MAURY USCG vessel records
← All vessels

L/B SPEEDY

L/B SPEEDY is a 1995 freight barge. The Coast Guard has recorded 71 inspections since 1995, most recently in May 2026, along with 112 deficiencies and 8 casualty investigations between 2003 and 2025.

Records from 1995 to 2026. Most recent: inspection, 13 May 2026.

Built
1995
Last inspected
13 May 2026
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Everything above is free. The detail below — the inspection history, the deficiency record, the tow units, the recorded names, the casualty record and the documentation record — is Professional, $39 a month. Sign in.

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.

Inspection record

Last inspected 13 May 2026
…with no type recorded22
Operational controls None recorded without a removal date
Years with a record 28 calendar years (1995–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

8768488
429987
Flag
UNITED STATES
Maury page id
psix-429987

Documentation record

Registered dimensions (L × B × D)249.6 ft × 72.0 ft × 16.0 ft
Registered tonnagegross 2,366 / net 709
ITC dimensions (L × B × D)249.6 ft × 72.0 ft × 16.0 ft
ITC tonnagegross 2,366 / net 709
BuilderCONRAD INDUSTRIES INC · MORGAN CITY, LA, UNITED STATES · built 1995
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portHOUMA, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 15 May 2026 · expires 30 June 2027
Service, as the file records itFreight Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it2366 - Convention (Subpart B), Gross Ton
709 - Convention (Subpart B), Net Ton
1559 - Dead Weight, Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
Detail on this page

71 inspections, each with its date, unit and type; 112 deficiencies with the resolution recorded against each; 6 vessels inspected with it, by name and date; 2 other recorded names, with years; 8 casualty investigations, with date and classification; the documentation record: dimensions, tonnage, builder, hailing port, endorsements, dates. The counts in the summary above are the same counts, and they are free.

$39 a month or $299 a year, every vessel page, cancel any time. Founding rate $19.99 a month for life, for the first 200 subscribers. Plans Sign in

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 6

Inspection history · 71

13 May 2026 Annual Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 8357153
2 April 2026 Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8340878
15 September 2025 Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8235456
8 April 2025 Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8108349
7 April 2025 COI Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8081437
3 January 2025 Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8057039
4 June 2024 Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7912977
7 June 2023 Commercial Dive Inspection · Administrative Inspection · MTSA Verification · Deficiency Check · Periodic Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7704441
28 April 2023 Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7677555
6 February 2023 Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7632926
1 June 2022 Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7465193
13 April 2021 Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7174128
9 August 2020 Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7080388
29 January 2020 COI Inspection · Internal Structural Exam · Hull Examination · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6898899
27 July 2017 Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6222659
20 June 2015 Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5169234
21 August 2014 Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4962393
7 May 2014 Administrative Inspection · Construction Oversight
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4856369
12 March 2014 Internal Structural Exam · Annual Inspection · Hull Examination
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4815036
24 June 2013 Periodic Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4617321
24 November 2012 Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4490330
13 June 2012 Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4341729
19 October 2010 Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3873044
11 October 2010 Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3868617
20 April 2010 Commercial Dive Inspection · MTSA/ISPS Verification · MARPOL Annex VI Survey · COI Inspection · MARPOL Annex I Examination · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3719968
22 March 2010 Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3889968
20 January 2010 Damage Survey
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3701128
4 January 2010 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3844424
6 February 2009 Internal Structural Exam · Administrative Inspection · Deficiency Check · Hull Examination · Examination of Repairs · Periodic Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3415034
27 March 2008 COI Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3167804
24 July 2007 Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3006230
17 May 2007 Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2936373
12 January 2007 Damage Survey
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2854972
12 January 2007 Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2857855
25 July 2006 Internal Structural Exam · Hull Examination · COI Inspection · MARPOL Annex I Examination
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2724315
24 January 2006 Administrative Inspection
Administrative · Marine Safety Center (MSC) · Activity 2572333
12 October 2005 Re-Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2512236
5 October 2005 Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2508593
6 January 2005 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2269871
21 September 2004 Re-Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2200840
20 April 2004 Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2051128
6 November 2003 Annual Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1942015
27 October 2003 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1957619
17 June 2003 Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1819942
6 May 2003 Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1928921
11 February 2003 Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1742783
13 January 2003 Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1730142
28 December 2002 Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1726304
2 December 2002 Re-Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 1712979
4 October 2001 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 761786
2 October 2001 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 189434
9 August 2001 COI Inspection · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1444553
20 March 2000 Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1432283
13 May 1999 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1130929
30 March 1999 COI Inspection · Hull Examination · Examination of Repairs · Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1452487
17 December 1998 Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1381434
6 August 1998 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1368944
17 February 1998 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 787750
17 February 1998 Hull Examination · Examination of Repairs · Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1411623
23 October 1997 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 777961
11 September 1997 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1398754
27 June 1997 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1113819
23 May 1997 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1105192
25 February 1997 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1434526
25 November 1996 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1181460
4 November 1996 Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1438497
7 February 1996 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 875928
6 December 1995 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 875479
9 November 1995 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 163618
10 October 1995 Damage Survey · COI Inspection · Hull Examination · Construction Oversight
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1421029
5 October 1995 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 132262

Deficiency record · 112

11 - Life Saving Appliances › N/A - No Subsystem › Line-throwing appliance
Issued 7 April 2025 Resolved
Before the vessel leaves the port, and at all times during the voyage, each lifesaving appliance must be in good working order and ready for immediate use. All four propellants were expired for the line throwing devices. 46 CFR 199.190(a)
Action required: 17 - Rectify deficiencies prior to departure
Due 7 April 2025
Resolved 8 April 2025
Resolution: Vessel purchased and installed 04 new propellants.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 7 April 2025 Resolved
If a lifebuoy is intended to operate the quick release arrangement provided for the self-activated smoke signals/ lights, it shall have a mass sufficient to operate the quick release arrangement, but not less than 4kg (8 pounds 13 ounces). The lifebuoys in this arrangement were regular deck buoys and not of adequate weight. 46 CFR 199.150-4(e)
Action required: 17 - Rectify deficiencies prior to departure
Due 7 April 2025
Resolved 8 April 2025
Resolution: Vessel installed new 4kg lifebuoys.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 7 April 2025 Resolved
Lifesaving appliance instructions to passengers must be marked. Life raft stations 4 and 2 were missing posted instructions. 46 CFR 97.37-42
Action required: 17 - Rectify deficiencies prior to departure
Due 7 April 2025
Resolved 8 April 2025
Resolution: Instructions were posted.
04 - Emergency Systems › N/A - No Subsystem › Emergency fire pump and its pipes
Issued 7 April 2025 Resolved
At each inspection for certification, the inspector will determine that all fire-extinguishing equipment is in suitable condition. The emergency fire pump shaft seal had excessive leaking while operating. 46 CFR 91.25-20
Action required: 17 - Rectify deficiencies prior to departure
Due 7 April 2025
Resolved 8 April 2025
Resolution: New seal installed; tested pump, all sat.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 April 2025 Resolved
Electric installations on vessels must ensure: Protection of passengers, crew, other persons, and the vessel from electrical hazards. There was a ground exhibited on the emergency generator switchboard. 46 CFR 111.01-1
Action required: 17 - Rectify deficiencies prior to departure
Due 7 April 2025
Resolved 8 April 2025
Resolution: Received third party tech report; tested ground detection, all sat.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 April 2025 Resolved
Electric installations on vessels must ensure: Protection of passengers, crew, other persons, and the vessel from electrical hazards. -Center aft light in pump room is held up with zip ties. -Life raft station “5” e-light wires were laying on deck not properly supported. -#3 generator oil pressure switch wires were disconnected and exposed. 46 CFR 111.01-1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 May 2025
Resolved 22 April 2025
Resolution: 08APR25: Center aft light in pump room was welded and liferaft station "5" e-light supports were installed. 22APR25: Oil pressure switch on the #03 gen. renewed.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 7 April 2025 Resolved
Containers and other similar stowage locations for lifesaving equipment must be marked with symbols in accordance with IMO Resolution A.760(18) indicating the device stowed in that location. The #5 life raft station embarkation ladder container was not marked. 46 CFR 199.178 46 CFR 199.178
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 May 2025
Resolved 8 April 2025
Resolution: #5 Liferaft station container was marked.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 7 April 2025 Resolved
The inspection shall insure that the vessel and its equipment is in satisfactory condition and fit for the service for which it is intended. The port aft deck light guard pipes have wasted off. - 46 CFR 91.25-10
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 May 2025
Resolved 22 April 2025
Resolution: The protective guard for the port aft deck light was renewed.
99 - Other › N/A - No Subsystem › Other (MARPOL operational)
Issued 7 April 2025 Resolved
For transfer of oil to, from, or within each vessel with a capacity of 250 barrels or more each metallic hose, must not leak under static liquid pressure of at least 1.5 times the maximum allowable working pressure, and be tested annually. Last documentation showed hydro test in 2022. Provide proof of recent annual test for 02 hoses on reels used to supply day tanks. 33 CFR 156.100 33 CFR 156.170
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 May 2025
Resolved 8 April 2025
Resolution: New hoses installed with hydro test completed by third party.
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 7 April 2025 Resolved
In each crew berthing area and wash area, the owner or operator must display information in a visible location regarding sexual assault and sexual harassment, retaliation, and drug and alcohol usage and the procedures and resources to report crimes, including sexual assault and sexual harassment IAW 46 USC 11101 and CVC Policy Letter 23-04. Vessel had not yet equipped each these areas with the above information. 46 USC 11101 CVC Policy Letter 23-04
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 May 2025
Resolved 22 April 2025
Resolution: Company generated a display of information in a visible location regarding sexual assault and sexual harassment, retaliation, and drug and alcohol usage and the procedures and resources to report crimes and posted the information at required locations.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 4 June 2024 Resolved
Each generator prime mover must have over speed device. Prove proper operation of over speed on generators.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 4 June 2024
Resolved 7 June 2024
Resolution: Tested overspeeds on the 2 and 3 generators.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 4 June 2024 Resolved
Each generator arranged for parallel operation must have reverse power trips. Prove proper operation of reverse power trips.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 4 June 2024
Resolved 10 June 2024
Resolution: Attended to verify reverse power trips.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 4 June 2024 Resolved
Examine vessel to determine satisfactory condition of openings in freeboard deck and openings in transverse subdivision bulkheads. All watertight closures require new gaskets. Engine room hatch has wasted trunk and missing dog handles.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 4 June 2024
Resolved 7 June 2024
Resolution: Work was done to hatches and doors. Attended to verify.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 4 June 2024 Resolved
Rules concerning lights shall be complied with from sunset to sunrise. Navigation light panel inoperable.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 4 June 2024
Resolved 7 June 2024
Resolution: Nav light panel replaced. Attended to verify operational.
07 - Fire Safety › N/A - No Subsystem › Evaluation of crew performance (fire drills)
Issued 4 June 2024 Resolved
Each crewmember must participate in one fire drill and one abandon ship drill every month. No records of drills were available.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 4 June 2024
Resolved 7 June 2024
Resolution: Attended to witness drills. Drills were logged.
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 4 June 2024 Resolved
Nothing in this subpart shall be construed as limiting the inspector from making such tests or inspections as he deems necessary to be assured of the seaworthiness of the vessel. Bilge alarms were not illuminating at operator station.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 July 2024
Resolved 10 June 2024
Resolution: Alarms tested sat.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 4 June 2024 Resolved
A room for storing paint must have explosion proof or intrinsically safe equipment. Bulkheads of paint lockers must be class A construction. Paint locker did not have explosion proof or intrinsically safe fixtures, bulkhead was severely wasted and not meeting class a boundary. Remove paint from stores.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 7 June 2024
Resolution: All paint was removed from vessel until new locker arrives.
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 4 June 2024 Resolved
Upon change of address of managing owner, owner shall notify NVDC of address change. COD address does not match requested address for COI.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 July 2024
Resolved 6 June 2024
Resolution: Sent in notification to NVDC and provided proof.
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 4 June 2024 Resolved
Vessel must have fixed containment around each fuel vent, overflow, or fill pipe. Mechanical closure for containment on fuel vent is not functional.
Condition: Improper/Lack of Maintenance
Action required: 703 - Prior to bunkering operations
Resolved 7 June 2024
Resolution: collars C/R and fitted with operational plugs.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 4 June 2024 Resolved
Each Muster station must be adequately illuminated. Life raft muster station port side emergency light inoperable.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 4 June 2024
Resolved 7 June 2024
Resolution: E-light replaced and tested.
01 - Certificates & Documentation › 012 - Crew Certificates › Manning specified by the minimum safe manning doc
Issued 7 June 2023 Resolved
There must be a sufficient number of trained persons on board the vessel for mustering and assisting untrained persons. Vessel only had three of the four lifeboatmen requires during inspection.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 June 2023
Resolution: DMI verified MMC.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 7 June 2023 Resolved
Each vessel must carry lifejackets approved for each person on board. Vessel only had the required number of lifejackets for the fire plan (46) rather than the number required by the COI for authorized number of persons on-board (92).
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 June 2023
Resolution: DMI verified appropiate lifejackets.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 7 June 2023 Resolved
Every crewmember must participate in at least one abandon-ship drill and one fire drill every month. Last fire and abandon-ship drill was on AUG2022.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 June 2023
Resolution: Vessel participated in both fire and abandon ship drill.
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 7 June 2023 Resolved
EPIRBs shall be tested monthly and recorded into the vessel's official logbook. No record of EPRIB testing was onboard.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 June 2023
Resolution: EPIRB was tested.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 7 June 2023 Resolved
Each item of survival equipment with an expiration date must be replaced during the annual inspection if the expiration date has passed. Lifebuoy's waterlight had an expired battery and one was not working.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 June 2023
Resolution: Verifed light for ringbuoy was operational.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 7 June 2023 Resolved
Internal combustion engine driven emergency generators shall be operated under load for at least 2 hrous, at least once in each month that that the vessel is navigated. Vessel was not able to provide proof of E-Gen testing, running, and maintenance.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 June 2023
Resolution: Vessel ran E-Gen for two hours and logged.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 7 June 2023 Resolved
Smoke detection system shall be maintained IAW industry standards and manufacture's guidance. Smoke detector in galley's eating area was disabled by the 9V battery being disconneted to prevent the smoke alarm from announcing low battery warning.
Action required: 10 - Deficiency Rectified
Resolved 7 June 2023
Resolution: Vessel replaced battery.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 7 June 2023 Resolved
Vessel shall maintain general arrangement plans (Fire control and safety plan). Vessel had Fire Extinguisher #21 missing and was required to be located.
Action required: 10 - Deficiency Rectified
Resolved 7 June 2023
Resolution: Vessel located and placed fire extinguisher in proper location.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 June 2023 Resolved
All safety and relief valves for use on pressure vessels shall meet the protection and service requirements. Dive Compressor #1 and #2 has a ball valve that would disable the safety relief pressure valve.
Action required: 10 - Deficiency Rectified
Resolved 7 June 2023
Resolution: Vessel removed ball valves from both dive air compressor pressure vessel.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 June 2023 Resolved
An elactrical apparatus must be designed, constructed ,and installed to prevent any person from accidentally contacting energized parts. Vessel was missing a blank covering the MLC distribution panel.
Action required: 10 - Deficiency Rectified
Resolved 7 June 2023
Resolution: Vessel found and reinstalled electrical blank for distrbution panel.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 28 April 2023 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 April 2023
Resolution: Vsl emailed proof of COFR.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 1 June 2022 Resolved
Vessels to which sub chapter "I" applies must have life rafts with a capacity on each side capable of carrying 150 percent of the persons on board. The COI allows for 92 persons on board. The capacity of the life rafts must be 138 in order to meet the 92 persons on board capacity. Until the capacity is increased, the persons on board shall not exceed 66.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 9 June 2023
Resolution: Vessel changed route to domestic only and only require 100% per side per 199.640c
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 13 April 2021 Resolved
All prime movers must be free of excessive leaks. The port Generator was leaking excessive oil from the governor, pooling on top of the engine. Vsl must repair the L/O leak on the PORT SSDG governor. 46 CFR 91.25-10
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 April 2021
Resolved 21 April 2021
Resolution: Attended vsl to inspect deficiencies found during initial inspection.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 13 April 2021 Resolved
Each generator prime mover must have an operational overspeed device. The port generator overspeed was inoperable. Vsl must provide an operational overspeed device for the PORT SSDG. 46 CFR 111.12-1(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 April 2021
Resolved 21 April 2021
Resolution: Attended vsl to inspect deficiencies found during initial inspection.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 April 2021 Resolved
All piping conveying vapors whose temperature exceeds 150 degrees F shall be properly insulated. The EDG exhaust was missing lagging. VSL must provide the exhaust lagging on the emergency generator. 46 CFR 56.50-1(k)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 May 2021
Resolved 21 April 2021
Resolution: Attended vsl to inspect deficiencies found during initial inspection.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 13 April 2021 Resolved
Lifebuoys and each life jackets must be marked in block letters with the name of the vessel. Lifebuoys and lifejackets were improperly marked. Vsl must provide lifebuoys and life jackets which are marked with the official name of the vessel. 46 CFR 199.70 (a)(2)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 May 2021
Resolved 21 April 2021
Resolution: Attended vsl to inspect deficiencies found during initial inspection.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 April 2021 Resolved
Pressure vessels are required to have legible U1A nameplates attached. The nameplates on the 3 pressure vessels in the engine room were not legible. Vsl must provide legible U1A nameplates. 46 CFR 54.01-2
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 May 2021
Resolved 21 April 2021
Resolution: Attended vsl to inspect deficiencies found during initial inspection.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 13 April 2021 Resolved
Metal cable retention devices are required to be installed every 48”. Cable retention devices are not installed every 24 inches on vertical runs and 98 inches on horizontal runs in the weld stall. Vsl must Install sufficient cable retention devices. 46 CFR 111.60-5(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 May 2021
Resolved 21 April 2021
Resolution: Attended vsl to inspect deficiencies found during initial inspection.
05 - Radio Communications › N/A - No Subsystem › Distress messages: obligations and procedures
Issued 13 April 2021 Resolved
Emergency radio broadcast is required to be posted at radio operating station. Vsl did not have radio distress procedures displayed. VSL must post emergency radio broadcast next to the primary operating radio station. 47 CFR 80.868
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 April 2021
Resolved 21 April 2021
Resolution: Attended vsl to inspect deficiencies found during initial inspection.
14 - Pollution Prevention › 145 - MARPOL Annex V › Garbage
Issued 13 April 2021 Resolved
VSL’s over 40’ are required to have a garbage management plan. VSL did not have a garbage management plan available for inspection. VSL must provide plan and ensure it is onboard at all times. 33 CFR 151.57
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 May 2021
Resolved 21 April 2021
Resolution: Attended vsl to inspect deficiencies found during initial inspection.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 13 April 2021 Resolved
VSL must be able maintain visibility from control tower. vsl has a broken window in control tower. VSL must replace or seal broken window in control tower. 46 CFR 92.01-3
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 May 2021
Resolved 21 April 2021
Resolution: Attended vsl to inspect deficiencies found during initial inspection.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 24 April 2020 Resolved
Bridge Bouy, smoke signal and water light must be ready deployable w/ one singllare movement. Vsls bridge bouy is currently mounted in a welding stall. Vsl must move bridge bouy and smoke signal in a ready deployable location. Pictures Acceptable
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 May 2020
Resolved 4 May 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 24 April 2020 Resolved
Prime movers must be free of F/O leaks. ENG has a F/O leak in around governer. VSL must fix leak.
Action required: 17 - Rectify deficiencies prior to departure
Due 24 May 2020
Resolved 4 May 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 24 April 2020 Resolved
F/O Line may not be cotton jacketed. VSL has cotton jacketted F?O lines of ssdg#1 & 3. VSL must replace all cotton jacketted F/O lines w/ SAE 1942 approved hoses.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 May 2020
Resolved 4 May 2020
05 - Radio Communications › N/A - No Subsystem › Reserve source of energy
Issued 24 April 2020 Resolved
VHF Radios are requried to operatore on emergency power. VSL radios are inoperative during power outages. VSL must provide VHF communications during periods of power outages.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 May 2020
Resolved 4 May 2020
11 - Life Saving Appliances › N/A - No Subsystem › Line-throwing appliance
Issued 29 January 2020 Resolved
FOUR IMPULSE CANNONS ARE REQUIRED TO BE CARRIED WITH FOUR SPARE CHARGES AND 1500 FEET OF MESSANGER LINE. VSL DOES NOT HAVE ANY. VSL MUST PROVIDE FOUR IMPULSE CANNONS FOUR SPARE CHARGES AND MESSANGER LINE. 46 CFR 94.45-10
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 4 May 2020
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 29 January 2020 Resolved
VSL IS REQUIRED TO MAINTAIN AN ADEQUATE FIRST AID KIT IAW THEIR SAFETY PLAN. VSL DOES NOT HAVE FIRST AID KIT. VSL MUST PROVIDE A SERVICEABLE FIRST AID KIT IN THE LOCATION TO WHICH THE SAFETY PLAN IDENTIFIES. 46 CFR 4.41
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 May 2020
04 - Emergency Systems › N/A - No Subsystem › Damage control plan
Issued 29 January 2020 Resolved
THE VSL FIRE/SAFETY PLAN MUST ACCURATELY REFLECT THE EQUIPMENT THAT IS ACTUALLY AVAILABLE ONBOARD. AT THE TIME ON INSPECTION THE SAFTY PLAN REFLECTED THERE WAS AN AED AVAILABLE ON THE MAIN DECK, HOWEVER THERE WAS NO AED PRESENT. VSL MUST EITHER PROVIDE AN AED OR REMOVE THE AED FROM THE SAFETY PLAN. 46 CFR 97.36
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 4 May 2020
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 29 January 2020 Resolved
DISTRESS SIGNALS SHALL BE STOWED IN A WATERTIGHT CONTAINER WHICH IS LABELED "DISTRESS SIGNALS". VSL HAS DISTRESS SIGNALS STOWED IN A WIRE BASKET IN THE WINCH TOWER. VSL MUST PROVIDE A WATERTIGHT CONTAINER WHICH IS PROPERLLY LABELED. 46 CFR 94.90
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 4 May 2020
Fire Fighting › Structural - A Class Divisions › Doors
Issued 12 March 2014 Resolved
Class A doors self returning device was removed on for galley.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 April 2014
Accommodation/Occupational Safety › Ventilation › General
Issued 12 March 2014 Resolved
Sewage vent's flame screen wasted away. Install new flame screen.
Due 16 April 2014
Resolved 16 April 2014
Operations/Management › Drug and Alcohol Testing › EAP Display Requirements
Issued 13 June 2012 Resolved
Post an EAP Placard in common area.
Due 13 July 2012
Resolved 28 June 2012
Electrical › Electrical Distribution System (service) › Junction Box
Issued 13 June 2012 Resolved
Provide an electrical junction box for loose and dead end wires under control station.
Due 13 July 2012
Resolved 28 June 2012
Communications › Public Address System › Broadcast Location
Issued 13 June 2012 Resolved
Post a proper emergency broadcast placard at the operating station.
Due 13 July 2012
Resolved 28 June 2012
Pollution Prevention/Response › Prevention Equipment › Means of Removal from within Coaming
Issued 13 June 2012 Resolved
Ensure non-sparking equipment/material is provided within the pollution prevention kit IAW SOPEP.
Due 13 July 2012
Resolved 18 June 2012
Engineering › Steering Gear System › Hydraulic Hose
Issued 13 June 2012 Resolved
Provide hard clamps/supports for loose hydraulic lines in pump room.
Due 13 July 2012
Resolved 18 June 2012
Engineering › Fuel Oil Storage/Transfer System › Hose
Issued 13 June 2012 Resolved
Secure all high pressure fuel oil lines on all three generators and two pump engines.
Due 13 July 2012
Resolved 28 June 2012
Fire Fighting › Firemans Outfit › Self-Contained Breathing Apparatus
Issued 13 June 2012 Resolved
Provide a NFPA approved SCBA.
Due 13 July 2012
Resolved 28 June 2012
Engineering › Lubricating Oil Storage/Transfer System › Piping
Issued 20 April 2004 Resolved
Vessel replaced existing system of hydraulic lines for pipe laying machinery, with lines of different material from original. Vessel shall provide Coast Guard approved plans for material replacement not "in kind".
Action required: 705 - Other - as specified
Due 9 August 2004
Resolved 21 September 2004
Resolution: Pipe system replaced with stainless steel vise iron pipe. The material used has similar characteristics as original.
Pollution Prevention/Response › Prevention Equipment
Issued 6 November 2003 Resolved
OWS not operating. Vessel instructed to retain all oily waste on board. LEGACY COMPONENT DESC: Oily Water Separator (15 ppm)
Action required: 705 - Other - as specified
Due 7 December 2003
Resolved 30 April 2004
Resolution: Witnessed satisfactory test of OWS.
Engineering › Generator (propulsion/auxiliary-electric)
Issued 6 November 2003 Resolved
Number 2 generator switchboard operates intermittently, inaccurately. LEGACY COMPONENT DESC: Switch
Action required: 705 - Other - as specified
Due 7 December 2003
Resolved 30 April 2004
Resolution: Witnessed satisfactory test of #2 generator switchboard, including instumentation, reverse power relay and parallel operation.
Electrical › Lighting (emergency)
Issued 6 November 2003 Resolved
Emergency Light on port side aft liferaft station inoperable.
Action required: 705 - Other - as specified
Due 7 December 2003
Resolved 6 November 2003
Resolution: Repaired as per TORCH letter dated 11/21/03 (scanned)
Electrical › Lighting (emergency)
Issued 6 November 2003 Resolved
Emergency lights in galley not properly labled.
Action required: 705 - Other - as specified
Due 7 December 2003
Resolved 30 April 2004
Resolution: Veiwed "E" stencils on galley emergecy lighting.
Accommodation/Occupational Safety › Other Accommodation Spaces
Issued 6 November 2003 Resolved
Clean lint and clothing behind dryers in laundry room (fire hazard). LEGACY COMPONENT DESC: Laundry
Action required: 705 - Other - as specified
Due 7 December 2003
Resolved 6 November 2003
Resolution: Corrected as per TORCH letter dated 11/21/03. (scanned)
Accommodation/Occupational Safety › Occupational Safety
Issued 6 November 2003 Resolved
Clean Galley Deck under all Equipment of grease and food items.
Action required: 705 - Other - as specified
Due 7 December 2003
Resolved 6 November 2003
Resolution: Corrected as per TORCH letter dated 11/21/03. (scanned)
Accommodation/Occupational Safety › Occupational Safety
Issued 6 November 2003 Resolved
Drums blocking access to emergency fuel shutdown and muster stations.
Action required: 705 - Other - as specified
Due 7 December 2003
Resolved 6 November 2003
Resolution: Corrected as per TORCH letter dated11/21/03. (scanned)
Accommodation/Occupational Safety › Other Accommodation Spaces
Issued 6 November 2003 Resolved
Replace cover on thermostat control outside workout room. LEGACY COMPONENT DESC: Recreation Space
Action required: 705 - Other - as specified
Due 7 December 2003
Resolved 6 November 2003
Resolution: Corrected as per TORCH letter dated dated 11/21/03. (scanned)
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 6 November 2003 Resolved
Properly label CO2 release station near paintlocker.
Action required: 705 - Other - as specified
Due 7 December 2003
Resolved 6 November 2003
Resolution: Corrected as per TORCH letter dated 11/21/03. (scanned)
Accommodation/Occupational Safety › Occupational Safety
Issued 6 November 2003 Resolved
02 bottles blocking Firebox and Emergency Exit.
Action required: 705 - Other - as specified
Due 7 December 2003
Resolved 6 November 2003
Resolution: Corrected as per TORCH letter dated 11/21/03. (scanned)
Electrical › Electric Generation Source (emergency)
Issued 6 November 2003 Resolved
Emergency Generator vent cover not connected.
Action required: 705 - Other - as specified
Due 7 December 2003
Resolved 6 November 2003
Resolution: Corrected as per TORCH letter dated 11/21/03. (scanned)
Documentation › Certificates/Documents
Issued 6 November 2003 Resolved
Vessel not manned IAW COI. Missing certificated mariners.
Action required: 705 - Other - as specified
Due 7 November 2003
Resolved 7 November 2003
Resolution: Received fax of documents providing proof of presence of cerificated mariners.
Electrical
Issued 20 March 2000 Resolved
MAKE REPAIRS TO #3 S/S GENERATOR (REPLACE MAIN BREAKER) SHOW PROPER OPERATION OF REVERSE POWER RELAY.
Condition: Unknown
Due 11 April 2000
Resolved 11 April 2000
Accommodation/Occupational Safety
Issued 20 March 2000 Resolved
PROVIDE ADEQUATE HOSPITAL SPACE AS PER 46CFR 92.20-35.
Condition: Unknown
Due 11 April 2000
Resolved 11 April 2000
Engineering
Issued 20 March 2000 Resolved
PROVIDE FUEL TRANSFER PROCEDURES AS PER 33CFR 155.750.
Condition: Unknown
Due 13 April 2000
Resolved 13 April 2000
Engineering
Issued 30 March 1999 Resolved
PROVE PROPER OPERATION OF HIGH JACKET WATER TEMP ALARMS FOR GENERATORS NR 1-3.
Condition: Unknown
Due 30 March 1999
Resolved 30 March 1999
Fire Fighting
Issued 30 March 1999 Resolved
CONDUCT SATISFACTORY FIRE AND ABANDON SHIP DRILLS WITH FULL CREW._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 30 March 1999
Resolved 30 March 1999
Lifesaving
Issued 17 December 1998 Resolved
Remove boxes stored in A/C room.
Condition: Unknown
Due 17 December 1998
Resolved 17 December 1998
Documentation
Issued 17 December 1998 Resolved
Update SOPEP to reflect local point of contacts/authorities to current operating areas, including San Juan, Puerto Rico.
Condition: Unknown
Due 17 December 1998
Resolved 17 December 1998
Electrical
Issued 17 December 1998 Resolved
Make permanent repairs to the #2 generator starboard side water temp. thermostat wiring (re-connect as original).
Condition: Unknown
Due 17 December 1998
Resolved 17 December 1998
Documentation
Issued 17 December 1998 Resolved
Provide evidence of #3 generator U.S. Coast Guard approval of drawings submitted as an additional generator.
Condition: Unknown
Due 17 December 1998
Resolved 17 December 1998
Lifesaving
Issued 17 December 1998 Resolved
Remove & replace with approved type brackets or ties all plastic wire ties throughout machinery spaces.
Condition: Unknown
Due 17 December 1998
Resolved 17 December 1998
Lifesaving
Issued 17 December 1998 Resolved
Remove or make permanent brackets for gas bottles throughout the barge.
Condition: Unknown
Due 17 December 1998
Resolved 17 December 1998
Documentation
Issued 17 December 1998 Resolved
Provide evidence of Certificate of Documentation renewal.
Condition: Unknown
Due 17 December 1998
Resolved 17 December 1998
Engineering
Issued 17 December 1998 Resolved
Repair as original #2 generator water cooling tubing into turbo charger.
Condition: Unknown
Due 17 December 1998
Resolved 17 December 1998
Documentation
Issued 17 December 1998 Resolved
Provide evidence of updated & approved drawings No. C3907-01, Rev.#15 (Gen.Arrangement & Hold Plan) to reflect addition of water cooling pump system in pump room, as well as #3 generator fuel oil separator and all other additions penciled in current drawing.
Condition: Unknown
Due 17 December 1998
Resolved 17 December 1998
Accommodation/Occupational Safety
Issued 17 December 1998 Resolved
Make repairs to unserviceable shower/toilet.
Condition: Unknown
Due 17 December 1998
Resolved 17 December 1998
Unknown
Issued 17 December 1998 Resolved
Complete owner rep. worklist items.
Condition: Unknown
Due 17 December 1998
Resolved 17 December 1998
Navigation
Issued 17 December 1998 Resolved
Make permanent repairs to the spud well damaged at stern.
Condition: Unknown
Due 17 December 1998
Resolved 17 December 1998
Documentation
Issued 17 December 1998 Resolved
Provide evidence of compliance with Chemical Testing Program requirements per 46 CFR Part 16.
Condition: Unknown
Due 17 December 1998
Resolved 9 January 1999
Lifesaving
Issued 11 September 1997 Resolved
CONDUCT ABANDON SHIP DRILL IN PRESENCE OF USCG MARINE INSPECTOR WITH FULL COMPLMENT OF PERSONNEL.
Condition: Unknown
Due 11 September 1997
Resolved 11 September 1997
Documentation
Issued 11 September 1997 Resolved
PROVIDE DOCUMENTATION OF TRAINING TO OCMI FOR EVALUATION TO DETERMINE WHEN VESSEL MEETS THE REQULATIONS FOR 4 LIFEBOATMEN.
Condition: Unknown
Due 11 September 1997
Resolved 11 September 1997
Lifesaving
Issued 11 September 1997 Resolved
PROVE PROPER OPERATION OF OILY WATER SEPARATOR, INCLUDING MONITORING SYSTEM, PRIOR TO OPERATING OWS.
Condition: Unknown
Due 11 October 1997
Resolved 3 October 1997
Lifesaving
Issued 11 September 1997 Resolved
PROVIDE AND PROPERLY INSTALL PER REGULATION CONTAINED IN SUBCHAPTER "F" A PUBLIC ADDRESS SYSTEM TO BE HEARD THROUGHOUT THE VESSEL
Condition: Unknown
Due 11 September 1997
Resolved 11 September 1997
Accommodation/Occupational Safety
Issued 11 September 1997 Resolved
PROVIDE ADEQUATE ACCOMODATIONS FOR PERSONNEL BERTHED IN 6 PERSON STATEROOMSAS PER 46 CFR 92.20-20.
Condition: Unknown
Due 19 November 1997
Resolved 9 October 1997
Documentation
Issued 4 November 1996 Resolved
ENSURE ALL CREW HAVE STCW DOCUMENTS AS REQUIRED.
Condition: Unknown
Due 4 November 1996
Resolved 4 November 1996
Engineering
Issued 4 November 1996 Resolved
PROVE PROPER OPERATION OF HIGH JACKET WATER TEMP ALARM AND LOW LUBE OIL SHUTDOWN ON EMERGENCY GENERATOR.
Condition: Unknown
Due 4 November 1996
Resolved 4 November 1996
Fire Fighting
Issued 4 November 1996 Resolved
PROVIDE INSULATION FOR GALLEY STORAGE LOCKER OVERHEAD.
Condition: Unknown
Due 4 November 1996
Resolved 4 November 1996
Fire Fighting
Issued 4 November 1996 Resolved
MAKE REPAIRS TO MISSING A-60 INSULATION IN EMERGENCY GENERATOR ROOM.
Condition: Unknown
Due 4 November 1996
Resolved 4 November 1996
Documentation
Issued 4 November 1996 Resolved
SUBMIT PLANS TO OCMI FOR CHANGE TO STAIRWAY, NAV. LIGHTS, AND ADDITION OF TWO FUEL OIL DAY TANKS.
Condition: Unknown
Due 4 November 1996
Resolved 4 November 1996
Engineering
Issued 4 November 1996 Resolved
PROVIDE PROPER SUPPORTS ON ALL NEWLY INSTALLED FUEL OIL AND LUBE OIL PIPING.
Condition: Unknown
Due 4 November 1996
Resolved 4 November 1996
Engineering
Issued 4 November 1996 Resolved
PROVE PROPER OPERATION OF HIGH JACKET WATER TEMP ALARM ON BOTH MAIN GENERATORS.
Condition: Unknown
Due 4 November 1996
Resolved 4 November 1996
Engineering
Issued 4 November 1996 Resolved
PROVE PROPER OPERATION OF HIGH JACKET WATER TEMP ALARMS AND LUBE OIL SHUTDOWNS ON BOTH JET PUMP ENGINES.
Condition: Unknown
Due 4 November 1996
Resolved 4 November 1996
Documentation
Issued 7 February 1996 Resolved
PROVIDE A U.S. COAST GUARD APPROVED SOPEP ON BOARD THE VESSEL._x001C_ (SOPEP SUBMITTED TO COMMANDANT FOR REVIEW AND APPROVAL ON 06FEB96)
Condition: Unknown
Due 7 February 1996
Resolved 7 February 1996
Fire Fighting
Issued 10 October 1995 Resolved
Submit corrected Fire & Safety Plan for approval to USCG Marine Inspector.
Condition: Unknown
Due 10 October 1995
Resolved 10 October 1995
Documentation
Issued 10 October 1995 Resolved
Provide SOPEP to USCG for approval.
Condition: Unknown
Due 10 October 1995
Resolved 10 October 1995
Lifesaving
Issued 10 October 1995 Resolved
Demonstrate installation of rescue boat davits to satisfaction of USCG Marine Inspector. Temp use of portable crane authorized in interim.
Condition: Unknown
Due 10 October 1995
Resolved 10 October 1995
Fire Fighting
Issued 10 October 1995 Resolved
Provide letter to G-MSC showing 3 accomodations hydrants as 1 1/2" as a firemain plan amendment.
Condition: Unknown
Due 10 November 1995
Resolved 30 October 1995
Engineering
Issued 10 October 1995 Resolved
Install personnel protective guards on generator & jet pump engines.
Condition: Unknown
Due 10 October 1995
Resolved 10 October 1995
Engineering
Issued 10 October 1995 Resolved
Install cooling water temp indicators per 46CFR58.01-5 and ABS rules 4/4.33.1 & prove to satisfaction of ABS Surveyor or USCG Marine Inspector. If ABS surveyor, provide class report to MSO Morgan City, LA.
Condition: Unknown
Due 10 October 1995
Resolved 10 October 1995
Unknown
Issued 10 October 1995 Resolved
Provide complete equipment list to MSO Morgan City for MSIS loading.
Condition: Unknown
Due 20 October 1995
Resolved 30 October 1995
Deck/Cargo
Issued 10 October 1995 Resolved
Obtain ABS NVIC 10-82, ch 2 approval or G-MSC approval of deck machinery hydraulic & air piping diagram/plans.
Condition: Unknown
Due 10 November 1995
Resolved 10 November 1995
Fire Fighting
Issued 10 October 1995 Resolved
Provide internal wiring & complete component lists for fire detection panel& subpanels; provide temporary emergency load battery calculations for firedetection system (per required G-MSC format).
Condition: Unknown
Due 10 November 1995
Resolved 10 November 1995

Casualty record · 8

17 June 2003Routine · role: Involved in a Marine Casualty · activity 1819942
27 October 2003Routine · role: Involved in a Marine Casualty · 1 dead · activity 1957619
17 May 2007Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 2936373
4 January 2010Routine · role: Involved in a Marine Casualty · activity 3844424
22 March 2010Routine · role: Involved in a Marine Casualty · activity 3889968
24 November 2012Routine · role: Acknowledged Pollution Source · activity 4490330
9 August 2020Routine · role: Involved in a Marine Casualty · 1 injured · activity 7080388
15 September 2025Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 8235456
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Recorded names · 2

MIDNIGHT RIDER (2003), RIDER (2007–2012). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.