This record may be incomplete: the most recent inspection recorded for this vessel was 34 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
1572 - Regulatory (Subpart C or D), Net Ton
1572 - Regulatory (Subpart C or D), Gross Ton
Maury page id
psix-40895
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
The Coast Guard recorded this vessel and the following in the same
inspection activity — normally a tug and the barges in its tow. Only barges and towing
vessels are in this archive, so any other vessel type in the same activity does not
appear here: these lists are a floor, not a complete manifest.
PROVIDE INFORMATION ON THE FOLLOWING TO COMDT(G-MSC) AND OBTAIN REVISED PLAN REVIEW INFORMATION SHEET: TANK CAPACITY INFORMATION FOR EACH CARGO TANK, NUMBER OF CARGO TANKS, LIGHT SHIP WEIGHT INFORMATION, DRAFT VS. DISPLACEMENT INFORMATION AND LIST OF ALL CARGOES CARRIED.
Condition: Unknown
Due 16 October 1989
Resolved 16 October 1989
Deck/Cargo
Issued 9 January 1989Resolved
PERMANENTLY REPAIR CARGO PIPING HEADER WHERE DAMAGED PRIOR TO CARGO OPERATIONS BUT NOT LATER THAN 19JAN89.
Condition: Unknown
Due 9 January 1989
Resolved 9 January 1989
Construction/Loadline
Issued 31 August 1988Resolved
REPAINT ALL VESSEL MARKINGS (NAME, WARNING SIGNS...) NOT LATER THAN 15 NOV 88.
Condition: Unknown
Due 31 August 1988
Resolved 31 August 1988
Construction/Loadline
Issued 31 August 1988Resolved
MAKE PERMANENT REPAIRS TO THE DECK COAMING ON THE STBD BOW IN WAY OF WASTED, TORN AND DISTORTED AREAS AT NEXT GAS FREE AVAILABILTIY BUT NOT LATER THAN 15NOV88.
Condition: Unknown
Due 31 August 1988
Resolved 31 August 1988
Deck/Cargo
Issued 31 August 1988Resolved
CONDUCT CARGO TANK AND PIPING SAFETY RELIEF VALVE TEST PRIOR TO LOADING CARGO BUT NOT LATER THAN 15NOV88.
Condition: Unknown
Due 31 August 1988
Resolved 31 August 1988
Construction/Loadline
Issued 31 August 1988Resolved
MAKE PERMANENT REPAIRS TO THE DECK FRACTURES LOCATED IN THE BOW RAKE 1' FROM THE HEADLOG AND APPROX 6',8',12', AND 14' FROM THE PORT SIDE AT NEXT GAS FREE AVAILABILITY BUT NOT LATER THAN 15NOV88.
Condition: Unknown
Due 31 August 1988
Resolved 31 August 1988
Construction/Loadline
Issued 31 August 1988Resolved
RENEW ALL WASTED, DISTORTED AND TORN HANDRAILS THROUGHOUT THE VESSEL AT NEXT GAS FREE AVAILABILITY BUT NOT LATER THAN 15NOV88.
Condition: Unknown
Due 31 August 1988
Resolved 31 August 1988
Construction/Loadline
Issued 31 August 1988Resolved
MAKE PERMANENT REPAIRS TO THE 14" DECK KNUCKLE FRACTURE LOCATED IN THE STERN LOG APPROX 10' FROM THE PORT SIDE AT NEXT GAS FREE AVAILABILITY BUT NOT LATER THAN 15NOV88.
Condition: Unknown
Due 31 August 1988
Resolved 31 August 1988
Deck/Cargo
Issued 22 January 1988Resolved
MAKE PERMANENT REPAIRS TO LEAKING SLIP TUBE GAUGING DEVICE IN WAY OF PORT AFT CARGO TANK PRIOR TO LOADING CARGO BUT NOT LATER THAN 29 FEB 88.
Condition: Unknown
Due 22 January 1988
Resolved 22 January 1988
Deck/Cargo
Issued 22 January 1988Resolved
MAKE PERMANENT REPAIRS TO LEAKING PACKING GLAND ON PORT AFT CARGO VALVE PRIOR TO LOADING CARGO BUT NOT LATER THAN 29 FEB 88.
Condition: Unknown
Due 22 January 1988
Resolved 22 January 1988
Construction/Loadline
Issued 19 November 1987Resolved
36" 'U' SHAPED FRACTURE IN TRANSOM ON THE STBD SIDE NEAR THE C/L 2' BELOW THE DECK. PERMANENTLY REPAIR THE FRACTURE TO THE SATISFACTION OF THE ATTENDING USCG MARINE INSPECTOR PRIOR TO LOADING THE NEXT CARGO,
Condition: Unknown
Due 19 November 1987
Resolved 19 November 1987
Deck/Cargo
Issued 3 February 1987Resolved
PROCEED TO DESTINATION, OFFLOAD PRESENT CARGO OF LIQUIFIED FLAMMABLE GAS, AND THEN MAKE PERMANENT REPAIRS TO CUTOFF VALVE LEAK FROM #2 PORT CYLINDRI-CAL TANK TO CARGO HEADER MANIFOLD. REQUIREMENT IS TO BE COMPLETED PRIOR TO NEXT CARGO LOADING.
Condition: Unknown
Due 3 February 1987
Resolved 3 February 1987
Deck/Cargo
Issued 3 September 1986Resolved
PROVIDE SIGNS FOR THE EMERGENCY CARGO VALVE SHUTDOWN SYSTEM WHICH ARE CONSPICUOUSLY POSTED.
Condition: Unknown
Due 3 September 1986
Resolved 3 September 1986
Unknown
Issued 3 September 1986Resolved
CONDUCT HYDRO TEST OF CARGO PIPING AT 1 1/2 TIMES THE MAWP, BUT NOT LESS THAN 187 PSI, AND SUBMIT EVIDENCE THAT ALL CARGO PRESSURE GAGES ARE WITHIN 10% ACURACY.
Condition: Unknown
Due 3 September 1986
Resolved 3 September 1986
Deck/Cargo
Issued 3 September 1986Resolved
TEST IN THE PRESSENCE OF THE COAST GUARD THE QUICK CLOSING AND REMOTE SHUTDOWN SYSTEM, AND THE RESTRICTED GAGING DEVICES.
Condition: Unknown
Due 3 September 1986
Resolved 3 September 1986
Deck/Cargo
Issued 3 September 1986Resolved
PROVIDE OIL TRANSFER PROCEDURES PER 33CFR155.750 PRIOR TO TRANSFER OF CARGO, INCLUDING CARGO INFORMATION FOR ALL AUTHORIZED CARGOES, PROPER PROCEDURES FOR GAGING, AND OPERATION OF CARGO HANDLING AND QUICK CLOSING VALVE SYSTEMS.
Condition: Unknown
Due 3 September 1986
Resolved 3 September 1986
Deck/Cargo
Issued 3 September 1986Resolved
PROVIDE FIXED CONTAINMENT PER 33CFR 155.310, AT THE CARGO MANIFOLD CONNEC- TIONS.
Condition: Unknown
Due 3 September 1986
Resolved 3 September 1986
Unknown
Issued 3 September 1986Resolved
POST CARGO INFORMATION CARD FOR EACH CARGO CARRIED.
Condition: Unknown
Due 3 September 1986
Resolved 3 September 1986
Deck/Cargo
Issued 3 September 1986Resolved
REMOVE AND BENCH TEST CARGO TANK AND PIPING RELIEF VALVES IN THE PRESENCE OF A COAST GUARD INSPECTOR, AND CONDUCT A BENCH TEST OR PROVE PROPER OPERATION OF THE EXCESS FLOW VALVES.
Condition: Unknown
Due 3 September 1986
Resolved 3 September 1986