Records from 1985 to 2012. Most recent: inspection, 15 June 2012.
Inspection history · 72
15 June 2012
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4368162
4 July 2009
Type not recorded
No type recorded · Maritime Safety & Security Team New York (91106) · Activity 3529044
5 March 2009
Internal Structural Exam · Deficiency Check · Hull Examination · Examination of Repairs · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3428236
28 March 2008
MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3173030
9 April 2007
MTSA Verification · MARPOL Annex V Examination · Hull Examination · Internal Structural Exam · Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2932699
7 July 2006
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2704822
12 June 2006
MTSA Verification · MARPOL Annex V Examination · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2679790
30 March 2005
Security Plan Amendment Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2323079
18 March 2005
Internal Structural Exam · Hull Examination · MARPOL Annex V Examination · COI Inspection · Deficiency Check · MTSA Verification
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2313799
13 April 2004
Annual Inspection · MARPOL Annex V Examination · Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2042866
20 March 2004
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2031035
25 November 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1954782
25 March 2003
Annual Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1762848
21 February 2003
Deficiency Check · Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1747150
26 April 2002
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1610854
27 March 2002
Annual Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1597946
12 June 2001
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1464392
9 May 2001
Annual Inspection · Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1449465
6 March 2001
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1452771
19 April 2000
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1049036
7 March 2000
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1448072
30 March 1999
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1418505
1 March 1999
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1436171
26 February 1999
Plan Review "T" Boat
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 796977
4 February 1999
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1470490
7 August 1998
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 6964
25 February 1998
MARPOL Annex V Examination · Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 781734
20 March 1997
COI Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1099424
18 February 1997
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1110200
6 March 1996
COI Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 885209
29 March 1995
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1144302
13 March 1995
MARPOL Annex V Examination · COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1138891
3 February 1995
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1146164
16 March 1994
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1165761
8 April 1993
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1150987
23 March 1993
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 839731
29 January 1993
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1142936
31 August 1992
Drydock Extension
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 957793
13 May 1992
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 949514
23 March 1992
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 946624
26 March 1991
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1218456
1 February 1991
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 912493
24 September 1990
Drydock Extension
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1214805
17 April 1990
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1224859
6 April 1990
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 923119
3 April 1990
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 912172
29 October 1989
Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1327503
27 June 1989
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1209600
5 April 1989
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 886679
1 March 1989
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1351934
8 November 1988
Drydock Extension
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1202411
3 June 1988
Plan Review "T" Boat
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1198387
17 May 1988
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1042770
5 May 1988
Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1348030
11 April 1988
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1194440
17 August 1987
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1338599
17 July 1987
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1331749
26 May 1987
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1026995
11 May 1987
Deficiency Check · Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1333244
13 April 1987
Plan Review "T" Boat
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1002726
10 March 1987
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1321117
24 February 1987
Plan Review "T" Boat
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1000586
30 December 1986
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1001897
1 December 1986
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1020736
22 September 1986
Credit Drydock
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1005047
8 September 1986
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1030309
28 August 1986
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1298142
17 July 1986
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1307315
25 April 1986
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 986885
20 April 1986
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 987071
17 July 1985
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 988448
19 March 1985
Credit Drydock
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 980025
Electrical › Electric Supply System (service) › Cable
Issued 27 March 2009
Resolved
Remove all dead end wiring in the forward service area main deck.
Action required: 705 - Other - as specified
Due 27 April 2009
Resolved 22 April 2009
Electrical › Electrical Distribution System (service) › Panelboard
Issued 27 March 2009
Resolved
Properly label distribution panel in the forward service area on main deck.
Action required: 705 - Other - as specified
Due 27 April 2009
Resolved 22 April 2009
Electrical › Electrical Distribution System (service) › Panelboard
Issued 27 March 2009
Resolved
Provide a latching mechanism for distribution panel located on second deck forward.
Action required: 705 - Other - as specified
Due 27 April 2009
Resolved 22 April 2009
Construction/Loadline › Structures › Superstructure
Issued 5 March 2009
Resolved
Repair broken windows, port aft, second deck forward port side, and third deck starboard side.
Action required: 705 - Other - as specified
Due 13 March 2009
Resolved 27 March 2009
Resolution: Windows were all replace.
Construction/Loadline › Hull › Longitudinal Frame
Issued 9 April 2007
Resolved
Make permanent repairs to holed 1st and 2nd frames from bulkhead in lazarette, port side.
Action required: 705 - Other - as specified
Resolved 17 May 2007
Electrical › Electrical Distribution System (service) › Wiring
Issued 9 April 2007
Resolved
Replace wire supports as indicated in fuel tank space.
Action required: 705 - Other - as specified
Resolved 17 May 2007
Construction/Loadline › Structures › Deck Plating
Issued 9 April 2007
Resolved
Permanently secure bottom ladder rung in fuel tank space.
Action required: 705 - Other - as specified
Resolved 17 May 2007
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 9 April 2007
Resolved
Secure CO2 bottles in 3rd deck galley space.
Action required: 705 - Other - as specified
Resolved 17 May 2007
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 9 April 2007
Resolved
Remove flammable materials from 2nd deck galley venilation ducts.
Action required: 705 - Other - as specified
Resolved 17 May 2007
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 9 April 2007
Resolved
Replace damaged electrical outlet located in main deck galley.
Action required: 705 - Other - as specified
Resolved 17 May 2007
Construction/Loadline › Structures › Door
Issued 12 June 2006
Resolved
Replace door stbd side galley.
Due 17 June 2006
Resolved 7 July 2006
Resolution: Received documentation attesting to the replacement of stbd side galley door.
Engineering › Pressure Vessel › Marking and Stamping
Issued 18 March 2005
Resolved
Pressure vsl for air compressor must be hydrostatically tested.
Due 27 April 2005
Resolved 4 May 2005
Resolution: Observed hydorstatic test for pressure vessel. All sat.
Construction/Loadline › Hull
Issued 13 April 2004
Resolved
c/r holes wasted in blkd at deck level in crawl space fwd of pilot control station on stbd side.
Due 13 May 2004
Resolved 3 June 2004
Construction/Loadline › Hull › Hull Plating
Issued 13 April 2004
Resolved
c/r holes wasted in deck above and below (overhead/deck n main deck space fwd stbd side adj. to exhaust fan (to be completed by next drydock).
Due 28 February 2005
Resolved 18 March 2005
Resolution: Holes Renewed to satisfaction of MI.
Deck/Cargo › Holds/Tanks
Issued 13 April 2004
Resolved
Remount exhaust fan inboard side of stbd forward main deck space. LEGACY COMPONENT DESC: Ventilation Exhaust Outlet
Due 13 May 2004
Resolved 3 June 2004
Construction/Loadline › Hull › Hull Plating
Issued 13 April 2004
Resolved
c/r holes wasted in overhead just aft of stbd side forward space void (to be completed by next drydock).
Due 28 February 2005
Resolved 18 March 2005
Resolution: Renewed Overhead to satisfaction of MI.
Construction/Loadline › Hull › Hull Plating
Issued 13 April 2004
Resolved
c/r holes wasted in overhead outboard side of port forward space (to be completed by next drydock).
Due 28 February 2005
Resolved 18 March 2005
Resolution: Renewed Overhead to Satisfaction of MI.
Stability › Watertight Integrity
Issued 13 April 2004
Resolved
Make port window (ivo aft freezer) watertight on main (galley) deck.
Due 13 May 2004
Resolved 3 June 2004
Stability › Watertight Integrity
Issued 13 April 2004
Resolved
Replace stbd window behind baker's rack on main deck.
Due 13 May 2004
Resolved 3 June 2004
Stability › Unintentional Flooding
Issued 13 April 2004
Resolved
Renew drain on port main deck ivo fwd bit.
Due 13 May 2004
Resolved 3 June 2004
Construction/Loadline › Structures
Issued 25 March 2003
Resolved
C/R frame in void space as discussed.
Due 15 April 2003
Resolved 11 April 2003
Resolution: Received fax from [name withheld] attesting to repair and verbal phonecon on 11Apr03.
Accommodation/Occupational Safety › Occupational Safety
Issued 25 March 2003
Resolved
Replace insulation on hot water pipe in 2nd deck galley.
Due 15 April 2003
Resolved 11 April 2003
Resolution: Received fax from [name withheld] attesting to repair and verbal phonecon on 11Apr03.
Engineering
Issued 25 March 2003
Resolved
Replace or clean all air filters on Main Engines and generators.
Due 15 April 2003
Resolved 11 April 2003
Resolution: Received fax from [name withheld] attesting to repair and verbal phone on 11Apr03.
Engineering
Issued 25 March 2003
Resolved
Replace missing brackets on air filters on main engines and generators.
Due 15 April 2003
Resolved 11 April 2003
Resolution: Received fax from [name withheld] and verbal via phone.
Accommodation/Occupational Safety › Occupational Safety
Issued 25 March 2003
Resolved
Provide proof of NYC health inspection prior to serving food.
Due 15 April 2003
Resolved 11 April 2003
Resolution: Received fax from [name withheld] attesting to repair and verbal phonecon on 11Apr03.
Electrical › Lighting (service)
Issued 27 March 2002
Resolved
Replace electrical receptacles in chiller room and engine room with approved type. LEGACY COMPONENT DESC: Outlet Box
Condition: Design Flaw
Due 14 April 2002
Resolved 26 April 2002
Resolution: New receptacles installed.
Accommodation/Occupational Safety › Occupational Safety
Issued 27 March 2002
Resolved
Replace broken window glass at port side in galley. LEGACY COMPONENT DESC: Window
Condition: Unknown
Due 14 April 2002
Resolved 26 April 2002
Resolution: New glass installed.
Electrical › Lighting (service) › Switch
Issued 27 March 2002
Resolved
Replace light switch in steering room.
Condition: Unknown
Due 14 April 2002
Resolved 28 March 2002
Resolution: Light switch repaired.
Engineering › Steering Gear System
Issued 27 March 2002
Resolved
Crop/renew upper cross arm to good metal and vee/weld lower cross arm as marked. LEGACY COMPONENT DESC: Ram
Condition: Unknown
Due 14 April 2002
Resolved 26 April 2002
Resolution: Upper and lower cross arms renewed as marked.
Construction/Loadline › Penetrations
Issued 27 March 2002
Resolved
Vee/weld engine room WTD coaming; replace missing dog and adjust door to fit vapor & watertight. LEGACY COMPONENT DESC: Watertight door
Condition: Improper/Lack of Maintenance
Due 14 April 2002
Resolved 26 April 2002
Resolution: Coaming renewed, new dog installed and door adjusted.
Accommodation/Occupational Safety › Potable Water System
Issued 27 March 2002
Resolved
Support fresh water piping to engine room overhead. LEGACY COMPONENT DESC: Piping
Condition: Unknown
Due 14 April 2002
Resolved 28 March 2002
Resolution: Piping braced to overhead.
Electrical
Issued 9 May 2001
Resolved
"Primary" distribution panel in engine room - provide covers for opening ininterior panel.
Condition: Unknown
Due 9 May 2001
Resolved 9 May 2001
Fire Fighting
Issued 9 May 2001
Resolved
Close opening in bulkhead at top of ladder to engine room to provide fire boundary.
Condition: Unknown
Due 9 May 2001
Resolved 9 May 2001
Electrical
Issued 9 May 2001
Resolved
Prove proper operation of overspeed trip on generator #1.
Condition: Unknown
Due 9 May 2001
Resolved 9 May 2001
Construction/Loadline
Issued 9 May 2001
Resolved
Service bilge system and prove proper operation of dewatering in all spaces.
Condition: Unknown
Due 9 May 2001
Resolved 9 May 2001
Engineering
Issued 9 May 2001
Resolved
Repair fuel leak on pressure relief for fuel supply to boiler.
Condition: Unknown
Due 9 May 2001
Resolved 9 May 2001
Fire Fighting
Issued 9 May 2001
Resolved
Repair louvers for boiler space & fusible link - prove proper operation.
Condition: Unknown
Due 9 May 2001
Resolved 9 May 2001
Lifesaving
Issued 9 May 2001
Resolved
Renew severely corroded pipe for chiller above electrical controller for stbd side air handler.
Condition: Unknown
Due 9 May 2001
Resolved 9 May 2001
Construction/Loadline
Issued 9 May 2001
Resolved
Make repairs and prove proper operation of 02 deck (third deck) aft weatherdoors.
Condition: Unknown
Due 9 May 2001
Resolved 9 May 2001
Electrical
Issued 9 May 2001
Resolved
At center panel in HVAC remove improperly installed and unknown 220 V outlet.
Condition: Unknown
Due 9 May 2001
Resolved 9 May 2001
Accommodation/Occupational Safety
Issued 9 May 2001
Resolved
Remove excess grease from grease trap and bulkhead next to fryers.
Condition: Unknown
Due 9 May 2001
Resolved 9 May 2001
Engineering
Issued 9 May 2001
Resolved
Test and inspect boiler in accordance with 46 CFR 61.05 in presence of USCGMarine Inspector.
Condition: Unknown
Due 9 May 2001
Resolved 9 May 2001
Lifesaving
Issued 9 May 2001
Resolved
Remove machinery (soda chillers) from bridge.
Condition: Unknown
Due 31 January 2002
Resolved 27 March 2002
Resolution: Items removed from bridge.
Construction/Loadline
Issued 6 March 2001
Resolved
Provide proper weathertight closure/stuffing tubes for penetration of crewsspace/aft bulkhead IWO piping and wiring at overhead.
Condition: Unknown
Due 6 March 2001
Resolved 6 March 2001
Construction/Loadline
Issued 6 March 2001
Resolved
Crop and renew hull plate 18"x!8" on stbd outboard side where old hull and new hull join.
Condition: Unknown
Due 6 March 2001
Resolved 7 March 2001
Construction/Loadline
Issued 6 March 2001
Resolved
In chiller compartment double bottom, C/R wasted frames on bottom hull in aft 2 bays on centerline port and stbd and outboard on stbd side.
Condition: Unknown
Due 6 March 2001
Resolved 7 March 2001
Construction/Loadline
Issued 6 March 2001
Resolved
Starbord side in double bottom of chiller compartment next to bilge suction, Plating is wasted. C/R area marked.
Condition: Unknown
Due 26 March 2001
Resolved 26 March 2001
Construction/Loadline
Issued 6 March 2001
Resolved
Provide 3" comings on weather tight doors located aft on the main deck.
Condition: Unknown
Due 9 April 2001
Resolved 9 April 2001
Construction/Loadline
Issued 6 March 2001
Resolved
In centerline hatch to stuffing boxes C/R wasted frames at hatch.
Condition: Unknown
Due 9 April 2001
Resolved 9 April 2001
Construction/Loadline
Issued 6 March 2001
Resolved
In steering compt. C/R multiple frames as marked.
Condition: Unknown
Due 9 April 2001
Resolved 9 April 2001
Navigation
Issued 6 March 2001
Resolved
Make repairs as discussed to stbd rudder post wood block: Broken Stop & wasted brackets.
Condition: Unknown
Due 9 April 2001
Resolved 9 April 2001
Construction/Loadline
Issued 6 March 2001
Resolved
C/R transverse web frame in transformer room double bottom as marked both port and stbd sides.
Condition: Unknown
Due 9 April 2001
Resolved 9 April 2001
Construction/Loadline
Issued 6 March 2001
Resolved
C/R stbd sideshell IWO female head port side where covered with epoxy.
Condition: Unknown
Due 26 March 2001
Resolved 26 March 2001
Construction/Loadline
Issued 6 March 2001
Resolved
C/R all sideshell and underdeck transverse & vertical frames in both port and stbd sewage comptartments above midpint longitudinal. Additionally crop and renew deck as required above starboard.
Condition: Unknown
Due 9 April 2001
Resolved 9 April 2001
Engineering
Issued 6 March 2001
Resolved
Renew support in center of heating pipe in engineroom.
Condition: Unknown
Due 9 April 2001
Resolved 9 April 2001
Construction/Loadline
Issued 6 March 2001
Resolved
Gauging required forepeak portside, uppershell of port engineroom, secondary firepump seachest, and double bottom stuffing box on fwd and aft bulkhead.
Condition: Unknown
Due 6 March 2001
Resolved 7 March 2001
Construction/Loadline
Issued 6 March 2001
Resolved
In compt #4 double bottom, C/R Center line longitudinal bhd, 3'x3'IWO severe bulking.
Condition: Unknown
Due 6 March 2001
Resolved 7 March 2001
Lifesaving
Issued 7 March 2000
Resolved
Mark all life jackets with vessel's name.
Condition: Unknown
Due 7 March 2000
Resolved 7 March 2000
Accommodation/Occupational Safety
Issued 7 March 2000
Resolved
Repair/renew rail port and stbd aft quarter where holes exist in metal.
Condition: Unknown
Due 7 March 2000
Resolved 7 March 2000
Lifesaving
Issued 7 March 2000
Resolved
Mark rescue boat with vessel's name on both sides of bow and mark with typeII retroreflective tape, all iaw 46 CFR 122.604.
Condition: Unknown
Due 7 March 2000
Resolved 7 March 2000
Accommodation/Occupational Safety
Issued 7 March 2000
Resolved
Renew broken windows (one on fantail, one on third deck).
Condition: Unknown
Due 7 March 2000
Resolved 7 March 2000
Lifesaving
Issued 1 March 1999
Resolved
INSTALL A PUBLIC ADDRESS SYSTEM (PA) SYSTEM AS REQUIRED BY 46 CFR 121.610
Condition: Unknown
Due 30 March 1999
Resolved 30 March 1999
Unknown
Issued 1 March 1999
Resolved
SECURE BOTTLES FOR SODA FOUTAIN LOCATED ON BRIDGE PORT SIDE CLOSET_x001C_ BOTTLES ARE NOT SECURED AT PRESENT TIME.
Condition: Unknown
Due 30 March 1999
Resolved 30 March 1999
Accommodation/Occupational Safety
Issued 1 March 1999
Resolved
REPLACE BROKEN WINDOW LOCATED ON UPPER DECK PORT SIDE #11 WINDOW IN CEILING/SIDE. 90* GLASS. BROKEN
Condition: Unknown
Due 30 March 1999
Resolved 30 March 1999
Electrical
Issued 1 March 1999
Resolved
INSTALL A JUNCTION BOX ON DEAD ENDED CABLE LOCATED IN LOWER DECK STBD BAR, BY WATER FILTER, OR REMOVE
Condition: Unknown
Due 30 March 1999
Resolved 30 March 1999
Accommodation/Occupational Safety
Issued 1 March 1999
Resolved
REPLACE BROKEN WINDOW, LAST WINDOW ON STBD SIDE OF LOWER DECK.
Condition: Unknown
Due 30 March 1999
Resolved 30 March 1999
Lifesaving
Issued 1 March 1999
Resolved
INSTALL A HANDLE ON STBD SIDE LOWER DECK LIFE JACKET STOWAGE COMPARTMENT. DIFFICULT TO OPEN DUE TO BEING FLUSH MOUNTED
Condition: Unknown
Due 30 March 1999
Resolved 30 March 1999
Accommodation/Occupational Safety
Issued 1 March 1999
Resolved
REPLACE BROKEN WINDOW ON PORTSIDE LOWER GALLEY LOCATED IN FWD STOWAGE AREA
Condition: Unknown
Due 30 March 1999
Resolved 30 March 1999
Construction/Loadline
Issued 4 February 1999
Resolved
Transformer room - double bottom, provide repair proposal to affect repairsto wastage of transverse frames, deep webs, and bulkheads. _x001C_
Condition: Unknown
Due 1 March 1999
Resolved 1 March 1999
Construction/Loadline
Issued 4 February 1999
Resolved
"SSB Void" outer Compartment- C/R #1&2 bulkhead stiffeners and brackets.
Condition: Unknown
Due 4 February 1999
Resolved 4 February 1999
Construction/Loadline
Issued 4 February 1999
Resolved
Engine room- C/R forward bulkhead port side to good metal.
Condition: Unknown
Due 1 March 1999
Resolved 1 March 1999
Construction/Loadline
Issued 4 February 1999
Resolved
Fwd Stair Tower- Provide center handrail 33-36" tall.
Condition: Unknown
Due 1 March 1999
Resolved 1 March 1999
Construction/Loadline
Issued 4 February 1999
Resolved
Thruster Compartment(#2)- C/R in way of holes in the fwd Port bilge area togood metal.
Condition: Unknown
Due 4 February 1999
Resolved 4 February 1999
Construction/Loadline
Issued 4 February 1999
Resolved
Forepeak-C&R base of sideshell transverse stiffeners #1-4 up to chine as marked.
Condition: Unknown
Due 4 February 1999
Resolved 4 February 1999
Construction/Loadline
Issued 4 February 1999
Resolved
Fresh Water Compartment Port double bottom, bay#2, V/Weld #2 vertical bulkhead stiffener at top as marked.
Condition: Unknown
Due 4 February 1999
Resolved 4 February 1999
Construction/Loadline
Issued 4 February 1999
Resolved
F/W (#5)- Renew stuffing tubes on upper stbd side of blkhd.
Condition: Unknown
Due 1 March 1999
Resolved 1 March 1999
Accommodation/Occupational Safety
Issued 4 February 1999
Resolved
Make engine room hatch operable.
Condition: Unknown
Due 4 February 1999
Resolved 4 February 1999
Construction/Loadline
Issued 4 February 1999
Resolved
NY03 C/R port side-shell amidships approx. 18" high in way of chine where marked.
Condition: Unknown
Due 4 February 1999
Resolved 4 February 1999
Construction/Loadline
Issued 4 February 1999
Resolved
Compartment #3- C/R fwd area of Centerline bulkhead in way of bilge to goodmetal.
Condition: Unknown
Due 4 February 1999
Resolved 4 February 1999
Construction/Loadline
Issued 4 February 1999
Resolved
Fresh Water Compartment- Port double bottom, bay#2, C/R bottom transverse #2 and top transverse #3 as marked.
Condition: Unknown
Due 4 February 1999
Resolved 4 February 1999
Construction/Loadline
Issued 4 February 1999
Resolved
Stbd Stuffing Box Void- C/R #4 bottom transverse frame bracket.
Condition: Unknown
Due 4 February 1999
Resolved 4 February 1999
Construction/Loadline
Issued 4 February 1999
Resolved
F/W(#5)- C/R inset in fwd blkhd approx. 1'x6' in way of deck as marked.
Condition: Unknown
Due 1 March 1999
Resolved 1 March 1999
Construction/Loadline
Issued 4 February 1999
Resolved
Fuel Tank Space- C/R vertical bulkhead stiffener #7 at bottom, approx. 1.5'.
Condition: Unknown
Due 1 March 1999
Resolved 1 March 1999
Construction/Loadline
Issued 4 February 1999
Resolved
Fuel Tank Space- C/R vertical bulkhead stiffener #6 at bottom, approx. 3'.
Condition: Unknown
Due 1 March 1999
Resolved 1 March 1999
Construction/Loadline
Issued 4 February 1999
Resolved
F/W(#5)- C&R in way of hole in deck, Port side fwd corner, approx. 2'x2' inway of drain pipe.
Condition: Unknown
Due 1 March 1999
Resolved 1 March 1999
Construction/Loadline
Issued 4 February 1999
Resolved
Forepeak- Provide stuffing tubes for sink drain piping penetrating overhead.
Condition: Unknown
Due 1 March 1999
Resolved 1 March 1999
Construction/Loadline
Issued 4 February 1999
Resolved
Fuel Tank Space- Renew 3" stuffing tube in stbd aft bulkhead.
Condition: Unknown
Due 1 March 1999
Resolved 1 March 1999
Construction/Loadline
Issued 4 February 1999
Resolved
Port Stuffing Box Void- C/ ransverse web frames #1-4 and bulkhead stiffeners to good metal.
Condition: Unknown
Due 1 March 1999
Resolved 1 March 1999
Construction/Loadline
Issued 4 February 1999
Resolved
Port Stuffing Box Void- C/R aft bulkhead in way of hole to good metal.
Condition: Unknown
Due 1 March 1999
Resolved 1 March 1999
Construction/Loadline
Issued 4 February 1999
Resolved
Pickup weld and re-weld to 100% penetration - the insert in way of the engine room emergency escape hatch.
Condition: Unknown
Due 1 March 1999
Resolved 1 March 1999
Fire Fighting
Issued 20 March 1997
Resolved
REPLACE CONTROLLER FOR FIXED CO2 SYSTEM IN STACKHOUSE. HEATING BOILER IS TO BE TAGGED OUT UNTIL CONTROLLER REPLACED AND CO2 SYSTEM CERTIFIED.
Condition: Unknown
Due 20 March 1997
Resolved 20 March 1997
Electrical
Issued 20 March 1997
Resolved
REMOVE EXCESS ELECTRICAL WIRING ON STBD HEAT/AC UNIT.
Condition: Unknown
Due 20 March 1997
Resolved 20 March 1997
Electrical
Issued 20 March 1997
Resolved
LABEL ELECTRICAL PANEL FORWARD OF GALLEY
Condition: Unknown
Due 20 March 1997
Resolved 20 March 1997
Deck/Cargo
Issued 20 March 1997
Resolved
REPAIR/RENEW WASTED MOORING BITT ON FANTAIL STBD SIDE.
Condition: Unknown
Due 20 March 1997
Resolved 20 March 1997
Engineering
Issued 13 March 1995
Resolved
PROVE PROPER OPERATION OF BILGE SUCTION IN LAZARETTE.
Condition: Unknown
Due 30 March 1995
Resolved 30 March 1995
Lifesaving
Issued 13 March 1995
Resolved
VESSEL NOT TO CARRY PASSENGERS UNTIL REQUIREMENTS #1 HAS BEEN MET.
Condition: Unknown
Due 30 March 1995
Resolved 30 March 1995
Electrical
Issued 23 March 1993
Resolved
CONDUCT HYDROSTATIC TEST @ 1 1/4 MAWP ON AIR RECEIVER IN ENGINE ROOM. TO BECOMPLETED TO THE SATISFACTION OF ATTENDING MARINE INSPECTOR._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 9 April 1993
Resolved 9 April 1993
Navigation
Issued 23 March 1993
Resolved
PROVE PROPER OPERATION OF RAYTHEON RADAR IN PILOT HOUSE. TO BE COMPLETED TOTHE SATISFACTION OF ATTENDING CG MARINE INSPECTOR._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 9 April 1993
Resolved 9 April 1993
Electrical
Issued 23 March 1993
Resolved
PROVIDE PROPER LABELING OF ELECTRICAL DISTRIBUTION PANEL ON FWD BULKHEAD INENGINE ROOM IN FRONT OF #1 GENERATOR. TO BE COMPLETED TO THE SATISFACTION OF ATTENDING CG MARINE INSPECTOR._x001C_ _x001C_
Condition: Unknown
Due 9 April 1993
Resolved 9 April 1993
Electrical
Issued 23 March 1993
Resolved
PROVIDE INTERIOR PANEL COVER ON THE PRIMARY DISTRIBUTION PANEL LOCATED IN FWD PORT CORNER OF THE ENGINEROOM. TO BE COMPLETED TO THE SATISFACTION OF ATTENDING CG MARINE INSPECTOR._x001C_ _x001C_
Condition: Unknown
Due 9 April 1993
Resolved 9 April 1993
Electrical
Issued 23 March 1993
Resolved
PROVE PROPER OPERATION OF OVERSPEED TRIP DEVICE ON #2 GENERATOR IN ENGINEROOM. TO BE COMPLETED TO THE SATISFACTION OF ATTENDING CG MARINE INSPECTOR._x001C_ _x001C_
Condition: Unknown
Due 9 April 1993
Resolved 9 April 1993
Construction/Loadline
Issued 31 August 1992
Resolved
CONDUCT CREDIT DRYDOCK EXAMINATION. VESSEL IS TO REMAIN AT PRESENT BERTH. NO PASSENGERS ALLOWED TO BE CARRIED UNTIL THIS REQUIREMENT IS COMPLETED.
Condition: Unknown
Due 31 August 1992
Resolved 31 August 1992
Construction/Loadline
Issued 31 August 1992
Resolved
PROPERLY SEAL HOLE IN VENT PIPE STARBOARD BOW THRUSTER VOID FOREWARD.
Condition: Unknown
Due 31 August 1992
Resolved 31 August 1992
Construction/Loadline
Issued 31 August 1992
Resolved
CROP AND RENEW SECOND FRAME AFT FROM FWD BULKHEAD STARBOARD SIDE BELOW DECKFOREPEAK._x001C_
Condition: Unknown
Due 31 August 1992
Resolved 31 August 1992
Construction/Loadline
Issued 31 August 1992
Resolved
CROP AND RENEW FWD END CENTER LINE BAFFLE PLATE, FOREPEAK._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 31 August 1992
Resolved 31 August 1992
Construction/Loadline
Issued 31 August 1992
Resolved
SEAL STUFFING TUBE PORT SIDE OF LADDER AFT BULKHEAD #5 F/W SPACE._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 31 August 1992
Resolved 31 August 1992
Construction/Loadline
Issued 31 August 1992
Resolved
CROP AND RENEW HOLED BULKHEAD AROUND PORT AND STARBOARD SHAFT BEARINGS IN VOID SPACE AFT E/R BULKHEAD.
Condition: Unknown
Due 31 August 1992
Resolved 31 August 1992
Construction/Loadline
Issued 31 August 1992
Resolved
CLEAN OIL IN ENGINEROOM BILGES._x001C_
Condition: Unknown
Due 31 August 1992
Resolved 31 August 1992
Accommodation/Occupational Safety
Issued 13 May 1992
Resolved
PROVIDE NEW GASKETS AND POSITIVE MEANS OF SECURING HATCHES FOR BOTH MSD HOLDING TANKS. NO PASSENGERS ARE TO BE CARRIED UNTIL COMPLETION OF THIS REQUIREMENT.
Condition: Unknown
Due 13 May 1992
Resolved 13 May 1992
Fire Fighting
Issued 13 May 1992
Resolved
PROVIDE FIREHOSES COMPLYING WITH 46CFR 181.15-10 D(1) AND NOZZLES OF AN APPROVED TYPE FOR EACH FIRE STATION. NO PASSENGERS MAY BE CARRIED UNTIL COMPLETION OF THIS REQUIREMENT.
Condition: Unknown
Due 13 May 1992
Resolved 13 May 1992
Construction/Loadline
Issued 23 March 1992
Resolved
VEE AND WELD HOLE IN OVERHEAD OF STEERING COMPARTMENT,STBD SIDE, 3FT_x001C_ FORWARD AND 2FT INBOARD OF STBD SIDE, SHELL PLATING.
Condition: Unknown
Due 23 March 1992
Resolved 23 March 1992
Accommodation/Occupational Safety
Issued 23 March 1992
Resolved
REMOVE ALL TEMPORARY OFFICE SUPPLIES AND RETURN VESSEL TO ORIGINAL SERVICE ARRANGEMENT. NO PASSENGERS MAY BE CARRIED UNTIL COMPLETION OF THIS REQUIREMENT.
Condition: Unknown
Due 23 March 1992
Resolved 23 March 1992
Electrical
Issued 23 March 1992
Resolved
PROVE PROPER OPERATION OF PORT GENERATOR AND ASSOCIATED OVERSPEED TRIPPING DEVICE.
Condition: Unknown
Due 23 March 1992
Resolved 23 March 1992
Construction/Loadline
Issued 24 September 1990
Resolved
REPAIR CRACKED WELD ON TRANSVERSE BULKHEAD BETWEEN #6 STBD WING VOID AND STBD OUTER FUEL OIL TANK.
Condition: Unknown
Due 24 September 1990
Resolved 24 September 1990
Engineering
Issued 3 April 1990
Resolved
HYDRO TEST AIR RECEIVER TO 1.5 X MAWP.
Condition: Unknown
Due 3 April 1990
Resolved 3 April 1990
Construction/Loadline
Issued 1 March 1989
Resolved
INSERTED 4FTX2.5FT X3/8 PLATE IN WAY OF PORT MSD TANK. MOST OF THE INTERNALS WERE RENEWED INSIDE THE MSD TANK.
Condition: Unknown
Due 1 March 1989
Resolved 1 March 1989
Construction/Loadline
Issued 1 March 1989
Resolved
IN THE STORAGE COMPARTMENT FORWARD OF THE COLLISION BULKHEAD, CROP AND RENEW PORTIONS PF FRAMES 3 AND 4 ON THE STARBOARD SIDE AND 1, 2 AND 3 ON THE PORT SIDE . CROPPED AND RENEWED MAIN DECK IN WAY OF BULLNOSE. CROPPED AND RENEWED BOTTOM 23IN OF PARTIAL BULKHEAD FWD OF COLL BULKHED
Condition: Unknown
Due 1 March 1989
Resolved 1 March 1989
Construction/Loadline
Issued 1 March 1989
Resolved
INSERTED 9FTX1.5FT PLATE IN WAY OF KEEL COOLER , STRB SIDE.
Condition: Unknown
Due 1 March 1989
Resolved 1 March 1989
Construction/Loadline
Issued 1 March 1989
Resolved
INSERTED 7FTX4FTX3/8 INSERT IN WAY OF FWD ENGINE ROOM BULKHEAD AND FUEL TANK FWD OF BULKHEAD.
Condition: Unknown
Due 1 March 1989
Resolved 1 March 1989
Construction/Loadline
Issued 1 March 1989
Resolved
IN THE NO.1 WING TANK, RENEW TO GOOD METAL AND RENEW THE OVERHEAD ON THE PORT SIDE AFT OF FRAMES 1, 2, 3. THIS IS MAIN DECK PLATE COVERED BY CEMENT.
Condition: Unknown
Due 1 March 1989
Resolved 1 March 1989
Electrical
Issued 11 April 1988
Resolved
PROVE PROPER OPERATION OF VOLTAGE REGULATOR FOR #1 SHIP SERVICE GENERATOR.
Condition: Unknown
Due 11 April 1988
Resolved 11 April 1988
Engineering
Issued 11 April 1988
Resolved
INSTALL PRESSURE GAUGE ON DISCHARGE SIDE OF THE BILGE PUMP.
Condition: Unknown
Due 11 April 1988
Resolved 11 April 1988
Fire Fighting
Issued 11 April 1988
Resolved
CONDUCT ANNUAL SERVICING OF CO2 FOR OIL FIRED HOT WATER HEATER INCLUDING VENT SHUTDOWN IN THE PRESENCE OF USCG MARINE INSPECTOR.
Condition: Unknown
Due 11 April 1988
Resolved 11 April 1988
Engineering
Issued 17 July 1987
Resolved
PROVIDE AND INSTALL FLAME SHIELDS ON FOUR MDE FUEL FILTERS IN ENGINEROOM.
Condition: Unknown
Due 17 July 1987
Resolved 17 July 1987
Accommodation/Occupational Safety
Issued 26 May 1987
Resolved
SUBMIT PLANS FOR REVIEW FOR PROPER INSTALLATION OF DECORATIVE LIGHTS OR REMOVE PRESENTLY INSTALLED DECORATIVE LIGHTS.
Condition: Unknown
Due 26 May 1987
Resolved 26 May 1987
Construction/Loadline
Issued 11 May 1987
Resolved
CROP AND INSERT WASTED AREAS IN WAY OF DECK ON INBOARD LONGITUDINAL BULKHEAD BETWEEN STARBOARD STUFFING BOX VOID AND STARBOARD ENGINE ROOM DOUBLE BOTTOM VOID.
Condition: Unknown
Due 11 May 1987
Resolved 11 May 1987
Construction/Loadline
Issued 11 May 1987
Resolved
CROP AND INSERT WASTED AREAS OF ENGINE ROOM PORT DOUBLE BOTTOM VOID TANK TOP, AFT OUTBOARD CORNER UNDER BATTERY INSTALLATION.
Condition: Unknown
Due 11 May 1987
Resolved 11 May 1987
Construction/Loadline
Issued 11 May 1987
Resolved
MAINTAIN RECORDS OF SOUNDINGS WHEN UNDERWAY MADE HOURLY OF THE ENGINE ROOM PORT AND STARBOARD DOUBLE BOTTOM VOIDS AND THE STARBOARD STUFFING BOX VOIDS.
Condition: Unknown
Due 11 May 1987
Resolved 11 May 1987
Construction/Loadline
Issued 22 September 1986
Resolved
CROP AND RENEW #3, #4 AND #5 UNDERDECK TRANSVERSALS OF THE PORT FORWARD TANK OF THE 5TH WATERTIGHT COMPARTMENT AT NEXT DRYDOCKING BUT IN NO CASE LATER THAN 31MAR87.
Condition: Unknown
Due 22 September 1986
Resolved 22 September 1986
Construction/Loadline
Issued 22 September 1986
Resolved
CROP AND RENEW #2 AND #3 FRAMES ON THE PORTSIDE IN THE FOREPEAK TANK AT NEXT DRYDOCKING, BUT IN NO CASE LATER THAN 31MAR87.
Condition: Unknown
Due 22 September 1986
Resolved 22 September 1986
Documentation
Issued 17 July 1986
Resolved
PROVIDE USCG APPROVED PLANS FOR INSTALLED FIXED FIRE FIGHTING SYSTEM IN ENGINE ROOM.
Condition: Unknown
Due 17 July 1986
Resolved 17 July 1986
Documentation
Issued 17 July 1986
Resolved
DEMONSTRATE THAT FIXED FIRE EXTINGUISHER IN MAIN GALLEY IS COAST GUARD APPROVED OR REPLACE WITH APPROVED TYPE.
Condition: Unknown
Due 17 July 1986
Resolved 17 July 1986
Engineering
Issued 17 July 1986
Resolved
PROVIDE SEPARATE ALARM SYSTEMS FOR BOTH MAIN DIESEL ENGINES.
Condition: Unknown
Due 17 July 1986
Resolved 17 July 1986
Electrical
Issued 17 July 1986
Resolved
REMOVE UNUSED ELECTRICAL CABLES IN ENGINE ROOM AND AFTER STEERING.
Condition: Unknown
Due 17 July 1986
Resolved 17 July 1986
Engineering
Issued 17 July 1986
Resolved
PROVE PROPER OPERATION OF OVERSIZED TRIPS ON BOTH MAIN DIESEL ENGINES.
Condition: Unknown
Due 17 July 1986
Resolved 17 July 1986
Deck/Cargo
Issued 17 July 1986
Resolved
PROVE PROPER OPERATION OF ANCHOR WINDLASS.
Condition: Unknown
Due 17 July 1986
Resolved 17 July 1986
Engineering
Issued 25 April 1986
Resolved
SUBMIT TESTING AND OPERATION MANUAL TO [name withheld] AND POST OPERATING PROCEDURES IN THE BOILER SPACE PRIOR TO 30 MAY 1986 TO THE SATISFACTION OF A MARINE INSPECTOR.
Condition: Unknown
Due 25 April 1986
Resolved 25 April 1986
Engineering
Issued 25 April 1986
Resolved
ON HEATING BOILING COMPLETE THE FOLLOWING: (A) PROVIDE LABLES ON ACCESS DOORS STATING "DOORS TO BE SECURED SHUT AT ALL TIMES",(B) DEMONSTRATE LOW WATER LEVEL ALARM AND LIGHTS,(C) PROVIDE PROPER LABING FOR FUEL OIL PUMP REMOTE SHUTDOWN SWITHCH AND CO2 PULL IN UPPER DECK SERVING AREA.
Condition: Unknown
Due 25 April 1986
Resolved 25 April 1986
Fire Fighting
Issued 19 March 1985
Resolved
INSTALL AUTOMATIC CLOSURE DEVICES ON ALL DOORS LEADING FROM THE MAIN DECK LOUNGE TO THE 01 DECK.
Condition: Unknown
Due 19 March 1985
Resolved 19 March 1985
Construction/Loadline
Issued 19 March 1985
Resolved
CROP/REMOVE THE PORT DOUBLER (AT APPROX. FRAME 70) AND INSTALL INSERT PLATE.
Condition: Unknown
Due 19 March 1985
Resolved 19 March 1985
Construction/Loadline
Issued 19 March 1985
Resolved
VEE AND REWELD 3 PIN HOLES (AS CHALKED) ON THE FWD SIDE OF FRAME 57, WHERE THE HYDRAULIC PIPING PENETRATIONS HAVE BEEN MADE AND AIR/SOAP TEST SAME.
Condition: Unknown
Due 19 March 1985
Resolved 19 March 1985
Fire Fighting
Issued 19 March 1985
Resolved
PROVIDE POSITIVE SUPPORT BRACKETS AND SECURING DEVICES FOR ALL PORTABLE FIRE EXTINGUISHERS THROUGHOUT THE VESSEL.
Condition: Unknown
Due 19 March 1985
Resolved 19 March 1985
Electrical
Issued 19 March 1985
Resolved
REPLACE GLASS LENS ON AFT (PORT) MAIN DECK FLOOD LAMP.
Condition: Unknown
Due 19 March 1985
Resolved 19 March 1985
Fire Fighting
Issued 19 March 1985
Resolved
INSTALL DOOR JAMBS THAT MEET A-CLASS STRUCTURAL FIRE PROTECTION FOR EACH OFTHE TWO (2) DOORS LEADING FROM THE MAIN DECK LOUNGE AREA TO THE 01 DECK.
Condition: Unknown
Due 19 March 1985
Resolved 19 March 1985
Unknown
Issued 19 March 1985
Resolved
RELAG THE GENERATOR EXHAUST MANIFOLD FROM THE HEADER UP TO APPROXIMATELY 4 FEET.
Condition: Unknown
Due 19 March 1985
Resolved 19 March 1985
Accommodation/Occupational Safety
Issued 19 March 1985
Resolved
INSTALL A RELIEF VALVE IN BETWEEN THE POTABLE WATER HEAD TANK AND; EITHER THE PRESSURIZING SOURCE OR IT'S 1ST SCREW DOWN VALVE FROM THE TANKS.
Condition: Unknown
Due 19 March 1985
Resolved 19 March 1985
Accommodation/Occupational Safety
Issued 19 March 1985
Resolved
INSTALL A RELIEF VALVE WITH HAND LIFTING CAPABILITY IN THE AIR RECEIVER AT THE AFT ENGINE ROOM BHD.
Condition: Unknown
Due 19 March 1985
Resolved 19 March 1985
Construction/Loadline
Issued 19 March 1985
Resolved
RENEW PORT AND STBD SIDE LIGHTS (WINDOWS) AT FWD SIDE ENTRANCES TO THE MAINDECK LOUNGE.
Condition: Unknown
Due 19 March 1985
Resolved 19 March 1985