This record may be incomplete: the most recent inspection recorded for this vessel was 27 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
756 - Regulatory (Subpart C or D), Net Ton
756 - Regulatory (Subpart C or D), Gross Ton
Maury page id
psix-40841
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
The Coast Guard recorded this vessel and the following in the same
inspection activity — normally a tug and the barges in its tow. Only barges and towing
vessels are in this archive, so any other vessel type in the same activity does not
appear here: these lists are a floor, not a complete manifest.
CROP & RENEW WASTED PORTION OF RAKE DECK WITH INSERT WHERE "PAD" WELD EXISTS. REPAIR TO BE COMPLETED TO THE SATISFACTION OF AN ATTENDING CG MARINE INSPECTOR NO LATER THAN 30 MAY 1998.
Condition: Unknown
Due 8 May 1998
Resolved 12 May 1998
Engineering
Issued 21 March 1997Resolved
REPAIR/REPLACE MUFFLER TO GENERATOR NO LATER THAN 21 APRIL 1997.
Condition: Unknown
Due 21 April 1997
Resolved 25 April 1997
Construction/Loadline
Issued 21 March 1997Resolved
REPAIR WASTED BULKHEAD IN WAY OF DECKHOUSE AT VESSEL'S NEXT DRYDOCK BUT NO LATER THAN 28 FEBRUARY 1999.
Condition: Unknown
Due 28 February 1999
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Construction/Loadline
Issued 13 August 1996Resolved
PRIOR TO LOADING CARGO, PROVIDE CERTIFIED MARINE CHEMIST TO ALLOW CG ACCESSTO ALL VOIDS/DOUBLE BOTTOM FOR EVALUATION OF HULL.
Condition: Unknown
Due 13 August 1996
Resolved 13 August 1996
Construction/Loadline
Issued 13 August 1996Resolved
PRIOR TO LOADING CARGO, PROVIDE ATTENDING CG MARINE INSPECTOR A COPY OF GAUGING REPORT DTD 1-25-94 AND CONDUCT ADDITIONAL GAUGINGS IN WAY OF AREAS INDICATING 20% OR MORE WASTAGE. REPORT TO BE SUBMITTED TO USCG AND ADDITIONAL GAUGINGS MAY BE REQUIRED AT DISCRETION OF CG INSPECTOR.
Condition: Unknown
Due 13 August 1996
Resolved 13 August 1996
Engineering
Issued 1 February 1996Resolved
REPLACE FUEL RETURN VALVE TO DIESEL STORAGE TANK (WHERE WASTED) AND PROVE PROPER OPERATION OF SAME.
Condition: Unknown
Due 1 February 1996
Resolved 2 February 1996
Deck/Cargo
Issued 1 February 1996Resolved
PRIOR TO OPERATING CARGO PUMP, DEMONSTRATE PROPER OPERATION OF EMERGENCY SHUTDOWN.
Condition: Unknown
Due 5 February 1996
Resolved 5 February 1996
Deck/Cargo
Issued 1 February 1996Resolved
INSTALL FLAME SCREENS ON ALL CARGO TANK VENTS.
Condition: Unknown
Due 1 February 1996
Resolved 2 February 1996
Navigation
Issued 1 February 1996Resolved
DEMONSTRATE PROPER OPERATION OF ALL RUNNING LIGHTS, INCLUDING FLASHING LIGHT.
Condition: Unknown
Due 1 February 1996
Resolved 2 February 1996
Deck/Cargo
Issued 1 February 1996Resolved
REPAIR CARGO TANK ACCESS TRUNK COVER (WHERE FRACTURED).
Condition: Unknown
Due 1 February 1996
Resolved 2 February 1996
Construction/Loadline
Issued 1 February 1996Resolved
DEMONSTRATE PROPER OPERATION OF ALL WATERTIGHT CLOSURES TO WING VOID TANKS.
Condition: Unknown
Due 1 February 1996
Resolved 2 February 1996
Electrical
Issued 1 February 1996Resolved
PRIOR TO OPERATING DIESEL GENERATOR, INSTALL SPARK ARRESTOR ON EXHAUST.
Condition: Unknown
Due 28 February 1996
Resolved 1 March 1996
Deck/Cargo
Issued 1 February 1996Resolved
REPAIR/REPLACE JUNCTION BOX TO CARGO PUMP NO LATER THAN 01MAR96.
Condition: Unknown
Due 28 February 1996
Resolved 1 March 1996
Construction/Loadline
Issued 1 February 1996Resolved
REPLACE GASKET ON WATERTIGHT DOOR TO DECK STORE ROOM, NO LATER THAN 01MAR96.
Condition: Unknown
Due 28 February 1996
Resolved 1 March 1996
Electrical
Issued 8 February 1993Resolved
RENEW WASTED JUNCTION BOX FOR NAVIGATION LIGHTS FORWARD.
Condition: Unknown
Due 8 February 1993
Resolved 8 February 1993
Navigation
Issued 8 February 1993Resolved
RENEW MOUNTING BRACKETS FOR RUNNING LIGHTS.
Condition: Unknown
Due 8 February 1993
Resolved 8 February 1993
Navigation
Issued 8 February 1993Resolved
RENEW WASTED YELLOW FLASHING LIGHT FIXTURE ON THE BOW.
Condition: Unknown
Due 8 February 1993
Resolved 8 February 1993
Deck/Cargo
Issued 8 February 1993Resolved
REPAIR REMOTE SHUTDOWN FOR THE DEEP WELL CARGO PUMP.
Condition: Unknown
Due 8 February 1993
Resolved 8 February 1993
Deck/Cargo
Issued 8 February 1993Resolved
PROVIDE DOCUMENTATION OF PROPER HYDROSTATIC TEST OF CARGO TRANSFER PIPING AND CARGO HOSE.
Condition: Unknown
Due 8 February 1993
Resolved 8 February 1993
Construction/Loadline
Issued 30 January 1990Resolved
CROP AND RENEW APPROX 2'X2'X3/8" SECTION WASTED MAIN DECK PLATE IN WAY OF #1 PORT WING VOID MID POINT APPROX 5' OUTBOARD OF CONTAINMENT COAMING.
Condition: Unknown
Due 30 January 1990
Resolved 30 January 1990
Construction/Loadline
Issued 30 January 1990Resolved
CROP AND RENEW APPROX 2'X3'X3/8" SECTION WASTED SIDE SHELL IN WAY OF FORWARD BULKHEAD AND #'S 2+3 SIDE LONGS IN #3 STARBOARD WING VOID.
Condition: Unknown
Due 30 January 1990
Resolved 30 January 1990
Construction/Loadline
Issued 30 January 1990Resolved
CROP AND RENEW APPROX 2'X3'X3/8" SECTION WASTED BOTTOM PLATE IN WAY OF PORT SIDE BASE OF LADDER IN THE FORWARD RAKE.
Condition: Unknown
Due 30 January 1990
Resolved 30 January 1990
Construction/Loadline
Issued 30 January 1990Resolved
CROP AND RENEW APPROX 2'X2'X3/8" SECTION WASTED SIDE SHELL PLATE IN WAY OF STARBOARD SIDE CHORD #2 (FROM BULKHEAD) AND #1 + 2 (FROM MAIN DECK) SIDELONGS IN THE FORWARD RAKE.
Condition: Unknown
Due 30 January 1990
Resolved 30 January 1990
Construction/Loadline
Issued 30 January 1990Resolved
CROP AND RENEW APPROX 2'X2'X3/8" SECTION WASTED BOTTOM PLATE IN WAY OF #'S 1 + 2 PORT SIDE WING VOIDS/DOUBLE BOTTOMS, APPROX 12' INBOARD OF BILGE KNUCKLE.
Condition: Unknown
Due 30 January 1990
Resolved 30 January 1990
Electrical
Issued 8 February 1988Resolved
PROVIDE APPROVED PLANS ON THE INSTALLATION OF THE DIESEL GENERATOR SET TO THE OCMI IN WHICH THE VESSEL IS BEING OPERATED.
Condition: Unknown
Due 8 February 1988
Resolved 8 February 1988
Deck/Cargo
Issued 5 May 1987Resolved
PROVIDE RED WARNING PENNANT FOR TRANSFERRING CARGO.
Condition: Unknown
Due 5 May 1987
Resolved 5 May 1987
Electrical
Issued 5 May 1987Resolved
LINE BATTERY BOX FOR GENERATOR SET WITH LEAD OR EQUIVALENT.
Condition: Unknown
Due 5 May 1987
Resolved 5 May 1987