Records from 2014 to 2026. Most recent: inspection, 29 July 2026.
Inspection history · 28
29 July 2026
Administrative Inspection
Administrative · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8449754
1 June 2026
Construction Oversight
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8385968
5 May 2026
Deficiency Check · Vessel Attendance
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8367607
9 February 2026
Deficiency Check · Administrative Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8308427
21 November 2025
Vessel Attendance · COI Inspection · Construction Oversight
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8272347
5 August 2025
Administrative Inspection · Examination of Repairs · Damage Survey
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 8194096
8 May 2025
Deadweight Survey
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8131797
26 October 2023
Drydock Exam · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7814714
9 May 2023
Load Line/Change of Employment
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7684614
3 May 2023
Construction Oversight · Internal Structural Exam · Administrative Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7834231
29 July 2022
Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7504571
18 June 2022
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7485030
22 February 2021
Internal Structural Exam · Annual Inspection · MTSA Verification · Examination of Repairs · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7139412
24 November 2020
Bulk Liquid Transfer Monitor
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7101901
27 July 2020
Periodic Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7011207
15 July 2019
Annual Inspection · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6751283
15 May 2019
Bulk Liquid Transfer Monitor
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6689382
6 February 2019
Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6621217
12 September 2018
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6540725
21 March 2018
COI Inspection · Internal Structural Exam · Administrative Inspection · Drydock Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6381417
23 October 2017
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6294022
29 March 2017
Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6113542
20 March 2017
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6126158
2 December 2016
Bulk Liquid Transfer Monitor
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6051379
6 October 2016
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6020911
5 July 2016
Periodic Inspection · Administrative Inspection · Construction Oversight
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5933210
18 March 2016
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5835755
2 March 2016
Internal Structural Exam · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5825382
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 21 November 2025
Resolved
The requirements of § 58.10-5 (a), (c), and (d) apply to diesel engine installations.
Engine design. All installations must be of marine type engines suitable for the intended service, designed and constructed in conformance with the requirements of this subchapter.
The installaton of the Diesel engines driving the refrigeration compressors is incomplete.
The installation shall be completed in accordance with the Coast Guard approved drawing, and verified by a Coast Guard Marine Inspector prior to using the system.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 30 January 2027
Resolved 5 May 2026
Resolution: Completion of the installation of the refrigeration machinery Diesel engine prime movers, has been completed to the satisfaction of the attending CG Marine Inspector.
01 - Certificates & Documentation › 011 - Ships Certificates › Load Lines (including Exemption)
Issued 21 November 2025
Resolved
All U.S.-flag vessels which engage in domestic voyages by sea (coastwise and intercoastal voyages) shall be subject to the applicable provisions of this part.
The statutory authority to prescribe rules and regulations requiring certain vessels to have and display load line marks indicating the maximum amidship draft to which such vessels may be safely loaded and certification thereof by the assigning authority is in 46 U.S.C. 5101-5116. Each vessel subject to load line requirements shall carry on board a valid certificate attesting to compliance with such requirements. (See §§ 42.07-35 and 42.07-40 for additional data furnished to the vessel.)
The vessel does not have a valid Load Line certificate.
The vessel shall have on board a valid Load Line Certificate issued by a recognized classification society prior to operating beyond any boundary line as defined in 46 CFR Cahapter I, Subchapter A, Part 7.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 30 January 2027
Resolved 9 February 2026
Resolution: Vessel was issued full term Load Line Certificate by ABS.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 9 May 2023
Resolved
MI found that after speaking with vessel rep and reviewing COI it was determined that the barge was loaded past its CTIE due date of 14 March 2023. Vessel required to be inspected by a marine chemist by 14 March 2023.
Action required: 10 - Deficiency Rectified
Due 19 May 2023
Resolved 19 May 2023
Resolution: Coast Guard completed CTIE bringing vessel back into compliance.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 July 2022
Resolved
The Officer in Charge, Marine Inspection must be notified before alterations or modifications that deviate from approved plans.
MI discovered newly installed battery charger temporarily mounted to the the bulkhead powering the Bergen system. Vessel representative was unable to provide approved plans for battery charger.
46CFR31.35-1 & 46CFR110.30-7
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 August 2022
Resolved 1 November 2023
Resolution: Vessel is undergoing a major conversion and is no longer operating as a tank barge.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 26 February 2021
Resolved
The operator did not provide periodic exposure monitoring during the annual COI inspection. The monitoring must be repeated each July or August if benzene containing cargoes are carried during those months; monitoring must be conducted under those weather conditions that will maximize benzene exposure, such as low wind, stable air, and high temperature. If benzene containing cargoes are not carried during those months, monitoring must be conducted at the time of carriage nearest those months; monitoring must be conducted under those weather conditions that will maximize benzene exposure, such as low wind, stable air, and high temperature. The crew logged gasoline transfers in July and August of 2020 in the Oil Record Book. Provide records for the periodic monitoring or complete the periodic monitoring at the next time of carriage for cargos containing benzene. Vessel is restricted from carrying benzene cargo in excess of 0.5% benzene by volume. 46 CFR 30.25-3 and 46 CFR 197.540.
Action required: 705 - Other - as specified
Due 26 March 2021
Resolved 1 March 2021
Resolution: Benzene exposure air monitoring for this vessel was completed by the company in July 2020. Records provided and reviewed.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 26 February 2021
Resolved
The employer must provide, and the employees must submit to, the medical surveillance examinations for employees, as required by this section. The employer shall ensure that no one performs a benzene operation exceeding the level criteria of paragraph (b)(2) of this section without having undergone an initial medical examination and periodic medical examinations yearly thereafter. The employer shall maintain an accurate record of all monitoring conducted in compliances with §197.540 for three years. All records required to be maintained by this section must be made available upon request to the Coast Guard. The employer did not provide medical records for employees involved in cargo operations on the tank barge. Provide proof of employee records enrolled in the Periodic medical surveillance exam. 46 CFR 30.25-3 and
46 CFR 197.570
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 March 2021
Resolved 1 March 2021
Resolution: The tankerman medical records for benzene medical surveillance were provided and reviewed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 26 February 2021
Resolved
Coamings of any fiddley, funnel, or machinery space ventilators in an exposed position on the freeboard or superstructure deck shall be as high above the deck as is reasonable and practicable. Fiddley openings shall be fitted with strong covers of steel or other equivalent material permanently attached in their proper positions and capable of being secured weathertight. Other openings in such casings shall be fitted with equivalent covers, permanently attached in their proper positions. Two fire dampers to the machinery space located on the aft bulkhead were unable to be closed weathertight when tested by the crew. Renew as original. 46 CFR 42.15-35
Action required: 17 - Rectify deficiencies prior to departure
Due 1 March 2021
Resolved 1 March 2021
Resolution: Fire dampers were renewed and operationally tested.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 26 February 2021
Resolved
A tank vessel with a capacity of 250 or more barrels that is carrying oil or hazardous material as cargo must have on board an emergency means to enable the person in charge of a transfer operation to a facility, to another vessel, or within the vessel to stop the flow of oil or hazardous material. The means to stop the flow must be operable from the cargo deck, cargo control room, or the usual operating station of the person in charge of the transfer operation. The crew operationally tested the emergency shut down for the port and starboard cargo pumps and the test could not be completed when using the pull cable from cargo tank #3 which is identified as an operating station for transfer. The pull cable only worked when pulled immediately outside of the machinery space. Provide an emergency shut down that is operable from the cargo deck, cargo control room, or the usual operating station of the person in charge of the transfer operation. 33 CFR 155.780
Action required: 17 - Rectify deficiencies prior to departure
Due 1 March 2021
Resolved 1 March 2021
Resolution: The emergency shut down pull cable was renewed by the shipyard and operationally tested.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 26 February 2021
Resolved
In any case where a venting system is required for a particular grade of liquid, the venting system permitted for a higher grade of liquid may be used instead. Grade A, B, or C liquids. Cargo tanks in which Grade A, B, or C liquids are to be transported shall be fitted with either individual pressure-vacuum relief valves which shall extend to a reasonable height above the weather deck or shall be fitted with a venting system consisting of branch vent lines connected to a vent header which shall extend to a reasonable height above the weather deck and be fitted with a pressure-vacuum relief valve. Grade D or E liquids. Cargo tanks in which Grade D or E liquids only are to be transported shall be fitted with gooseneck vents and flame screens. The inspector identified flame screens missing or damaged on the following cargo tanks: 1S, 2S, 2P, 4P, 4S, and 5P. The vessel outfitted with P/V relief valves for Grade A, B, or C liquids. The operator is not permitted to load using flame screens in an open ventilation arrangement for grade D or E cargo until the flame screens are replaced in the cargo tanks missing flame screens. 46 CFR 32.55-25
Action required: 705 - Other - as specified
Due 1 March 2021
Resolved 1 March 2021
Resolution: All cargo tank flame screens were renewed and placed into service.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Loading instrument
Issued 26 February 2021
Resolved
A cargo tank of the tank vessel connected to a vapor collection system must be equipped with a permanent or portable cargo gauging device that is a closed type as defined in 46 CFR 151.15.10(c) that does not require opening the tank to the atmosphere during cargo transfer and allows the operator to determine the level of liquid in the tank for the full range of liquid levels in the tank. The magnet for the tankerman to check the cargo level on the closed gauging system is missing on cargo tanks 1P and 1S. Replace and renew as original. Rectify prior to conducting cargo operations in cargo tanks 1P and 1S. 46 CFR 39.2003
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 March 2021
Resolved 1 March 2021
Resolution: The Bergens representative attended the vessel and provided new magnets for the cargo gauging system.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Loading instrument
Issued 26 February 2021
Resolved
Each cargo tank of a tank barge must have one of the following liquid overfill protection arrangements: 1. A system meeting the requirements of 46 CFR 39.2007, 2. An intrinsically safe overfill control system, or 3. A spill valve that meets ASTM F1271 requirements (incorporated by reference, see 46 CFR 39.1005. The alarm panel for the high level and overfill alarms has inoperable lights for the following cargo tanks: 1S overfill, 3S overfill, and 4S high level. Renew as original prior to loading in these cargo tanks. 46 CFR 39.2009
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 March 2021
Resolved 1 March 2021
Resolution: The Bergens representative attended the vessel and provided new lights for 1S overfill, 3S overfill, and 4S high level.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 22 July 2019
Resolved
Multiple copies of the vessel procedures were on board, ones that were outdated needed to be removed.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 22 July 2019
Resolved 22 July 2019
09 - Working and Living Conditions › 092 - Working Conditions › Warning notices
Issued 22 July 2019
Resolved
Port cargo hatches labeling was faded, told vessel rep to paint "DANGER, KEEP OUT".
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 22 July 2019
Resolved 22 July 2019
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 22 July 2019
Resolved
Gaskets were not in satisfactory condition for the vent closures, need to be replaced.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 22 July 2019
Resolved 22 July 2019
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 22 July 2019
Resolved
Lagging on the port cargo pump prime mover exhaust needs to be replaced due to unsatisfactory condition.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 22 July 2019
Resolved 22 July 2019
Documentation › Markings/Placards › Oil Discharge Placard
Issued 3 May 2018
Resolved
FUEL & SLOP TANKS DO NOT HAVE DISCHARGE OF OIL PROHIBITED PLACARD. SHIPS 26FT AND GREATER IN LENGTH MUST HAVE A PLACARD FIXED IN A CONSPICUOUS PLACE. 33 CFR 155.450
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 3 May 2018
Resolution: PLACED PLACARD AS REQUIRED FOR FUEL & SLOP TANKS.
Electrical › Electric Generation Source (service) › Power Requirement
Issued 3 May 2018
Resolved
TANKERMAN HOUSE INSTALLED W/ ELECTRICAL SYSTEM NOT USCG PLAN REVIEWED. PLANS FOR ELECTRICAL SYSTEMS MUST BE SUBMITTED FOR USCG PLAN REVIEW AND APPROVAL. PRIOR TO OPERATION OF NEW ELECTRICAL INSTALL. 46 CFR 31.35-1, 46 CFR 110.25-1
Action required: 705 - Other - as specified
Resolved 22 July 2019
Documentation › Certificates/Documents › Permit, Other
Issued 23 October 2017
Resolved
Barge is operating with an invalid COI. Barge is currently overdue for an annual inspection by 63 days including a 90 day allowable grace period. COI Anniversary date is 23MAY. Vessel is restricted from loading cargo until satisfactory Coast Guard inspection is complete.
Action required: 705 - Other - as specified
Due 23 October 2017
Resolved 23 October 2017
Resolution: Completed satisfactory inspection, and edorsed COI.
Documentation › Certificates/Documents › Certificate of Financial Responsibility
Issued 9 March 2016
Resolved
Vessel's COFR currently reflects the previous vessel's name (EMS 5001). Provide updated COFR with current vessel's name IAW 33 CFR 138.70
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 9 March 2016
Resolved 11 March 2016
Resolution: Resolved to the satisfaction of the Marine Inspector.
Operations/Management › Cargo Transfer/Lightering › Vessel Transfer Procedures on Hand
Issued 9 March 2016
Resolved
Vessel's transfer procedure reflects previous vessel's name. Provide updated transfer procedure with current vessel's name IAW 33 CFR 155.750
Condition: Invalid
Action required: 705 - Other - as specified
Due 9 April 2016
Resolved 11 March 2016
Resolution: Provided updated transfer procedures