MAURY USCG vessel records Sign in
← All vessels

STRAITS EXPRESS

STRAITS EXPRESS is a 1995 passenger vessel (inspected). The Coast Guard has recorded 89 inspections since 1995, most recently in June 2026, along with 140 deficiencies — 1 with no resolution recorded —, 1 operational control, 1 with no removal date recorded and 17 casualty investigations between 2006 and 2024.

Records from 1995 to 2026. Most recent: inspection, 1 June 2026.

Built
1995
Last inspected
1 June 2026
Documentation
Valid · documentation file of 10 September 2026
Controls
1 with no removal date recorded

Identity

WDK4384
420790
Flag
UNITED STATES
368054610
Maury page id
psix-420790

Inspections, by type

…with no type recorded18
…past their stated due date1
Years with a record 26 calendar years (1995–2026)
The 89 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)91.6 ft × 28.8 ft × 10.0 ft
Registered tonnagegross 99 / net 67
ITC dimensions (L × B × D)91.6 ft × 28.8 ft × 10.0 ft
ITC tonnagegross 265 / net 79
BuilderMARINETTE MARINE CORPORATION · MARINETTE, WI, UNITED STATES · built 1995
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portNEW YORK, NY
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 20 May 2026 · expires 30 June 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it265 - Convention (Subpart B), Gross Ton
99 - Regulatory (Subpart C or D), Gross Ton
79 - Convention (Subpart B), Net Ton
77 - Displacement, Ton
67 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDK4384MMSI 368054610 · active · compulsorily equipped · granted 14 August 2018, expires 14 August 2028
WDI6658MMSI 367720890 · expired · compulsorily equipped · granted 15 March 2016, cancelled 16 May 2026
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspected as a tow unit · 1

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

MACKINAC EXPRESS Passenger (Inspected) · MISLE 281582 · 17 June 2008 · activity 3239932

Inspection history · 89

1 June 2026 Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 8385701
18 May 2026 COI Inspection · Administrative Inspection · Deficiency Check · DAPI Audit
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8367440
29 July 2025 Deficiency Check · Annual Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8194323
6 June 2025 Examination of Repairs · Drydock Exam · Administrative Inspection · Internal Structural Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8153674
1 June 2025 Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8149017
8 January 2025 Damage Survey
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8060098
1 October 2024 Annual Inspection · Deficiency Check · Internal Structural Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8008594
6 May 2024 Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7907713
6 May 2024 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7921483
27 November 2023 In-Service Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7827679
18 September 2023 Administrative Inspection · Security Breach
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7793868
2 August 2023 Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7758952
26 June 2023 Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7723590
13 June 2023 MTSA/ISPS Verification · Administrative Inspection · Annual Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7710051
13 May 2023 In-Service Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7693773
3 May 2023 Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7674446
4 October 2022 Damage Survey · Examination of Repairs
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7571573
3 October 2022 In-Service Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7570884
22 July 2022 Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7513759
24 June 2022 Administrative Inspection · Damage Survey · Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7486250
24 June 2022 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7513522
31 May 2022 Annual Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7463805
15 April 2022 Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7431775
15 March 2022 Deficiency Check · Administrative Inspection · Examination of Repairs
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7412070
11 March 2022 Examination of Repairs · Administrative Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7410196
6 February 2022 Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7391387
20 December 2021 Examination of Repairs · Damage Survey
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7370845
20 November 2021 Administrative Inspection · Damage Survey
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7354861
25 October 2021 Damage Survey · Administrative Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7339438
5 October 2021 Damage Survey
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7329380
14 June 2021 Plan Review (Other than "T") · In-Service Inspection · Permit to Proceed · Deficiency Check · Damage Survey · Examination of Repairs
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7225340
9 June 2021 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7262126
10 May 2021 Administrative Inspection · Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7193269
31 March 2021 COI Inspection · Deadweight Survey · Construction Oversight · Plan Review (Other than "T")
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7200394
10 December 2018 Administrative Inspection · Internal Structural Exam · Drydock Exam · Plan Review (Other than "T")
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6594766
7 November 2018 Examination of Repairs · Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6583513
20 August 2018 COI Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6517555
10 August 2017 Examination of Repairs · Drydock Exam · COI Inspection · Administrative Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6402656
27 April 2017 Damage Survey · Plan Review (Other than "T")
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6148990
18 January 2017 Damage Survey
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6148981
18 October 2016 Damage Survey
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6029586
12 April 2016 Plan Review (Other than "T")
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 5914352
1 December 2015 Drydock Exam
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 5914390
21 July 2012 Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4385799
18 July 2012 Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4382782
16 July 2012 Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4381458
14 July 2012 Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4380878
5 July 2012 Damage Survey
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4368049
4 July 2012 Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4368003
18 June 2012 Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4348243
18 June 2012 Damage Survey
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4349290
3 June 2012 Examination of Repairs
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4333739
2 June 2012 Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4334690
31 May 2012 Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4330179
22 May 2012 COI Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4318654
4 November 2010 Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3884823
17 June 2008 Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3239932
16 June 2008 Damage Survey
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3245560
22 May 2008 Annual Inspection · MTSA Verification
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3219288
1 July 2007 Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 2990376
28 May 2007 MTSA Verification · COI Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 2948364
2 April 2007 Plan Review (Other than "T")
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 2910467
7 March 2007 Damage Survey
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 2901724
28 August 2006 Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 2761827
8 June 2006 Periodic Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 2674968
25 April 2006 Hull Examination
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 2674953
11 June 2005 Periodic Inspection · Examination of Repairs
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 2390349
1 June 2005 MTSA Verification
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 2376749
28 May 2004 Periodic Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 2087261
23 December 2003 Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1978142
21 July 2003 Damage Survey
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1853817
4 June 2003 Periodic Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1809776
20 June 2002 Deficiency Check
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1633983
28 May 2002 COI Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1626395
4 September 2001 Re-Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1382381
18 April 2001 Hull Examination
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1412270
8 July 2000 Type not recorded
No type recorded · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 28992
30 May 2000 Re-Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1369699
3 June 1999 COI Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1375846
12 June 1998 Re-Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1128121
9 September 1997 Deficiency Check · Re-Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1375113
3 October 1996 Type not recorded
No type recorded · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 63703
25 July 1996 Deficiency Check · COI Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1089813
13 February 1996 Deadweight Survey · Examination of Repairs
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1084810
18 December 1995 Administrative
Administrative · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1082689
12 August 1995 Type not recorded
No type recorded · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 95682
10 June 1995 Type not recorded
No type recorded · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 9026
8 June 1995 Type not recorded
No type recorded · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 182831
30 May 1995 Initial Certification · Plan Review "T" Boat · Hull Examination · Initial Construction-Excluding Oversight
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1438313

Deficiency record · 140

07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 18 May 2026 Resolved
Vapor barriers must be provided where insulation of any type is used in spaces where flammable and combustible liquids or vapors are present, such as machinery spaces. Engine room is protected by a CO2 fire suppression system. The access hatch was found not dealing properly due to wasted rubber gasket. 46 CFR 116.330.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 May 2026
Resolution: Hatch rubber gaskets were replaced and now sealing.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 18 May 2026 No resolution recorded
Each hatch exposed to the weather must be watertight. The following hatches were found with deteriorated rubber gaskets, allowing large mounts t flood the compartment: a. port side collision bulkhead hatch cover b. port side void 2 hatch cover. c. stbd side collision bulkhead hatch cover d. stbd side void 2 hatch cover. 46 CFR 174.220
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 August 2026 — due date passed with no resolution recorded
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 18 May 2026 Resolved
All escape hatches and emergency exits used as a means of escape must be clearly marked on both sides. The text must read: "EMERGENCY EXIT, KEEP CLEAR". The lettering must be clearly legible and at least 2 inches. Both Port and stbd engine room forward excape hatches are not marked "EMERGENCY EXIT, KEEP CLEAR" in both sides. 46 CFR 185.30-15.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 June 2026
Resolved 3 June 2026
Resolution: Hatches were marked on each side.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 18 May 2026 Resolved
A-Class bulkheads or decks must be composed of steel or equivalent material, suitably stiffened and made intact with the main structure of the vessel, such as the shell, structural bulkheads, and decks. They must be so constructed that, if subjected to the standard fire test, they are capable of preventing the passage of smoke and flame for 1 hour. In addition, they must be so insulated with approved structural insulation, bulkhead panels, or deck covering so that, if subjected to the standard fire test for the applicable time period listed below, the average temperature on the unexposed side does not rise more than 139 °C (250 °F) above the original temperature, nor does the temperature at any one point, including any joint, rise more than 181 °C (325 °F) above the original temperature. The structural fire protection (fire insulation) was found either deteriorated or hanging in the following locations: a. under passenger stairways port side by engine room access, and next to the blower. b. under passenger stairways stbd side by engine room access and next to the blower. c. adjacent to the ventilation louvers, inside of the engine room port side, outer side. 46 CFR 116.415 (i) 46 CFR 72.05 46 CFR 72.05-20 46 CFR 72.05-10
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 May 2026
Resolution: All damaged or missing fire insulation was replaced.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 18 May 2026 Resolved
All piping, valves, and fittings of ferrous materials shall be protected inside and outside against corrosion. The fire main piping located in the port side engine room was found to have installed at least 02 clamps with evidence of corrosion of a suspected leak. Remove the clamps and conduct permanent repairs to the fire main piping. 46 CFR 181.20-20(c).
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 June 2026
Resolved 22 May 2026
Resolution: Leaks corrected with norseman clamps.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 18 May 2026 Resolved
Except as further modified, where fire extinguishing systems or equipment are not required but installed, the system or equipment and its installation shall meet the requirements of this part. The fire pump pressure gauge is not required, but found with a broken glass display. 46 CFR 181.05-5.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 June 2026
Resolved 22 May 2026
Resolution: New gauge installed.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 18 May 2026 Resolved
At each inspection for certification, the marine inspector shall view the vessel afloat and shall inspect the hull structure. Examine all accessible parts of the hull. Areas with deep pitting and corrosion were found, at both sides of the keel in the port side void number 2. These areas are deep enough to request the vessel to undergo repairs, to cut and renew the affected areas identified during the exam. 46 CFR 176.25-5 (a)(1). Prior Carrying Passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 June 2026
Resolution: Cleared by MSU STT under activity 8385701. Area was cropped and renewed.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 29 July 2025 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 17 - Rectify deficiencies prior to departure
Due 29 July 2025
Resolved 1 August 2025
Resolution: Training was provided and questioned the crew.
07 - Fire Safety › N/A - No Subsystem › Evaluation of crew performance (fire drills)
Issued 29 July 2025 Resolved
At each inspection for certification and at every other vessel inspection all observed unsafe practices, fire hazards, and other hazardous situations must be corrected and all required guards and protective devices must be in satisfactory condition. Vessel master and crew lack of knowledge, lack of communication, on how to operate the main diesel engines override system after simulation of the CO2 fire suppression systems. Provide evidence of training for all crew and master in how to operate the emergency system, and carry out the testing again, with the same crew and master, in presence of an attending USCG Marine Inspector. 46 CFR 115.830
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 August 2025
Resolution: Vessel master and crew demonstrated how to operate the CO2 override system.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 29 July 2025 Resolved
Penetrations in A-Class fire control boundaries for electrical cables, pipes, trunks, ducts, etc. must be constructed to prevent the passage of flame and smoke for one hour. In addition, the penetration must be designed or insulated so that it will withstand the same temperature rise limits as the boundary penetrated. A hole penetration was found in both port and starboard forward ventilation rooms at the deck, adjacent to the ventilation fans. Rectify to the satisfaction of competent Marine Inspector. 46 CFR 116.415
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 August 2025
Resolution: Penetrations were sealed by welding.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 29 July 2025 Resolved
Internal combustion engine exhausts, boiler and galley uptakes, and similar sources of ignition must be kept clear of and suitably insulated from combustible material. Engine Room is a Class 10 space, requiring A-60 fire protection in all its boundaries. Multiple areas as identified during the exam, and provided photographic evidence shows that there are areas with missing approved thermal insulation, in both port and starboard sides. Install missing fire retardant insulation as approved in the original vessel plans. 46 CFR 116.405 46 CFR 116.415
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 August 2025
Resolution: Fire insutation was re-installed.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 29 July 2025 Resolved
Connections and terminations to all conductors must retain the original electrical, mechanical, flame-retarding, and, where necessary, fire-resisting properties of the cable. All connecting devices must be suitable for copper stranded conductors. The connections must be made within an enclosure and the insulated cap of the connector must be secured. Dead end wires found under operating station. Rectify to the satisfaction of the attending Marine Inspector. 46 CFR 111.60-17
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 August 2025
Resolved 15 August 2025
Resolution: Rectified to the satisfaction of the attending Marine Inspector.
10 - Safety of Navigation › N/A - No Subsystem › Voyage or passage plan
Issued 29 July 2025 Resolved
Before getting underway on a voyage or as soon as practicable thereafter, the master of a vessel shall ensure that suitable public announcements are made informing all passengers of— Either: (i) The proper method of donning and adjusting life jackets of the type(s) carried on the vessel including a demonstration of the proper donning of a lifejacket, or (ii) That passengers may contact a crew member for a demonstration. During safety orientation, there was no demonstration of how to don a lifejacket. Rectify to the satisfaction of competent Marine Inspector. 46 CFR 122.506(a)(3)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 August 2025
Resolved 1 August 2025
Resolution: PFD demonsgration will be conducted.
02 - Structural Conditions › N/A - No Subsystem › Marking of IMO number
Issued 29 July 2025 Resolved
For vessels other than those covered in paragraphs (b) and (c) of this section, the name of the vessel must be marked on some clearly visible exterior part of the port and starboard bow and the stern of the vessel. The hailing port of the vessel must be marked on some clearly visible exterior part of the stern of the vessel. Vessel name missing from bow, Port & Starboard. Add name to both Port & Starboard of bow. 46 CFR 67.123(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 August 2025
Resolved 25 August 2025
Resolution: Vessel name was displayed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 July 2025 Resolved
Exhaust gas must not leak from the piping or any connections. The piping must be properly supported by noncombustible hangers or blocks. Exhaust leak present in starboard side engine room exhaust piping. Rectify to the satisfaction of the attending Marine Inspector. 46 CFR 119.430(b).
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 August 2025
Resolved 1 August 2025
Resolution: Exhaust leaks corrected.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 1 June 2025 Resolved
A vessel that is exposed to salt water more than three months in any 12 month period since the last examination must undergo a drydock examination and an internal structural examination at least once every two years. The vessel has lapsed on its drydock inspection deadline. A drydock inspection to the satisfaction of the cognizant OCMI must be conducted prior to clearance of this deficiency. 46 CFR 115.600 (c)(1)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 July 2025
Resolution: Deficiency resolved in DD.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 8 January 2025 Resolved
46 CFR 155.800 (a) A vessel is inspected for compliance with the standards required by this subchapter. Machinery, equipment, materials, and arrangements not covered by standards in this subchapter may be inspected in accordance with standards acceptable to the cognizant OCMI as good marine practice. Photo and video evidence of the welds to repair the damaged rub rail show impurities. Submit a repair proposal to [email withheld] for approval prior to conducting repairs. Repairs to be completed at next DD
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 22 January 2025
Resolved 15 July 2025
Resolution: Resolved in DD.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 1 October 2024 Resolved
Each vessel must be provided with a visual and audible alarm at the operating station to indicate a high water level in a machinery space bilge. Both high water level visual alarms for the port engine room did not properly go off. Repair to ensure audio and visual are operational. 46 CFR 119.530(a)(2) 16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 October 2024
Resolved 25 October 2024
Resolution: New high water level float installed in engine room.
01 - Certificates & Documentation › 012 - Crew Certificates › Evidence of Basic Training
Issued 1 October 2024 Resolved
The training program must address firefighting proficiency and must include fire and smoke detection and automatic systems on board. Crew was unfamiliar with proper testing of fire and smoke detection systems, resulting in melting of the detectors. Familiarize crew with fire control plan and proper testing of detectors. 46 CFR 122.420(b)(1)(vi) 16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 October 2024
Resolved 25 October 2024
Resolution: Crew demonstrated new detectors.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 1 October 2024 Resolved
The owner or managing operator shall provide satisfactory evidence of the required servicing to the marine inspector. No firefighting servicing reports were provided for the smoke and heat detectors. Provide the servicing reports to the Coast Guard. 46 CFR 115.810(b)(2) 16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 October 2024
Resolved 25 October 2024
Resolution: Servicing report provided. See attached doc.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 1 October 2024 Resolved
Each vessel must be equipped with at least two operable portable battery lights. One light was broken. Vessel requires two operable portable lights. 46 CFR 120.430 16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 October 2024
Resolved 25 October 2024
Resolution: New batteries installed in the portable lights.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 6 May 2024 Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. Vessel reported a total loss of both port and starboard main diesel engines. 1. Vessel is allowed to return back to Ceiba for repairs without any passengers on board. 2. Prove proper operation of both port and starboard main diesel engines under load during sea trials with an attending USCG Marine Inspector. 3. Provide a written technical report of root cause analysis of what caused the loss of propulsion to the satisfaction of an attending USCG Marine Inspector. 46 CFR 119.200 17C
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 October 2024
Resolution: Demonstrated full operation during annual inspection. See activity 8008594.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 13 June 2023 Resolved
Each floating water light must be approved in accordance with § 161.010 in subchapter Q of this chapter, or other standard specified by the Commandant. The water lights installed on board do not have the battery type required by the manufacturer. 46 CFR 117.70
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 June 2023
Resolved 20 June 2023
Resolution: Proper batteries installed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 13 June 2023 Resolved
At each inspection all observed unsafe practices, fire hazards, and other hazardous situations must be corrected. 01 deck, port side door leading to the aft outside seating area does not latch closed. 46 CFR 115.910
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 June 2023
Resolved 20 June 2023
Resolution: Door properly latches closed.
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 3 May 2023 Resolved
Repair port fuel tank main return line at point of leak. Pressure test to ensure repairs effective.
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Due 19 May 2023
Resolved 11 May 2023
Resolution: Connection on fuel line found to be loose. Connection tightened.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 3 May 2023 Resolved
Remove all sea valves for inspection.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 5 May 2023
Resolved 5 May 2023
Resolution: Sea valves pulled and inspected all sat
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 3 May 2023 Resolved
Replace zincs on sea chests.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 5 May 2023
Resolved 11 May 2023
Resolution: zincs replaced in shipyard
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 4 October 2022 Resolved
Make repairs to the Starboard Hull engineroom hull forward of the main engine. A 12-14" crack was reported allowing water to compromise the watertight envelope of the starboard hull. Make repairs to the temporary reparis in the port forward void. Also weld the missing welds in the internal structure in the port fwd void.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 October 2022
Resolved 8 October 2022
Resolution: Verified listed repairs and NDT dye pen testing.
02 - Structural Conditions › N/A - No Subsystem › Decks - cracking
Issued 3 October 2022 Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull, protection against fire, means of escape in case of a sudden unexpected casualty, guards and rails in hazardous places, ventilation of enclosed spaces, and necessary facilities for passengers and crew. Vessel has a 12' hairline fracture next to the sea chest on the stbd side engine room. 46cfr116.100(a)
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 October 2022
Resolution: Repairs conducted in STT with MSD supervising.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 24 June 2022 Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull, protection against fire, means of escape in case of a sudden unexpected casualty, guards and rails in hazardous places, ventilation of enclosed spaces, and necessary facilities for passengers and crew. Vessel STBD side aft corner has a fracture around 1" in length.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 July 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 24 June 2022 Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. Port side Jet lost communication with engine. Provide a tech report attesting to the satisfactory working condition of the engine for the approval of the attending marine inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 July 2022
Resolution: MJP tech found metal debris in port pressure reducing vlave. Replaced both port and stbd valves and conducted sat sea trial.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 31 May 2022 Resolved
A door in a bulkhead required to be A-60, A-30, or A-15 Class must be of hollow steel or equivalent material construction, solidly filled with approved structural insulation, and capable of meeting the requirements of an A-15 Class bulkhead; Both engine room doors had piercing penetrations around 1/2" diameter compromising fire boundary.Deficiency has to be corrected at DDX.
Action required: 705 - Other - as specified
Resolved 13 June 2023
Resolution: After annual inspection 2023 door is not compromised and there is a hatch behind the accommodation door that serves as the fire boundary to both engine compartments.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 31 May 2022 Resolved
Electrical equipment on a vessel must be installed and maintained to: (a) Provide services necessary for safety under normal and emergency conditions; (b) Protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock; (c) Minimize accidental personnel contact with energized parts; and (d) Prevent electrical ignition of flammable vapors. Loose cables on port and stbd engine room must be secure.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 1 June 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 6 February 2022 Resolved
The vessel Port MDE failed which resulted in trouble shooting and a top-half over hall
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 April 2022
Resolution: Port side engined repaired.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 29 December 2021 Resolved
Submit a repair proposal addressing the following deficiencies found in the following locations: a. Damage found (2'5" long x 7" high x 2" deep) in both aluminum side shell and bottom plating at the shine, port side-outside of the engine room. b. Unapproved repair of two plug welds identified between frames 3 and 4, and 1.5" from the waterline, port side. c. Vessel owner/operator must follow the mitigation proposal submitted to USCG Sector San Juan. 46 CFR 116.100
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 January 2022
Resolved 14 March 2022
Resolution: A new insert plate was wlded in place.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 20 December 2021 Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull, protection against fire, means of escape in case of a sudden unexpected casualty, guards and rails in hazardous places, ventilation of enclosed spaces, and necessary facilities for passengers and crew. -Void num 2 port FR 8 - FR 9 mid ships, repair 4 broken welds as marked. -Void num 2 port FR 7 - FR 8 mid ships repair 2 broken welds as marked. - Void num 2 port FR 7 - FR 8 mid ships submit repair proposal for 4inch hairline crack, 4 inch gouge and Pit more 25% as marked. -Void num 2 port between FR 5- FR 6 mid ships reapir 2 broken welds as marked. - Void num 3 Stbd submit repair proposal for 3' dent between frame 12-11 as marked. - Void num 2 stbd between FR 8-9 repair broken weld as marked. - Void num 2 stbd between fr 5-6 broken weld as marked.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 December 2021
Resolution: All items found to be properly repaired.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 25 October 2021 Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull, protection against fire, means of escape in case of a sudden unexpected casualty, guards and rails in hazardous places, ventilation of enclosed spaces, and necessary facilities for passengers and crew. Vessel has a 2" by 1/8" hairline crack in the hull on the port side inboard engine room approx 18" above the water line.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 October 2021
Resolution: NDT has been performed vessel, insulation has been replaced. Vessel is cleared to operated.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 5 October 2021 Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. Capt of vessel noticed RPM reduction and white smoke on port side exhaust from manin engine. Provide the following to the attending marine inspector: -Repair Plan -Diesel tank report -Test report of fuel
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 October 2021
Resolution: Vessel drained fuel from port side tank after discovering water was accidently poured into fuel tank. Replaced filters and cleaned lines. New fuel delivered and 51 min seatrial conducted with sat results.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 1 July 2021 Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI. The owner or managing operator shall submit drawings, sketches, or written specifications describing the details of any proposed alterations to the cognizant [name withheld] alterations must be approved by the OCMI before work is started. The vessel rep stated that there would be a design change to the internal frames in the Port and Starboard voids. Also in the starboard #2 void a design change was discussed to repair the fractures in the crotch of the wet deck under frames 11-15.
Condition: Design Flaw
Action required: 17 - Rectify deficiencies prior to departure
Due 1 July 2021
Resolved 21 September 2021
Resolution: Repair proposal submitted and approved by SECSJ.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 1 July 2021 Resolved
A-Class bulkheads or decks must be composed of steel or equivalent material, suitably stiffened and made intact with the main structure of the vessel, such as the shell, structural bulkheads, and decks. In addition, they must be so insulated with approved structural insulation. In the starboard engine room, forward bulkhead found the structural insulation missing around the raw water heated exchanger mounting brackets.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 1 July 2021
Resolved 17 September 2021
Resolution: New approved structual fire protection insulation installed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 1 July 2021 Resolved
At each inspection for certification and at every other vessel inspection all observed unsafe practices and other hazardous situations must be corrected. Starboard transom, in board of the water jet, found an unused plastic open stuffing tube penetrating the hull.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 1 July 2021
Resolved 17 September 2021
Resolution: Inserts were installed and welded in place.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 14 June 2021 Resolved
Penetrations in A-Class fire control boundaries for electrical cables, pipes, trunks, ducts, etc. must be constructed to prevent the passage of flame and smoke for one hour. In addition, the penetration must be designed or insulated so that it will withstand the same temperature rise limits as the boundary penetrated. a. Starboard engine room, inboard, found cable penetration that was not completely sealed b. Port engine room, forward bulkhead near the overhead, found an unused plastic electrical cable stuffing tube penetrating the bulkhead.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 1 July 2021
Resolved 17 September 2021
Resolution: Openings sealed using approved matieral.
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 14 June 2021 Resolved
Vessels to which this subchapter applies must meet the applicable provisions in subchapter S (Subdivision and Stability) of this chapter, except that the requirements in subpart K of this part may be met in lieu of the requirements of §§ 171.124 through 171.155 in subchapter S of this chapter. Repair plans 0183-114-v01 and 183-118-v00 modified internal framing in P/S #2 and #3 voids. Submit documentation to the Marine Safety Center addressing the change in the vessel lightship characteristics; TECHNICAL NOTE (MTN) NO. 04-95, CH2.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 October 2021
Resolved 21 September 2021
Resolution: Updates to weight change sent to MSC.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 14 June 2021 Resolved
The shapes specified in these Rules shall comply with the provisions of Annex I of these Rules (33 CFR part 84.06. Vessel missing two balls and a diamond day shapes.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 October 2021
Resolved 22 September 2021
Resolution: Three balls and a diamond day shapes are onboard the vessel.
14 - Pollution Prevention › 145 - MARPOL Annex V › Garbage management plan
Issued 14 June 2021 Resolved
The master or person in charge of a ship to which this section applies shall ensure that the ship is not operated unless a garbage management plan meeting paragraph (b) of this section is on the ship and that each person handling garbage follows the plan. The West Marine Placard on the bridge did not meet all the elements for the garbage management plan.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 17 September 2021
Resolved 22 September 2021
Resolution: Garbage management plan posted on the bridge
01 - Certificates & Documentation › 013 - Documents › Signs, indications
Issued 14 June 2021 Resolved
On a vessel on which the number of passengers permitted on upper decks is limited by stability criteria, as indicated by the vessel's stability letter, the maximum number of passengers allowed on an upper deck must be indicated by a durable marking of at least 25 millimeters (1 inch) numbers and letters at the entranceway to that deck. Mark the top deck with maximum capacity (75 passengers) at the entrance of that deck. Mark entrance of second deck Maximum Passenger capacity of 195 on upper two decks.
Action required: 701 - Prior to carriage of passengers/cargo
Due 17 September 2021
Resolved 22 September 2021
Resolution: Maximum number of passengers posted on the top step on all entrances to the top two decks.
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 14 June 2021 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Due 17 September 2021
Resolved 22 September 2021
Resolution: Company produced a Senior Deck Hand letter for a licensed master. Vessel operating with two masters until Senior Deck Hands are trained.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 14 June 2021 Resolved
The Certificate of Inspection and any SOLAS Certificates must be posted under glass or other suitable transparent material, such that all pages are visible, in a conspicuous place on the vessel where observation by passengers is likely. The Certificate of Inspection was not posted.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 17 September 2021
Resolved 29 September 2021
Resolution: COI posted under glass port side main deck passenger accommodations.
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 14 June 2021 Resolved
When, in accordance with § 170.120 in subchapter S of this chapter, a vessel must be provided with a stability letter, the stability letter must be posted under glass or other suitable transparent material, such that all pages are visible, at the operating station of the vessel. The Stability Letter was not posted.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 17 September 2021
Resolved 22 September 2021
Resolution: Stabilty Letter has been laminated and posted on the port sided of the bridge console.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 14 June 2021 Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant [name withheld] repair of welds as marked in #3 Port Void, #2 Starboard void and #3 Void.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 October 2021
Resolved 26 October 2021
Resolution: Conducted satisfactory visual inspection of all weld repairs.
04 - Emergency Systems › N/A - No Subsystem › Muster list
Issued 14 June 2021 Resolved
An Emergency Instruction placard containing the following information will stratify the requirements of 46 CFR 122.510 or this part. No Emergency Instructions on board.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 October 2021
Resolved 18 October 2021
Resolution: Emergency Checkoff list provided by the operator.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 June 2021 Resolved
Gauges to indicate engine revolutions per minute (RPM), jacket water temperature, and lubrication oil pressure must be provided for all engines installed in the vessel. The gauges must be readable at the operating station The RPM, jacket water temp. and oil pressure gauges or the STBD electronic display were not operational. Crew to take local readings every 15 minutes until the electronic display is operational.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 6 October 2021
Resolved 15 April 2022
Resolution: Gauges were repaired and visible both digitally and through camera via the operating stations.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 14 June 2021 Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. Port side turbocharge for MDE is not operational.
Action required: 17 - Rectify deficiencies prior to departure
Due 23 September 2021
Resolved 26 September 2021
Resolution: Technician identify fault in Num. 11 cylinder head.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 14 June 2021 Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. Port side jacket water cooling system is not operational.
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 September 2021
Resolved 18 October 2021
10 - Safety of Navigation › N/A - No Subsystem › GNSS receiver/terrestrial radio navigation system
Issued 14 June 2021 Resolved
AIS Carriage - a self propelled vessel that is certified to carry more than 150 passengers. The AIS is not working correctly.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 October 2021
Resolved 26 October 2021
Resolution: Verified AIS unit at the operating station was deplaying the required information.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 14 June 2021 Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. Capt of vessel notice RPM reduction and exercise smoke on port side main engine. Provide the following to the attending marine inspection: - Provide repair plan. - Sound Diesel tank report. - Provide a test report of the fuel.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 October 2021
Resolution: Company provided necesary docs.
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 31 March 2021 Resolved
Vessel under went modification, a dead weight was conducted and stability calcs have been submitted to MSC. Prior to operating with passengers, the vessel must poses a valid stability letter.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 June 2021
Resolution: Complete
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 31 March 2021 Resolved
Vessel will be operating in Sector Puerto Rico's AOR conduct a NTZ and demonstrate proper drills.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 September 2021
Resolution: New to Zone Inspection completed.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 10 December 2018 Resolved
Repairs or alterations to the hull that affect the safety of the vessel must not be made without the approval of the OCMI. The owner or operator shall submit drawings describing the details of any proposed alterations to the [name withheld] alterations must be approved before the work is started. Vessel must submit drawings for approval and prove proper installation of alteration to the satisfaction of a Coast Guard Marine Inspector prior to the carriage of passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 June 2021
Resolution: Complete
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 20 August 2018 Resolved
A Vessel must be provided with a satisfactory arrangement for draining any watertight compartment under all practicable conditions. Prove function of bilge pumping system. 46 CFR 119.500
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 August 2018
Resolution: Function proved to marine inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 20 August 2018 Resolved
Non-metallic hoses must be in accordance with SAE-J1942. Prove compliance of flexible connections in bilge piping system. 46 CFR 119.720
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 August 2018
Resolution: Proof of SAE compliance provided.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage treatment plant
Issued 20 August 2018 Resolved
At every inspection, spaces may be examined to determine if they are in a sanitary condition. Sewage is leaking out of the tank in the engine room. 46 CFR 115.818
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 August 2018
Resolution: Sewage cleaned and tank resealed.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 20 August 2018 Resolved
Machinery, equipment, material, and arrangements not covered by standards in this subchapter may be inspected in accordance with standards acceptable to the cognizant OCMI as good marine practices. Fuel return lines must be cleaned of leaking fuel and joints resealed. 46 CFR 115.800
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 August 2018
Resolution: Fuel lines cleaned and sealing compound reapplied.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 20 August 2018 Resolved
A life jacket must be provided on board for every adult passenger. Vessel is short 27 Life jackets and will be limited to 350 total persons on board. 46 CFR 117.71
Action required: 705 - Other - as specified
Resolved 23 August 2018
Resolution: 27 lifejacks places onboard to meet COI pax count.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 20 August 2018 Resolved
A device must be provided to automatically shut down engines that draw intake air from a protected space prior to the release of extinguishing agent into the space. Prove function of engine shutdowns for fire suppression system. 46 CFR 118.410 (b)(10)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 September 2018
Resolved 23 August 2018
Resolution: Engine shut downs repaired.
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 20 August 2018 Resolved
A vessel with more than one deck must have a public address system from the control station. Vessel must prove operation of PA system. 46 CFR 121.610(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 September 2018
Resolved 23 August 2018
Resolution: PA system repaired and function tested.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 20 August 2018 Resolved
Machinery, equipment, material, and arrangements not covered by standards in this subchapter may be inspected in accordance with standards acceptable to the cognizant OCMI as good marine practices. Bilge manifold piping must be labeled for space it services.46 CFR 115.800
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 September 2018
Resolved 23 August 2018
Resolution: Manifold labled
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 20 August 2018 Resolved
Electrical equipment on a vessel must be installed and maintained to protect persons and vessel from electrical hazards. Prove proper installation and circuit protection of engine room LED light system. 46 CFR 120.200(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 September 2018
Resolved 23 August 2018
Resolution: LED lights removed from engine room.
01 - Certificates & Documentation › 013 - Documents › Shipboard working arrangements
Issued 20 August 2018 Resolved
A station bill must be posted by the master on a vessel over 65ft in length and requiring more than four crew members. An updated station bill must be drafted and posted. 46 CFR 122.514(a)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 September 2018
Resolved 23 August 2018
Resolution: Station bill generated and posted.
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for radio personnel
Issued 20 August 2018 Resolved
Initial inspections may include inspection of certificates and operating manuals including certificates issued by the FCC. No FCC documentation was available for inspection. 46 CFR 115.402(c)(4)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 September 2018
Resolved 23 August 2018
Resolution: FCC docs obtained and made available on the bridge.
Construction/Loadline › Hull › Girder
Issued 18 October 2016 Resolved
Multiple fractures found in girders/structures beneath propulsion reduction gear IWO P/S enginerooms. Reduction gears have extensive history of severe vibration. COI has been inactive for nearly 4 years. To be corrected prior to inspection for certification.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 June 2017
Resolved 5 July 2018
Engineering › Diesel Engine (propulsion-reduction gear) › Turbocharger
Issued 18 July 2012 Resolved
Provide report from engine manufacturer which identifies root cause of turbocharger failures and recommended solution and repairs. Complete servicing and permanent repairs to both main engines and demonstrate proper operation of same to the satisfaction of the attending marine inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 August 2012
Resolved 21 July 2012
Resolution: Witnessed satisfactory operation of both main engines and focused on condition of turbo chargers. As per Catepillar''s recommendations, the lube oil has been changed to 10W40 and a ten minute cool down instruction is posted.
Engineering › Diesel Engine (propulsion-reduction gear) › Turbocharger
Issued 18 June 2012 Resolved
Repair and demonstrate proper operation of starboard main engine. Inboard turbocharger had failed during operation.
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 June 2012
Resolved 20 June 2012
Resolution: Replaced in kind and tested satisfactory. See narrative.
Engineering › Lubricating Oil Service System › Piping
Issued 18 June 2012 Resolved
Pressurized oil supply tubing for inboard turbocharger on starboard main engine was worn from contact with mountings, due to worn anit-chafing materials, replacement of tubing and mountings required.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 20 June 2012
Resolved 20 June 2012
Resolution: Replaced with OEM spares. See narrative.
Engineering › Freshwater System (jacketwater cooling) › Piping
Issued 3 June 2012 Resolved
Jacket water cooling line on starboard engine had a o ring failure resultant from excessive vibration. Section of line was replaced and a new bracket was installed to prevent further casualties.
Action required: 705 - Other - as specified
Resolved 3 June 2012
Resolution: Corrected on the spot.
Engineering › Reduction Gearing/Clutches › Gear
Issued 22 May 2012 Resolved
Permanently repair starboard reduction gear to eliminate excessive vibration and demonstrate proper operation of same.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 June 2012
Resolved 26 May 2012
Resolution: Witnessed proper operation underway.
Fire Fighting › Ventilation Systems › Ducts
Issued 22 May 2012 Resolved
Exhaust vent fire damper for starboard engineroom would not close completely, linkage misaligned, corrected during inspection.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 24 May 2012
Resolved 24 May 2012
Construction/Loadline › Hull › Side Shell
Issued 16 June 2008 Resolved
Evidence of strain on fwd port quarter side shell between frames 1 and 2. Monitor throughout season and crop and renew prior to next operating season.
Action required: 705 - Other - as specified
Due 1 April 2009
Resolved 16 June 2009
Engineering › Shafting/Propeller Arrangements › Stern Tube Lubrication/Sealing
Issued 22 May 2008 Resolved
Prior to next operating season, make permanent repairs to both port & stbd shaft seal systems.
Condition: Unknown
Due 15 May 2009
Resolved 16 June 2009
Electrical › Electrical Distribution System (service) › Wiring
Issued 28 May 2007 Resolved
Install approved wiring fasteners to engine room wiring.
Condition: Unknown
Due 28 June 2007
Resolved 28 June 2007
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 28 May 2007 Resolved
Install approved walkway in engine room.
Condition: Unknown
Due 28 June 2007
Resolved 16 June 2009
Engineering › Gas Turbine (propulsion-electric) › Piping
Issued 28 May 2007 Resolved
Install chaffing gear to stbd engine generator fuel line.
Condition: Unknown
Due 28 June 2007
Resolved 28 June 2007
Lifesaving › Inflatable Buoyant Apparatus › Servicing
Issued 8 June 2006 Resolved
Install legible servicing tags on hydrostatic releases for IBA's.
Condition: Unknown
Due 8 July 2006
Resolved 9 June 2006
Construction/Loadline › Hull › Weld
Issued 21 July 2003 Resolved
Make permanent repairs to port bow corner and supporting bracing.
Due 22 September 2003
Resolved 9 June 2005
Electrical › Electric Supply System (service)
Issued 4 June 2003 Resolved
Remove unused coil of cable in port engine room space. LEGACY COMPONENT DESC: Cable
Due 4 July 2003
Resolved 30 June 2003
Electrical › Electric Supply System (service)
Issued 4 June 2003 Resolved
Secure bare wires on stbd engine hot start. LEGACY COMPONENT DESC: Cable
Due 4 July 2003
Resolved 30 June 2003
Construction/Loadline › Hull
Issued 4 June 2003 Resolved
Repair weld fractures in #2 stbd compartment. LEGACY COMPONENT DESC: Weld
Due 18 July 2003
Resolved 31 July 2003
Electrical › Electric Supply System (service)
Issued 4 June 2003 Resolved
Repair junction box on #2 stbd compartment bilge alarm. LEGACY COMPONENT DESC: Cable
Due 4 July 2003
Resolved 30 June 2003
Engineering › Fuel Oil Storage/Transfer System
Issued 4 June 2003 Resolved
Secure fuel leak at stbd f/o tank pipe union. LEGACY COMPONENT DESC: Piping
Due 4 July 2003
Resolved 30 June 2003
Engineering › Bilge Water Management System
Issued 4 June 2003 Resolved
Hard pipe bilge suction extenders in after steering port and stbd. LEGACY COMPONENT DESC: Piping
Due 4 July 2003
Resolved 30 June 2003
Lifesaving › Lifebuoys
Issued 28 May 2002 Resolved
Mark lifering on main deck forward with vessel name prior to the compliance date.
Condition: Improper Installation
Due 2 July 2002
Resolved 3 June 2002
Electrical › Electric Generation Source (service)
Issued 28 May 2002 Resolved
Repalce bilge high level alarm sensor in aft port compartment prior to the compliance date. LEGACY COMPONENT DESC: Power Requirement
Condition: Unknown
Due 2 June 2002
Resolved 3 June 2002
Accommodation/Occupational Safety › Occupational Safety
Issued 28 May 2002 Resolved
Remount loose bench seats on main deck prior to the compliance date.
Condition: Design Flaw
Due 17 June 2002
Resolved 12 June 2002
Construction/Loadline
Issued 4 September 2001 Resolved
PERMANENTLY REPAIR CRACKED WELDMENTS IN WAY OF FORWARD BULKHEAD IN 2ND VOIDSPACE AT INBOARD TRANSITIONS OF PORT AND STARBOARD HULLS, BEFORE THE COMPLIANCE DATE.
Condition: Unknown
Due 4 September 2001
Resolved 4 September 2001
Fire Fighting
Issued 4 September 2001 Resolved
3 OF NINE PORTABLE CO2 FIRE EXTINGUISHERS WERE OVERDUE FOR HYDROSTATIC TESTING, REPLACED IN KIND DURING INSPECTION.
Condition: Unknown
Due 20 September 2001
Resolved 20 September 2001
Accommodation/Occupational Safety
Issued 4 September 2001 Resolved
PERMANENTLY REPAIR SEWAGE DRAIN PIPING IN WAY OF STARBOARD ENGINEROOM OVERHEAD, BEFORE THE COMPLIANCE DATE AND PRIOR TO OPERATING IN YEAR 2002.
Condition: Unknown
Due 1 May 2002
Resolved 28 May 2002
Fire Fighting
Issued 4 September 2001 Resolved
INSTALL PROTECTIVE CAPS ON ALL OPEN FIRING MECHANISMS ON CO2 CYLINDER HEADSIN FIXED CO2 SYSTEM. CORRECTED.
Condition: Unknown
Due 20 September 2001
Resolved 20 September 2001
Lifesaving
Issued 4 September 2001 Resolved
LABEL LIFE PRESERVER STOWAGE LOCKERS UNDER BENCH SEATS IN MAIN DECK PASSENGER SPACE, BEFORE THE COMPLIANCE DATE.
Condition: Unknown
Due 4 September 2001
Resolved 4 September 2001
Electrical
Issued 4 September 2001 Resolved
REPAIR OR REPLACE MAIN BATTERY CHARGER IN PORT ENGINERROM BEFORE THE COMPLIANCE DATE. MEANWHILE IT SHALL REMAIN DE-ENERGIZED AND TAGGED OUT OF SERVICE.
Condition: Unknown
Due 4 September 2001
Resolved 4 September 2001
Construction/Loadline
Issued 18 April 2001 Resolved
Provide for review and approval repairs to fractures in # 1, # 2 and # 3 compartments as marked. Conduct repairs to the satisfaction of the attending marine inspector.
Condition: Unknown
Due 15 May 2001
Resolved 30 April 2001
Engineering
Issued 18 April 2001 Resolved
Replace cracked sea suction valve, starboard side engine room.
Condition: Unknown
Due 15 May 2001
Resolved 30 April 2001
Accommodation/Occupational Safety
Issued 30 May 2000 Resolved
Carry no more than 392 passengers until the damaged fixed seating (8 seats total) is repaired and prior to the compliance date.
Condition: Unknown
Due 30 May 2000
Resolved 30 May 2000
Construction/Loadline
Issued 30 May 2000 Resolved
Die penetrant test, drill stop, back gouge and repair fractures as marked in the # 1 compartment (8 fractures marked) and in the # 2 compartment (10 fractures marked) prior to the compliance date.
Condition: Unknown
Due 30 May 2000
Resolved 30 May 2000
Construction/Loadline
Issued 30 May 2000 Resolved
Conduct a credit hull exam prior to the compliance date.
Condition: Unknown
Due 30 May 2000
Resolved 30 May 2000
Electrical
Issued 3 June 1999 Resolved
MOUNT AND SUPPORT CONTROL WIRING BUNDLE FOR PORT MAIN ENGINE BEFORE THE COMPLIANCE DATE.
Condition: Unknown
Due 16 July 1999
Resolved 16 July 1999
Accommodation/Occupational Safety
Issued 3 June 1999 Resolved
EMERGENCY EGRESS NOT REQUIRED FROM UNMANNED ENGINEROOMS, INSTRUCTED OWNER TO REMOVE EXISTING MARKINGS DUE TO INDICATED ROUTE IS UNSAFE, BLOCKED BUY OPERATING MACHINERY AND HOT PIPING. CORRECTED
Condition: Unknown
Due 16 July 1999
Resolved 16 July 1999
Electrical
Issued 3 June 1999 Resolved
TERMINALS LOOSE ON BATTERIES FOR STARTING AND S/S SYSTEMS, CORRECTED,
Condition: Unknown
Due 16 July 1999
Resolved 16 July 1999
Construction/Loadline
Issued 3 June 1999 Resolved
COMPLETE PERMANENT REPAIRS TO CRACKED WELDS AND INTERNAL STRUCTURES IN STARBOARD FOREPEAK AND STARBOARD #1 VOID, BEFORE THE COMPLIANCE DATE.
Condition: Unknown
Due 16 July 1999
Resolved 16 July 1999
Fire Fighting
Issued 3 June 1999 Resolved
REPLACE DEFECTIVE CHECK VALVE IN MAIN FIRE PUMP SUCTION PIPING BEFORE THE COMPLIANCE DATE.
Condition: Unknown
Due 16 July 1999
Resolved 16 July 1999
Electrical
Issued 3 June 1999 Resolved
ELECTRICAL JUNCTION BOX FOR BILGE ALARM WIRING ADRIFT IN E/R BILGE, CORRECTED.
Condition: Unknown
Due 16 July 1999
Resolved 16 July 1999
Construction/Loadline
Issued 3 June 1999 Resolved
BILGE HIGH LEVEL ALARM FOR PORT LAZARETT INOPERABLE, CORRECTED.
Condition: Unknown
Due 16 July 1999
Resolved 16 July 1999
Lifesaving
Issued 3 June 1999 Resolved
FIRST AID KIT MISSING EYEWASH BOTTLE, CORRECTED.
Condition: Unknown
Due 16 July 1999
Resolved 16 July 1999
Lifesaving
Issued 3 June 1999 Resolved
FOUR CHILD SIZE PFDS MISSING, CORRECTED.
Condition: Unknown
Due 16 July 1999
Resolved 16 July 1999
Lifesaving
Issued 3 June 1999 Resolved
SEA PAINTERS IMPROPERLY SECURED TO VESSEL, CORRECTED.
Condition: Unknown
Due 16 July 1999
Resolved 16 July 1999
Engineering
Issued 3 June 1999 Resolved
FUEL SUPPLY PIPING LEAKED AT 1ST UNION FROM PORT FUEL TANK, CORRECTED.
Condition: Unknown
Due 16 July 1999
Resolved 16 July 1999
Construction/Loadline
Issued 12 June 1998 Resolved
Provide/install bilge suction strainers for engineroom pick-ups with an area 3 times that of the pipe diameter.
Condition: Unknown
Due 12 June 1998
Resolved 12 June 1998
Construction/Loadline
Issued 12 June 1998 Resolved
Repair fractured welds as noted on work-list.
Condition: Unknown
Due 12 June 1998
Resolved 12 June 1998
Construction/Loadline
Issued 9 September 1997 Resolved
Carry no passengers until fractured welds and fractured shell plate and fractured bulkhead are repaired. Crop & renew fractured shell plate & bulkhead in way of #1 & #2 STBD tanks. Renew all fractured welds. Drill stop and weld all other fractures in Tank #2 STBD.
Condition: Unknown
Due 11 September 1997
Resolved 19 September 1997
Lifesaving
Issued 9 September 1997 Resolved
Carry no passengers prior to replacing expired hydrostatic release unit on inflatable survival craft.
Condition: Unknown
Due 11 September 1997
Resolved 19 September 1997
Fire Fighting
Issued 25 July 1996 Resolved
Resolve comment #4 of MSC letter (ser H2-9501237) dated April 6, 1995 regarding the FORMICA brand laminate used in the type 5A spaces. The laminate must meet the requirements of 46 CFR 164.012.
Condition: Unknown
Due 25 July 1996
Resolved 25 July 1996
Lifesaving
Issued 25 July 1996 Resolved
Place retro-reflective material on ring buoys.
Condition: Unknown
Due 25 August 1996
Resolved 13 August 1996
Construction/Loadline
Issued 25 July 1996 Resolved
Repair fractured welds IAW worklist dated 25 JULY 1996.
Condition: Unknown
Due 25 August 1996
Resolved 13 August 1996
Unknown
Issued 25 July 1996 Resolved
Provide durable placard at VHF radiotelephone installation with emergency broadcast instructions and information, specific to the vessel, IAW 46 CFR 121.506.
Condition: Unknown
Due 25 August 1996
Resolved 13 August 1996
Fire Fighting
Issued 25 July 1996 Resolved
Resolve comment #6 of MSC letter (H2-9501237) dated April 6, 1995 regardingthe durability of the Arrest-A-Flame XLL-B carpet flame treatment. Providethe cognizant OCMI test results of the durability of the Arrest-A-Flame when applied to carpet subject to foot traffic of typical passenger ferry.
Condition: Unknown
Due 25 July 1996
Resolved 25 July 1996
Fire Fighting
Issued 25 July 1996 Resolved
Resolve comment #3 of MSC letter (ser H2-9501237) dated April 6, 1995 regarding the fire resistance of the fixed seating in the passenger spaces.The fabric must meet NFPA standard 701 and the foam padding must meet ASTM D-1692. As per 46 CFR 72.05-55
Condition: Unknown
Due 25 July 1996
Resolved 25 July 1996
Documentation
Issued 30 May 1995 Resolved
Provide a complete set of aproved plans. 46CFR 177.05-3(a)
Condition: Unknown
Due 30 May 1995
Resolved 30 May 1995
Lifesaving
Issued 30 May 1995 Resolved
Provide six(6) additional child life preservers in order to properly match stowage bins on aft upper deck stowage marked containing 18 each; minimum child life preservers required: 41. 46CFR 180.25-5, 185.25-10
Condition: Unknown
Due 30 May 1995
Resolved 30 May 1995
Engineering
Issued 30 May 1995 Resolved
Resolve comments of MSC letters regarding details of engine control electrical panel, pilothouse console propulsion controls, instrumentation alarms and thrust control alarms. 46CFR 58.05-1
Condition: Unknown
Due 30 May 1995
Resolved 30 May 1995
Lifesaving
Issued 30 May 1995 Resolved
Mark life preserver stowage where PFD's are not readily visible in seat backs. Markings must be 1" letters with the quantity contained therein. 46CFR 185.30-1
Condition: Unknown
Due 30 May 1995
Resolved 30 May 1995
Lifesaving
Issued 30 May 1995 Resolved
Provide suitable rescue boat or rescue ladder/platform. 46CFR 180.10-35
Condition: Unknown
Due 30 May 1995
Resolved 30 May 1995
Lifesaving
Issued 30 May 1995 Resolved
Post emergency check list in a conspicuous place accessible to crew and passengers. 46CFR 185.25-1(a)
Condition: Unknown
Due 30 May 1995
Resolved 30 May 1995
Construction/Loadline
Issued 30 May 1995 Resolved
Mark upper and topmost decks with maximum number of passengers permitted asindicated on the stability letter. 46CFR 185.30-3(e)
Condition: Unknown
Due 30 May 1995
Resolved 30 May 1995
Navigation
Issued 30 May 1995 Resolved
Prove proper operation of the steering rudder angle indicators. 46CFR 183.01-10(a)
Condition: Unknown
Due 30 May 1995
Resolved 30 May 1995
Engineering
Issued 30 May 1995 Resolved
Prove proper operation of gas turbine engine shut down for overspeed and loss of oil pressure and alarms for high oil temperature, high gas temperature, reduced oil pressure and excessive speed. 46CFR 58.10-15(g)
Condition: Unknown
Due 30 May 1995
Resolved 30 May 1995
Electrical
Issued 30 May 1995 Resolved
Provide globes for DC lighting fixtures in main cabin and bridge deck passenger accomodations where globes are not installed. 46CCFR 183.01-15(a)
Condition: Unknown
Due 30 May 1995
Resolved 30 May 1995
Fire Fighting
Issued 30 May 1995 Resolved
Resolve comment #3 of MSC Letter (ser H2-9501237) dated April 6, 1995 regarding the fire resistance of the fixed seating in the passenger spaces.The fabric must meet NFPA Standard 701 and the foam padding must meet ASTM D-1692. As per 46 CFR 72.05-55
Condition: Unknown
Due 30 May 1995
Resolved 30 May 1995
Fire Fighting
Issued 30 May 1995 Resolved
Resolve comment #4 of MSC Letter (ser H2-9501237) dated April 6, 1995 regarding the FORMICA Brand Laminate used in the type 5A spaces. The Laminate must meet the requirements of 46 CFR 164.012.
Condition: Unknown
Due 30 May 1995
Resolved 30 May 1995
Fire Fighting
Issued 30 May 1995 Resolved
Resolve comment #6 of MSC Letter (H2-9501237) dated April 6, 1995 regardingthe durability of the Arrest-A-Flame XLL-B carpeting flame treatment. Provide to the cognizant OCMI, test results of the durability of the ArrestA-Flame when applied to carpet subject to foot traffic typical pass. ferry.
Condition: Unknown
Due 30 May 1995
Resolved 30 May 1995
Documentation
Issued 30 May 1995 Resolved
Post stability letter in pilothouse. 46CFR 185.12-1
Condition: Unknown
Due 30 May 1995
Resolved 30 May 1995
Lifesaving
Issued 30 May 1995 Resolved
Conduct underway emergency drills in the presence of a CG Marine Inspector.4 6CFR 185.25-10
Condition: Unknown
Due 30 May 1995
Resolved 30 May 1995

Casualty record · 17

28 August 2006Routine · role: Involved in a Marine Casualty · activity 2761827
1 July 2007Routine · role: Involved in a Marine Casualty · activity 2990376
17 June 2008Routine · role: Moored/Anchored in Vicinity of Primary Subject · activity 3239932
23 October 2009Routine · role: Involved in a Marine Casualty · activity 3620987
27 July 2010Routine · role: Involved in a Marine Casualty · activity 3809018
13 April 2012Routine · role: Involved in a Marine Casualty · activity 4287769
31 May 2012Routine · role: Involved in a Marine Casualty · activity 4330179
2 June 2012Routine · role: Involved in a Marine Casualty · activity 4334690
18 June 2012Routine · role: Involved in a Marine Casualty · activity 4348243
4 July 2012Routine · role: Involved in a Marine Casualty · activity 4368003
14 July 2012Routine · role: Involved in a Marine Casualty · activity 4380878
16 July 2012Routine · role: Involved in a Marine Casualty · activity 4381458
28 August 2012Routine · role: Involved in a Marine Casualty · activity 4427024
23 September 2012Routine · role: Involved in a Marine Casualty · activity 4448534
9 June 2021Routine · role: Involved in a Marine Casualty · activity 7262126
24 June 2022Routine · role: Involved in a Marine Casualty · activity 7513522
6 May 2024Routine · role: Involved in a Marine Casualty · activity 7921483
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.