Documentation record
Registered dimensions (L × B × D)91.1 ft × 25.0 ft × 9.2 ft
Registered tonnagegross 98 / net 67
ITC dimensions (L × B × D)91.1 ft × 25.0 ft × 9.2 ft
ITC tonnagegross 183 / net 84
BuilderGULF CRAFT INC · PATTERSON, LA, UNITED STATES · built 1994
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portPLYMOUTH, MA
Endorsements, as the file codes themcw_un, fi, reg
DocumentationValid · issued 24 February 2026 · expires 28 February 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it183 - Convention (Subpart B), Gross Ton
98 - Regulatory (Subpart C or D), Gross Ton
84 - Convention (Subpart B), Net Ton
67 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 24
14 May 2026
Vessel Attendance · Annual Inspection · Internal Structural Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8358094
23 April 2026
Internal Structural Exam · Vessel Attendance · Drydock Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 8355333
22 May 2025
Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8128822
27 February 2025
Examination of Repairs
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 8085827
30 April 2024
Internal Structural Exam · Deficiency Check · COI Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7870904
5 February 2024
Internal Structural Exam · Drydock Exam · Examination of Repairs
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7856409
12 May 2023
Internal Structural Exam · In-Service Inspection · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7668807
11 April 2023
Plan Review (Other than "T") · In-Service Inspection · Examination of Repairs
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 7667691
24 August 2022
In-Service Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7522060
28 April 2022
Annual Inspection · Internal Structural Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7414225
14 March 2022
Internal Structural Exam · Drydock Exam · Examination of Repairs
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7404491
21 September 2021
In-Service Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7311136
10 May 2021
Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7231961
26 May 2020
Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6960480
27 February 2020
Drydock Exam · Internal Structural Exam · Examination of Repairs
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6907849
9 April 2019
Deficiency Check · COI Inspection · MTSA Verification
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6657847
30 August 2018
Administrative Inspection · Deficiency Check
Physical examination · Navigation Center · Activity 6527635
15 May 2018
MTSA Verification · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6414084
5 April 2018
Internal Structural Exam · Hull Examination
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6366987
17 August 2017
Deficiency Check
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6244744
6 July 2017
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6199385
24 April 2017
Deficiency Check · Annual Inspection · MTSA Verification
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6132437
7 June 2016
MTSA Verification · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5900244
22 February 2016
Examination of Repairs · Drydock Exam · Internal Structural Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 5819767
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 14 May 2026
Resolved
The intent of this part is to insure that the scantlings, material, fastenings, workmanship, and arrangement of the vessel are such construction to provide for the safe operation of the vessel in accordance with the terms and conditions of it's Certificate of Inspection giving special consideration to provisions of a seaworthy hull. Multiple cracks were identified in the vicinity of the fore peak deck area around the tow/anchor bit. Interior inspection resulted in several cracked welds around the bit structure and the deck stiffeners, and a full thickness crack through the deck. O/O to submit a repair proposal to cognizant OCMI and carry out approved repairs prior to conducting passenger operations.
46 CFR 177.01-5
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 May 2026
Resolution: O/O made repairs to tow/anchor bit and surrounding areas.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 30 April 2024
Resolved
Shutoff valves, installed so as to close against the fuel flow, must be fitted in the fuel supply lines, one at the tank connection and one at the engine end of the fuel line to stop fuel flow when servicing accessories. Fuel shutoff valve did not close/seat all the way, which could allow fuel flow after actuated. Owner/Operator shall show full actuation of valve to stop fuel flow.
46 CFR 119.455(b)(3)
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 May 2024
Resolved 3 May 2024
Resolution: Cleared to the attending MI satification.
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 30 April 2024
Resolved
When using DSC techniques, coast stations and ship stations must use maritime mobile service identities (MMSI) assigned by the Commission or its designees. The second radio on the PORT side of the pilothouse did not show MMSI. Owner/Operator must provide evidence of MMSI being installed.
47 CFR 80.103(b)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2024
Resolved 7 May 2024
Resolution: Received email from Rep showing MMSI was inputted on radio with FCC Bridge-to-Bridge and Radiotelephony Certificates.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 30 April 2024
Resolved
The flame screens or flame arresters must be of such size and design as to prevent reduction in the net cross sectional area of the vent pipe and permit cleaning or renewal of the flame screens or arrester elements. Flame screen on fuel vent needs to be adjusted to provide a proper fit.
46 CFR 119.455(b)(3)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2024
Resolved 6 May 2024
Resolution: Cleared to the attending MI satification.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 30 April 2024
Resolved
Each ring life buoy on a vessel must be approved in accordance with § 160.050 in subchapter Q of this chapter, or other standard specified by the Commandant, including, but not limited to, approval series 160.150. 01 of the 03 life is wasted beyond use and must be replaced.
46 CFR 117.70(b)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2024
Resolved 3 May 2024
Resolution: Cleared to the attending MI satification.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 30 April 2024
Resolved
Unless other means are provided to ensure that a potential waste receptacle fire would be limited to the receptacle, waste receptacles must be constructed of noncombustible materials with no openings in the sides or bottom. The plastic receptacles on the vessel must be removed and replaced with noncombustible.
46 CFR 117.70(b)(1)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2024
Resolved 3 May 2024
Resolution: Cleared to the attending MI satification.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 April 2024
Resolved
All cable and wire must be protected from the weather. STBD electrical outlet cover missing, but installed during inspection.
46 CFR 120.340(b)(3)
Action required: 10 - Deficiency Rectified
Due 30 April 2024
Resolved 30 April 2024
Resolution: Cleared to the attending MI satification.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 30 April 2024
Resolved
The inspection and maintenance of the equipment listed in paragraph (a) of this section shall be logged or otherwise documented for review by the Coast Guard upon request. The survival crafts maintenance must be logged IAW manufacturer's instructions.
46 CFR 122.702(a)
Action required: 10 - Deficiency Rectified
Due 30 April 2024
Resolved 30 April 2024
Resolution: Cleared to the attending MI satification.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 30 April 2024
Resolved
For portable fire extinguishers, the inspections, maintenance procedures and hydrostatic pressure tests required by Chapter 4 of NFPA 10,with the frequency specified by NFPA 10. If equipment or records have not been properly maintained, a qualified servicing facility may be required to perform an inspection. Maintenance was being conducted but not documented in a log. This corresponds with Monthly maintenance under NFPA 10.
46 CFR 115.810(b)(1)
Action required: 10 - Deficiency Rectified
Due 30 April 2024
Resolved 30 April 2024
Resolution: Cleared to the attending MI satification.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 5 February 2024
Resolved
The owner or managing operator shall submit drawings, sketches, or written specifications describing the
details of any proposed alterations. Submit weight change calculations to the Marine Safety Center for stability review for new generator installation. Prior to carriage of passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 March 2024
Resolved 5 April 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 5 February 2024
Resolved
Each generator and motor must be designed for an ambient temperature of 50 °C (122 °F). Fill out and return repower worksheet to local OCMI for new generator installation. Prove generator meets 50C temperature rating. Prior to carriage of passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 March 2024
Resolved 19 March 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 5 February 2024
Resolved
The OCMI may require an inspection and testing whenever a repair or alteration is undertaken. Prove proper operation of new generator under load, test built in safeties such as low lube oil pressure alarm, high jacket water temperature alarm, and overspeed shutdown/alarm (if equipped) to the satisfaction of the attending USCG MI. Prior to carriage of passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 March 2024
Resolved 16 April 2024
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 9 April 2019
Resolved
A vessel owner or operator may use an Alternative Security Program as approved under subsection 101.120 if the Alternative Security Program is implemented in its entirety. Vessel has not completed an exercise or drills in accordance with their ASP.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 April 2019
Resolved 19 April 2019
Resolution: Vsl representative provided documentation of satisfactory exercise.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 9 April 2019
Resolved
The discharge ends of vent pipes shall be fitted with removable flame screens or flame arresters. The flame screens shall consist of a single screen of corrosion resistant wire of at least 30x30 mesh. The flame screens or flame arresters shall be of such size and design as to prevent reduction in the net cross-sectional area of the vent pipe. No flame screens or arresters were fitted on the discharge ends of the vent pipes for the fuel tanks. 46CFR182.20-35(d)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 April 2019
Resolved 19 April 2019
Resolution: Flame screens were fitted on the discharge ends of the vent pipes.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 9 April 2019
Resolved
A vessel must carry adequate and up-to-date: (1) charts of large enough scale to make safe navigation possible; (2) U.S. Coast Pilot or similar; (3) Coast Guard Light list. Vessel had outdated charts, U.S. Coast Pilot, and light lists.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 April 2019
Resolved 19 April 2019
Resolution: Updated charts were present on vessel. Receipt for purchase of updated light lists and U.S. Coast Pilot was provided.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 30 August 2018
Resolved
Vsl is broadcasting no static draft information.
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 16 October 2018
Resolution: While running a query in VIVS, the draft for the vessel had been updated and AIS was broadcasting the proper information.
Engineering › Engine Controls (Electric/Electronic) › Software
Issued 6 July 2017
Resolved
Obtain DVPT approval letter from MSC.
Action required: 705 - Other - as specified
Due 28 September 2017
Resolved 28 September 2017
Resolution: Recieved approval letter from MSC on 08/15/17. Document is uploaded in MISLE.
Engineering › Diesel Engine (propulsion-reduction gear) › Emergency shutdown
Issued 24 April 2017
Resolved
Provide copy of approved letter from MSC for Design Verification Test Procedures (DVTP) and Periodic Safety Test Procedures (PSTP) for vessel.
Condition: Invalid
Action required: 705 - Other - as specified
Due 19 May 2017
Resolved 24 April 2017
Resolution: Recieved email with DVTP attached, filed under vessel file not vessel inspection file. Still waiting for MSC approved PSTPs.
Engineering › Engine Controls (Electric/Electronic) › Software
Issued 22 February 2016
Resolved
Provide approved DVTP's and PSTP's for the 4 new engines and controls.
Action required: 705 - Other - as specified
Due 30 April 2018
Resolved 18 August 2017