MAURY USCG vessel records
← All vessels

OUTWARD BOUND

OUTWARD BOUND is a 1995 passenger vessel (inspected). The Coast Guard has recorded 19 inspections since 2016, most recently in October 2025, along with 47 deficiencies and 1 casualty investigation in 2007.

Records from 2007 to 2025. Most recent: inspection, 8 October 2025.

Built
1995
Last inspected
8 October 2025
Documentation
Case Pending · documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 8 October 2025
Operational controls None recorded without a removal date
Years with a record 9 calendar years (2016–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDI8553
428222
Flag
UNITED STATES
Maury page id
psix-428222

Documentation record

Registered dimensions (L × B × D)64.9 ft × 19.0 ft × 8.2 ft
Registered tonnagegross 67 / net 54
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderGLADDING-HEARN SHIPBUILDING · SOMERSET, MA, UNITED STATES · built 1995
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portBOSTON, MA
Trade endorsementsCoastwise, unrestricted
DocumentationCase Pending · issued 30 June 2004
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it67 - Simplified, Gross Ton
54 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 19

8 October 2025 Drydock Exam · Vessel Attendance · Plan Review "T" Boat · Internal Structural Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 8249448
25 March 2025 Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8088215
5 March 2024 Deficiency Check · COI Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7874543
7 February 2024 Administrative Inspection · Drydock Exam · Internal Structural Exam · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7851191
3 November 2023 Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7820747
29 April 2021 COI Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7180750
11 March 2021 Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7154274
11 December 2020 Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7110180
25 February 2020 Deficiency Check · Examination of Repairs
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6915409
10 January 2020 Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6888959
17 December 2019 Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6874572
3 July 2019 Construction Oversight
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6734620
16 April 2019 Deficiency Check · Administrative Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6663327
10 December 2018 Deficiency Check · Annual Inspection · Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6593509
21 December 2017 Annual Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6327365
16 December 2016 Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6065724
27 September 2016 Deficiency Check · COI Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6010322
1 April 2016 Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5845376
2 February 2016 Examination of Repairs
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5811356

Deficiency record · 47

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 17 July 2026 Resolved
A vessel that carries more than 49 passengers that is not more than 65 feet is required to have 1 fixed power bilge pump and 1 portable hand pump. A secondary powered bilge pump may serve as an alternative to the hand pump. The engine driven bilge pump was not operational at the conclusion of the drydock examination. Repair engine driven bilge pump and prove proper operation. Vessel is authorized to transit to homeport in Boston Harbor with the powered fire pump serving as the bilge pump.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 20 July 2026
Resolution: Proved proper operation of bilge pump after clearing discharge outlet of accumulated blast media.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 17 July 2026 Resolved
Cable must be installed with metal supports spaced not more than 24 inches apart. Cables in the engine room have metal supports spaced more than 24 inches. Ensure all cables in the engine room have supports spaced no more than 24 inches.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 August 2026
Resolved 20 July 2026
Resolution: Metal brackets provided.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 12 January 2026 Resolved
C&R the sbd side forpeak as marked to good metal.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 2 June 2026
Resolution: See Activity Number 8249448.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 8 October 2025 Resolved
C&R the lower aft steering to Engine room bulkhead to good metal.
Action required: 705 - Other - as specified
Resolved 2 June 2026
Resolution: See Activity Number 8249448.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 8 October 2025 Resolved
All observed hazardous conditions must be corrected. The light for the exterior stairwell was not operational, Prove proper operation of the exterior stairwell light.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 August 2026
Resolved 20 July 2026
Resolution: Lightbulb was replaced.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 25 March 2025 Resolved
Unless other means are provided to ensure that a potential waste receptacle fire would be limited to the receptacle, waste receptacles must be constructed of noncombustible materials with no openings in the sides or bottom. Trash can on board was constructed of plastic with no lid. 46 CFR 177.405(f)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 April 2025
Resolved 27 March 2025
Resolution: Operator submitted objective evidence (photos) of approved metal trash receptacles.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 25 March 2025 Resolved
Each vessel must be equipped with at least two operable portable battery lights. One of these lights must be located at the operating station and the other at the access to the propulsion machinery space. Battery operated portable flashlight at the operating station was inoperable. 46 CFR 183.430
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 April 2025
Resolved 27 March 2025
Resolution: Operator submitted objective evidence (photos) of working flashlights.
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 11 March 2024 Resolved
The master shall conduct sufficient drills and give sufficient instructions to make sure that all crew members are familiar with their duties during emergencies that necessitate abandoning ship or the recovery of persons who have fallen overboard. During inspection, crew was not able to demonstrate full competency in recovering a person falling overboard due to not conducting sufficient drills to achieve satisfactory results. Master and crew are to conduct sufficient training and demonstrate satisfactory drills to the satisfaction of the attending marine inspector prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 March 2024
Resolution: Attended vessel and observed satisfactory man overboard drill with crew.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 11 March 2024 Resolved
The master of the vessel shall ensure that each EPIRB must be tested monthly using the integrated test circuit and output indicator to determine that it is operative and shall be logged or otherwise documented. After reviewing the vessel's log, there was no documentation or log entry of monthly EPIRB testing. Informed vessel master of monthly test requirement and log entry. Provide evidence of EPIRB monthly test log entry to the satisfaction of the attending marine inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 22 March 2024
Resolution: Attended vessel and observed an established means of logging EPIRB testing, along with a recent EPIRB test.
10 - Safety of Navigation › N/A - No Subsystem › Voyage or passage plan
Issued 11 March 2024 Resolved
The master of a vessel shall keep a correct, written count of all passengers that embark on and disembark from the vessel. Prior to departing on a voyage, the passenger count must be communicated verbally or in writing, and available ashore at the vessel's normal berthing location or with a representative of the owner or managing operator of the vessel. During inspection, master stated vessel documents passenger count via vessel log entry, but has not established a method of relaying passenger count ashore. Vessel must establish means of communicating passenger count ashore prior to each voyage with passengers. Provide proof of means to the satisfaction of the attending marine inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 22 March 2024
Resolution: Attended vessel and observed installed mailbox on pier dedicated for recording passenger count prior to each voyage.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 11 March 2024 Resolved
At each initial and subsequent inspection for certification of a vessel the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of machinery, fuel, and piping systems, including operational test of the means provided for pumping bilges. During inspection, the bilge suction in the forward compartment and forward cabin were not operable. Fix and provide proof of proper operation of all bilge suction points to the satisfaction of the marine inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 22 March 2024
Resolution: Attended vessel and observed satisfactory operation of all bilge suction points.
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 11 March 2024 Resolved
Abandon ship and man overboard drills and training shall be logged or otherwise documented for review by the Coast Guard upon request. The drill entry shall include the following information: (1) Date of the drill and training; and (2) General description of the drill scenario and training topics. During inspection, there was no documentation of abandon ship and man overboard drills being done. Master is responsible for ensuring such drills are properly documented and available for review by Coast Guard upon request.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 22 March 2024
Resolution: Attended vessel and observed dedicated drill logbook with recent drills logged.
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 11 March 2024 Resolved
The person in command of a documented vessel must have on board that vessel the original Certificate of Documentation currently in effect for that vessel. During inspection, the vessel did not have a valid Certificate of Documentation (COD). Vessel is not allowed to operate or move until evidence is provided to marine inspector that a new COD has been paid for and is in processing.
Action required: 10 - Deficiency Rectified
Resolved 11 March 2024
Resolution: Vessel rep provided proof of payment and COD processing by end of inspection.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 11 March 2024 Resolved
A vessel must carry either a first-aid kit that meets the requirements in 46CFR199.175(b)(10) or a kit with equivalent contents and instructions. Several items in vessel's first aid kit were found expired. Replace expired medication items in first aid kid.
Action required: 10 - Deficiency Rectified
Resolved 11 March 2024
Resolution: Vessel rep replaced expired first aid medication by end of inspection.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 3 November 2023 Resolved
To maintain a valid Certificate of Inspection, you must complete an annual inspection within the periods specified in § 176.500(b)(1) and your Certificate of Inspection must be endorsed. The vessel missed the annual inspections for CY 2022 and 2023. Vessel is prohibited from carrying passengers for hire until a satisfactory COI renewal inspection is completed.
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 November 2023
Resolved 11 March 2024
Resolution: Conducted COI renewal on vessel. Activity #7874543.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 3 November 2023 Resolved
A vessel that is exposed to salt water more than three months in any 12 month period since the last examination must undergo a drydock examination and internal structural at least once every 2 years. Vessel did not conduct the require hull exam before the due date of 31MAR23. Vessel must complete satisfactory hull exam prior to the carriage of passengers for hire.
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 November 2023
Resolved 15 February 2024
Resolution: Hull exam credited.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 17 December 2019 Resolved
All vessels of 26 feet in length and over shall be provided with individual bilge lines and bilge suctions for each watertight compartment except as follows: The space forward of the collision bulkhead need not be fitted with a bilge suction line when the arrangement of the vessel is such that ordinary leakage may be removed from this compartmant by the use of a hand portable bilge pump or other equipment and such equipment is provided. MI observed the bilge system was unable to draw suction from the forward compartment and there was no other equipment available to remove water. Correct prior to carrying passengers
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 29 February 2020
Resolved 30 March 2020
Resolution: Replaced existing bilge piping, valves, strainers and fittings of fixed bilge system in kind. Tested SAT.
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 17 December 2019 Resolved
Each EPIRB, other than an EPIRB in an inflatable liferaft, must be tested monthly, using the integrated test circuit and output indicator, to determine that it is operative; The EPIRB test required shall be logged or otherwise documented. Vessel representative stated they do not keep a log of EPIRB testing.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2020
Resolved 10 January 2020
Resolution: Vessel Rep submitted updated EPRIB maintenance procedures, including monthly EPIRB test log, to Sector Boston.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 16 April 2019 Resolved
One life raft sent out for service. Vessel restricted to one mile from shore untill IBA is returned.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 7 May 2019
Resolution: Verified proper installation of serviced liferaft.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 14 March 2019 Resolved
Operator requested replacing existing life floats with IBAs. Provide installation proposal fro approval, install if approved, schedule inspection of installation with CG. Must be corrected prior to carrying passengers for hire.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 March 2019
Resolution: Verified proper installation of IBAs as approved.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 10 December 2018 Resolved
Each life float must be fitted with a light. Water light on life float intermittently operates.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 December 2018
Resolved 15 January 2019
Resolution: life float fitted with a light. tested, sat
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 10 December 2018 Resolved
A vessel's hull must not carry current. Main switchboard ground detection system indicated current on the hull in excess of 10 amps. Must be corrected prior to carrying passengers for hire.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 March 2019
Resolution: Found faulty AMP meter, replaced meter, tested sat.
02 - Structural Conditions › N/A - No Subsystem › Openings to cargo area, doors, ... scuttles
Issued 10 December 2018 Resolved
Overboard discharge on stbd side has no check/positive action valve. Ensure no water ingress by installing valve or terminating discharge if not in use. Must be corrected prior to carrying passengers for hire.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 February 2019
Resolution: Terminated discharge.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 10 December 2018 Resolved
Wasted transverse frame on starboard side forepeak. Crop and renew in kind to good metal. Must be corrected prior to carrying passengers for hire.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 February 2019
Resolution: cropped renewed to good metal in kind.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 10 December 2018 Resolved
Wasted frame on port side support to Laz hatch. Crop and renew in kind to good metal. Must be corrected prior to carrying passengers for hire.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 February 2019
Resolution: Cropped renewed in kind to good metal.
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 10 December 2018 Resolved
Main deck aft wasted IWO emergency steering tiller access cap. Crop and renew in kind to good metal. Must be corrected prior to carrying passengers for hire.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 February 2019
Resolution: Cropped renewed in kind to good metal. tested, sat
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 10 December 2018 Resolved
Wasted areas IWO port engine room bilge. Conduct thickness gauging and provide repair proposal for approval. Must be corrected prior to carrying passengers for hire.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 February 2019
Resolution: Gauging complete. Identified 36x20 area that requires crop and renew. Discussed expectations with vessel rep. tested weld sat
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 10 December 2018 Resolved
Wasted steel IWO aft pilot house and deck. Provide repair proposal. Must be corrected prior to carrying passengers for hire.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 March 2019
Resolution: Cropped, renewed to good metal. Tested weld sat.
Engineering › Diesel Engine (propulsion-direct drive) › Gear, Timing
Issued 21 December 2017 Resolved
Repair leak in transmission on main diesel.
Action required: 705 - Other - as specified
Due 4 January 2018
Resolved 6 March 2018
Resolution: Leak on transmission was repaired.
Electrical › Electric Generation Source (service) › Ground Detection
Issued 21 December 2017 Resolved
Minimize or eliminate amps to ground.
Action required: 705 - Other - as specified
Due 4 January 2018
Resolved 26 January 2018
Resolution: Amp to ground indicator read less than 1 amp.
Communications › Radio Communications › EPIRB
Issued 21 December 2017 Resolved
Install appropriate hydrostatic release unit on EPIRB.
Action required: 705 - Other - as specified
Due 4 January 2018
Resolved 26 January 2018
Resolution: Installed appropriate hydrostatic release unit on EPIRB.
Electrical › Electric Generation Source (service) › Conductor
Issued 21 December 2017 Resolved
Remove or replace in electrical box, dead end wires in void #2 and engine room.
Action required: 705 - Other - as specified
Due 4 January 2018
Resolved 26 January 2018
Resolution: Removed dead end wires in void #2 and engine room.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 21 December 2017 Resolved
Replace line on life ring on bow.
Action required: 705 - Other - as specified
Due 4 January 2018
Resolved 26 January 2018
Resolution: Replaced line on life ring on bow.
Operations/Management › Drills/Instruction › Safety Orientation
Issued 21 December 2017 Resolved
Provide emergency instructions list.
Action required: 705 - Other - as specified
Due 4 January 2018
Resolved 26 January 2018
Resolution: Provided emergency instructions list.
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 21 December 2017 Resolved
Repair light on life float light.
Action required: 705 - Other - as specified
Due 4 January 2018
Resolved 26 January 2018
Resolution: Repaired light on life float light.
Electrical › Electric Generation Source (service) › Ground Indicator
Issued 21 December 2017 Resolved
Repair/replace the amp to ground indicator to working condition.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 9 February 2018
Resolved 6 March 2018
Resolution: Replaced gauge on amp to ground indicator.
Pollution Prevention/Response › Prevention Equipment › Bilge Monitor
Issued 21 December 2017 Resolved
Remove oily water from the E/R bilge.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 9 February 2018
Resolved 6 March 2018
Resolution: Oily water was removed from the bilge.
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 27 September 2016 Resolved
Fire dampers missing on both intakes. Provide dampers.
Condition: Invalid
Action required: 705 - Other - as specified
Due 11 October 2016
Resolved 25 October 2016
Resolution: Vessel rep. provided fire dampers.
Fire Fighting › Fire Hoses › Material
Issued 27 September 2016 Resolved
Missing 02 nozzles for fire hoses. Provide 02 nozzles.
Condition: Invalid
Action required: 705 - Other - as specified
Due 11 October 2016
Resolved 25 October 2016
Resolution: Two nozzels were provided.
Lifesaving › Lifejacket/PFD (General) › Marking
Issued 27 September 2016 Resolved
Missing life jacket stowage signs. Provide signage.
Condition: Invalid
Action required: 705 - Other - as specified
Due 11 October 2016
Resolved 25 October 2016
Resolution: Life jacket stowage signs were installed.
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 27 September 2016 Resolved
Provide logs on fire fighting and MOB drills.
Condition: Invalid
Action required: 705 - Other - as specified
Due 11 October 2016
Resolved 25 October 2016
Resolution: Vessel rep performed and logged drills.
Navigation › Piloting/Steering › US Coast Pilot
Issued 27 September 2016 Resolved
Provide coast pilot and light list.
Condition: Invalid
Action required: 705 - Other - as specified
Due 11 October 2016
Resolved 25 October 2016
Resolution: Vessel provided publications.
Fire Fighting › Means of Escape › Escape Route Signs
Issued 27 September 2016 Resolved
Label 02 emergency escape hatches.
Condition: Invalid
Action required: 705 - Other - as specified
Due 11 October 2016
Resolved 25 October 2016
Resolution: Emergency escape hatches were labeled.
Lifesaving › Lifefloat › Markings
Issued 27 September 2016 Resolved
Stencil name of VSL and capacity on LFs and paddles.
Condition: Invalid
Action required: 705 - Other - as specified
Due 11 October 2016
Resolved 25 October 2016
Resolution: Life floats were stenciled.
Lifesaving › Lifefloat › Paddle
Issued 27 September 2016 Resolved
Missing 02 paddles. Provide 02 paddles, lashed to LF.
Condition: Invalid
Action required: 705 - Other - as specified
Due 11 October 2016
Resolved 25 October 2016
Resolution: Two addtional paddles were provided and lashed.
Engineering › Bilge Water Management System › Not Operational
Issued 27 September 2016 Resolved
Provide proper operation of valve at bilge manifold for FWD peak.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 11 October 2016
Resolved 25 October 2016
Resolution: Bilge manifold valve operates properly.
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 1 April 2016 Resolved
Water light was cracked. Still operational and float tested sat. New light was on order. Current light authorized until new one arrives.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 April 2016
Resolved 14 April 2016

Casualty record · 1

26 March 2007Routine · role: Involved in a Marine Casualty · activity 2896219
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.