Records from 2005 to 2026. Most recent: inspection, 23 March 2026.
Everything above is free. The detail below — the inspection history, the deficiency record, the casualty record and the documentation record — is Professional, $39 a month. Sign in.
Inspection history · 19
23 March 2026
Administrative Inspection · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8330560
24 July 2025
Internal Structural Exam · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8193345
18 March 2025
Administrative Inspection · Internal Structural Exam · Examination of Repairs · Deficiency Check · Drydock Exam · Hull Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8095459
16 April 2024
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7841503
20 March 2023
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7605547
24 September 2022
In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7548898
16 March 2022
COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7411688
6 December 2021
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7363791
28 July 2020
Annual Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7018003
24 June 2020
In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6994453
28 January 2020
Drydock Exam · Internal Structural Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6897590
28 October 2019
Examination of Repairs · Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6843394
4 October 2019
In-Service Inspection · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6828420
6 June 2019
Deficiency Check · DAPI Audit · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6704673
21 July 2018
Plan Review "T" Boat
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6515211
8 May 2018
Administrative Inspection · Deficiency Check · Plan Review "T" Boat · Annual Inspection · Attraction Vessel Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6394990
18 May 2017
COI Inspection · DAPI Audit · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6144925
6 July 2016
Administrative Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5934378
27 April 2016
Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5863562
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil and oily mixtures from machinery spaces
Issued 23 March 2026
Resolved
At each inspection for certification and at every other vessel inspection the bilges and other spaces may be examined to see that there is no excessive accumulation of oil, trash, debris, or other matter that might create a fire hazard, clog bilge pumping systems, or block emergency escapes. MIs observed accumulation of oil in the bilge under the engine. Clean to the satisfaction of MI.
46 CFR 176.830(b)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 June 2026
Resolved 28 May 2026
Resolution: Vessel cleaned oil accumulation in bilge and provided photographic proof.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 16 March 2022
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. Noted routing of MDE throttle cable, transmission control cable, and electrical cable from helm control topside thru the deck opening for steering gears and chain; may cause chafing of cables posing significant risk of control failure for throttle, transmission, steering, and electrical hazard. Issued requirement to reroute all cables to avoid contact with steering system moving parts.
CITE: 46 CFR §182.100
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 April 2022
Resolved 25 March 2022
Resolution: Rec'd photos of rerouted cabling. Requirement cleared.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 28 July 2020
Resolved
Repair/Replace bilge pump activation switch in engine room. 46CFR 182.520e
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 August 2020
Resolved 5 August 2020
Resolution: Float switch replaced and tested satisfactorily.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 23 October 2019
Resolved
Remove 450W invertor or submit plan review for its installation. - 46 CFR 176.700 (b)
Action required: 10 - Deficiency Rectified
Due 22 November 2019
Resolved 23 October 2019
Resolution: Vessel representative removed invertor in the presence of the MI.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 23 October 2019
Resolved
Remove power strip from navigation desk. Submit plans for GFCI outlet. - 46 CFR 176.700 (b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 November 2019
Resolved 1 November 2019
Resolution: Verified removal and installation of a plan reviewed 110V outlet.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 23 October 2019
Resolved
Provide covers for berths in the passenger lounge. - 46 CFR 177.30-7 (b)
Extended til May 18 2021 at the owners request. Berths will not be used for passengers until rectified. The extension is to give the operators time to fabricate custom covers.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 November 2019
Resolved 7 December 2021
Resolution: Witnessed newly upholstered berthing mattresses.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 4 October 2019
Resolved
Label fuel shutoff with minimum of 1 inch lettering. 46 CFR 185.608
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 November 2019
Resolved 1 November 2019
Resolution: Verified acceptable labeling.
09 - Working and Living Conditions › 091 - Living Conditions › Sleeping room
Issued 4 October 2019
Resolved
Complete overnight passenger verification inspection. - 46 CFR 2.01-10
Action required: 705 - Other - as specified
Resolved 23 October 2019
Resolution: Vessel completed overnight passenger verification inspection.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 14 June 2019
Resolved
Premanufacture fixed fire protection system engine shutdoawns did not initially work. Crew corrected system on the spot by tightening connection on ignition switch.
Action required: 10 - Deficiency Rectified
Resolved 14 June 2019
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 6 June 2019
Resolved
Seal openings in bulkhead between engine compartment and steering compartment with fire retardent material. 46 CFR 181.420.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 July 2019
Resolved 14 June 2019
Resolution: Openings sealed with fire block foam.
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 6 June 2019
Resolved
Install indicator light for each high water bilge alarm. 46 CFR 182.53(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 July 2019
Resolved 14 June 2019
Resolution: Additional indicator light installed.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 6 June 2019
Resolved
Replace expired hydrostatic release on EPIRB or remove EPIRB. EPIRB is not required on current route. 46 CFR 185.740(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 July 2019
Resolved 14 June 2019
Resolution: New hydrostatic release has exp date of 06/2021.
Lifesaving › Hand Flares › Quantity
Issued 8 May 2018
Resolved
PWG01) 11116 Procure appropriate flares for a limited coastwise route. Vessel is limited to a Lakes, Bays, Sounds route until procured. 46 CFR 180.68
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 30 June 2018
Resolved 17 May 2018
Resolution: COI Amended on 17 MAY 2018 restricting vessel to a LBS Route
Communications › Radio Communications › EPIRB
Issued 8 May 2018
Resolved
PWG02) 05111 Update EPIRB registration and log monthly EPIRB test in ship's log. Vessel restricted to operations with in 3 nm of shore until registration is renewed, 46 CFR 180.64, 46 CFR 180.718
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 30 June 2018
Resolved 24 May 2018
Resolution: EPIRB is now registered
Communications › Audible Communications › Horn/Whistle
Issued 8 May 2018
Resolved
PWG03) Install appropriate permanently affixed ship's whistle. 33 CFR 86.01
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 May 2018
Resolved 24 May 2018
Resolution: Horn permenantly installed. However, wire for horn not yet permenantly installed.Added worklist item.
Communications › Radio Communications › VHF Radiotelephone
Issued 8 May 2018
Resolved
PWG04) 05709 Attach GPS and program MMSI data to VHFDSC radio. 47 CFR 82
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 May 2018
Resolved 24 May 2018
Resolution: New VHF DSC Radio installed w/ MMSI and GPS.
Operations/Management › Drug and Alcohol Testing › Testing, Serious Marine Incident
Issued 8 May 2018
Resolved
PWG05) 18244 Procure Alcohol Test Strips. 46 CFR 16.240
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 May 2018
Resolved 24 May 2018
Resolution: New strips acquired.
Documentation › Safety/Response Plans/Programs › Waste Management Plan
Issued 8 May 2018
Resolved
PWG06) 14503 Write a waste management plan. 33 CFR 151.59
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 May 2018
Resolved 24 May 2018
Fire Fighting › Fire Bucket › Quantity
Issued 8 May 2018
Resolved
PWG07) 07199 Procure two additional 2.5 gallon fire buckets. 46 CFR 181.610
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 May 2018
Resolved 24 May 2018
Accommodation/Occupational Safety › Occupational Safety › Lifeline
Issued 8 May 2018
Resolved
PWG08) 09298 Replace all "not for climbing" carabiners with rated carabiners. 46 CFR 180.25
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 May 2018
Resolved 24 May 2018
Resolution: All were replaced with stainless steel carabiners of adequate strength.
Operations/Management › Vessel Activity › Underway
Issued 18 May 2017
Resolved
KG01: Make vessel rig and sails ready for operation and availabale for underway inspection by USCG Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 May 2017
Resolution: Went underway and witnessed sailing rig work
Documentation › Certificates/Documents › FCC Safety Radiotelephony Certificate
Issued 18 May 2017
Resolved
KG02: Provide valid FCC Radio Telephony Certificate. 47 CFR 80. Due 01 JUN 2017.
Action required: 705 - Other - as specified
Due 1 June 2017
Resolved 24 May 2017
Resolution: Vessel received new certificate
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 9 May 2016
Resolved
Demonstrate man overboard drill to the satisfaction of the onsight marine inspector prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 May 2016
Resolution: Satisfactory drills were conducted with 2 crew members and one master.
Documentation › Logs/Records › Operational Procedures for Engines or Equipment
Issued 9 May 2016
Resolved
Provide preventative maintenance plan (PMP) for sail rigging and associated components.
Due 15 September 2016
Resolved 13 May 2016