MAURY USCG vessel records
← All vessels

ST EUGENE

Built
1995
Last inspected
22 May 2026
Documentation
Valid · NVDC file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 22 May 2026
Operational controls None recorded without a removal date
Years with a record 10 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDD2607
419783
Flag
UNITED STATES
Maury page id
psix-419783

Documentation record

Registered dimensions (L × B × D)65.0 ft × 23.0 ft × 6.0 ft
Registered tonnagegross 27 / net 22
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderALLEN MARINE TOURS INC · SITKA AK, UNITED STATES · built 1995
Hull materialAluminum
PropulsionJet Drive
Hull shapeUNSPECIFIED
Hull configurationTwin Hull
Hailing portSITKA, AK
Endorsements, as the file codes themcw_un
DocumentationValid · issued 21 April 2026 · expires 30 April 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it22 - Simplified, Net Ton
25 - Displacement, Gross Ton
27 - Simplified, Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel

Behind this panel: 28 inspections, each with its date, unit and type; 18 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 28

22 May 2026 Internal Structural Exam · Annual Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8378618
7 November 2025 Hull Examination · Examination of Repairs · Vessel Attendance · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8264289
30 September 2025 In-Service Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8244472
31 July 2025 DAPI Audit
Administrative · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8245724
7 May 2025 Annual Inspection · Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8130318
23 May 2024 Annual Inspection · Internal Structural Exam · Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7915904
30 October 2023 Examination of Repairs · Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7816793
12 May 2023 Internal Structural Exam · Administrative Inspection · In-Service Inspection · Annual Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7685739
29 November 2022 Liferaft Servicing
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7608534
29 August 2022 Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7547616
13 May 2022 COI Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7441353
4 April 2022 Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7431554
1 April 2022 Administrative Inspection · Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7422563
22 March 2022 Liferaft Servicing
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7427460
4 February 2022 Examination of Repairs · Internal Structural Exam · Hull Examination · Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7390699
3 June 2021 Deadweight Survey
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7222840
30 October 2019 Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6845829
7 July 2019 Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6742122
3 May 2019 Construction Oversight · Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6676373
16 October 2018 Internal Structural Exam · Annual Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6562788
27 August 2018 Deficiency Check · Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6524398
10 August 2018 Administrative Inspection
Administrative · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6507613
6 August 2018 Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6504931
7 May 2018 Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6408684
11 December 2017 Internal Structural Exam · Deficiency Check · Hull Examination
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6322695
9 November 2017 Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6304527
2 October 2017 Annual Inspection · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6281586
16 September 2016 Annual Inspection · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5998773

Deficiency record · 18

11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 23 May 2024 Resolved
Each item of lifesaving equipment determined by the marine inspector to not be in serviceable condition must be repaired or replaced. 02 life rings onboard were found with UV damage and cracking. 46 CFR 176.808(d)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 May 2024
Resolution: All ring buoys were replaced.
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 23 May 2024 Resolved
On a vessel of more than 19.8 meters (65 feet) in length, the public address system must be a fixed installation and be audible during normal operating conditions throughout the accommodation spaces and all other spaces normally manned by crew members. Public address system was tripping offline during drills. 46 CFR 184.610(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 May 2024
Resolution: PA system was repaired and tested Sat.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 23 May 2024 Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date charts of large enough scale to make safe navigation possible. Charts were not updated on navigation computer. 46 CFR 184.420(a)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 May 2024
Resolution: Charts were updated.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 23 May 2024 Resolved
Electrical equipment on a vessel must be installed and maintained to provide services necessary for safety under normal and emergency conditions. Engine room access lights in overhead were not operational. 46 CFR 183.200
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 May 2024
Resolution: Light bulbs were replaced and tested sat.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 23 May 2024 Resolved
Each item of lifesaving equipment with an expiration date must be replaced during the annual inspection and repair if the expiration date has passed. 01 liferaft hydrostatic release unit was found past its expiration date. 46 CFR 185.726(c)
Action required: 10 - Deficiency Rectified
Resolved 23 May 2024
Resolution: New HRU was installed prior to completion of inspection.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 29 August 2022 Resolved
Each small battery installation must be located in a well ventilated space and protected from falling objects. Battery installations in engine room and in the aft battery compartment were not protected from falling objects. 46 CFR 183.354(b)
Action required: 10 - Deficiency Rectified
Resolved 29 August 2022
Resolution: Battery covers were placed onto battery boxes and properly secured.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 29 August 2022 Resolved
Electrical equipment on a vessel must be installed and maintained to rotect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Port engine room ECM distribution panel was not closed or properly secured. 46 CFR 183.200(b)
Action required: 10 - Deficiency Rectified
Resolved 29 August 2022
Resolution: Port engine room ECM distribution panel was closed and secured properly.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 30 October 2019 Resolved
Investigate dripping water in way of doubler plate on outboard port bow at weld seem.
Action required: 17 - Rectify deficiencies prior to departure
Due 1 November 2019
Resolved 31 December 2019
Resolution: Area of dripping water is the result of a doubler plate that has a crackes seem. The cracked weld wasa grinded out and re-welded.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 30 October 2019 Resolved
Crop and renew to good aluminum marked area of wasted engine room aft bulkhead upper section.
Action required: 17 - Rectify deficiencies prior to departure
Due 1 November 2019
Resolved 31 December 2019
Resolution: Area cropped and renewed.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 30 October 2019 Resolved
Through hull fittings are required to be metallic. The through hull fittings on the heater units have nylon fittings. Replace fittings with metallic fittings.
Action required: 17 - Rectify deficiencies prior to departure
Due 1 November 2019
Resolved 31 December 2019
Resolution: Through hull fittings replaced with welded in nipples.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 10 August 2018 Resolved
Vessel is allowed to temporarily operate with a portable fire/bilge pump aboard. Vessel's crew shall be trained in the operation of the equipment prior to sailing.
Action required: 705 - Other - as specified
Due 31 August 2018
Resolved 27 August 2018
Resolution: Verified engine was renewed. Verified installation and witnessed an operational test including the belt driven fire pump.
Operations/Management › Navigation Safety › Carriage of Charts and Publications
Issued 2 October 2017 Resolved
Provide current nautical charts for area of operations.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 1 May 2018
Resolved 7 May 2018
Resolution: Verified up-to-date charts were provided.
Pollution Prevention/Response › Prevention Equipment › Sewage System Valve
Issued 2 October 2017 Resolved
Secure sewage system valve to prevent ovbd discharge when in U.S. Territorial waters.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 May 2018
Resolved 7 November 2017
Resolution: Y valve was secured to prevent ovbd discharge.
Construction/Loadline › Penetrations › Pipe Flange
Issued 2 October 2017 Resolved
Remove non-metalic through hull penetration in the port jet void in way of the fwd tunnel.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 May 2018
Resolved 2 May 2018
Resolution: Verified decommissioned OVD discharge was removed and affected area was inserted.
Construction/Loadline › Hull › Transverse Frame
Issued 2 October 2017 Resolved
Identified an excessively crushed area in way of the transverse water tight bulkhead separating the #2 and #3 voids on the outboard side, port hull. Provide repair proposal.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 1 May 2018
Resolved 2 May 2018
Resolution: Verified affected area was properly cropped and renewed.
Operations/Management › Drills/Instruction › Not Conducted
Issued 2 October 2017 Resolved
Conduct drills in Spring 2018.
Condition: Invalid
Action required: 705 - Other - as specified
Due 1 May 2018
Resolved 7 May 2018
Resolution: Conducted underway drills, to include; man overboard, fire, and abandon ship.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 2 October 2017 Resolved
Make AC raw water cooling line bulkhead penetration valve operable from the bulkhead deck or provide 1 valve on either side of the bulkhead.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 May 2018
Resolved 9 November 2017
Resolution: One valve was provided on each side of the bulkhead.
Engineering › Lubricating Oil Service System › Gauge
Issued 2 October 2017 Resolved
Renew or repair the operating station L/O PSI gauge for the #1 main diesel engine.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 May 2018
Resolved 7 May 2018
Resolution: Verified L/O gauge was properly operating.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.