Records from 1995 to 2026. Most recent: inspection, 22 May 2026.
Inspection history · 71
22 May 2026
Internal Structural Exam · Annual Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8378618
7 November 2025
Hull Examination · Examination of Repairs · Vessel Attendance · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8264289
30 September 2025
In-Service Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8244472
31 July 2025
DAPI Audit
Administrative · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8245724
7 May 2025
Annual Inspection · Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8130318
23 May 2024
Annual Inspection · Internal Structural Exam · Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7915904
30 October 2023
Examination of Repairs · Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7816793
12 May 2023
Internal Structural Exam · Administrative Inspection · In-Service Inspection · Annual Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7685739
29 November 2022
Liferaft Servicing
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7608534
29 August 2022
Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7547616
13 May 2022
COI Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7441353
4 April 2022
Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7431554
1 April 2022
Administrative Inspection · Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7422563
22 March 2022
Liferaft Servicing
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7427460
4 February 2022
Examination of Repairs · Internal Structural Exam · Hull Examination · Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7390699
3 June 2021
Deadweight Survey
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7222840
30 October 2019
Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6845829
7 July 2019
Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6742122
3 May 2019
Construction Oversight · Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6676373
16 October 2018
Internal Structural Exam · Annual Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6562788
27 August 2018
Deficiency Check · Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6524398
10 August 2018
Administrative Inspection
Administrative · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6507613
6 August 2018
Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6504931
7 May 2018
Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6408684
11 December 2017
Internal Structural Exam · Deficiency Check · Hull Examination
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6322695
9 November 2017
Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6304527
2 October 2017
Annual Inspection · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6281586
16 September 2016
Annual Inspection · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5998773
29 December 2015
Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 5788407
24 November 2015
Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5769848
14 September 2015
COI Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5719745
9 August 2014
Administrative Inspection · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 4951592
8 August 2014
Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 4948532
5 August 2014
Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 4961354
9 May 2014
Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 4857574
11 January 2012
Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 4237884
22 July 2011
Administrative Inspection
Administrative · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 4090648
10 December 2010
COI Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 3909701
8 December 2009
Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 3646784
29 April 2009
Annual Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 3463905
20 December 2007
Annual Inspection · Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 3118919
19 May 2007
Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 2936749
10 May 2007
Annual Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 2927249
9 January 2007
Administrative Inspection
Administrative · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 2852904
21 July 2006
Type not recorded
No type recorded · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 2713704
28 June 2006
Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 2696694
5 May 2006
COI Inspection
Physical examination · MSD SITKA · USCG Arctic District (CGD-A) · Activity 2641685
28 October 2005
Hull Examination · Internal Structural Exam
Physical examination · MSD SITKA · USCG Arctic District (CGD-A) · Activity 2524265
6 May 2005
Annual Inspection
Physical examination · MSD SITKA · USCG Arctic District (CGD-A) · Activity 2351333
10 August 2004
Damage Survey
Physical examination · MSD SITKA · USCG Arctic District (CGD-A) · Activity 2162537
28 July 2004
Annual Inspection
Physical examination · MSD SITKA · USCG Arctic District (CGD-A) · Activity 2148511
28 July 2004
Type not recorded
No type recorded · MSD SITKA · USCG Arctic District (CGD-A) · Activity 2149089
12 December 2003
Hull Examination · Deficiency Check · Examination of Repairs
Physical examination · MSD SITKA · USCG Arctic District (CGD-A) · Activity 1968891
27 May 2003
Annual Inspection
Physical examination · MSD SITKA · USCG Arctic District (CGD-A) · Activity 1803854
24 April 2003
Hull Examination · Internal Structural Exam · Deficiency Check
Physical examination · MSD SITKA · USCG Arctic District (CGD-A) · Activity 1779960
20 March 2002
Annual Inspection · MARPOL Annex V Examination · Administrative Inspection
Physical examination · MSD SITKA · USCG Arctic District (CGD-A) · Activity 1490159
13 June 2001
Damage Survey · Examination of Repairs
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1066173
12 June 2001
Type not recorded
No type recorded · MSD SITKA · USCG Arctic District (CGD-A) · Activity 156483
30 March 2001
COI Inspection · Hull Examination · MARPOL Annex V Examination
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1373421
5 May 2000
Deficiency Check
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 817871
28 April 2000
MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1403119
25 July 1999
Type not recorded
No type recorded · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 73882
26 May 1999
Deficiency Check
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 802683
28 April 1999
Deficiency Check · Re-Inspection
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 792181
22 March 1999
Hull Examination
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1429099
17 March 1998
COI Inspection
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1441350
10 April 1997
Administrative
Administrative · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1106590
10 April 1997
MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1377999
3 February 1997
Hull Examination
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1363940
26 April 1996
MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1407689
5 May 1995
Hull Examination · Initial Certification
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1201205
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 23 May 2024
Resolved
Each item of lifesaving equipment determined by the marine inspector to not be in serviceable condition must be repaired or replaced. 02 life rings onboard were found with UV damage and cracking.
46 CFR 176.808(d)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 May 2024
Resolution: All ring buoys were replaced.
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 23 May 2024
Resolved
On a vessel of more than 19.8 meters (65 feet) in length, the public address system must be a fixed installation and be audible during normal operating conditions throughout the accommodation spaces and all other spaces normally manned by crew members. Public address system was tripping offline during drills.
46 CFR 184.610(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 May 2024
Resolution: PA system was repaired and tested Sat.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 23 May 2024
Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date charts of large enough scale to make safe navigation possible. Charts were not updated on navigation computer.
46 CFR 184.420(a)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 May 2024
Resolution: Charts were updated.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 23 May 2024
Resolved
Electrical equipment on a vessel must be installed and maintained to provide services necessary for safety under normal and emergency conditions. Engine room access lights in overhead were not operational.
46 CFR 183.200
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 May 2024
Resolution: Light bulbs were replaced and tested sat.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 23 May 2024
Resolved
Each item of lifesaving equipment with an expiration date must be replaced during the annual inspection and repair if the expiration date has passed. 01 liferaft hydrostatic release unit was found past its expiration date.
46 CFR 185.726(c)
Action required: 10 - Deficiency Rectified
Resolved 23 May 2024
Resolution: New HRU was installed prior to completion of inspection.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 29 August 2022
Resolved
Each small battery installation must be located in a well ventilated space and protected from falling objects. Battery installations in engine room and in the aft battery compartment were not protected from falling objects.
46 CFR 183.354(b)
Action required: 10 - Deficiency Rectified
Resolved 29 August 2022
Resolution: Battery covers were placed onto battery boxes and properly secured.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 29 August 2022
Resolved
Electrical equipment on a vessel must be installed and maintained to rotect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock.
Port engine room ECM distribution panel was not closed or properly secured.
46 CFR 183.200(b)
Action required: 10 - Deficiency Rectified
Resolved 29 August 2022
Resolution: Port engine room ECM distribution panel was closed and secured properly.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 30 October 2019
Resolved
Investigate dripping water in way of doubler plate on outboard port bow at weld seem.
Action required: 17 - Rectify deficiencies prior to departure
Due 1 November 2019
Resolved 31 December 2019
Resolution: Area of dripping water is the result of a doubler plate that has a crackes seem. The cracked weld wasa grinded out and re-welded.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 30 October 2019
Resolved
Crop and renew to good aluminum marked area of wasted engine room aft bulkhead upper section.
Action required: 17 - Rectify deficiencies prior to departure
Due 1 November 2019
Resolved 31 December 2019
Resolution: Area cropped and renewed.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 30 October 2019
Resolved
Through hull fittings are required to be metallic. The through hull fittings on the heater units have nylon fittings. Replace fittings with metallic fittings.
Action required: 17 - Rectify deficiencies prior to departure
Due 1 November 2019
Resolved 31 December 2019
Resolution: Through hull fittings replaced with welded in nipples.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 10 August 2018
Resolved
Vessel is allowed to temporarily operate with a portable fire/bilge pump aboard. Vessel's crew shall be trained in the operation of the equipment prior to sailing.
Action required: 705 - Other - as specified
Due 31 August 2018
Resolved 27 August 2018
Resolution: Verified engine was renewed. Verified installation and witnessed an operational test including the belt driven fire pump.
Operations/Management › Navigation Safety › Carriage of Charts and Publications
Issued 2 October 2017
Resolved
Provide current nautical charts for area of operations.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 1 May 2018
Resolved 7 May 2018
Resolution: Verified up-to-date charts were provided.
Pollution Prevention/Response › Prevention Equipment › Sewage System Valve
Issued 2 October 2017
Resolved
Secure sewage system valve to prevent ovbd discharge when in U.S. Territorial waters.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 May 2018
Resolved 7 November 2017
Resolution: Y valve was secured to prevent ovbd discharge.
Construction/Loadline › Penetrations › Pipe Flange
Issued 2 October 2017
Resolved
Remove non-metalic through hull penetration in the port jet void in way of the fwd tunnel.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 May 2018
Resolved 2 May 2018
Resolution: Verified decommissioned OVD discharge was removed and affected area was inserted.
Construction/Loadline › Hull › Transverse Frame
Issued 2 October 2017
Resolved
Identified an excessively crushed area in way of the transverse water tight bulkhead separating the #2 and #3 voids on the outboard side, port hull. Provide repair proposal.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 1 May 2018
Resolved 2 May 2018
Resolution: Verified affected area was properly cropped and renewed.
Operations/Management › Drills/Instruction › Not Conducted
Issued 2 October 2017
Resolved
Conduct drills in Spring 2018.
Condition: Invalid
Action required: 705 - Other - as specified
Due 1 May 2018
Resolved 7 May 2018
Resolution: Conducted underway drills, to include; man overboard, fire, and abandon ship.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 2 October 2017
Resolved
Make AC raw water cooling line bulkhead penetration valve operable from the bulkhead deck or provide 1 valve on either side of the bulkhead.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 May 2018
Resolved 9 November 2017
Resolution: One valve was provided on each side of the bulkhead.
Engineering › Lubricating Oil Service System › Gauge
Issued 2 October 2017
Resolved
Renew or repair the operating station L/O PSI gauge for the #1 main diesel engine.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 May 2018
Resolved 7 May 2018
Resolution: Verified L/O gauge was properly operating.
Operations/Management › Navigation Safety › Carriage of Charts and Publications
Issued 14 September 2015
Resolved
Provide properly updated and corrected navigational paper charts. By 28SEP15.
Action required: 705 - Other - as specified
Due 28 September 2015
Resolved 23 November 2015
Resolution: Owner / operator placed new and updated nav charts onboard the vessel.
Operations/Management › Navigation Safety › Proper Use of Navigation/Anchor Lights
Issued 14 September 2015
Resolved
Prove proper operation of port side running light. Corrected on the spot.
Action required: 705 - Other - as specified
Due 28 September 2015
Resolved 14 September 2015
Resolution: Master corrected deficiency during inspection.
Engineering › Diesel Engine (propulsion-direct drive) › Bearing
Issued 8 August 2014
Resolved
#4 Main Engine Thruster Bearing seized up.
Action required: 701 - Prior to carriage of passengers/cargo
Due 11 August 2014
Resolved 8 August 2014
Resolution: bearing and seal replaced and tested sat.
Engineering › Freshwater System (cylinder head cooling) › Sensor
Issued 8 August 2014
Resolved
#2 and #4 main engine low coolant audible and visual alarms were not functioning.
Action required: 705 - Other - as specified
Due 15 August 2014
Resolved 9 August 2014
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 10 May 2007
Resolved
Replace missing cover and ground fault outlet used for vacuum cleaner in the front storage on the main deck.
Due 10 June 2007
Resolved 16 May 2007
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 10 May 2007
Resolved
Prove proper operation of the port & Starboard navigation lights
Due 10 June 2007
Resolved 10 May 2007
Communications › Alarms/Indicators › Bilge Alarm
Issued 10 May 2007
Resolved
Prove proper operation of the bilge alarm in the starboard lazerette.
Due 10 June 2007
Resolved 16 May 2007
Stability › Watertight Integrity › Coaming
Issued 5 May 2006
Resolved
Provide 6" coamings in weather tight doors or provide water tight hatches in main deck openings inside the house in accordance with MSO Juneau letter of 2004.
Action required: 705 - Other - as specified
Due 5 July 2006
Resolved 31 October 2006
Electrical › Electrical Distribution System (service) › Wiring
Issued 5 May 2006
Resolved
Remove multiple dead ended wires above suspended ceiling near "galley".
Due 5 June 2006
Resolved 30 June 2006
Construction/Loadline › Hull › Bracket
Issued 5 May 2006
Resolved
V & weld crack in braket that supports the PTO for the bilge pump.
Due 5 June 2006
Resolved 30 June 2006
Engineering › Diesel Engine (propulsion-reduction gear) › Valve Actuating Gear
Issued 5 May 2006
Resolved
Replace missing washer and cotter pin on connecting rod for injector cut-off solienoid.
Due 5 June 2006
Resolved 30 June 2006
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type III
Issued 5 May 2006
Resolved
Provide a proper goose neck vent for the MSD tank.
Due 5 June 2006
Resolved 30 June 2006
Engineering › Diesel Engine (propulsion-reduction gear) › Silencer (exhaust)
Issued 28 October 2005
Resolved
V & weld both forward external exhaust boxes, where mounts attached to the hull are broken
Action required: 705 - Other - as specified
Resolved 30 March 2006
Electrical › Electrical Distribution System (service) › Wiring
Issued 28 October 2005
Resolved
Repair CPVC conduit used to run electrical lines in void #2 stbd where it is broken free and placing tension on cables
Action required: 705 - Other - as specified
Resolved 30 March 2006
Engineering › Bilge Water Management System › Valve
Issued 28 October 2005
Resolved
In both port & stbd # 3 voids remove "T" pipe connector from the wrong side of the overboard discharge valve. Possible drain lines from accommodation space.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Resolved 5 May 2006
Engineering › Bilge Water Management System › Hose
Issued 28 October 2005
Resolved
In port engine room, on main bilge system, where pipe connects to flexible hose for pump, provide double clamp at pipe end of hose.
Action required: 705 - Other - as specified
Resolved 5 May 2006
Engineering › Bilge Water Management System › Pump
Issued 28 October 2005
Resolved
In port engine room and Port & Stbd jet rooms; reattach the Rule bilge pumps to filter/mounts.
Action required: 705 - Other - as specified
Resolved 5 May 2006
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type III
Issued 6 May 2005
Resolved
Remove vent for Marine Sanitation Device where it is connected to overboard discharge. Run vent properly up through deck and provide flame screen. As installed vent is designed to allow overflow to freely discharge overboard.
Due 6 June 2005
Resolved 6 May 2005
Communications › Alarms/Indicators › Engineers' Assistance-needed Alarm
Issued 6 May 2005
Resolved
Mke repairs to alarm in Stbd engine room
Due 6 June 2005
Resolved 5 May 2006
Electrical › Electrical Distribution System (service) › Wiring
Issued 6 May 2005
Resolved
Make repairs to portable bilge pump wiring in stbd engine room. Replace splices and rewire as necessary.
Due 6 June 2005
Resolved 5 May 2006
Electrical › Electrical Distribution System (service) › Wiring
Issued 6 May 2005
Resolved
Remove deadended wires in port jet room identified as flow meter/alarm.
Due 6 June 2005
Resolved 6 May 2005
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 28 July 2004
Resolved
Remove fuel from bilge in port fuel tank space. Determine source of fuel, examine tank for leaks/cracks and provide report of findings back to the Coast Guard.
Action required: 705 - Other - as specified
Due 28 August 2004
Resolved 6 May 2005
Engineering › Diesel Engine (propulsion-reduction gear) › Injector (fuel injection)
Issued 28 July 2004
Resolved
Repair Fuel leak at injector piping on top of forward cylinder of forward engine in port engine room.
Action required: 705 - Other - as specified
Due 28 August 2004
Resolved 6 May 2005
Electrical › Electrical Distribution System (service) › Wiring
Issued 28 July 2004
Resolved
Remove dead ended wires located in both jet rooms, on outboard sides, mid compartment, next to shafts.
Action required: 705 - Other - as specified
Due 28 August 2004
Resolved 6 May 2005
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type III
Issued 28 July 2004
Resolved
Renew broken PVC couplings at shore side discharge for the Marine Sanitation Device
Action required: 705 - Other - as specified
Due 28 August 2004
Resolved 6 May 2005
Communications › Alarms/Indicators › Bilge Alarm
Issued 28 July 2004
Resolved
Prove proper operation of bilge high level alarms.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 July 2004
Resolution: Found and replaced blown fuse in alarm panel.
Construction/Loadline › Structures › Machinery Space Opening
Issued 28 July 2004
Resolved
Replace retention wires for both aft main deck watertight hatches to jet rooms.
Action required: 705 - Other - as specified
Due 28 August 2004
Resolved 6 May 2005
Communications › Radio Communications › EPIRB
Issued 28 July 2004
Resolved
Renew expired registration with NOAA
Due 28 August 2004
Resolved 28 July 2004
Resolution: Renewed registration with NOAA over the internet immediately following the inspection.
Construction/Loadline › Penetrations
Issued 12 December 2003
Resolved
Renew Seachests/raw water stand pipes due to excessive coorosion of flange and pipes LEGACY COMPONENT DESC: Sea Chests/stand pipes
Due 12 January 2004
Resolved 22 January 2004
Resolution: Seachests/stand pipes renewed.
Construction/Loadline › Hull
Issued 24 April 2003
Resolved
Make repairs to first frame forward in port void forward of collision bulkhead. Crop & renew cracked section approx. 18" x 18". LEGACY COMPONENT DESC: Transverse Frame
Due 24 May 2003
Resolved 30 April 2003
Resolution: Repaired
Construction/Loadline › Hull › Transverse Frame
Issued 24 April 2003
Resolved
Make repairs to first frame forward in stbd void forward of collision bulkhead. V & weld cracked welds as marked.
Due 24 May 2003
Resolved 30 April 2003
Resolution: Repaired
Construction/Loadline › Structures › Transverse Bulkhead
Issued 24 April 2003
Resolved
Reweld underside of lower bilge pipe bulkhead penetration.
Due 24 May 2003
Resolved 30 April 2003
Resolution: Repaired
Construction/Loadline › Hull › Hull Plating
Issued 24 April 2003
Resolved
Pick-up weld in bay #2 outboard and #3 inboard chine seams.
Due 24 May 2003
Resolved 30 April 2003
Resolution: Repaired
Construction/Loadline › Hull › Side Shell
Issued 24 April 2003
Resolved
Weld inside of the insert that is in the upper outboard corner of the port jet room.
Due 24 May 2003
Resolved 30 April 2003
Resolution: Repaired
Communications › Internal Communications System
Issued 28 February 2002
Resolved
Phone on Bridge was inop. LEGACY COMPONENT DESC: Phone
Condition: Unknown
Due 20 March 2002
Resolved 28 February 2002
Lifesaving › Lifebuoys
Issued 28 February 2002
Resolved
Vessel's name was worn and had to be restenciled. LEGACY COMPONENT DESC: Markings (ship name/port)
Condition: Unknown
Due 20 March 2002
Resolved 20 March 2002
Fire Fighting › Portable Dry Chemical Fire Extinguisher
Issued 28 February 2002
Resolved
Portable fire extinguishers had not been servied. LEGACY COMPONENT DESC: Service
Condition: Unknown
Due 20 March 2002
Resolved 20 March 2002
Documentation › Certificates/Documents
Issued 28 February 2002
Resolved
COD was missing. LEGACY COMPONENT DESC: Certificate of Documentation (CG-1270)
Due 20 March 2002
Resolved 20 March 2002
Lifesaving › Buoyant Apparatus
Issued 28 February 2002
Resolved
The three IBAs were due for servicing. LEGACY COMPONENT DESC: Servicing
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 20 March 2002
Resolved 20 March 2002
Engineering › Bilge Water Management System
Issued 28 February 2002
Resolved
Port Jet bilge high water alarm was inop. LEGACY COMPONENT DESC: High Water Alarm
Condition: Unknown
Due 20 March 2002
Resolved 20 March 2002
Accommodation/Occupational Safety › Washroom/Toilet
Issued 28 February 2002
Resolved
Saltwater pump for aft head was inop. Repaired during inspection. LEGACY COMPONENT DESC: Toilet
Condition: Unknown
Due 20 March 2002
Resolved 20 March 2002
Accommodation/Occupational Safety › Occupational Safety
Issued 28 February 2002
Resolved
Wire and net courses were loose on the upper deck railing. LEGACY COMPONENT DESC: Deck Rail
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 20 March 2002
Resolved 20 March 2002
Engineering › Fuel Oil Storage/Transfer System
Issued 28 February 2002
Resolved
Port remote fuel emergency shutoff was inop. LEGACY COMPONENT DESC: Valve
Condition: Improper/Lack of Maintenance
Due 20 March 2002
Resolved 20 March 2002
Navigation › Piloting/Steering
Issued 28 February 2002
Resolved
Coast Pilot Publication was out of date. LEGACY COMPONENT DESC: Coast Pilot Publication
Condition: Unknown
Due 20 March 2002
Resolved 20 March 2002
Lifesaving
Issued 28 April 2000
Resolved
Provide 3 additional Coast Guard approved child-size life preservers so thevessel has a total of 12 child-size life preservers in accordance with 46 CFR 180.25-5.
Condition: Unknown
Due 8 May 2000
Resolved 8 May 2000
Fire Fighting
Issued 28 April 2000
Resolved
Covered metal trash containers shall be provide in lounge area in accordance with 46 CFR 177.30-7(d).
Condition: Unknown
Due 8 May 2000
Resolved 8 May 2000
Engineering
Issued 28 April 1999
Resolved
REPAIR OIL PRESSURE GAGE FOR PORT/FWD MAIN DIESEL ENGINE.
Condition: Unknown
Due 28 April 1999
Resolved 28 April 1999
Lifesaving
Issued 28 April 1999
Resolved
PROVIDE DOCUMENTARY EVIDENCE THAT LIFESAVING EQUIPMENT IS REGULARLY INSPECTED.
Condition: Unknown
Due 28 April 1999
Resolved 28 April 1999
Lifesaving
Issued 28 April 1999
Resolved
DEMONSTRATE SATISFACTORY EMERGENCY DRILLS USING SEASONAL CREW.
Condition: Unknown
Due 28 April 1999
Resolved 28 April 1999
Lifesaving
Issued 28 April 1999
Resolved
ENSURE FIRST AID KIT IS COMPLETE AND HAS NO EXPIRED MEDICINES.
Condition: Unknown
Due 28 April 1999
Resolved 28 April 1999
Accommodation/Occupational Safety
Issued 22 March 1999
Resolved
Install bulwarks or 4 inch rail courses in all passenger accessible locations as required by 46CFR177.900(g)(1). No passengers may be carried on the upper deck until this is corrected and NLT 22APR99.
Condition: Unknown
Due 22 March 1999
Resolved 22 March 1999
Navigation
Issued 17 March 1998
Resolved
Install magnetic compass at the primary operating station per 46CFR184.402.
Condition: Unknown
Due 17 March 1998
Resolved 17 March 1998
Accommodation/Occupational Safety
Issued 17 March 1998
Resolved
Provide bulkwarks, netting, etc below the upper rail in all passenger accessible locations per 46CFR177.900(g)(1).
Condition: Unknown
Due 17 March 1998
Resolved 17 March 1998