Registered dimensions (L × B × D)83.2 ft × 32.0 ft × 12.7 ft
Registered tonnagegross 98 / net 67
ITC dimensions (L × B × D)83.2 ft × 32.0 ft × 12.7 ft
ITC tonnagegross 238 / net 71
BuilderMARINER LLC · HOUMA · built 2008
Hull materialSteel
PropulsionDiesel
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portMORGAN CITY, LA
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 14 April 2026 · expires 31 May 2027
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it238 - Convention (Subpart B), Gross Ton
98 - Regulatory (Subpart C or D), Gross Ton
71 - Convention (Subpart B), Net Ton
67 - Regulatory (Subpart C or D), Net Ton
144 - Dead Weight, Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 18
28 January 2026
COI Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8303070
21 April 2025
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8116171
16 April 2025
Drydock Exam · Internal Structural Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8112842
1 April 2025
Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8103501
16 October 2024
Type not recorded
No type recorded · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 8024067
14 June 2024
Annual Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7934963
15 June 2023
Annual Inspection · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7713500
26 April 2023
Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7676436
26 April 2022
Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7420537
18 March 2021
MTSA Verification · COI Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7159412
17 January 2021
Type not recorded
No type recorded · USCGC ISAAC MAYO (WPC 1112) · USCG Southeast District (CGD-SE) · Activity 7126216
2 December 2018
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6590808
4 December 2017
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6350476
25 October 2017
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 6299820
5 June 2011
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4071693
18 January 2011
MTSA Verification · Deficiency Check
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3928319
13 January 2011
Industry Initiated Exam · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3926822
4 January 2010
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3844424
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 1 April 2025
Resolved
The owner or managing operator must notify the cognizant OCMI when the condition of the vessel may create an unsafe condition. Submit written repair proposal for damaged port and stbd kort nozzles.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 2 April 2025
Resolution: O/O submitted repair proposal, refer to documents
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 1 April 2025
Resolved
The owner or managing operator must notify the cognizant OCMI when the condition of the vessel may create an unsafe condition. Submit written repair proposal for damaged port and stbd rudders.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 2 April 2025
Resolution: O/O submitted repair proposal, refer to documents
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 1 April 2025
Resolved
The owner or managing operator must notify the cognizant OCMI when the condition of the vessel may create an unsafe condition. Submit written repair proposal for wastage IWO the stbd side sweet water box under shaft seal.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 2 April 2025
Resolution: O/O submitted repair proposal, refer to documents
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 1 April 2025
Resolved
Verification of compliance with design standards must include review and analyses of sufficient plans, drawings, schematics, calculations, and other documents to ensure the vessel complies with the standards used. The plans must be stamped with the seal authorized for use by the individual or entity performing the verification of compliance, or otherwise indicate that they have been reviewed and determined to meet the applicable standards by an individual or entity who meets the requirements of § 144.140. Vessel must provide approval letter for removal of port/stbd kort nozzle.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 9 April 2025
Resolution: Vessel provided repair proposal
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 1 April 2025
Resolved
All weight modifications to the vessel (additions, removals, and relocations) including a calculation of the aggregate weight change (absolute total of all additions, removals, and relocations) must be recorded in the history, along with a description of the change(s), when and where accomplished, moment arms, etc. After each modification, the lightweight characteristics must be recalculated. When the aggregate weight change is more than 2 percent of the vessel's approved lightweight displacement, or the recalculated change in the vessel's lightweight LCG is more than 1 percentthe LBP, a deadweight survey must be performed to determine the vessel's current lightweight displacement and LCG. Use the following table to determine when the deadweight survey results or the vessel's aggregate weight change requires the vessel to undergo a specified stability test. Vessel must conduct a review of stability plan.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 9 April 2025
Resolution: Vessel provided repair proposal and approved by ABS
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 1 April 2025
Resolved
The owner or managing operator must notify the cognizant OCMI when the condition of the vessel may create an unsafe condition. Call out local Marine Inspector for insert in stuffing box to include cut out, fit up, back gouge and final.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 14 April 2025
Resolution: Final for stuffing box was sat
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 1 April 2025
Resolved
The owner or managing operator must notify the cognizant OCMI when the condition of the vessel may create an unsafe condition. Call out local Marine Inspector for weld repairs for port/stbd rudder.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 14 April 2025
Resolution: Vessel completed repairs satisfactory to ABS and CG
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 June 2024
Resolved
Fuel shutoff requirements: The valve must be operable from a safe place outside the space where the valve is installed.
MIs observed hydraulic leaks on the fuel shutoffs, rendering them partially inoperable. Vessel to provide evidence of corrective action to the Coast Guard.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 June 2024
Resolved 17 June 2024
Resolution: Valves were cleaned and hydaulic reservoir serviced. ABS witnessed several successful actuations and submitted a survey attesting to its function.