MAURY USCG vessel records Sign in
← All vessels

LADY ASH

LADY ASH is a 1960 passenger vessel (inspected). The Coast Guard has recorded 81 inspections since 1985, most recently in June 2012, along with 155 deficiencies, 1 operational control and 1 casualty investigation in 2007.

Records from 1985 to 2012. Most recent: operational control imposed, 6 June 2012.

Built
1960
Last inspected
6 June 2012
Documentation
Expired · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WCY2937
Flag
UNITED STATES
366550000, 367340270, 367485950 (licence lapsed)
Maury page id
psix-43887

Inspections, by type

…with no type recorded21
Years with a record 28 calendar years (1985–2012)
The 81 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 14 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)61.3 ft × 18.0 ft × 5.2 ft
Registered tonnagegross 48 / net 33
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderGILLIKIN BOAT WORKS · HARKERS ISLAND, NC, UNITED STATES · built 1960
Hull materialWood
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portBROOKLYN, NY
Trade endorsementsCoastwise, unrestricted, Fishery
DocumentationExpired · issued 30 June 2004
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it33 - Regulatory (Subpart C or D), Net Ton
48 - Regulatory (Subpart C or D), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDF7581MMSI 367485950 · expired · compulsorily equipped · granted 14 April 2011, cancelled 19 June 2021 · licensed under a name not among this hull’s recorded names (not shown)
WCY2937MMSI 367340270 · expired · compulsorily equipped · granted 28 February 2008, cancelled 9 June 2018
WBL8061MMSI 366550000 · expired · compulsorily equipped · granted 24 September 1997, cancelled 15 December 2007 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspected as a tow unit · 2

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

EVELYN CUTLER Towing Vessel · MISLE 122231 · 20 October 2007 · activity 3085223G.L. 65 Industrial Vessel · MISLE 589660 · 20 October 2007 · activity 3085223

Inspection history · 81

6 June 2012 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 4335970
22 May 2012 Internal Structural Exam · Hull Examination · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4318448
15 February 2011 Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3946979
4 January 2011 Deficiency Check · In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3921620
14 January 2010 Hull Examination · Internal Structural Exam · Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3663462
10 March 2009 Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3431189
31 October 2008 Type not recorded
No type recorded · Station Sandy Hook · USCG Northeast District (CGD-NE) · Activity 3355919
24 April 2008 Type not recorded
No type recorded · Station Sandy Hook · USCG Northeast District (CGD-NE) · Activity 3191679
11 February 2008 Deficiency Check · Hull Examination · Annual Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3145837
20 October 2007 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 3085223
27 February 2007 Annual Inspection · MARPOL Annex V Examination · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2880178
24 February 2006 MARPOL Annex V Examination · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2591111
26 January 2006 Deficiency Check · Internal Structural Exam · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2605875
7 March 2005 Annual Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2304852
29 March 2004 Hull Examination · Internal Structural Exam
Physical examination · MSFO LONG ISLAND · USCG Northeast District (CGD-NE) · Activity 2032036
9 March 2004 Annual Inspection · MARPOL Annex V Examination
Physical examination · MSFO LONG ISLAND · USCG Northeast District (CGD-NE) · Activity 2021037
13 March 2003 Annual Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1756474
25 February 2002 Internal Structural Exam · Hull Examination · Annual Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1489085
23 March 2001 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1379344
1 March 2000 Deficiency Check · MARPOL Annex V Examination · Re-Inspection
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1412055
28 February 2000 Hull Examination · Deficiency Check
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1415288
21 October 1999 Plan Review "T" Boat
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 791095
14 April 1999 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1415163
22 January 1999 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 787845
14 July 1998 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1128858
5 May 1998 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1125086
24 April 1998 COI Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1124692
16 March 1998 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1446606
13 March 1998 Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1375303
17 September 1997 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 779311
3 June 1997 Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1112649
21 March 1997 Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1094188
29 June 1996 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 215514
7 June 1996 Re-Inspection · Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1245444
18 September 1995 Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1182182
7 September 1995 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1187970
30 June 1995 Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 882153
23 June 1995 Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1382985
15 June 1995 Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1382986
6 June 1995 COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 873767
24 May 1995 Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1241927
8 May 1995 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 753334
1 May 1995 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 200753
1 May 1995 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1348728
17 February 1995 Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1155243
5 December 1994 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1181449
3 October 1994 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1180965
19 July 1994 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 862898
1 July 1994 Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1175053
17 June 1994 Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1327885
25 May 1994 Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1467867
19 November 1993 Drydock Extension
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1147457
3 September 1993 Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 841350
22 July 1993 Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 847045
16 July 1993 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 103020
21 June 1993 Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 843065
10 May 1993 Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 832294
26 January 1993 Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1144124
13 November 1992 Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 960968
4 July 1992 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 643794
4 July 1992 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 643795
11 June 1992 COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1267336
6 May 1992 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1258769
4 November 1991 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1252818
25 February 1991 Deficiency Check · Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 924043
15 November 1990 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1242427
1 November 1990 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 910936
20 February 1990 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 899897
3 November 1989 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 922711
31 March 1989 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 897300
27 February 1989 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1033620
2 February 1989 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1345396
4 November 1988 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1202915
14 March 1988 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1029896
25 November 1987 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1335425
17 February 1987 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1014063
12 November 1986 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1016043
3 March 1986 Credit Drydock
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 987529
4 November 1985 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1302855
18 June 1985 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1287682
5 March 1985 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 978526

Deficiency record · 155

Construction/Loadline › Hull › Transverse Frame
Issued 4 January 2011 Resolved
FS01: Replace in kind transverse deck frame port side #2 void as indicated by CGMI during inspection.
Due 4 February 2011
Resolved 15 February 2011
Resolution: Deck frame was replaced as needed and pictures were provided for file.
Construction/Loadline › Hull › Stringer
Issued 4 January 2011 Resolved
FS02: Replace in kind deck frame STB side engine room aft, as indicated by CGMI during inspection.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 February 2011
Resolution: Frame was replaced as needed and inspected by [name withheld] were also provided.
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 4 January 2011 Resolved
FS 03: Properly seal hole on port side lazerette space as indicated by CGMI.
Due 4 February 2011
Resolved 15 February 2011
Resolution: Hole was repaired as needed.
Stability › Watertight Integrity › General
Issued 2 March 2010 Resolved
Properly label watertight door.
Action required: 705 - Other - as specified
Due 2 April 2010
Resolved 9 March 2010
Resolution: Deficiency cleared.
Lifesaving › Lifefloat › Lifeline
Issued 2 March 2010 Resolved
Replace wasted grab line on 12 person life float.
Action required: 705 - Other - as specified
Due 9 March 2010
Resolved 9 March 2010
Resolution: Deficiency cleared.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 2 March 2010 Resolved
Weld cracked rail support IWO aft portside railing.
Action required: 705 - Other - as specified
Due 2 April 2010
Resolved 9 March 2010
Resolution: Deficiency cleared.
Electrical › Electrical Distribution System (emergency) › Wiring
Issued 2 March 2010 Resolved
Properly support wiring in the #3 void space.
Action required: 705 - Other - as specified
Due 2 April 2010
Resolved 9 March 2010
Resolution: Deficiency cleared.
Electrical › Electric Generation Source (emergency) › Generator Cable
Issued 2 March 2010 Resolved
Properly cap dead end wiring in generator space.
Action required: 705 - Other - as specified
Due 2 April 2010
Resolved 9 March 2010
Resolution: Deficiency cleared.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 2 March 2010 Resolved
Re-attach grounding wire on port fuel tank.
Action required: 705 - Other - as specified
Due 2 April 2010
Resolved 9 March 2010
Resolution: Deficiency cleared.
Engineering › Gasoline Engine (propulsion) › Exhaust Piping (4 cycle)
Issued 2 March 2010 Resolved
Replace lagging for generator exhaust.
Action required: 705 - Other - as specified
Due 2 April 2010
Resolved 9 March 2010
Resolution: Deficiency cleared.
Engineering › Fuel Oil Storage/Transfer System › Vent Pipe
Issued 2 March 2010 Resolved
Properly secure vent line on port fuel tank.
Action required: 705 - Other - as specified
Due 2 April 2010
Resolved 9 March 2010
Resolution: Deficiency cleared.
Engineering › Bilge Water Management System › Piping
Issued 2 March 2010 Resolved
Replace PVC elbow on bilge line in lazarette space.
Action required: 705 - Other - as specified
Due 2 April 2010
Resolved 9 March 2010
Resolution: Deficiency cleared.
Electrical › Electrical Distribution System (service) › Wiring
Issued 10 March 2009 Resolved
Properly wire shore-tie connection inside of life jacket locker, bridge deck.
Action required: 705 - Other - as specified
Due 10 April 2009
Resolved 10 March 2009
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 10 March 2009 Resolved
Vessel missing 1 adult PFD life jacket.
Action required: 705 - Other - as specified
Due 10 April 2009
Resolved 12 March 2009
Engineering › Bilge Water Management System › Not Operational
Issued 10 March 2009 Resolved
Demonstrate operation of bilge float alarm in tank room. **PTCP**
Action required: 705 - Other - as specified
Resolved 12 March 2009
Construction/Loadline › Structures › Deck Plating
Issued 10 March 2009 Resolved
Re-caulk deck plank 4 and 5 deck board in from gunnel knee wall aft of 1st bit port side.
Action required: 705 - Other - as specified
Due 10 April 2009
Resolved 10 March 2009
Construction/Loadline › Structures › Deck Plating
Issued 10 March 2009 Resolved
Re-caulk around gunnel knee wall frame port side after of 1st bit port side.
Action required: 705 - Other - as specified
Due 10 April 2009
Resolved 10 March 2009
Engineering › Bilge Water Management System › Valve
Issued 10 March 2009 Resolved
Demonstrate operation of skin bilge valve port side, crew quarters.
Action required: 705 - Other - as specified
Due 10 April 2009
Resolved 10 March 2009
Fire Fighting › Nozzles › Number
Issued 10 March 2009 Resolved
Provide nozzle for fire hose.
Action required: 705 - Other - as specified
Due 10 April 2009
Resolved 12 March 2009
Engineering › Bilge Water Management System › Pump
Issued 10 March 2009 Resolved
Prove proper operation of bilge pump in forepeak space. **PTCP**
Action required: 705 - Other - as specified
Resolved 10 March 2009
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 10 March 2009 Resolved
Complete fire and man overboard drills in the presence of Coast Guard Marine Inspector.
Action required: 705 - Other - as specified
Due 10 April 2009
Resolved 10 March 2009
Engineering › Bilge Water Management System › Valve
Issued 11 February 2008 Resolved
Remark bilge manifold valves
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 March 2008
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type III
Issued 11 February 2008 Resolved
Replace handle on MSD pump.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 March 2008
Engineering › Freshwater System (jacketwater cooling) › Hose
Issued 11 February 2008 Resolved
Replace both keel cool hoses on port engine.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 March 2008
Construction/Loadline › Structures › Deck Plating
Issued 11 February 2008 Resolved
Provide proposal for wood rot IWO main deck beam and vertical support.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 February 2008
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 11 February 2008 Resolved
Repair cracked window located in main cabin.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 March 2008
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 11 February 2008 Resolved
Repair broken rail (3 spots). 1 forward port and 2 starboard aft. Aluminum supports are cracked.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 March 2008
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 11 February 2008 Resolved
Re-tighten top step leading to second deck.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 March 2008
Documentation › Certificates/Documents › Stability Letter
Issued 11 February 2008 Resolved
Provide copy of stability letter.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 February 2008
Construction/Loadline › Structures › Deck Plating
Issued 11 February 2008 Resolved
Replace carriage bolts 3rd frame aft. Port bottom and 5th aft port bottom.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 March 2008
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 11 February 2008 Resolved
Remove area of rot stbd engine room overhead and treat.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 March 2008
Deck/Cargo › Holds/Tanks › Independent Tank
Issued 11 February 2008 Resolved
Replace keelson bolts in tank space as indicated. (8).
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 March 2008
Engineering › Fuel Oil Service System › Valve
Issued 11 February 2008 Resolved
Prove proper operation of fuel shut-off valves.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 March 2008
Engineering › Fuel Oil Service System › Hose
Issued 11 February 2008 Resolved
Install fuel tank vent hoses.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 March 2008
Engineering › Bilge Water Management System › Pump
Issued 11 February 2008 Resolved
Prove proper operation of electric submersible bilge pump.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 March 2008
Engineering › Steering Gear System › Bracket/Clamp
Issued 11 February 2008 Resolved
Replace carriage bolts first gusset stbd bottom and 2nd gusset port bottom lazerrete.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 March 2008
Engineering › Freshwater System (air cooling) › Drainage
Issued 11 February 2008 Resolved
Replace hose clamp in way of port exhaust.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 March 2008
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 11 February 2008 Resolved
Install captive chains in way of all deck hatches.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 March 2008
Operations/Management › Drug and Alcohol Testing › Employee Coverage
Issued 11 February 2008 Resolved
Provide list of crew enrolled in Marine Employers Drug Testing program.
Action required: 705 - Other - as specified
Due 5 April 2008
Resolved 10 March 2008
Engineering › Steering Gear System › Pin
Issued 11 February 2008 Resolved
Provide locknut/double nut/cotterpin in way of steering system cross member.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 March 2008
Engineering › Bilge Water Management System › Hose
Issued 11 February 2008 Resolved
Properly support hoses in way of electric submersible bilge pumps in lazarette and tank space.
Action required: 705 - Other - as specified
Due 5 April 2008
Resolved 10 March 2008
Fire Fighting › Ventilation Systems › Ducts
Issued 11 February 2008 Resolved
Provide caps for engine room exhaust vents port and starboard.
Action required: 705 - Other - as specified
Due 5 April 2008
Resolved 10 March 2008
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 11 February 2008 Resolved
Provide 14 adult lifejackets. Vessel is restricted to the carriage of 66 total persons until complete.
Action required: 705 - Other - as specified
Due 5 April 2008
Resolved 10 March 2008
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 11 February 2008 Resolved
Provide portable lights at operating station and pilot house.
Action required: 705 - Other - as specified
Due 5 April 2008
Resolved 10 March 2008
Engineering › Fuel Oil Service System › Hose
Issued 11 February 2008 Resolved
Properly clamp down rigid fuel lines located in engine compartment.
Action required: 705 - Other - as specified
Due 5 April 2008
Resolved 10 March 2008
Engineering › Diesel Engine (propulsion-direct drive) › Gear/Clutch Starter (electric)
Issued 11 February 2008 Resolved
Proplerly clamp down positive cable to starboard side MDE starter.
Action required: 705 - Other - as specified
Due 5 April 2008
Resolved 10 March 2008
Electrical › Electric Supply System (service) › Cable
Issued 11 February 2008 Resolved
Properly bundle wiring leading to port side MDE alternator.
Action required: 705 - Other - as specified
Due 5 April 2008
Resolved 10 March 2008
Engineering › Bilge Water Management System › Pump
Issued 11 February 2008 Resolved
Properly mount electric submersible bilge pump in engine compartment.
Action required: 705 - Other - as specified
Due 5 April 2008
Resolved 10 March 2008
Engineering › Bilge Water Management System › Piping
Issued 11 February 2008 Resolved
Properly clamp down metallic fixed bilge lines leading to aft two spaces located in engine room bilge.
Action required: 705 - Other - as specified
Due 5 April 2008
Resolved 10 March 2008
Engineering › Diesel Engine (propulsion-direct drive) › Piping (exhaust)
Issued 11 February 2008 Resolved
Re-wrap exhaust lagging on both MDE exhaust lines fwd of wet exhaust.
Action required: 705 - Other - as specified
Due 5 April 2008
Resolved 10 March 2008
Engineering › Diesel Engine (propulsion-direct drive) › Piping (exhaust)
Issued 11 February 2008 Resolved
Double clamp starboard side MDE wet exhaust.
Action required: 705 - Other - as specified
Due 5 April 2008
Resolved 10 March 2008
Electrical › Electric Supply System (service) › Overcurrent Device
Issued 11 February 2008 Resolved
Properly affix/attach battery cable leading to starter solenoid utilized for anchor windlass.
Action required: 705 - Other - as specified
Due 5 April 2008
Resolved 10 March 2008
Stability › Watertight Integrity › General
Issued 27 February 2007 Resolved
Make permanent repair to hole in deck, port side, IWO 1st frame aft of collision bulkhead.
Action required: 705 - Other - as specified
Due 9 March 2007
Resolved 7 March 2007
Resolution: Deck plank pieced in and sealed.
Stability › Watertight Integrity › General
Issued 22 February 2006 Resolved
Remove pipe (or plug) between engine room and generator room to make bulkhead watertight as discussed w/ rep.
Condition: Unknown
Due 8 March 2006
Resolved 8 March 2006
Electrical › Electrical Distribution System (service) › Junction Box
Issued 22 February 2006 Resolved
Cover electrical connection on port bulkhead in galley.
Condition: Unknown
Due 8 March 2006
Resolved 8 March 2006
Resolution: Electrical connection covered.
Construction/Loadline › Penetrations › Bottom Plug
Issued 26 January 2006 Resolved
Replace valve in e/r as discussed with rep.
Action required: 705 - Other - as specified
Resolved 31 January 2006
Resolution: Valve replaced with new.
Construction/Loadline › Hull › Hull Plating
Issued 26 January 2006 Resolved
Recaulk areas on hull as discussed with rep.
Action required: 705 - Other - as specified
Resolved 31 January 2006
Resolution: Areas were sat recaulked.
Construction/Loadline › Hull › Hull Plating
Issued 26 January 2006 Resolved
Repalce plank stbd side fwd as discussed with rep.
Action required: 705 - Other - as specified
Resolved 31 January 2006
Resolution: Plank replaced.
Construction/Loadline › Hull › Hull Plating
Issued 26 January 2006 Resolved
Sand back to good wood all areas in e/r #2, #3 fram fwd of bulkhead as discussed with rep.
Action required: 705 - Other - as specified
Resolved 31 January 2006
Resolution: Areas sanded - all sat.
Construction/Loadline › Hull › Longitudinal Frame
Issued 26 January 2006 Resolved
Sister/partially sister frame in laz port side as discussed with rep.
Action required: 705 - Other - as specified
Resolved 31 January 2006
Resolution: Frame sistered - all sat.
Construction/Loadline › Hull › Bracket
Issued 26 January 2006 Resolved
Refasten gusset in laz stbd side as discussed with rep (04 bolts).
Action required: 705 - Other - as specified
Resolved 31 January 2006
Resolution: Gusset was refastened.
Construction/Loadline › Hull › Bracket
Issued 26 January 2006 Resolved
Replace (02) lag bolts in laz as discussed with rep.
Action required: 705 - Other - as specified
Resolved 31 January 2006
Resolution: Lag bolts replaced.
Construction/Loadline › Hull › Bracket
Issued 26 January 2006 Resolved
Replace (02) bolts in butt block port side laz as discussed with rep.
Action required: 705 - Other - as specified
Resolved 31 January 2006
Resolution: Bolts replaced.
Accommodation/Occupational Safety › Medical/First Aid
Issued 9 March 2004 Resolved
Provide ammonia inhalants & eyewash. LEGACY COMPONENT DESC: Medicine Chest
Due 9 April 2004
Resolved 29 March 2004
Resolution: Returned to vessel, eyewash and ammonia inhalants on board.
Electrical › Electrical Distribution System (service)
Issued 9 March 2004 Resolved
Rewire stepdown transformer under console. LEGACY COMPONENT DESC: Wiring
Due 9 April 2004
Resolved 29 March 2004
Resolution: Returned to vessel, re-inspected wiring, wire nuts eliminated.
Electrical › Electrical Distribution System (emergency)
Issued 9 March 2004 Resolved
Eliminate or properly end all dead end wires under console. LEGACY COMPONENT DESC: Wiring
Due 9 April 2004
Resolved 29 March 2004
Resolution: Returned to vessel, re-inspected wiring, dead-end wires properly ended.
Fire Fighting › Fire Hydrants
Issued 21 March 2002 Resolved
Replace valve to deck fire hydrant. LEGACY COMPONENT DESC: Valve
Condition: Unknown
Due 28 March 2002
Resolved 3 April 2002
Resolution: Witnessed installation of valve.
Fire Fighting › Ventilation Systems › Duct Hatches
Issued 21 March 2002 Resolved
Provide means to secure ventilation to engine room.
Condition: Unknown
Due 28 March 2002
Resolved 21 March 2002
Resolution: Witnessed installation of vent covers.
Electrical › Electrical Distribution System (service)
Issued 25 February 2002 Resolved
Provide covers for two battery boxes in engine room. LEGACY COMPONENT DESC: Battery Box
Condition: Unknown
Due 28 March 2002
Resolved 3 April 2002
Resolution: Witnessed installation of battery box covers
Electrical › Lighting (emergency)
Issued 25 February 2002 Resolved
Install emergency lighting at exits of vsl IAW 46 CFR 183.432. LEGACY COMPONENT DESC: Lighting Fixture
Condition: Unknown
Due 28 March 2002
Resolved 3 April 2002
Resolution: Witnessed installation of lighting.
Construction/Loadline
Issued 23 March 2001 Resolved
Provide audible and visual bilge alarms separate from Submersible pump ckt.
Condition: Unknown
Due 23 March 2001
Resolved 23 March 2001
Lifesaving
Issued 23 March 2001 Resolved
Perform man overboard drill.
Condition: Unknown
Due 26 March 2001
Resolved 26 March 2001
Lifesaving
Issued 23 March 2001 Resolved
Provide markings on childrens lifejackets iaw 46CFR 185.604 reflective tapeand vessels name.
Condition: Unknown
Due 26 March 2001
Resolved 26 March 2001
Engineering
Issued 23 March 2001 Resolved
IAW 46CFR 182.720(e)(3)(ii) Fuel hose can not pass through watertight bulkheads. Install correctly IAW 46CFR 182.720 between engineroom and generator compartment.
Condition: Unknown
Due 26 March 2001
Resolved 26 March 2001
Construction/Loadline
Issued 23 March 2001 Resolved
Float switch in compartment #2 requires mounting.
Condition: Unknown
Due 26 March 2001
Resolved 26 March 2001
Electrical
Issued 23 March 2001 Resolved
Lighting fixture in compartment #2 has no cover and no flourecent bulb. Provide cover and bulb.
Condition: Unknown
Due 26 March 2001
Resolved 26 March 2001
Engineering
Issued 23 March 2001 Resolved
IAW 46CFR 182.720(e)(3)(ii) Flexible hose must not pass through a watertight bulkhead. Provide CG with plans to correct fuel hoses passing between Fuel tank compartment and engineroom. Plans must iaw 46CFR 182.720(e).
Condition: Unknown
Due 26 March 2001
Resolved 26 March 2001
Engineering
Issued 23 March 2001 Resolved
Can not read data on pressure vessel(air compressor reciever). Prove vesselis less than 5 cu ft or test as required with Marine inspector present.
Condition: Unknown
Due 26 March 2001
Resolved 26 March 2001
Navigation
Issued 23 March 2001 Resolved
Magnetic compass has no means of illumination. Provide light for compass.
Condition: Unknown
Due 26 March 2001
Resolved 26 March 2001
Navigation
Issued 23 March 2001 Resolved
Current light list is outdated by 8 years. Provide an updated copy.
Condition: Unknown
Due 26 March 2001
Resolved 26 March 2001
Lifesaving
Issued 23 March 2001 Resolved
Bouyant Appartus and lifefloat is not secured to prevent shifting and will not floatfree with the present installation. Prove proper installation.
Condition: Unknown
Due 26 March 2001
Resolved 26 March 2001
Lifesaving
Issued 23 March 2001 Resolved
IAW 46CFR 185.728(a) provide log to prove EPIRB's monthly test is conducted.
Condition: Unknown
Due 26 March 2001
Resolved 26 March 2001
Lifesaving
Issued 1 March 2000 Resolved
INSTALL L/Fs TO THE SATISFACTION OF THE ATTENDING USCG INSPECTOR.
Condition: Unknown
Due 14 March 2000
Resolved 2 March 2000
Construction/Loadline
Issued 28 February 2000 Resolved
CROP OUT TO GOOD WOOD ALL AREAS IN #2 COMPT. P & S SIDES IWO AREAS WHERE DECK MEETS SIDESHELL. RAIN WATER LEAKING THROUGH AND ROT PRESENT.
Condition: Unknown
Due 28 February 2000
Resolved 28 February 2000
Construction/Loadline
Issued 28 February 2000 Resolved
CROP OUT TO GOOD WOOD AND INSTALL GRAVING PIECES IWO STRUT MOUNTS IN LAZ.
Condition: Unknown
Due 28 February 2000
Resolved 28 February 2000
Construction/Loadline
Issued 28 February 2000 Resolved
CROP OUT AREA IWO METAL STRIP ON AFT END OF HULL BOTTOM. WOOD APPREARS TO BE DETERIORATING.
Condition: Unknown
Due 28 February 2000
Resolved 28 February 2000
Construction/Loadline
Issued 28 February 2000 Resolved
PULL FASTENERS AND MAKE SAME AVAILABLE FOR INSPECTION THE FASTENERS IN CHINE CLAMP, STBD SIDE, #3 COMPT, BTW FRAMES 3 AND 4 AS COUNTED FM AFT.
Condition: Unknown
Due 28 February 2000
Resolved 28 February 2000
Construction/Loadline
Issued 28 February 2000 Resolved
SCRAPE OUT ROT IN #1 DECK CROSS BEAM IN CRASH COMPT.
Condition: Unknown
Due 28 February 2000
Resolved 28 February 2000
Electrical
Issued 28 February 2000 Resolved
REMOVE ALL DEAD ENDED WIRING IN E/R.
Condition: Unknown
Due 28 February 2000
Resolved 28 February 2000
Construction/Loadline
Issued 28 February 2000 Resolved
SCRAPE OUT ALL ANGEL HAIR IN E/R.
Condition: Unknown
Due 28 February 2000
Resolved 28 February 2000
Construction/Loadline
Issued 28 February 2000 Resolved
CROP AND RENEW ROTTED DECK PLANKS IWO VENTS IN E/R.
Condition: Unknown
Due 28 February 2000
Resolved 28 February 2000
Construction/Loadline
Issued 28 February 2000 Resolved
SCRAPE OUT ROTTED WOOD, STBD SIDE OF CRASH COMPT. FWD OF #1 DECK CROSS BEAMAND MAKE AVAILABLE FOR INSPECTION.
Condition: Unknown
Due 28 February 2000
Resolved 28 February 2000
Electrical
Issued 14 April 1999 Resolved
Place wiring for bilge system in lazarette in aproved junction box.
Condition: Unknown
Due 21 April 1999
Resolved 21 April 1999
Engineering
Issued 14 April 1999 Resolved
REPLACE SUPPORT FOR STBD EXHAUST PIPING. SEAL BULKHEAD IWO EXHAUST PIPE.
Condition: Unknown
Due 21 April 1999
Resolved 21 April 1999
Fire Fighting
Issued 22 January 1999 Resolved
Submit plans for review and approval for the installation of a Fixed Fire Fighting System in the machinery spaces in accordance with 46 CFR 181.115(b) and 46 CFR 181.400
Condition: Unknown
Due 25 October 1999
Resolved 25 October 1999
Fire Fighting
Issued 22 January 1999 Resolved
Install a Fixed Fire Fighting System in machinery spaces in accordance withU.S. Coast Guard approved plans.
Condition: Unknown
Due 25 October 1999
Resolved 25 October 1999
Fire Fighting
Issued 22 January 1999 Resolved
Vessel is not to be operated with passengers for hire after March 11, 1999,until the above requirements have been cleared to the satisfaction of an attending U.S. Coast Guard Marine Inspector.
Condition: Unknown
Due 25 October 1999
Resolved 25 October 1999
Unknown
Issued 24 April 1998 Resolved
Provide and post following notices aboard vsl: emergency instructions, lifepreserver instructions, drug use hotline phone #, garbage pollution placard.
Condition: Unknown
Due 24 May 1998
Resolved 6 May 1998
Lifesaving
Issued 16 March 1998 Resolved
Provide proof of current EPIRB registration with NOAA.
Condition: Unknown
Due 16 April 1998
Resolved 18 March 1998
Lifesaving
Issued 16 March 1998 Resolved
Properly mount bouyant apparatus and ring bouy
Condition: Unknown
Due 16 April 1998
Resolved 18 March 1998
Lifesaving
Issued 16 March 1998 Resolved
Provide covers for all battery boxes.
Condition: Unknown
Due 16 March 1998
Resolved 16 March 1998
Construction/Loadline
Issued 16 March 1998 Resolved
Repair/replace wooden support member for steering shaft, stbd side, in lazerette.
Condition: Unknown
Due 16 March 1998
Resolved 16 March 1998
Unknown
Issued 16 March 1998 Resolved
Provide proof of enrollment in drug testing consortium.
Condition: Unknown
Due 16 April 1998
Resolved 18 March 1998
Lifesaving
Issued 3 June 1997 Resolved
Provide three (3) adult life preservers, the number of passengers is restricted to 77 total persnons.
Condition: Unknown
Due 30 June 1997
Resolved 12 August 1997
Construction/Loadline
Issued 15 June 1995 Resolved
PERMANENTLY SEAL NON-QUICK ACTING WATERTIGHT DOOR BETWEEN COMPARTMENTS #2 AND #3 FROM THE STEM.
Condition: Unknown
Due 15 June 1995
Resolved 15 June 1995
Accommodation/Occupational Safety
Issued 6 June 1995 Resolved
PRIOR TO CARRYING PASSENGERS IN EXCURSION SERVICE, PROVIDE WIRE MESH OR EQUIVALENT BELOW THE UPPER RAIL OF DECK RAILINGS.
Condition: Unknown
Due 6 June 1995
Resolved 6 June 1995
Documentation
Issued 6 June 1995 Resolved
REPLACE OUTDATED COAST PILOT.
Condition: Unknown
Due 14 June 1995
Resolved 14 June 1995
Documentation
Issued 6 June 1995 Resolved
REPLACE OUTDATED LIGHT LIST.
Condition: Unknown
Due 14 June 1995
Resolved 14 June 1995
Accommodation/Occupational Safety
Issued 6 June 1995 Resolved
PRIOR TO CARRYING PASSENGERS ON THE UPPER DECK, PROVIDE A SECOND MEANS OF ESCAPE FROM THE UPPER DECK.
Condition: Unknown
Due 6 June 1995
Resolved 6 June 1995
Construction/Loadline
Issued 6 June 1995 Resolved
PROVIDE 25 GPM FIXED BILGE PUMP.
Condition: Unknown
Due 9 June 1995
Resolved 7 June 1995
Fire Fighting
Issued 6 June 1995 Resolved
PROVIDE ONE APPROVED B-I PORTABLE FIRE EXTINGUISHER.
Condition: Unknown
Due 14 June 1995
Resolved 14 June 1995
Lifesaving
Issued 6 June 1995 Resolved
PROVIDE 13 APPROVED ADULT PFD'S.
Condition: Unknown
Due 14 June 1995
Resolved 14 June 1995
Fire Fighting
Issued 6 June 1995 Resolved
REPLACE SUBSTANDARD FIRE HOSE WITH COMMERCIAL GRADE HOSE.
Condition: Unknown
Due 14 June 1995
Resolved 14 June 1995
Construction/Loadline
Issued 24 May 1995 Resolved
REPLACE CAULKING ON STEM, PORT AND STARBOARD.
Condition: Unknown
Due 1 June 1995
Resolved 1 June 1995
Construction/Loadline
Issued 24 May 1995 Resolved
REMOVE #1 AND #2 CHINE BOLTS, PORT AND STARBOARD FROM STEM.
Condition: Unknown
Due 1 June 1995
Resolved 1 June 1995
Construction/Loadline
Issued 24 May 1995 Resolved
REPLACE ALL FIXED BILGE PIPING WITH METALLIC PIPE.
Condition: Unknown
Due 1 June 1995
Resolved 1 June 1995
Construction/Loadline
Issued 24 May 1995 Resolved
PROVE WATERTIGHT INTEGRITY OF WATERTIGHT DOOR VIA CHALK TEST.
Condition: Unknown
Due 1 June 1995
Resolved 1 June 1995
Construction/Loadline
Issued 24 May 1995 Resolved
CAP OVERBAORD DISCHARGE OF OLD GENERATOR COOLING LINE.
Condition: Unknown
Due 1 June 1995
Resolved 1 June 1995
Electrical
Issued 24 May 1995 Resolved
SECURE WIRE CABLE ON STARBOARD SIDE IN WAY OF #3 COMPARTMENT TO FRAME.
Condition: Unknown
Due 1 June 1995
Resolved 1 June 1995
Construction/Loadline
Issued 24 May 1995 Resolved
REPLACE DECK PLANK ON STARBOARD SIDE AFT OF FWD MOORING BIT.
Condition: Unknown
Due 1 June 1995
Resolved 1 June 1995
Construction/Loadline
Issued 24 May 1995 Resolved
REPLACE DECK PLANK ON PORT SIDE AFT OF FWD MOORING BIT.
Condition: Unknown
Due 1 June 1995
Resolved 1 June 1995
Construction/Loadline
Issued 24 May 1995 Resolved
REPLACE DECK PLANK ON PORT SIDE INBOARD OF AFT MOORING BIT.
Condition: Unknown
Due 1 June 1995
Resolved 1 June 1995
Electrical
Issued 24 May 1995 Resolved
REMOVE DEAD END WIRE ON FWD BULKHEAD IN ENGINE ROOM.
Condition: Unknown
Due 1 June 1995
Resolved 1 June 1995
Construction/Loadline
Issued 24 May 1995 Resolved
SCRAPE AND TREAT ENGINE ROOM FRAMES AND UNDER DECK PLANKS FOR ANGEL HAIR.
Condition: Unknown
Due 1 June 1995
Resolved 1 June 1995
Navigation
Issued 24 May 1995 Resolved
REPLACE WOODEN SUPPORT FOR STEERING SHAFT IN ENGINE ROOM COMPARTMENT, PORT SIDE.
Condition: Unknown
Due 1 June 1995
Resolved 1 June 1995
Construction/Loadline
Issued 24 May 1995 Resolved
REPLACED COLLISION BULKHEAD DUE TO ROT.
Condition: Unknown
Due 1 June 1995
Resolved 1 June 1995
Construction/Loadline
Issued 24 May 1995 Resolved
REPLACE BILGE VALVE IN FWD COMPARTMENT.
Condition: Unknown
Due 1 June 1995
Resolved 1 June 1995
Construction/Loadline
Issued 24 May 1995 Resolved
PROVE VSL WATERTIGHT BY MEANS OF AND UNDERWAY EXAM.
Condition: Unknown
Due 1 June 1995
Resolved 1 June 1995
Documentation
Issued 5 December 1994 Resolved
PRIOR TO CARRYING PASSENGERS ON THE UPPER DECK IN 1995, CONDUCT A STABILITYTEST IN THE PRESENCE OF A USCG MARINE INSPECTOR. ALTERNATIVELY, PROVIDE TEST RESULTS OF A USCG WITNESSED TEST THAT SHOW ADEQUATE STABILITY FOR UPPER DECK PASSENGERS. (SEE MSO PHILADELPHIA LETTER DATED 07OCT94)
Condition: Unknown
Due 5 December 1994
Resolved 5 December 1994
Construction/Loadline
Issued 3 October 1994 Resolved
PROPERLY REPAIR BOWSPRIT.
Condition: Unknown
Due 3 October 1994
Resolved 3 October 1994
Documentation
Issued 19 July 1994 Resolved
PROVIDE DOCUMENTATION OF THE RECENT INSTALLATION OF FIXED BENCH SEATS ON THE SECOND DECK._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 19 July 1994
Resolved 19 July 1994
Lifesaving
Issued 17 June 1994 Resolved
PRIOR TO CARRYING MORE THAN 64 PASSENGERS, PROVIDE AN ADDITIONAL _x001C_ 4 ADULT-SIZE AND 1 CHILD-SIZE USCG APPROVED TYPE I LIFE PRESERVERS.
Condition: Unknown
Due 17 June 1994
Resolved 17 June 1994
Fire Fighting
Issued 17 June 1994 Resolved
PRIOR TO CARRYING PASSENGERS, SERVICE ALL PORTABLE FIRE EXTINGUISHERS.
Condition: Unknown
Due 17 June 1994
Resolved 17 June 1994
Construction/Loadline
Issued 17 June 1994 Resolved
PRIOR TO CARRYING PASSENGERS, RE-ATTACH KEEPER LINES AN ALL WEATHER DECK HATCHES.
Condition: Unknown
Due 17 June 1994
Resolved 17 June 1994
Navigation
Issued 17 June 1994 Resolved
PRIOR TO OPERATING NORTH OF HERFORD INLET, NJ, PROVIDE A CURRENT NAUTICAL CHART FOR THE AREA FROM HERFORD INLET, NJ, TO SANDY HOOK, NJ.
Condition: Unknown
Due 17 June 1994
Resolved 17 June 1994
Construction/Loadline
Issued 17 June 1994 Resolved
PRIOR TO CARRYING PASSENGERS, REMOVE DIESEL FUEL FROM THE ENGINEROOM BILGE.
Condition: Unknown
Due 17 June 1994
Resolved 17 June 1994
Engineering
Issued 25 May 1994 Resolved
SUBMIT PLANS FOR COAST GUARD APPROVAL OF HORIZONTAL WET EXHAUST SYSTEM._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 25 May 1994
Resolved 25 May 1994
Construction/Loadline
Issued 19 November 1993 Resolved
COMPLETE A CREDIT DRYDOCK EXAM TO THE SATISFACTION OF AN ATTENDING USCG MARINE INSPECTOR PRIOR TO CARRYING PASSENGERS AFTER 30NOV93.
Condition: Unknown
Due 19 November 1993
Resolved 19 November 1993
Engineering
Issued 10 May 1993 Resolved
PRESENT VESSEL'S AIR RECEIVER FOR INTERNAL EXAMINATION OR HYDRO TEST THE SAME IN THE PRESENCE OF A COAST GUARD MAIRINE INSPECTOR.
Condition: Unknown
Due 10 May 1993
Resolved 10 May 1993
Unknown
Issued 10 May 1993 Resolved
REPAIR OR RENEW RELIEF VALVE ON AIR RECIEVER AND PRESSURE TEST THE SAME.
Condition: Unknown
Due 10 May 1993
Resolved 10 May 1993
Lifesaving
Issued 10 May 1993 Resolved
VESSEL IS LIMITED TO THE CARRIAGE OF 68 TOTAL PERSONS UNTIL PROVIDED WITH 5ADDITIONAL ADULT PFD'S WHICH WERE REJECTED DURING VESSEL'S FIRST REINSPECT-ION DUE TO DRY ROTTING AND FAULTY SNAPS.
Condition: Unknown
Due 10 May 1993
Resolved 10 May 1993
Documentation
Issued 10 May 1993 Resolved
PROVIDE CURRENT RADIO CERTIFICATE SHOWING VESSEL'S CORRECT NAME. NOTE: EXISTING CERTIFICATE SHOWS VESSEL'S OLD NAME.
Condition: Unknown
Due 10 May 1993
Resolved 10 May 1993
Electrical
Issued 10 May 1993 Resolved
UPON COMPLETION OF REPAIRS TO THE 4.5 KW AUXILIARY GENERATOR DEMONSTRATE SATISFACTORY OPERATION OF THE SAME.
Condition: Unknown
Due 10 May 1993
Resolved 10 May 1993
Documentation
Issued 11 June 1992 Resolved
PROVIDE DOCUMENTATION THAT THE FCC STATION LICENSE HAS BEEN RENEWED._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 11 June 1992
Resolved 11 June 1992
Fire Fighting
Issued 1 November 1990 Resolved
PROVIDE [name withheld] OF HYDROSTRATIC TESTING OF 2 ENGINEROOM BII FIREEXTINGUISHER OR APPROVED REPLACEMENTS ARE ONBOARD PRIOR TO OPERATION, BUT IN NO CASE ANY LATER THAN 06 NOV 90.
Condition: Unknown
Due 1 November 1990
Resolved 1 November 1990
Lifesaving
Issued 1 November 1990 Resolved
NUMBER OF PASSENGERS RESTRICTED TO 66 UNTIL 1 APPROVED LIFEJACKET IS PLACEDONBOARD. TO BE COMPLETED NO LATER THAN 06 NOV 90.
Condition: Unknown
Due 1 November 1990
Resolved 1 November 1990
Navigation
Issued 1 November 1990 Resolved
PROVIDE PROOF THAT EXISTING RUNNING LIGHTS COMPLY WITH COLREGS OR REPLACE RUNNING LIGHTS WITH USCG APPROVED FIXTURES, TO BE COMPLETED NO LATER THAN 15 NOVEMBER 1990.
Condition: Unknown
Due 1 November 1990
Resolved 1 November 1990
Lifesaving
Issued 3 November 1989 Resolved
REPLACE 9 (NINE) ADULT LIFE PRESERVERS ONBOARD VESSEL. TOTAL PERSONS ON BOARD LIMITED TO 64 UNTIL REPLACEMENT MADE.
Condition: Unknown
Due 3 November 1989
Resolved 3 November 1989
Electrical
Issued 4 November 1988 Resolved
REMOVE ALL WIRE NUTS AND REPLACE IN PROPER FASHION.
Condition: Unknown
Due 4 November 1988
Resolved 4 November 1988
Unknown
Issued 4 November 1988 Resolved
PROVIDE GLOBES AND/OR GUARDS FOR LIGHTS.
Condition: Unknown
Due 4 November 1988
Resolved 4 November 1988
Construction/Loadline
Issued 4 November 1988 Resolved
REPLACE CAULKING IN SECOND FRAME STBD SIDE BELOW RUB RAIL FROM AFT BULKHEADIN SECOND COMPARTMENT.
Condition: Unknown
Due 4 November 1988
Resolved 4 November 1988
Construction/Loadline
Issued 4 November 1988 Resolved
REPLACE THROUGH HULL FITTING FOR WASH BASINS AND PROVIDE PROPER VALUE FOR SAME,
Condition: Unknown
Due 4 November 1988
Resolved 4 November 1988
Fire Fighting
Issued 4 November 1988 Resolved
PROVIDE ONE B-II FIRE EXTINGUISHER.
Condition: Unknown
Due 4 November 1988
Resolved 4 November 1988
Construction/Loadline
Issued 4 November 1988 Resolved
WATERTIGHT DOOR BETWEEN SECOND AND THIRD COMPARTMENT TO BE REPLACED WITH CLASS 1 DOOR WITH INDICATOR LIGHT ON BRIDGE.
Condition: Unknown
Due 4 November 1988
Resolved 4 November 1988
Lifesaving
Issued 4 November 1988 Resolved
PROVIDE WATERTIGHT CONTAINER FOR FLARES.
Condition: Unknown
Due 4 November 1988
Resolved 4 November 1988

Casualty record · 1

20 October 2007Significant Marine Casualty · role: Transiting Vicinity of Primary Subject · serious marine incident, as classified · 2 dead · 2 injured · activity 3085223
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Recorded names · 1

CAPT. DAVE (2007). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.