MAURY USCG vessel records
← All vessels

JACKIE B.

JACKIE B. is a 1995 towing vessel. The Coast Guard has recorded 26 inspections since 1995, most recently in January 2026, along with 16 deficiencies and 2 casualty investigations in 2009.

Records from 1995 to 2026. Most recent: inspection, 22 January 2026.

Built
1995
Last inspected
22 January 2026
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Identity

9127215
WCW4124
427878
Flag
UNITED STATES
Maury page id
psix-427878

Inspections, by type

…with no type recorded5
Years with a record 16 calendar years (1995–2026)
The 26 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Towing Vessel class in Maury's sources begin in 1980.

Documentation record

Registered dimensions (L × B × D)104.9 ft × 34.0 ft × 19.0 ft
Registered tonnagegross 94 / net 64
ITC dimensions (L × B × D)104.9 ft × 34.0 ft × 19.0 ft
ITC tonnagegross 451 / net 135
BuilderTRINITY MARINE GROUP · LOCKPORT, LA, UNITED STATES · built 1995
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 7 November 2025 · expires 30 November 2026
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it94 - Regulatory (Subpart C or D), Gross Ton
451 - Convention (Subpart B), Gross Ton
64 - Regulatory (Subpart C or D), Net Ton
135 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

One vessel history report for this hull — every record on this page in one dated, citable document — $300, on request.

Inspected as a tow unit · 2

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

RED CLOUD Towing Vessel · MISLE 192273 · 28 July 2009 · activity 3548981MAXIMUS Freight Barge · MISLE 937040 · 28 July 2009 · activity 3548981

Inspection history · 26

22 January 2026 COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8291105
15 October 2025 In-Service Inspection · Drydock Exam · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8253553
25 February 2025 MTSA Verification · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8072309
7 March 2024 Deficiency Check · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7875451
7 March 2024 ISM Oversight · TPO Audit
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7879809
25 January 2024 Administrative Inspection · Drydock Exam · Internal Structural Exam · Hull Examination
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7855505
20 March 2023 Annual Inspection · Deficiency Check · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7644706
8 June 2022 Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7445385
24 November 2020 Initial Certification · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7101613
9 September 2020 Administrative Inspection · Initial Certification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7114605
12 May 2015 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5124016
28 March 2015 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5119301
15 May 2012 Deficiency Check · MARPOL Annex VI Survey · MTSA/ISPS Verification · MARPOL Annex I Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4291164
9 February 2010 Administration · MTSA/ISPS Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3674294
11 November 2009 Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3634844
1 October 2009 MARPOL · MTSA/ISPS Verification · Industry Initiated Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3607002
28 July 2009 Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3548981
23 October 2008 Administration · MTSA/ISPS Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3346076
16 November 2007 Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3094179
4 October 2006 MARPOL Annex I Examination · Administrative Inspection · Deficiency Check · MTSA/ISPS Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2793431
24 July 2006 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2723334
24 July 2006 Administrative Inspection
Administrative · Marine Safety Center (MSC) · Activity 2723373
10 May 2005 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2354139
20 April 2005 Type not recorded
No type recorded · Station New Orleans · USCG Heartland District (CGD-H) · Activity 2340163
18 November 2003 Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1951426
15 September 1995 Inclining Experiment
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 872373

Deficiency record · 16

07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 20 March 2023 Resolved
To stop the flow of fuel in the event of a fire or break in the fuel line, a remote fuel shutoff valve must be fitted on any fuel line that supplies fuel directly to a propulsion engine or generator prime mover. A leak was found in the pneumatic line which operates the emergency fuel shut-off. Conduct needed repairs. 46 CFR 143.260(b).
Action required: 701 - Prior to carriage of passengers/cargo
Due 20 March 2023
Resolved 23 March 2023
Resolution: Received photographic evidence of replacement of pneumatic valve with new.
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 20 March 2023 Resolved
The operation of controls for each fixed fire-extinguishing system must be inspected to ensure proper operation. Installed local operating instructions for CO2 system were unclear. Provide clear instructions at local station. 46 CFR 142.240(a)(5).
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 April 2023
Resolved 12 April 2023
Resolution: Received photographic evidence of new instruction labels installed on fixed fire fighting.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 20 March 2023 Resolved
Machinery must be maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. A leak was found in the pneumatic line for the aft generator. Conduct needed repairs. 46 CFR 143.205.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 April 2023
Resolved 23 March 2023
Resolution: Received photographic evidence of replacement part on line.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 20 March 2023 Resolved
A 40-B portable fire extinguisher must be located near the flammable liquid storage room or cabinet. The designated extinguisher was not properly mounted. 46 CFR 142.225(d).
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 April 2023
Resolved 24 March 2023
Resolution: Received photo of new extinguisher properly mounted near the flammable liquids storage locker.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 20 March 2023 Resolved
All bilges and void spaces are kept free from accumulation of combustible and flammable materials and liquids insofar as practicable. Bilges in the engine room were found with a large quantity of pooling oil. Remove oil and clean bilges. 46 CFR 142.220(a).
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 April 2023
Resolved 23 March 2023
Resolution: Received photographic evidence of bilges cleaned satisfactorily.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 20 March 2023 Resolved
A vessel must be operated in accordance with applicable laws and regulations and in such a manner as to afford protection against hazards to life, property, and the environment. Water heater relief valves are directed in a way that may cause a hazards to life. Redirect. 46 CFR 140.205(a).
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 April 2023
Resolved 23 March 2023
Resolution: Received photographic evidence of installation of relief valve line directed downward toward bilges.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 20 March 2023 Resolved
Each vessel must be designed and constructed to minimize fire hazards insofar as reasonable and practicable. Vessel was designed with structural fire protection in the engine room. SFP IVO potable water pump has a broken mount and is hanging down. Repair SFP. 46 CFR 144.405.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 April 2023
Resolved 23 March 2023
Resolution: Received photographic evidence of replacement of structural fire protection panels to original position.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 20 March 2023 Resolved
Fixed fire extinguishing system shall be located, installed, or protected so that they are not subject to mechanical, chemical, or other damage that would render them inoperable. Cylinders of fixed fire extinguishing system are stored directly on the deck, causing degradation. Provide alternate arrangements. 46 CFR 140.205(a).
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 April 2023
Resolved 12 April 2023
Resolution: Received photographic evidence of corrected arrangement.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 June 2022 Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Port and starboard air receivers for clutches in engine room are rated for 165 max working pressure, but safety relief valves for the receivers are set to 200 psi. Replace safety relief valves in accordance with 46 CFR 143.300(a).
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 June 2022
Resolved 17 June 2022
Resolution: On 14JUN2022 Southern Marine & Repair Inc. furnished 1 3/4" pop off valve set at 165 PSI.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 8 June 2022 Resolved
Emergency lighting must be provided for all internal crew working and living areas. Emergency lighting sources must provide for sufficient illumination under emergency conditions to facilitate egress from each space and be either: (1) Automatic, battery operated with a duration of no less than two hours; or (2) Non-electric, phosphorescent adhesive lighting strips that are installed along escape routes and sufficiently visible to enable egress with no power. Ensure emergency lighting or phosphorescent adhesive lighting is installed in crew quarters.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 June 2022
Resolved 17 June 2022
Resolution: Provided photos of photoluminescent lighting strips in accomodation spaces.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 12 March 2021 Resolved
Individual circuit breakers on switchboards and distribution panels must be labeled with a description of the loads they serve. MI observed multiple distribution panels and circuit breakers improperly labeled. Provide evidence of all panels correctly labeled to the satisfaction of the attending Inspector. 46 CFR 143.400(d)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 March 2021
Resolved 25 March 2021
Resolution: Received Port Engineers statement of all breakers were tested and marked.
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 12 March 2021 Resolved
Towing vessels must be equipped with the following equipment: Illuminated magnetic compass. MI observed illuminating light for the magnetic compass inoperable. Provide evidence of repaired light to the satisfaction of the attending Inspector. 46 CFR 140.725(d)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 March 2021
Resolved 25 March 2021
Resolution: Received Port engineer statement that light was fixed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 12 March 2021 Resolved
The following systems must be equipped with gauges at the machinery location: Auxiliary generator engine lubricating oil pressure and auxiliary generator engine RPM. MI observed no RPM gauges on auxiliary generators. Install gauges to the satisfaction of the attending Inspector. 46 CFR 143.230(c)(3)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 March 2021
Resolved 25 March 2021
Resolution: Received picture and video of Tach added to engine and operational.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 12 March 2021 Resolved
Emergency lighting must be provided for all internal crew working and living areas. Emergency lighting sources must provide for sufficient illumination under emergency conditions to facilitate egress from each space. MI observed no emergency lighting in forward stores. Install emergency lighting to the satisfaction of the attending Inspector. 46 CFR 143.410(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 March 2021
Resolved 25 March 2021
Resolution: Received picture of new lighting installed.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 12 March 2021 Resolved
A 40-B portable fire extinguisher must be located near the storage room or cabinet. This is in addition to the portable fire extinguishers required by tables 142.230(a) and 142.230(b) of this part. MI observed no portable fire extinguisher mounted near engine room paint locker. Extinguisher installed to the satisfaction of the attending Inspector. 46 CFR 142.225(d)
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 12 March 2021
Resolution: Extinguisher installed near engine room paint locker.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 12 March 2021 Resolved
Portable and semi-portable fire extinguishers must be inspected, maintained, and tested in accordance with the inspection, maintenance procedures, and hydrostatic pressure tests required by Chapters 7 and 8 of NFPA 10. MI observed 02 extinguishers with expired inspection tags. Expired extinguishers replaced. 46 CFR 142.240(a)(1)
Action required: 10 - Deficiency Rectified
Resolved 12 March 2021
Resolution: Expired extinguishers replaced to the satisfaction of attending Marine Inspector.

Casualty record · 2

28 July 2009Routine · role: Involved in a Marine Casualty · activity 3548981
11 November 2009Routine · role: Involved in a Marine Casualty · activity 3634844
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.