified
Due 22 February 2017
Resolved 17 February 2017
Resolution: fire buckets on board
Lifesaving › Lifefloat › Serviceable
Issued 8 February 2017
Resolved
provide CG approved lifefloat
Action required: 705 - Other - as specified
Due 15 March 2017
Resolved 1 March 2017
Resolution: installed USCG approved liferaft
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 8 February 2017
Resolved
provide a quick disconnect clip on the lanyard that holds the light float to ring
Action required: 705 - Other - as specified
Due 22 February 2017
Resolved 17 February 2017
Resolution: installed stainless steel clip
Construction/Loadline › Hull › Longitudinal Frame
Issued 2 December 2016
Resolved
longitudinal frames on the inboard section of both hulls jsut below the entry hatches are showing signs of wood rot.
Action required: 705 - Other - as specified
Resolved 5 December 2016
Resolution: removed the rotted areas and sistered with douglass fir and seal with West system epoxy and filler
Construction/Loadline › Hull › Transverse Frame
Issued 2 December 2016
Resolved
first ring frame in stbd hull just fwd of entry hatch showing signs of stress fractures
Action required: 705 - Other - as specified
Resolved 5 December 2016
Resolution: Repaired with 2 pieces of marine grade plywood on both sides of frame and sealed with West System epoxy resin
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 18 February 2016
Resolved
Provide 3-6' laynard for water light on ring buoy.
Action required: 705 - Other - as specified
Due 5 March 2016
Resolved 2 March 2016
Resolution: Laynard replaced.
Documentation › Markings/Placards › Warning Signs
Issued 18 February 2016
Resolved
Properly label emergency fuel shut-off valves.
Action required: 705 - Other - as specified
Due 5 March 2016
Resolved 2 March 2016
Resolution: Fuel shut-off placards installed.
Communications › Audible Communications › Horn/Whistle
Issued 18 February 2016
Resolved
Provide sound producing device.
Action required: 705 - Other - as specified
Due 5 March 2016
Resolved 2 March 2016
Resolution: Portable air horn on board.
Personnel › Certificates/Documents/Licenses › STCW Endorsement
Issued 18 February 2016
Resolved
Provide proof of completion of crowd/crisis management course and DAPI enrollment for crewmember Seabrook.
Action required: 705 - Other - as specified
Due 5 March 2016
Resolved 2 March 2016
Resolution: Crewmember removed from international routes until training completed.
Communications › Radio Communications › VHF Radiotelephone
Issued 18 February 2016
Resolved
Prove proper operation of DSC capabilities on VHF-FM radio.
Action required: 705 - Other - as specified
Due 5 March 2016
Resolved 15 April 2016
Resolution: DSC radio witnessed.