This record may be incomplete: the most recent inspection recorded for this vessel was 31 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
280 - Regulatory (Subpart C or D), Net Ton
280 - Regulatory (Subpart C or D), Gross Ton
Maury page id
psix-41601
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
The Coast Guard recorded this vessel and the following in the same
inspection activity — normally a tug and the barges in its tow. Only barges and towing
vessels are in this archive, so any other vessel type in the same activity does not
appear here: these lists are a floor, not a complete manifest.
HYDROSTATICALLY TEST CARGO PIPING TO 1.5 MAWP AND PROVIDE A COPY OF RESULTSTO OCMI NY.
Condition: Unknown
Due 29 May 1992
Resolved 29 May 1992
Deck/Cargo
Issued 29 May 1992Resolved
INSTALL FLAME SCREENS ON BOTH RAKE VENTS AND #8 CARGO TANK P/V VALVE.
Condition: Unknown
Due 29 May 1992
Resolved 29 May 1992
Deck/Cargo
Issued 27 March 1991Resolved
PROVIDE VALVE WHEEL FOR STEM ON CARGO LINE IN PORT SIDE AFT DECKHOUSE.
Condition: Unknown
Due 27 March 1991
Resolved 27 March 1991
Navigation
Issued 27 March 1991Resolved
PROVE PROPER OPERATION OF BATTERY OPERATED STERN LIGHT.
Condition: Unknown
Due 27 March 1991
Resolved 27 March 1991
Deck/Cargo
Issued 27 March 1991Resolved
REMOVE SOFT PATCH AND MAKE PERMANENT REPAIRS TO CARGO TRANSFER LINE ON AFTER DECK OF BARGE. VESSEL NOT PERMITTED TO TRANSFER CARGO UNTIL REPAIREDPROPERLY AND HYDROSTEST OF LINE HAS BEEN PERFORMED, TO SATISFACTION OF ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 27 March 1991
Resolved 27 March 1991
Deck/Cargo
Issued 9 July 1990Resolved
DEMONSTRATE PROPER OPERATION OF CARGO PUMP EMERGENCY SHUT DOWN (DEAD BATTERY).
Condition: Unknown
Due 9 July 1990
Resolved 9 July 1990
Construction/Loadline
Issued 9 July 1990Resolved
VESSEL MUST FULLY COMPLY WITH REQUIREMENTS AS PER 46 CFR 31.10-21 BEFORE ITCAN CARRY ANYMORE CARGO. LAST CARGO 05 APR 90.
Condition: Unknown
Due 9 July 1990
Resolved 9 July 1990
Construction/Loadline
Issued 29 March 1989Resolved
FORWARD BILGE PUMP BROKEN IN WAY OF CRACKED INNER CASTING SUPPORTING FLAPPER ASSEMBLY. REPAIR OR REPLACE AS NECESSARY.
Condition: Unknown
Due 29 March 1989
Resolved 29 March 1989
Deck/Cargo
Issued 29 March 1989Resolved
EMERGENCY PUMP ENGINE SHUTOFF NOTICE RE-STENCILED ON BULKHEAD AFT STARBOARDCORNER OF THE HOUSE.
Condition: Unknown
Due 29 March 1989
Resolved 29 March 1989
Construction/Loadline
Issued 29 March 1989Resolved
BILGE STRAINERS MISSING IN FORE & AFT RAKES. PROVIDE BILGE STRAINERS AND PROPER INSTALLATION.
Condition: Unknown
Due 29 March 1989
Resolved 29 March 1989
Electrical
Issued 29 March 1989Resolved
GLOBE AND GUARD REPLACED IN STARBOARD SIDE CREW ACCOMODATIONS.
Condition: Unknown
Due 29 March 1989
Resolved 29 March 1989
Deck/Cargo
Issued 5 June 1986Resolved
REPLACE/FREE UP TANK COVER DOGS WHERE REQUIRED.
Condition: Unknown
Due 5 June 1986
Resolved 5 June 1986
Deck/Cargo
Issued 5 June 1986Resolved
UPDATE AND POST (OR MAKE READILY AVAILABLE) CARGO TRANSFER PROCEDURES.
Condition: Unknown
Due 5 June 1986
Resolved 5 June 1986
Deck/Cargo
Issued 5 June 1986Resolved
CONDUCT THE REQUIRED ARRIVAL TESTS OF CARGO TRANSFER SYSTEM AND CARGO HOSES.
Condition: Unknown
Due 5 June 1986
Resolved 5 June 1986
Deck/Cargo
Issued 5 June 1986Resolved
PROVIDE IN ACCORDANCE WITH 46 CFR 32.50-35 A MANUAL REMOTE SHUTDOWN FOR THEENGINE DRIVEN CARGO PUMP.
Condition: Unknown
Due 5 June 1986
Resolved 5 June 1986
Construction/Loadline
Issued 5 June 1986Resolved
MAKE PERMANENT REPAIRS TO THE FORWARD STBD BITT FOUNDATION PLATE.
Condition: Unknown
Due 5 June 1986
Resolved 5 June 1986
Construction/Loadline
Issued 5 June 1986Resolved
RENEW FOOTINGS ON THE BOW AND STERN CENTER MOORING CLEATS.
Condition: Unknown
Due 5 June 1986
Resolved 5 June 1986
Construction/Loadline
Issued 5 June 1986Resolved
MAKE REPAIRS TO WASTED SECTION IN WAY OF HATCH TRUNK STARBOARD ACCESS TO FORWARD RAKE.
Condition: Unknown
Due 5 June 1986
Resolved 5 June 1986
Deck/Cargo
Issued 5 June 1986Resolved
MAKE REPAIRS TO CARGO TANK PRESSURE VESSELS VALVES WHERE REQUIRED.
Condition: Unknown
Due 5 June 1986
Resolved 5 June 1986