AMERICAN COUNTESS is a 1995 passenger vessel (inspected). The Coast Guard has recorded 147 inspections since 1995, most recently in April 2024, along with 153 deficiencies — 2 with no resolution recorded —, 2 operational controls, 1 with no removal date recorded and 11 casualty investigations between 2003 and 2023.

Records from 1995 to 2024. Most recent: inspection, 29 April 2024.

Built
1995
Last inspected
29 April 2024
Documentation
Expired · documentation file of 10 September 2026
Controls
1 with no removal date recorded

Identity

WDK3816
433477
Flag
UNITED STATES
368048990
Maury page id
psix-433477

Inspections, by type

…with no type recorded28
…past their stated due date2
Years with a record 19 calendar years (1995–2024)
The 147 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)310.1 ft × 78.0 ft × 14.0 ft
Registered tonnagegross 5,620 / net 4,931
ITC dimensions (L × B × D)310.1 ft × 78.0 ft × 14.0 ft
ITC tonnagegross 9,590 / net 2,877
BuilderATLANTIC MARINE INC · JACKSONVILLE, FL, UNITED STATES · built 1995
Hull materialSteel
PropulsionDiesel Electric
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portLOUISVILLE, KY
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationExpired · issued 30 June 2004
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it9590 - Convention (Subpart B), Gross Ton
5620 - Regulatory (Subpart C or D), Gross Ton
2877 - Convention (Subpart B), Net Ton
4931 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDK3816MMSI 368048990 · active · compulsorily equipped · granted 7 July 2018, expires 7 July 2028
WCV4287MMSI 367075940 · expired · compulsorily equipped · granted 10 November 2005, cancelled 16 January 2016
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspected as a tow unit · 1

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

DENNIS J. PASENTINE Towing Vessel · MISLE 1048454 · 19 August 2022 · activity 7538455

Inspection history · 147

29 April 2024 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7903401
19 February 2024 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7874334
14 November 2023 Administrative Inspection
Administrative · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 7824696
6 November 2023 Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7820751
4 November 2023 Administrative Inspection
Administrative · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 7820230
17 October 2023 Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7810515
9 October 2023 Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 7805503
9 October 2023 Type not recorded
No type recorded · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 7806888
2 October 2023 Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7802102
23 August 2023 Administrative Inspection
Administrative · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7774761
22 August 2023 Re-Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7754595
15 July 2023 Type not recorded
No type recorded · Marine Safety Detachment Quad Cities · USCG Heartland District (CGD-H) · Activity 7744592
1 May 2023 Re-Inspection · Deficiency Check
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7678789
16 April 2023 Damage Survey
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7669309
10 April 2023 Excursion Permit
Administrative · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7679248
16 March 2023 Permit to Proceed · Administrative Inspection
Administrative · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 7652264
14 February 2023 COI Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7614480
15 November 2022 Re-Inspection
Physical examination · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 7594958
11 November 2022 Security Breach
Type not classified · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7594033
29 October 2022 Deficiency Check
Physical examination · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 7587913
27 October 2022 Deficiency Check
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 7584850
9 October 2022 Type not recorded
No type recorded · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 7577392
30 September 2022 Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Quad Cities · USCG Heartland District (CGD-H) · Activity 7569451
7 September 2022 In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Huntington · USCG Heartland District (CGD-H) · Activity 7553891
31 August 2022 Type not recorded
No type recorded · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7555245
19 August 2022 Type not recorded
No type recorded · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7538455
14 August 2022 Type not recorded
No type recorded · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7534152
9 August 2022 Re-Inspection · Administrative Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7529811
21 July 2022 Administrative Inspection
Administrative · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 7513452
29 June 2022 Deficiency Check
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7497013
16 June 2022 Damage Survey
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7479140
16 June 2022 Type not recorded
No type recorded · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7482829
9 May 2022 Re-Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 7446952
23 March 2022 Type not recorded
No type recorded · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 7439285
1 March 2022 Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7403715
21 January 2022 COI Inspection · Damage Survey
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7383886
20 December 2021 Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7370706
19 October 2021 Re-Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 7331812
11 August 2021 Administrative Inspection
Administrative · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 7283700
15 July 2021 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7256813
28 June 2021 Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7237995
19 March 2021 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7159165
15 March 2021 Deficiency Check · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7156611
28 February 2021 Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7148933
11 February 2021 COI Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7139575
2 February 2021 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7134480
17 April 2020 Initial Certification · COI Inspection · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6940525
22 January 2019 Construction Oversight · Administrative Inspection
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 6613968
30 November 2018 Initial Certification · Construction Oversight · MTSA Verification · Administrative Inspection · Hull Examination · Welding Related Inspections Qualification Testing · Deadweight Survey
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6589983
13 July 2018 Administrative Inspection
Administrative · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6492492
22 February 2007 Administrative Inspection
Administrative · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 2875890
27 October 2005 COI Inspection
Physical examination · MSD QUAD CITIES · USCG Heartland District (CGD-H) · Activity 2516784
4 May 2005 Periodic Inspection
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 2348962
13 February 2005 Periodic Inspection
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 2291440
24 January 2005 Administrative Inspection
Administrative · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 2280072
15 October 2004 Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 2221461
15 September 2004 COI Inspection
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 2196608
26 August 2004 MTSA Verification
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 2177242
25 August 2004 Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 2288585
4 August 2004 Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 2301237
30 July 2004 Periodic Inspection
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 2150534
9 April 2004 Administrative Inspection
Administrative · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 2040907
8 April 2004 Re-Inspection
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 2048538
16 December 2003 Deficiency Check
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 1964968
24 October 2003 COI Inspection
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 1933616
17 May 2003 Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 1882579
2 April 2003 Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 1774129
28 March 2003 Re-Inspection
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 1764602
20 November 2002 Deficiency Check
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 1708508
23 October 2002 COI Inspection · Underwater Inspection in lieu of Drydock
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 1690099
8 April 2002 Deadweight Survey · Re-Inspection
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 1605747
23 January 2002 Re-Inspection
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 1479438
6 November 2001 Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 772033
25 October 2001 Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1366647
19 October 2001 COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1387201
26 June 2001 Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1425157
14 May 2001 Administrative
Administrative · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1063941
27 March 2001 Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1431012
24 January 2001 Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1472174
20 October 2000 Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1421954
20 October 2000 COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1468166
2 August 2000 Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1381995
25 July 2000 Damage Survey
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 819777
23 June 2000 Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 818954
20 June 2000 Damage Survey
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1050847
25 April 2000 Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1450471
2 March 2000 Type not recorded
No type recorded · MSD QUAD CITIES · USCG Heartland District (CGD-H) · Activity 24269
25 January 2000 Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1442947
8 November 1999 Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 803677
20 October 1999 COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1406589
7 July 1999 Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1369269
3 May 1999 Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1127332
5 April 1999 Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1423157
14 January 1999 Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1125486
13 January 1999 Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1381442
4 November 1998 Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 805148
20 October 1998 COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1402724
14 July 1998 Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1437421
19 May 1998 Deadweight Survey
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 791472
8 April 1998 Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1125655
6 April 1998 Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1394937
6 April 1998 Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1411681
30 March 1998 Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 787009
13 February 1998 Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1112163
13 January 1998 Type not recorded
No type recorded · MSD QUAD CITIES · USCG Heartland District (CGD-H) · Activity 212603
13 January 1998 Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1404499
1 December 1997 Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1112245
21 October 1997 COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1455525
14 September 1997 Type not recorded
No type recorded · MSD QUAD CITIES · USCG Heartland District (CGD-H) · Activity 101919
19 June 1997 Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1468411
10 June 1997 Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1109396
7 April 1997 Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1462574
27 February 1997 Type not recorded
No type recorded · MSD QUAD CITIES · USCG Heartland District (CGD-H) · Activity 758406
26 February 1997 Type not recorded
No type recorded · MSD QUAD CITIES · USCG Heartland District (CGD-H) · Activity 208559
14 February 1997 Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1095146
29 January 1997 Administrative
Administrative · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1101528
23 January 1997 Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1418087
16 January 1997 Administrative
Administrative · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1099116
26 December 1996 Administrative
Administrative · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1095013
26 December 1996 Administrative
Administrative · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1100089
29 November 1996 Administrative
Administrative · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 873611
29 November 1996 Administrative
Administrative · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 876980
5 November 1996 Type not recorded
No type recorded · MSD QUAD CITIES · USCG Heartland District (CGD-H) · Activity 23381
30 October 1996 COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1439793
23 September 1996 Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1371547
15 September 1996 Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 962119
10 September 1996 Damage Survey
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 950857
10 September 1996 Examination of Repairs
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 955659
9 September 1996 Type not recorded
No type recorded · MSD QUAD CITIES · USCG Heartland District (CGD-H) · Activity 117742
13 August 1996 Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1388097
16 July 1996 Administrative
Administrative · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1089361
28 June 1996 Administrative
Administrative · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 934296
28 June 1996 Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1089319
21 June 1996 Type not recorded
No type recorded · MSD QUAD CITIES · USCG Heartland District (CGD-H) · Activity 20198
4 June 1996 Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1404172
14 May 1996 Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1085542
25 April 1996 Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1093023
28 March 1996 Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1419630
26 March 1996 Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1079402
29 February 1996 Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 885560
12 February 1996 Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1185354
1 February 1996 Type not recorded
No type recorded · MSD QUAD CITIES · USCG Heartland District (CGD-H) · Activity 73761
17 January 1996 Type not recorded
No type recorded · MSD QUAD CITIES · USCG Heartland District (CGD-H) · Activity 27897
9 January 1996 Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1394451
6 December 1995 COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1414548
10 November 1995 Initial Certification
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1184110
10 November 1995 Hull Examination · Initial Construction-Excluding Oversight · Deadweight Survey
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1185721

Deficiency record · 153

04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 6 November 2023 No resolution recorded
Due to the maintenance period layup of the vessel and reduced crewing (To fill all WQSB stations) no drills were witnessed during this quarterly inspection. Prior to getting the vessel underway with passengers all Fire/Safety/Security and rescue boat operations drills will be required to be witnessed by the USCG. This deficiency will need to be resolved at the end of this current maintenance period. Estimated to be Feb 2024. Contact Tom Alho [phone withheld] for resolution. [email withheld]
Due 18 February 2024 — due date passed with no resolution recorded
10 - Safety of Navigation › N/A - No Subsystem › Rate-of-turn indicator
Issued 6 November 2023 No resolution recorded
During the inspection of the Pilot House it was discovered that the "Rate of Turn" indicator was not operational. This is relied upon by the masters of the vessel and requires repairs. This deficiency will need to be resolved at the end of this current maintenance period. Estimated to be Feb 2024. Contact Tom Alho [phone withheld] for resolution.
Due 18 February 2024 — due date passed with no resolution recorded
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 4 November 2023 Resolved
Electric Installations on vessels must ensure: (3) maintenance of systems integrity through compliance with applicable system requirements to which plan review has been approved. The AMERICAN COUNTESS's electrical system was approved for 04 SSDG's at 1440 KW each. The #3 SSDG failed. Trouble shoot and repair the #3 SSDG to the satisfaction of the OCMI.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 November 2023
Resolved 28 November 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 2 October 2023 Resolved
All marine engineering details and their appurtenances installed on the vessel shall be designed, constructed and installed in accordance with Subchapter F of 46 CFR. Vessel reported the engine for the STBD paddle wheel is inoperable due to a faulty circuit signal. Provide proof of repair and operation of subject engine.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 October 2023
Resolved 6 October 2023
Resolution: Received necessary documentation from vessel master to clear deficiency.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 April 2023 Resolved
Vessel reported loss of controls / feedback for the starboard Z Drive propulsion unit while underway near LMR 242. Prior to using the starboard Z Drive for propulsion, provide technician report detailing cause of failure and rectification of the unit. 46 CFR 77.05-01
Action required: 705 - Other - as specified
Resolved 16 April 2023
Resolution: Port engineer report received for temp solution, uploaded to documents
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 March 2023 Resolved
The vessel experienced propulsion failure to its starboard azipod while departing from Memphis, TN on 15MAR23 due to unknown causes. In addition, it was reported that each azipod control intermittently alarms a "common alarm". The Marine Inspector witnessed the port azipod control initiate the "common alarm" on 16MAR23 while conducting a casualty investigation. Provide a technician report for the cause of the alarm and make satisfactory repairs.
Action required: 705 - Other - as specified
Resolved 21 March 2023
Resolution: See technician report. Reprogrammed temperature alarm setpoint from 200F to 300F to clear the port drive common alarm. Re-tuned the sensitivity of the overvoltage alarm shutdown to better serve the marine environment.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 March 2023 Resolved
The starboard paddle-wheel's inboard shaft bearings failed at MM 523 of the Lower Mississippi River. The paddle-wheel was taken out of service by the crew. Provide a report for the cause of the failure and make satisfactory repairs.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 April 2023
Resolved 4 April 2023
Resolution: Downgraded from prior to movement with passengers to 14 days. 4/4/2023: Cleared deficiency. See AN 7654669
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 29 October 2022 Resolved
No repairs or alterations affecting the safety of the vessel with regard to the hull, machinery, or equipment shall be made without the knowledge of the [name withheld] center Z drive or related components is not operational. Repair or replace center Z drive or associated component(s) prior to operation and provide repair report to the satisfaction of the attending Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 November 2022
Resolved 1 November 2022
Resolution: Tech Power Cycled Unit. All SAT
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 30 September 2022 Resolved
No repairs or alterations affecting the safety of the vessel with regard to the hull, machinery, or equipment shall be made without the knowledge of the [name withheld] center Z drive or related components is not operational. Repair or replace starboard Z drive or associated component(s) prior to operation and provide repair report to the satisfaction of the attending Marine Inspector. Prior to entering each COTP Zone you must notify the local OCMI of the vessels current condition relating to the center Z drive.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 October 2022
Resolved 17 October 2022
Resolution: SEE REPORT
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 July 2022 Resolved
(a) The material, design, construction, workmanship, and arrangement of main propulsion machinery and of each auxiliary, directly connected to the engine and supplied as such, must be at least equivalent to the standards established by the ABS Steel Vessel Rules (incorporated by reference, see 46 CFR 58.03-1), except as otherwise provided by this subchapter. (b) When main and auxiliary machinery is to be installed without classification society review, the builder shall submit in quadruplicate to the cognizant Officer in Charge, Marine Inspection, such drawings and particulars of the installation as are required by the American Bureau of Shipping Rules for Building and Classing Steel Vessels, Part 4 Vessel Systems and Machinery (2003) for similar installations on classed vessels. Vessel reported a loss of propulsion from STBD Z-drive when transiting lock 7, and made way to La Crosse with tug escort. Determine cause, provide repair plan, and technical repair report upon completion.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 September 2022
Resolution: Completely replace center and starboard thruster control units and prime movers. Conducted full operational test of both units in accordance to the Perot proved msc drawings and procedures, all test satisfactory GS
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 July 2022 Resolved
When alteration or repair of machinery systems becomes necessary, the work shall be done under the cognizance of the Officer in Charge, Marine Inspection, and shall be done in accordance with the regulations. Plans of alterations to the propulsion system must be submitted to the Coast Guard for approval in accordance with 46CFR50.20-5 and 46CFR50.20-10. The vessel must receive proper plan approval, design verification, and inspection by an attending Marine Inspector. Vessel shall operate in accordance with an approved transit plan for each COTP Zone that the vessel transits until conditions are met. 46 CFR 62.20 / 46 CFR 50.20-5
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 8 September 2022
Resolution: See attached approved, drawings test plan and approval letters.GS
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 June 2022 Resolved
The #4 generator shutdown during operation for unknown reasons. Repair/replace the generator to bring it back into operational status. Vessel is allowed to continue normal operations since the sole purpose of this generator is to provide power for the paddle wheel. The paddle wheel is not an essential component to navigation as the vessel has 3 z-drives.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 July 2022
Resolved 29 June 2022
Resolution: Force Power Systems repaired/replaced failed portions of the #4 generator
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 17 May 2022 Resolved
46 CFR 199.630(e)(1) e) As an alternative to the survival craft requirements of § 199.201(b), vessels may carry - (1) Liferafts having an aggregate capacity, together with the capacities of any lifeboats carried on board, sufficient to accommodate the total number of persons on board that are served by launching appliances or marine evacuation systems evenly distributed on each side of the vessel. Vessel has six (06) inflatable life rafts with each a capacity of fifty (50) persons = 300 total persons. Vessel is restricted to carrying 300 total persons. An appeal was submitted to SLMR OCMI; CG-835V is upheld by [name withheld] routed to D8 for determination. Per District Eight Prevention, [name withheld], 30 days has been granted from 27MAY2022 to rectify lifesaving deficiency; allowing the vessel to operate with 378 total persons onboard with Six (06) Fifty (50) person inflatable liferafts during this period. Issued a revised CG 835V to the vessel restricting the vessel to a total count of 358 persons. Vessel has (04) Liferafts at (50) persons each and (02) IBAs at (50) persons each. 378-200=178, 178x67%=120. 378-20=358.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 27 October 2022
Resolution: Vessel has six (06) 50 person IBAs onboard.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 17 May 2022 Resolved
The fixed sprinkler system pump in the chiller compartment has static leak at the shaft packing. The system remains operable and the system is supplied with an additional pump as well. Replace shaft packing at next off-season maintenance period to the satisfaction of the local OCMI.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 January 2023
Resolved 23 February 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 1 March 2022 Resolved
46CFR58.05-1 Material, design and construction. (a) The material, design, construction, workmanship, and arrangement of main propulsion machinery and of each auxiliary, directly connected to the engine and supplied as such, must be at least equivalent to the standards established by the ABS Steel Vessel Rules ( incorporated by reference, see 46 CFR 58.03-1), except as otherwise provided by this sub-chapter. (b) When main and auxiliary machinery is to be installed without classification society review, the builder shall submit in quadruplicate to the cognizant Officer in Charge, Marine Inspection, such drawings and particulars of the installation as are required by the American Bureau of Shipping Rules for Building and Classing Steel Vessels, Part 4 Vessel Systems and Machinery (2003) for similar installations on classed vessels. The currently installed center "Z" drive propulsion unit is not operating properly. Repair or replace this defective unit. Provide documentation of the replacement unit/delivery time and replacement time. This vessel may continue to operate IAW your letter of 28Feb2022 for the first voyage of the vessel from New Orleans. This 835 requirement is to be re-evaluated upon its return trip to New Orleans on 15Mar2022, to allow the vessel to continue to operate until the next re-evaluation. The subsequent re-evaluations (Noted Below) will be conducted by SECTOR New Orleans OCMI. The vessel must contact the SECTOR New Orleans OCMI at the following numbers for re-evaluation of this 835 at either: [name withheld] @ [phone withheld] [name withheld] @ [phone withheld] [name withheld] @ [phone withheld] Re-evaluations will be on 15Mar2022, 22Mar2022, 29Mar2022. Documentation of the new "Z" drive purchase and delivery times must be provided to the [name withheld] prior to the inspection on 03Mar2022 for review by the OCMI. This 835 requirement is going to expire on 03Apr2022, (30 Days). Extended until 16 Aug and then again until 31 Aug 2022.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 April 2022
Resolved 23 February 2023
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 22 February 2022 Resolved
Every crew member must participate in at least one abandon ship drill and fire drill every month. Drills must be held before sailing when a vessel enters serviced for the first time ,after modifications of a major character, or when a new crew is engaged. Drills shall be completed by [name withheld] prior to vessel carrying passengers for hire.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 March 2022
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 22 February 2022 Resolved
The VSO must ensure that at least one security drill is conducted at least every 3 months, except when a vessel is out of service due to repairs or seasonal suspension of operation provided that in such cases a drill must be conducted within one weeks of the vessel's reactivation. A security drill shall be completed by [name withheld] prior to vessel carrying passengers for hire.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 March 2022
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 22 February 2022 Resolved
Class 1 doors within passenger, crew, and working spaces are permitted only above a deck, the molding line of which, at its lowest point at side is at least 7 feet (2.14 meters) above the deepest load water line. Class 1 door between the generator room and the chiller room did not maintain a proper seal when operated. Vessel is to make sure class 1 door is functioning properly and maintains a proper seal when chalk tested.
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 March 2022
Resolved 3 March 2022
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 19 October 2021 Resolved
Vessels must be equipped with independently driven fire pumps IAW Table 46 CFR 76.10-5(a). Submit fire pump installation proposal to cognizant OCMI for review. After conducting the inspection, I recommend the vessel continue to operate due to: 1. Fire pumps currently onboard are in separate spaces, 2. Vessel is outfitted with three (03) separate CO2 systems covering the emergency generator room, Paint locker, and liquor storage room, 3. Satisfactorily tested the fire pumps/system, 4. Vessel has an installed water spray system covering the hold deck, main deck, 2nd deck, and 3rd deck giving this vessel adequate fire protection coverage until the additional fire pump can be added to comply with the regulations.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 November 2021
Resolved 23 February 2022
Resolution: Vessel installed a new independenly driven fire pump.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 11 August 2021 Resolved
The Vessel Response Plan (VRP) must cover all geographic areas of the United States in which the vessel intends to handle, store or transport oil, including port areas and offshore transit areas. The vessels VRP does not have the Sector Lower River Mississippi or Sector Ohio Valley COTP zone listed on its current VRP.
Action required: 60 - Rectify deficiencies prior to movement
Due 11 August 2021
Resolved 11 August 2021
Resolution: Company updated VRP to include SLMR and Sector Ohio Valley COTP zones.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 15 March 2021 Resolved
Propulsion machinery, including main engines, reduction gears, shafting, and bearings must be suitable for route and service. It was reported that the vessel experienced a reduction in propulsion due to the vessel's starboard shafting bolts shearing from the reduction gear. The vessel is authorized to transit from Sector New Orleans [name withheld] to James Marine Hahnville for emergency dry-docking where the company is to conduct survey of the affected systems and make permanent repairs to the satisfaction of their TPO (ABS) and local USCG OCMI.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 20 March 2021
Resolution: SCR Replaced and tested satisfactory.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 10 March 2021 Resolved
Every crew member must participate in at least one abandon ship drill and fire drill every month. Drills must be held before sailing when a vessel enters serviced for the first time ,after modifications of a major character, or when a new crew is engaged. This vessel has been in laid up service for over 6 months and several of the crew members are new to this vessel. Drills shall be completed by [name withheld] prior to vessel carrying passengers for hire.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 March 2021
Resolution: Satisfactory Drills Held
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 10 March 2021 Resolved
The VSO must ensure that at least one security drill is conducted at least every 3 months, except when a vessel is out of service due to repairs or seasonal suspension of operation provided that in such cases a drill must be conducted within one weeks of the vessel's reactivation. Vessel has been laid up for over 6 months and several crew members are new to this vessel. A security drill shall be completed by [name withheld] prior to vessel carrying passengers for hire.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 March 2021
Resolution: Satisfactory drills held
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 18 August 2020 Resolved
Drills must be held before sailing when a vessel enters service for the first time, after modification of a major character, or when a new crew is engaged. While conducting the Initial COI, vessel was unable to conducted emergency drills for the attending Marine Inspectors, due to Covid-19 and crew complication. Prior to carrying passengers, vessel must complete all emergency drills for the attending Marine Inspector. 46 CFR 199.180(c)(3) 701C
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 March 2021
Resolution: Issue new 835 to cover drills
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 17 April 2020 Resolved
Means shall be provided for closing all openings to the space protected from outside such space. In this respect, relatively tight doors, shutters, or dampers shall be provided for openings in the lower portion of the space. The construction shall be such that openings in the upper portion of the space can be closed off either by permanently installed means or by the use of canvas or other material which is normally carried by the vessel. Vessel's engine room is protected by CO2. Vessel's exhaust stacks (natural ventilation) for the engine room had no provisions for keeping the CO2 in the engine room. Vessel is required to install a compliant means to prevent the CO2 from escaping the engine room through the stacks. 46CFR76.15-35(c) 701C
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 March 2021
Resolution: verityed during damper testing
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 2 March 2020 Resolved
Except as provided in paragraph (b) of this section, each vessel must have a stability letter issued by the Coast Guard before the vessel is placed into service. This letter sets forth conditions of operation. Vessel does not have an approved stability letter.
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 March 2020
Resolved 12 March 2021
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 2 March 2020 Resolved
Each launching appliance must be approved under 46 CFR part 160, subpart 160.132 for use with the intended craft, with a winch approved under 46 CFR part 160, subpart 160.115 for use with the intended craft. Davit and winch are not approved under 46 CFR 160.
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 March 2020
Resolved 12 March 2021
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 2 March 2020 Resolved
The following plans, if applicable to the particular vessel, must be submitted for Coast Guard review in accordance with §110.25-3. Submitted electrical plans are not approved and under review.
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 March 2020
Resolved 12 March 2021
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 2 March 2020 Resolved
All automatically or remotely controlled or monitored vital systems addressed by part 62 of this subchapter must be subjected to tests and inspections to evaluate the operation and reliability of controls, alarms, safety features, and interlocks. Test procedures must be submitted to the Coast Guard for approval. Test procedures are not approved and under review.
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 March 2020
Resolved 12 March 2021
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 2 March 2020 Resolved
Drills must be held before sailing when a vessel enters service for the first time, after modification of a major character, or when a new crew is engaged. Vessel needs to conduct drills with all crew onboard.
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 March 2020
Resolved 12 March 2021
Resolution: 835 issued for drills
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 2 February 2020 Resolved
A Certificate of Documentation is required for the operation of a vessel in certain trades, serves as evidence of vessel nationality, and permits a vessel to be subject to preferred mortgages. Vessel does not currently have valid COD.
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 March 2020
Resolved 4 March 2020
Resolution: NVDC issued COD to American Countess.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 15 November 2005 Resolved
Install / replace time delay for emergency generator. 26 sec/ should be 30 seconds. Leave door open when in space till replaced. NLT 10 Nov
Due 10 December 2005
Resolved 22 February 2007
Electrical › Lighting (service) › Outlet Box
Issued 27 October 2005 Resolved
Install GFCI in wet deck area's to include 208 Volt outlets or install water tight covers.
Due 7 November 2005
Resolved 15 November 2005
Electrical › Lighting (service) › Outlet Box
Issued 27 October 2005 Resolved
Remove power strips / power cords and install electrical outlets in office area's NLT 27 nov
Due 27 November 2005
Resolved 15 November 2005
Electrical › Lighting (emergency) › Lighting Fixture
Issued 27 October 2005 Resolved
Relocate emergency lighting starboard side Texas deck, so that it illuminate passageway's not slot machines. NLT 27 Nov
Due 27 December 2005
Resolved 15 November 2005
Communications › Audible Communications › SPD (Other)
Issued 27 October 2005 Resolved
Demonstrate proper operation of the emergency public address system, install temporary power supply for exit signs and public address system. NLT 27 nov
Due 27 November 2005
Resolved 15 November 2005
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 27 October 2005 Resolved
Weigh and certify all co2 bottles on fixed fire fighting system. NLT 3 Nov 2005
Due 3 November 2005
Resolved 3 November 2005
Fire Fighting › Automatic Sprinkler System › Testing Switches (Alarm/Sprinklers)
Issued 27 October 2005 Resolved
Demonstrate proper operation of sprinkler in accordance with CG approval, manufacture tech and 46 cfr 76.25 . To include hi and low water, low/high air pressure alarms, and both sprinkler pump pressure setting. 10 nov 2005
Due 16 December 2005
Resolved 22 February 2007
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 27 October 2005 Resolved
Submit vessel fire control plan for approval using IMO symbols in accordance with 46 CFR 78.45 . NLT 27 nov
Due 16 December 2005
Resolved 22 February 2007
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 27 October 2005 Resolved
Repair or replace fire screen doors starboard side upper deck forward.
Due 27 October 2005
Resolved 27 October 2005
Fire Fighting › Automatic Sprinkler System › Pump
Issued 27 October 2005 Resolved
Operational function of emergency fire pump and sprinkler system, until alternate sea- suction is installed.
Due 27 October 2005
Resolved 27 October 2005
Fire Fighting › Fixed CO2 Fire Extinguishing System › Remote Pulls
Issued 27 October 2005 Resolved
Make repairs to the co2 pulls for engine room and provide certification report. NLT 10 Nov.
Due 16 December 2005
Resolved 22 February 2007
Electrical › Lighting (emergency) › Lighting Fixture
Issued 27 October 2005 Resolved
Repair transitional lighting and battery back- ups to upper cage. NLT 27 nov
Due 7 November 2005
Resolved 15 November 2005
Electrical › Electrical Distribution System (service) › Switchboard
Issued 27 October 2005 Resolved
Provide documentation from manufacture on reverse power and designed time ranges for time delays. 10 Nov
Due 16 December 2005
Resolved 22 February 2007
Engineering › Pressure Vessel › Relief Valve
Issued 27 October 2005 Resolved
Demonstrate proper operation of pressure relief valves on air compressor tanks. NLT 10 nov
Due 10 November 2005
Resolved 15 November 2005
Accommodation/Occupational Safety › Ventilation › General
Issued 27 October 2005 Resolved
Mech clean exhaust ventilation ducting and fans.
Due 18 November 2005
Resolved 15 November 2005
Fire Fighting › Fixed Fire Detection System › Control Panel
Issued 20 October 2005 Resolved
Repair fault on Fire detection system, ground fault in alarm panel on bridge.
Due 16 December 2005
Resolved 22 February 2007
Electrical › Electrical Distribution System (service) › Panelboard
Issued 20 October 2005 Resolved
Properly mount electrical box for new UPS system on bulkhead. NLT 12 Dec
Due 12 December 2005
Resolved 22 February 2007
Fire Fighting › Fire Hoses › Material
Issued 20 October 2005 Resolved
Replace all fire hoses that are not UL approved and have the UL label on hose. Vessel can check with local Fire Marshall to purchase fire hoses which can be used when vessel becomes PMV
Due 16 December 2005
Resolved 22 February 2007
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 13 February 2005 Resolved
Add outlets on bridge to prevent overloads
Condition: Improper/Lack of Maintenance
Due 29 April 2005
Resolved 10 May 2005
Accommodation/Occupational Safety › Ventilation › General
Issued 13 February 2005 Resolved
Clean FCU units on all decks
Condition: Improper/Lack of Maintenance
Due 29 April 2005
Resolved 10 May 2005
Accommodation/Occupational Safety › Occupational Safety › Receptacle Outlet
Issued 13 February 2005 Resolved
install GFCI rcpt ckts in all bar areas within 6ft of water
Condition: Placed in Improper Service
Due 29 April 2005
Resolved 10 May 2005
Electrical › Electrical Distribution System (service) › Panelboard
Issued 13 February 2005 Resolved
label HVAC box in 3rd deck bar area and stow paperwork properly
Condition: Improper/Lack of Maintenance
Due 29 April 2005
Resolved 10 May 2005
Electrical › Electrical Distribution System (service) › Overcurrent Device
Issued 13 February 2005 Resolved
add hardwired power strips to IT and surveilance to eliminate portable power strips
Condition: Improper/Lack of Maintenance
Due 29 April 2005
Resolved 10 May 2005
Electrical › Electrical Distribution System (service) › Fuse
Issued 13 February 2005 Resolved
show in-line fuses on electrical wiring diagrams
Condition: Improper/Lack of Maintenance
Due 29 April 2005
Resolved 22 February 2007
Electrical › Electrical Distribution System (service) › Wiring
Issued 13 February 2005 Resolved
Bring overhead wiring up to IEEE45 and NEC standards
Condition: Improper/Lack of Maintenance
Due 29 April 2005
Resolved 22 February 2007
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 15 September 2004 Resolved
Replace lifelines and grab lines on all liferings
Condition: Improper/Lack of Maintenance
Due 29 October 2004
Resolved 27 October 2004
Accommodation/Occupational Safety › Occupational Safety › Welding/Hot Work
Issued 15 September 2004 Resolved
Provide gas free certificate for all spaces and voids requiring confined space entry for Coast Guard Inspections
Condition: Unknown
Due 29 October 2004
Resolved 27 October 2004
Accommodation/Occupational Safety › Occupational Safety › Welding/Hot Work
Issued 15 September 2004 Resolved
Provide demonstration of all bilge alarms
Condition: Improper/Lack of Maintenance
Due 29 October 2004
Resolved 27 October 2004
Fire Fighting › Fire Main › Pressure
Issued 15 September 2004 Resolved
provide auxiliary fire pump along with maintenance and emergency contingency response plan for the pump and fuel stowage. Plan to include dealing with winter conditions and emergency conditions applicable to the pump installation.
Condition: Improper/Lack of Maintenance
Due 29 October 2004
Resolved 27 October 2004
Resolution: COTP Order 021-04 issued 20 October and recinded 22 October, 2004. Vessel had plans approved to utilize the local fire department and available crew resources and local fire main to deal with fires. A drill was held including an evacuation drill.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 15 September 2004 Resolved
Provide portable CO2 extinguishers to double the amount of required CO2 extinguishers currently in the engineroom. Do not run any rotating machinery in the engineroom by internal combustion.
Condition: Improper/Lack of Maintenance
Due 29 October 2004
Resolved 27 October 2004
Fire Fighting › Fire Main › Condition
Issued 15 September 2004 Resolved
Provide a daily report to the local fire department on the vessels fire fighting ability.
Condition: Improper/Lack of Maintenance
Due 29 October 2004
Resolved 27 October 2004
Operations/Management › Drills/Instruction › Not Conducted
Issued 15 September 2004 Resolved
Provide SSMCP plan and be able to demonstrate it.
Condition: Improper/Lack of Maintenance
Due 29 October 2004
Resolved 27 October 2004
Operations/Management › Casualty Reporting/Post-Casualty Actions › Report of Potential Vessel Casualty
Issued 15 September 2004 Resolved
provide written report within 10 working days of why the vessel was allowed to go aground in its' slip and why no dredging was performed to prevent the vessel from grounding.
Condition: Improper/Lack of Maintenance
Due 10 November 2004
Resolved 15 November 2004
Fire Fighting › Structural - Main Vertical Zones
Issued 24 October 2003 Resolved
Weld all holes and unwelded seams to make elevator shaft an A-O space prior to 31JAN2004.
Condition: Improper Installation
Due 31 January 2004
Resolved 16 December 2003
Resolution: Received memo from Chris Crane, the Chief Engineer from the vessel stating that all openings have been welded closed.
Engineering › Diesel Engine (propulsion/auxiliary-electric)
Issued 24 October 2003 Resolved
Provide properly operating high jacket water temperature shutdowns on all Gensets. LEGACY COMPONENT DESC: Waste Heat Recovery
Condition: Improper/Lack of Maintenance
Due 2 December 2003
Resolved 16 December 2003
Resolution: New sensors were put in and tested, all sat.
Fire Fighting
Issued 23 October 2002 Resolved
Weld insert to crawl holes lower deck of elevator shafts and provide firestop on cable runs. LEGACY COMPONENT DESC: Structural Bulkhead Construction
Condition: Improper Installation
Due 24 November 2002
Resolved 20 November 2002
Resolution: Inserts welded on pre-existing crawl holes.
Electrical
Issued 23 October 2002 Resolved
Provide temporary lighting in Z-drive room, engineroom, and auxiliary machinery room. LEGACY COMPONENT DESC: Lighting Fixture
Condition: Improper Installation
Due 24 November 2002
Resolved 20 November 2002
Resolution: Emergency lights installed in all Coast Guard designated areas.
Engineering
Issued 23 October 2002 Resolved
Replace safety relief valve on #1 air receiver. LEGACY COMPONENT DESC: Valve
Condition: Unknown
Due 24 November 2002
Resolved 20 November 2002
Resolution: A new safety relief valve was procured and installed into #1 air receiver.
Electrical › Lighting (emergency)
Issued 17 April 2002 Resolved
Provide battery powered emergency lighting throughout vessel. LEGACY COMPONENT DESC: Battery Operated Lantern
Condition: Improper Installation
Due 8 May 2002
Resolved 22 April 2002
Resolution: Vessel crew installed new emergency lighting in all noted areas.
Fire Fighting
Issued 19 October 2001 Resolved
Provide a space of 2 inches between the flooring and the bottom of the cylinders as per 46 CFR 76.15-25.
Condition: Unknown
Due 25 November 2001
Resolved 6 November 2001
Accommodation/Occupational Safety
Issued 19 October 2001 Resolved
Weld down aluminum decks in beer cooler.
Condition: Unknown
Due 25 October 2001
Resolved 6 November 2001
Lifesaving
Issued 25 July 2000 Resolved
VESSEL IS TO REPLACE THE FORE AND AFT RESCUE BOAT WINCHES WITH APPROVED WINCHES AND CONDUCT TESTS OF INSTALLATION TO 110% OF MAX LOAD. UNTIL REPLACED AND TESTED RESCUE BOATS TO BE DEPLOYED ANYTIME PASSENGERS ARE ONBOARD.
Condition: Unknown
Due 25 July 2000
Resolved 25 July 2000
Electrical
Issued 20 June 2000 Resolved
PRIOR TO VESSEL SAILING, MAKE PERMANENT REPAIRS TO THE EMERGENCY GENERATOR RADIATOR.
Condition: Unknown
Due 20 June 2000
Resolved 20 June 2000
Engineering
Issued 20 October 1999 Resolved
HAVH BOTH AIR RECEIVER RELIEF VALVES SERVICED TO POP OFF AT RATED SETTING ON THE VALVE AS PER 46 CFR 61.10-5(i) AND 46 CFR 54.15-10(a).
Condition: Unknown
Due 20 October 1999
Resolved 20 October 1999
Fire Fighting
Issued 5 April 1999 Resolved
REPACK FIRE PUMP PACKING GLAND.
Condition: Unknown
Due 9 April 1999
Resolved 14 April 1999
Engineering
Issued 5 April 1999 Resolved
REPLACE OR REPAIR HIGH LUBE OIL TEMP SHUT DOWN ON MAIN ENGINES.
Condition: Unknown
Due 5 April 1999
Resolved 5 April 1999
Lifesaving
Issued 5 April 1999 Resolved
REPLACE MISSING GENERAL ALARM SIGN ON AFT THE TX DECK.
Condition: Unknown
Due 5 April 1999
Resolved 14 April 1999
Lifesaving
Issued 5 April 1999 Resolved
HARDWIRE ELECTRICAL WINCH TO STERN RESCUE BOAT STATION.
Condition: Unknown
Due 9 April 1999
Resolved 14 April 1999
Accommodation/Occupational Safety
Issued 13 January 1999 Resolved
CLEAN UNDER ALL BARS AND ENSURE THAT THEY ARE FREE OF DISH TOWELS, BOTTLE CAPS, FOOD AND TRASH.
Condition: Unknown
Due 14 January 1999
Resolved 21 January 1999
Fire Fighting
Issued 13 January 1999 Resolved
POST UPDATED FIRE/SAFETY PLAN.
Condition: Unknown
Due 13 January 1999
Resolved 13 January 1999
Accommodation/Occupational Safety
Issued 13 January 1999 Resolved
SECURE PASSENGER ELEVATOR UNTIL PISTON AND PISTON PACKING HAS BEEN REPLACED.
Condition: Unknown
Due 13 January 1999
Resolved 21 January 1999
Electrical
Issued 20 October 1998 Resolved
REMOVE DUCT, ELEC, MASKING AND SCOTCH TAPE FOR SECURING POWER IN SWITCH BOARDS LP213, 209, 208, AND 212. USE PROPER TAG OUT PROCEDURES AS PER GOODMARINE PRACTICE.
Condition: Unknown
Due 27 October 1998
Resolved 27 October 1998
Lifesaving
Issued 20 October 1998 Resolved
COMPLETE ANNUAL ELEVATOR INSPECTION.
Condition: Unknown
Due 27 October 1998
Resolved 27 October 1998
Electrical
Issued 20 October 1998 Resolved
PROVIDE BLANKS FOR SWITCHBOARDS IN SP213B IN SLOT POWER ROOM.
Condition: Unknown
Due 27 October 1998
Resolved 27 October 1998
Fire Fighting
Issued 20 October 1998 Resolved
LABEL ALL FIRE DAMPERS "OPEN AND CLOSE" ON THE TOP DECK. ALSO LABEL ALL DECK VENTS.
Condition: Unknown
Due 27 October 1998
Resolved 27 October 1998
Navigation
Issued 20 October 1998 Resolved
AS PER INLAND NAV RULES 23, PROVIDE NAV LIGHTS FOR RESCUE BOATS.
Condition: Unknown
Due 20 October 1998
Resolved 20 October 1998
Navigation
Issued 20 October 1998 Resolved
REPAIR STBD NAVIGATION RUNNING LIGHT.
Condition: Unknown
Due 22 October 1998
Resolved 27 October 1998
Accommodation/Occupational Safety
Issued 19 May 1998 Resolved
PROVE OPERATION OF VENTILATION SHUTDOWN THIRD DECK.
Condition: Unknown
Due 19 May 1998
Resolved 19 May 1998
Electrical
Issued 19 May 1998 Resolved
PROVIDE RUBBER MAT IN FRONT OF CIRCUIT SWITCHBOARD EMERGENCY GENERATOR ROOM.
Condition: Unknown
Due 19 May 1998
Resolved 19 May 1998
Fire Fighting
Issued 19 May 1998 Resolved
PROVIDE PACKING IN A-15 BULKHEAD, TWO AREAS, ABOVE CENTERLINE DOORWAY AND PORT OFFICE.
Condition: Unknown
Due 19 May 1998
Resolved 19 May 1998
Electrical
Issued 19 May 1998 Resolved
REMOVE TEMPORARY WIRING AT GERERAL ALARM CIRCUIT BOX, EMERGENCY GENERATOR ROOM.
Condition: Unknown
Due 19 May 1998
Resolved 19 May 1998
Electrical
Issued 19 May 1998 Resolved
PROVIDE EMERGENCY LIGHTING IN CREW'S BREAKROOM THIRD DECK.
Condition: Unknown
Due 19 May 1998
Resolved 19 May 1998
Navigation
Issued 6 April 1998 Resolved
REPAIR OR REPLACE STBD BRIDGE WING Z DRIVE FOLLOW-UP INDICATOR, PRIOR TO GETTING U/W
Condition: Unknown
Due 6 April 1998
Resolved 6 April 1998
Navigation
Issued 6 April 1998 Resolved
UNDERWAY OPERATIONS DURING DAYLIGHT HOURS ONLY UNTIL RESTORATION OF OPERATION OF NAV LIGHTS.
Condition: Unknown
Due 6 May 1998
Resolved 13 April 1998
Electrical
Issued 6 April 1998 Resolved
REPLACE EXPOSED ELECTRICAL MOTOR UNDER 1ST DECK BAR.
Condition: Unknown
Due 6 April 1998
Resolved 6 April 1998
Lifesaving
Issued 30 March 1998 Resolved
WHILE UNDERWAY, REDUCE PASSENGER COUNT BY 600 PASSENGERS WHILE LIFERAFTS ARE HAVING ANNUAL SERVICES BEING TESTED. NOTIFY MSD QUAD CITIES WHEN LIFERAFTS ARE BACK ON STATION.
Condition: Unknown
Due 7 April 1998
Resolved 8 April 1998
Construction/Loadline
Issued 13 January 1998 Resolved
REPLACE RELAY FOR REMOTE CLOSURE OF WTD 1-14 FROM THE BRIDGE.
Condition: Unknown
Due 30 January 1998
Resolved 20 January 1998
Fire Fighting
Issued 13 January 1998 Resolved
REPLACE MISSING ID TAG FOR FIRE STATION #117.
Condition: Unknown
Due 13 January 1998
Resolved 20 January 1998
Lifesaving
Issued 13 January 1998 Resolved
REMOVE PLASTIC BUCKETS FROM ENGINE ROOM.
Condition: Unknown
Due 13 January 1998
Resolved 20 January 1998
Electrical
Issued 13 January 1998 Resolved
REMOVE ELECTRICAL EXT. CORD FROM COMPUTER ROOM NEXT TO SLOT MARKETING.
Condition: Unknown
Due 13 January 1998
Resolved 20 January 1998
Electrical
Issued 13 January 1998 Resolved
REPLACE 110 VOLT ELECT. OUTLET FACE PLATE, MAIN DECK, STBD SIDE CASHIERS CAGE.
Condition: Unknown
Due 13 January 1998
Resolved 20 January 1998
Lifesaving
Issued 1 December 1997 Resolved
WHILE UNDERWAY , REDUCE PASSENGER COUNT BY 1000 WHILE TWO 50 PERSON LIFEFAFTS ARE BEING SERVICED.
Condition: Unknown
Due 1 December 1997
Resolved 1 December 1997
Fire Fighting
Issued 21 October 1997 Resolved
SEAL LIQUOR LINES THAT PENETRATE MAIN DECK TO LOUNGE WITH APPROVED FIRE STOP MATERIAL.
Condition: Unknown
Due 21 October 1997
Resolved 28 October 1997
Electrical
Issued 21 October 1997 Resolved
REPLACE PROTECTIVE COVER ON LIGHT BULBS IN THE BEER COOLER STORAGE AREA.
Condition: Unknown
Due 21 October 1997
Resolved 28 October 1997
Lifesaving
Issued 21 October 1997 Resolved
REMOVE FIVE GALLON PAINT CAN FROM MAIN HOLD BILGES.
Condition: Unknown
Due 21 October 1997
Resolved 28 October 1997
Electrical
Issued 21 October 1997 Resolved
REMOVE EXCESSIVE WIRES FROM CASHIERS CAGES.
Condition: Unknown
Due 21 October 1997
Resolved 28 October 1997
Accommodation/Occupational Safety
Issued 21 October 1997 Resolved
REMOVE POSTERS IN THE STAIRTOWERS.
Condition: Unknown
Due 21 October 1997
Resolved 28 October 1997
Lifesaving
Issued 10 June 1997 Resolved
WHILE UNDERWAY, REDUCE PASSENGER COUNT BY 600 WHILE 50 AND 10 PERS. LIFERAFTS ARE BEING SERVICED.
Condition: Unknown
Due 10 June 1997
Resolved 10 June 1997
Fire Fighting
Issued 7 April 1997 Resolved
Repair port side, second deck stair tower fire dooor.
Condition: Unknown
Due 7 April 1997
Resolved 7 April 1997
Navigation
Issued 7 April 1997 Resolved
Repair sounding equipment on bridge.
Condition: Unknown
Due 30 April 1997
Resolved 30 April 1997
Electrical
Issued 23 January 1997 Resolved
PROVIDE JUNCTION BOX FOR DEAD END WIRING IN AUX. MACH ROOM.
Condition: Unknown
Due 23 February 1997
Resolved 24 February 1997
Fire Fighting
Issued 23 January 1997 Resolved
PROVIDE ADDITIONAL CLEARANCE UNDER SPRINKLER HEAD IN HOLD AREA NEAR BEER COOLER.
Condition: Unknown
Due 23 February 1997
Resolved 24 February 1997
Fire Fighting
Issued 23 January 1997 Resolved
MOUNT PORTABLE FIRE EXTINGUISHER IN AUXILIARY MACHINERY ROOM.
Condition: Unknown
Due 23 February 1997
Resolved 24 February 1997
Engineering
Issued 30 October 1996 Resolved
REPAIR TACHS ON MAIN, STBD WING, AND PORT WING STEERING STATIONS.
Condition: Unknown
Due 30 October 1996
Resolved 30 October 1996
Lifesaving
Issued 30 October 1996 Resolved
SERVICE LIFERAFTS #JO6,JO7, AND JO8. NO PASSENGERS WILL BE ALLOWED TO GET UNDERWAY AFTER 310CT96 UNTIL THESE LIFERAFTS ARE SERVICED.
Condition: Unknown
Due 30 October 1996
Resolved 30 October 1996
Engineering
Issued 15 September 1996 Resolved
VESSEL CAN ONLY OPERATE WITH THE ASSISTANCE OF TUGS, UNTIL REPAIRS ARE COMPLETED ON THE FWD BOW THRUSTER.
Condition: Unknown
Due 16 October 1996
Resolved 24 September 1996
Navigation
Issued 10 September 1996 Resolved
VESSEL TO REMAIN DOCKSIDE UNTIL SATISFACTORY REPAIRS ARE MADE TO BOW THRUSTER. REPAIRS MUST BE WITNESSED BY THE ATTENDING MARINE INSPECTOR. OPERATIONAL TEST WILL BE CONDUCTED DURING TWO HOUR SEA TRIAL W/O PASSENGERSON BOARD.
Condition: Unknown
Due 10 September 1996
Resolved 10 September 1996
Navigation
Issued 10 September 1996 Resolved
PROVIDE AUDIBLE ALARMS AT THE BRIDGE WINGS, PILOTHOUSE AND EOC FOR THE BOW THRUSTER'S CONTROL FAILURE AND PROPULSION ALARM.
Condition: Unknown
Due 10 September 1996
Resolved 10 September 1996
Fire Fighting
Issued 13 August 1996 Resolved
MAKE REPAIRS TO 2ND DECK FWD FIRESCREEN DOOR, STBD OUTBOARD SIDE.
Condition: Unknown
Due 16 August 1996
Resolved 16 August 1996
Lifesaving
Issued 28 June 1996 Resolved
PROVIDE ADDITIONAL LEFERAFT PRIOR TO THE CARRIAGE OF ADDITIONAL PASSENGERS.
Condition: Unknown
Due 29 June 1996
Resolved 15 July 1996
Lifesaving
Issued 28 March 1996 Resolved
ENSURE CREW IS PROPERLY TRAINED FOR MAN OVERBOARD SITUATIONS.
Condition: Unknown
Due 5 April 1996
Resolved 10 July 1996
Fire Fighting
Issued 28 March 1996 Resolved
REMOVE ALL PLASTIC TRASH CANS ON VESSEL.
Condition: Unknown
Due 28 April 1996
Resolved 10 July 1996
Electrical
Issued 28 March 1996 Resolved
PROPERLY MARK AEVADS ON EMERGENCY GENERATOR PANEL.
Condition: Unknown
Due 28 April 1996
Resolved 10 July 1996
Lifesaving
Issued 28 March 1996 Resolved
ENSURE LIFEJACKERS ARE MORE ACCESSIBLE AND SEGREGATED UNDER PILOTHOUSE.
Condition: Unknown
Due 28 April 1996
Resolved 10 July 1996
Lifesaving
Issued 28 March 1996 Resolved
STORE FLAMMABLE LIQUIDS IN PROPER CONTAINERS.
Condition: Unknown
Due 28 April 1996
Resolved 10 July 1996
Lifesaving
Issued 28 March 1996 Resolved
PROVIDE "NO UNAUTHORIZED PERSONNEL" LEADING TO UPPER DECK.
Condition: Unknown
Due 28 April 1996
Resolved 10 July 1996
Fire Fighting
Issued 9 January 1996 Resolved
PROVIDE INSTRUCTINS FOR ACTUATION OF CO2 SYSTEM IN ENGINEERING SPACES.
Condition: Unknown
Due 9 January 1996
Resolved 9 January 1996
Fire Fighting
Issued 9 January 1996 Resolved
SUBMIT PROPOSAL FOR FIRE PROTECTION SYSTEM IN LIQUOR LOCKER TO MSD DAVENPORT.
Condition: Unknown
Due 9 January 1996
Resolved 9 January 1996
Engineering
Issued 9 January 1996 Resolved
PROVIDE DIRECTIONAL ARROWS FOR EMERGENCY FUEL OIL CUT-OUT VALVES.
Condition: Unknown
Due 9 January 1996
Resolved 9 January 1996
Engineering
Issued 9 January 1996 Resolved
MARINE INSPECTOR SHALL BE ON BOARD FOR FIRST UNDERWAY PERIOD ON VESSEL TO WITNESS ADEQUATE PROPULSION POWER.
Condition: Unknown
Due 9 January 1996
Resolved 9 January 1996
Fire Fighting
Issued 9 January 1996 Resolved
PROVIDE METAL THRESHOLD IN ALL CLASS A & B DOORWAYS.
Condition: Unknown
Due 9 January 1996
Resolved 9 January 1996
Fire Fighting
Issued 9 January 1996 Resolved
PROVIDE TWO INCH CLEARANCE UNDER CO2 BOTTLES IN EMERGENCY GENERATOR ROOM.
Condition: Unknown
Due 9 January 1996
Resolved 9 January 1996
Fire Fighting
Issued 10 November 1995 Resolved
PROVIDE FOR THE FOLLOWING HAND PORTABLE FIRE EXTINGUISHERS PROPER MARINE BRACKETS: F.S. 2, 3, 9, 10, 11, 12, 18, AND 21.
Condition: Unknown
Due 10 November 1995
Resolved 10 November 1995
Fire Fighting
Issued 10 November 1995 Resolved
PROVIDE THE FOLLOWING DRY CHEMICAL (A-II) HAND PORTABLE FIRE EXTINGUISHERS:MAIN DECK, STBD BAR; 01-DECK, STBD BAR; AND CREW BREAK ROOM. (SEE FIRE AND SAFETY PLAN)
Condition: Unknown
Due 10 November 1995
Resolved 10 November 1995
Fire Fighting
Issued 10 November 1995 Resolved
PROVE PROPER OPERATION OF THE LOCAL AND REMOTE CONTROL FOR ALL FIRE SCREEN DOORS.
Condition: Unknown
Due 10 November 1995
Resolved 10 November 1995
Fire Fighting
Issued 10 November 1995 Resolved
SUBMIT FOR APPROVAL TO THE MARINE SAFETY CENTER PLANS AND INFORMATION FOR THE SMOKE AND FIRE DETECTION SYSTEM. PROVE PROPER OPERATION OF SAME.
Condition: Unknown
Due 10 November 1995
Resolved 10 November 1995
Electrical
Issued 10 November 1995 Resolved
INSTALL NON-CONDUCTIVE MATTING IN THE EMERGENCY GENERATOR ROOM AND THE E.O.S. IN WAY OF THE SWITCHGEAR.
Condition: Unknown
Due 10 November 1995
Resolved 10 November 1995
Accommodation/Occupational Safety
Issued 10 November 1995 Resolved
INSTALL IN THE ELEVATORS A SOUND POWER TELEPHONE WHICH CALLS TO A MANNED CONTROL STATION FOR EMERGENCY USE.
Condition: Unknown
Due 10 November 1995
Resolved 10 November 1995
Fire Fighting
Issued 10 November 1995 Resolved
IN THE HOLD DECK, FR 37 1/2, INSTALL A SPRINKLER HEAD DEFLECTOR IN WAY OF THE TWO (2) LIGHTING PANEL BREAKER BOXES.
Condition: Unknown
Due 10 November 1995
Resolved 10 November 1995
Engineering
Issued 10 November 1995 Resolved
SUBMIT FOR APPROVAL TO THE MARINE SAFETY CENTER THE ENGINEROOM ALARM SYSTEMAS MEETING THE ENVIRONMENTAL DESIGN STANDARDS IN 46CFR62.25-30.
Condition: Unknown
Due 10 November 1995
Resolved 10 November 1995
Accommodation/Occupational Safety
Issued 10 November 1995 Resolved
PROVE THE ELEVATOR OPERATION TO THE HOLD DECK IS BY CREW KEY ONLY.
Condition: Unknown
Due 10 November 1995
Resolved 10 November 1995
Documentation
Issued 10 November 1995 Resolved
UPON APPROVAL, POST THE STABILITY LETTER AND PROVIDE ON BOARD THE VESSEL THE TRIM AND STABILITY BOOK APPROVED BY THE MARINE SAFETY SCHOOL.
Condition: Unknown
Due 10 November 1995
Resolved 10 November 1995
Fire Fighting
Issued 10 November 1995 Resolved
PROVE PROPER OPERATION OF THE FIRE ALARM PULL SWITCHES AT ALL LOCATIONS.
Condition: Unknown
Due 10 November 1995
Resolved 10 November 1995
Accommodation/Occupational Safety
Issued 10 November 1995 Resolved
IN THE Z-DRIVE ROOM AND THE PUMP JET ROOM, INSTALL PERSONNEL GUARDS OR PERIFERY RAILS IN WAY OF THE POWER PACKS, HIHG HATS, AND TRACTION MOTORS.
Condition: Unknown
Due 10 November 1995
Resolved 10 November 1995
Accommodation/Occupational Safety
Issued 10 November 1995 Resolved
CONDUCT INSTALLATION TESTS IN COMPLIANCE WITH THE ASME/ANSI 17.2 STANDARDS FOR ELEVATORS AND SATISFY ANY COMMENTS AS A RESULT OF MARINE SAFETY CENTER PLAN REVIEW.
Condition: Unknown
Due 10 November 1995
Resolved 10 November 1995
Fire Fighting
Issued 10 November 1995 Resolved
CONDUCT A PITOT TEST OF THE SPRINKLER SYSTEM PIPING FLOW FROM THE MAIN AND EMERGENCY SPRINKLER PUMPS FOR THE HOLD, MAIN, 01, AND TEXAS DECKS. PROVE PROPER OPERATION OF THE SPRINKLER TANK PRESSURE RELIEF VALVE.
Condition: Unknown
Due 10 November 1995
Resolved 10 November 1995
Engineering
Issued 10 November 1995 Resolved
PROVE COMPLIANCE WITH AND SUBMIT PLANS AND INFORMATION TO THE MARINE SAFETYCENTER FOR THE ENGINEROOM ALARM SYSTEM POWER SUPPLY AND OPERATION IN ACCORDANCE WITH 46CFR62.23-20(e)(1)(ii). (SEE G-MSC-2 LTR SER E2-9504011 DTD 02NOV95.)
Condition: Unknown
Due 10 November 1995
Resolved 10 November 1995
Navigation
Issued 10 November 1995 Resolved
POST IN THE PILOT HOUSE THE VESSEL MANEUVERING INFORMATION REQUIRED BY 33CFR164.35(g).
Condition: Unknown
Due 10 November 1995
Resolved 10 November 1995
Accommodation/Occupational Safety
Issued 10 November 1995 Resolved
PROVE PROPER OPERATION OF THE AEVADS.
Condition: Unknown
Due 10 November 1995
Resolved 10 November 1995
Electrical
Issued 10 November 1995 Resolved
PROVE PROPER OPERATION OF, AND ADEQUACY OF THE EMERGENCY LIGHTING SYSTEM, TO INCLUDE EMBARKATION LIGHTS FOR THE RESCUE BOATS AND INFLATABLE BUOYANT APPARATUS. PROVIDE MARKINGS FOR ALL "E" LIGHTS.
Condition: Unknown
Due 10 November 1995
Resolved 10 November 1995
Construction/Loadline
Issued 10 November 1995 Resolved
PROPERLY SEAL THE BEER CHASE AND BEVERAGE CHASE PENETRATIONS FOR THE DISPENSING HOSES TO MEET THE MINIMUM FIRE PROTECTION AND HULL INTEGRITY OF THE DECKS AND BULKHEADS PENETRATED AND AT THE DISTRIBUTION PENETRATIONS.
Condition: Unknown
Due 10 November 1995
Resolved 10 November 1995
Documentation
Issued 10 November 1995 Resolved
SUBMIT FOR APPROVAL TO THE COGNIZANT OFFICER IN CHARGE, MARINE INSPECTION, THE FIRE AND SAFETY PLAN, G.P.&A. DWG. 70994-583-05, SHT 1 OF 1 (REV. D. LAST REVISION).
Condition: Unknown
Due 10 November 1995
Resolved 10 November 1995

Casualty record · 11

17 May 2003Routine · role: Involved in a Marine Casualty · 1 injured · activity 1882579
4 August 2004Routine · role: Involved in a Marine Casualty · activity 2301237
28 February 2021Routine · role: Involved in a Marine Casualty · activity 7148933
23 March 2022Routine · role: Involved in a Marine Casualty · 1 injured · activity 7439285
16 June 2022Routine · role: Involved in a Marine Casualty · activity 7482829
14 August 2022Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 7534152
19 August 2022Routine · role: Involved in a Marine Casualty · activity 7538455
31 August 2022Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 7555245
9 October 2022Routine · role: Involved in a Marine Casualty · activity 7577392
15 July 2023Routine · role: Involved in a Marine Casualty · at CLINTON RAILROAD DRAWBRIDGE · activity 7744592
9 October 2023Routine · role: Involved in a Marine Casualty · activity 7806888
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Recorded names · 1

KANESVILLE QUEEN (2003–2004). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.