MAURY USCG vessel records Sign in
← All vessels

PLACIDA QUEEN

PLACIDA QUEEN is a 1960 passenger vessel (inspected). The Coast Guard has recorded 57 inspections since 1985, most recently in October 2018, along with 168 deficiencies and 1 casualty investigation in 2005.

Records from 1985 to 2018. Most recent: inspection, 10 October 2018.

Built
1960
Last inspected
10 October 2018
Documentation
No Operation - PM · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDD4234
Flag
UNITED STATES
367141990 (licence lapsed)
Maury page id
psix-43920

Inspections, by type

…with no type recorded8
Years with a record 26 calendar years (1985–2018)
The 57 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 8 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)57.1 ft × 16.0 ft × 5.3 ft
Registered tonnagegross 55 / net 37
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
Builderbuilder not recorded · ROCK HALL, MD, UNITED STATES · built 1960
Hull materialWood
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portPLACIDA, FL
Trade endorsementsCoastwise, unrestricted, Fishery, Recreational
DocumentationNo Operation - PM · issued 30 June 2004
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it55 - Regulatory (Subpart C or D), Gross Ton
37 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDD4234MMSI 367141990 · expired · compulsorily equipped · granted 27 September 2006, cancelled 3 December 2016
WCZ3234MMSI not assigned · expired · compulsorily equipped · granted 8 June 1999, cancelled 8 August 2009
WST5895MMSI not assigned · expired · compulsorily equipped · granted 4 April 1994, cancelled 15 August 2004 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspected as a tow unit · 1

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

ANGLER'S DREAM Passenger (Inspected) · MISLE 396505 · 2 July 2007 · activity 3081722

Inspection history · 57

10 October 2018 Type not recorded
No type recorded · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 6558482
13 January 2009 Administrative Inspection
Administrative · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 3393156
4 October 2008 Type not recorded
No type recorded · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 3357567
23 June 2008 Administrative Inspection
Administrative · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 3285202
28 November 2007 Deficiency Check · Administrative Inspection
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 3114763
25 October 2007 COI Inspection · Deficiency Check
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 3086364
2 July 2007 Deficiency Check · Administrative Inspection
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 3019194
2 July 2007 Type not recorded
No type recorded · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 3081722
27 February 2007 Deficiency Check · In-Service Inspection
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 2898152
20 September 2006 Administrative Inspection · Deficiency Check · Annual Inspection
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 2781392
6 October 2005 Deficiency Check
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 2514674
17 May 2005 COI Inspection
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 2359910
2 February 2005 Type not recorded
No type recorded · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 2285785
2 February 2005 Type not recorded
No type recorded · Station Fort Myers Beach · USCG Southeast District (CGD-SE) · Activity 2286459
2 February 2005 Examination of Repairs · Damage Survey
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 2289124
10 January 2005 Deficiency Check
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 2280755
9 December 2004 Annual Inspection
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 2256080
9 July 2004 Examination of Repairs
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 2139311
28 June 2004 Hull Examination
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 2113326
25 August 2003 Deficiency Check
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 1887951
1 July 2003 Administrative Inspection · Annual Inspection
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 1831348
11 September 2002 Annual Inspection
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 1673664
28 June 2002 Hull Examination
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 1631809
4 September 2001 Re-Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1467323
21 July 2000 Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1051974
19 June 2000 Hull Examination · COI Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1410351
15 July 1999 Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 777712
15 June 1999 Re-Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1411915
9 March 1999 Plan Review "T" Boat
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 812807
20 January 1999 Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 778112
26 May 1998 Re-Inspection · Hull Examination
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1131066
24 July 1997 MARPOL Annex V Examination · COI Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 781106
26 September 1996 MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1165585
23 May 1996 Deficiency Check · Hull Examination
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1090453
14 July 1995 Re-Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1182495
2 July 1995 Hull Examination · Deficiency Check
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1188061
8 August 1994 Administrative
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1179215
28 July 1994 MARPOL Annex V Examination · Drydock Extension · COI Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 861716
23 August 1993 Re-Inspection · MARPOL Annex V Examination
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 830995
20 October 1992 Hull Examination
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 935891
15 September 1992 Re-Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 949007
11 October 1991 Hull Examination
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1246978
23 August 1991 COI Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1250391
22 October 1990 Administrative
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 905213
6 September 1990 Re-Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1240806
27 June 1990 Hull Examination
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 904764
18 September 1989 Re-Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1350686
20 March 1989 Hull Examination
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1209962
25 August 1988 COI Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1037526
23 December 1987 Administrative
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1314041
19 August 1987 Re-Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1030272
9 April 1987 Hull Examination
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1332767
25 August 1986 Re-Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 986714
27 August 1985 COI Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 991237
6 August 1985 Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1292914
30 May 1985 Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1288264
8 April 1985 Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1291872

Deficiency record · 168

Documentation › Logs/Records › Drug Test Records
Issued 25 October 2007 Resolved
PROVIDE EVIDENCE THAT SUPERVISORS/CREW TRAINING HAS BEEN CONDUCTED FOR EMPLOYEE ASSISTANCE PROGRAM.
Action required: 705 - Other - as specified
Due 1 November 2007
Resolved 31 October 2007
Documentation › Manifests/Lists › Emergency Checkoff List
Issued 25 October 2007 Resolved
POST EMERGENCY INSTRUCTION LIST I.A.W. 46CFR185.504
Action required: 705 - Other - as specified
Due 1 November 2007
Resolved 31 October 2007
Navigation › Piloting/Steering › Coast Guard Light List
Issued 25 October 2007 Resolved
UPDATE ALL NAVIGATION PUBS/CHARTS
Action required: 705 - Other - as specified
Due 1 November 2007
Resolved 31 October 2007
Lifesaving › Hand Flares › Quantity
Issued 25 October 2007 Resolved
REPLACE 3 EXPIRED FLARES
Action required: 705 - Other - as specified
Due 1 November 2007
Resolved 31 October 2007
Communications › Public Address System › Loudspeaker
Issued 25 October 2007 Resolved
MAKE PERMANENT REPAIRS TO THE INTERNAL COMMUNICATION SYSTEM IN WAY OF THE PASSENGER CABIN. REPAIR/REPLACE WIRING FROM MISSING SPEAKER STBD/AFT.
Action required: 705 - Other - as specified
Due 1 November 2007
Resolved 31 October 2007
Lifesaving › Lifefloat › Retroreflective Material
Issued 25 October 2007 Resolved
REPLACE WASTED RETROREFLECTIVE TAPE ON LIFEFLOAT.
Action required: 705 - Other - as specified
Due 28 November 2007
Resolved 28 November 2007
Fire Fighting › Means of Escape › Doorways
Issued 25 October 2007 Resolved
PROVIDE MEANS OF SECURING BOTH PASSENGER CABIN DOORS FROM THE INSIDE AND PROPERLY MARK - "EMERGENCY EXIT-KEEP CLEAR"
Action required: 705 - Other - as specified
Due 25 October 2007
Resolved 31 October 2007
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 25 October 2007 Resolved
PROVIDE NON CORROSIVE CLIP IN CONJUNCTION WITH A 3'-6' LANYARD FOR THE RING BUOY.
Action required: 705 - Other - as specified
Due 1 November 2007
Resolved 31 October 2007
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 30 July 2007 Resolved
Repair cracked exhaust piping.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 October 2007
Documentation › Logs/Records › Drug Test Records
Issued 2 July 2007 Resolved
Provide documentation (MIS report) that vessel is in compliance with chemical testing program.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 October 2007
Personnel › Certificates/Documents/Licenses › License, Master
Issued 2 July 2007 Resolved
Provide valid Coast Guard license operator for the vessel.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 October 2007
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 2 July 2007 Resolved
Provide passenger count and log book. (Cleared the same day)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 July 2007
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 2 July 2007 Resolved
Remove the number 8 D battery from main deck.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 October 2007
Documentation › Certificates/Documents › Certificate of Inspection
Issued 2 July 2007 Resolved
Complete in-service/annual exam.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 October 2007
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 27 February 2007 Resolved
Vessel to complete an in-service inspection and clear outstanding requirements prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 March 2007
Documentation › Certificates/Documents › FCC SSL
Issued 20 September 2006 Resolved
Renw expired FCC Radiotelephony Cert.
Action required: 705 - Other - as specified
Due 10 October 2006
Resolved 9 October 2006
Documentation › Certificates/Documents › FCC SSL
Issued 20 September 2006 Resolved
Provide documentary proof that a member of Dream Catchers Charters, Inc has a valid FCC Marine Operators Permit.
Action required: 705 - Other - as specified
Due 10 October 2006
Resolved 9 October 2006
Communications › Radio Communications › EPIRB
Issued 20 September 2006 Resolved
Update 406 EPIRB NOAA registration. O/o and emergency contact information needs to reflect new company.
Action required: 705 - Other - as specified
Due 27 September 2006
Resolved 27 September 2006
Resolution: Cleared
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 20 September 2006 Resolved
Remove excess water from engine room bilge. Also remove rotted out overhead panels in engine room hanging overtop of machinery
Action required: 705 - Other - as specified
Due 27 September 2006
Resolved 3 October 2006
Resolution: Cleared
Lifesaving › Lifefloat › Paddle
Issued 20 September 2006 Resolved
replace missing lifefloat paddles. Should be two paddles per lifefloat.
Action required: 705 - Other - as specified
Due 27 September 2006
Resolved 27 September 2006
Resolution: Cleared
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 20 September 2006 Resolved
Refresh expired first aid kit items.
Action required: 705 - Other - as specified
Due 27 September 2006
Resolved 27 September 2006
Resolution: Cleared
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 20 September 2006 Resolved
Service or replace B-I portable fire extinguisher in galley area
Action required: 705 - Other - as specified
Due 27 September 2006
Resolved 3 October 2006
Resolution: Cleared
Electrical › Electric Supply System (service) › Battery Conductor
Issued 20 September 2006 Resolved
Replace battert wing nuts with hex nuts
Action required: 705 - Other - as specified
Due 27 September 2006
Resolved 3 October 2006
Resolution: Cleared
Stability › Unintentional Flooding › General
Issued 20 September 2006 Resolved
Repair or seal galley area deck drain. Currently water is going directly into the bilge and not overboard.
Action required: 705 - Other - as specified
Due 27 September 2006
Resolved 3 October 2006
Resolution: Cleared
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type III
Issued 20 September 2006 Resolved
Place a lock on the MSD overboard valve.
Action required: 705 - Other - as specified
Due 27 September 2006
Resolved 3 October 2006
Resolution: Cleared
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 17 May 2005 Resolved
PROVIDE A PROPER MASTHEAD LIGHT AS PER COAST GUARD NAV RULES.
Due 17 June 2005
Resolved 6 October 2005
Lifesaving › Buoyant Apparatus › Floating Electric Waterlight
Issued 17 May 2005 Resolved
PROVIDE PROPER FLOAT LIGHT BATTERIES FOR RING BOUYS AND BOUYANT APPARATUS LIGHTS.
Due 27 May 2005
Resolved 6 October 2005
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 10 February 2005 Resolved
Provide repair proposal to arrest corrosion on fuel tanks.
Action required: 705 - Other - as specified
Due 1 March 2005
Resolved 23 February 2005
Engineering › Fuel Oil Storage/Transfer System › Filter/Strainer
Issued 10 February 2005 Resolved
Provide flame screen on fuel strainer for generator.
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 February 2005
Resolved 23 February 2005
Engineering › Diesel Engine (propulsion-reduction gear) › Bedplate
Issued 10 February 2005 Resolved
Provide repair proposal to correct worn engine mounts.
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 February 2005
Resolved 23 February 2005
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 10 February 2005 Resolved
Repair coolant leak on front of generator.
Action required: 705 - Other - as specified
Due 1 March 2005
Resolved 23 February 2005
Engineering › Diesel Engine (propulsion-reduction gear) › Air-flex Clutch
Issued 10 February 2005 Resolved
Remount PTO belt on starboard engine to prevent chaffing.
Action required: 705 - Other - as specified
Due 1 March 2005
Resolved 23 February 2005
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 10 February 2005 Resolved
Provide working temp gauge for starboard engine.
Action required: 705 - Other - as specified
Due 1 March 2005
Resolved 23 February 2005
Stability › Watertight Integrity › General
Issued 10 February 2005 Resolved
Double clamp deck drain at hull penetration in lazarette.
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 February 2005
Resolved 23 February 2005
Stability › Watertight Integrity › General
Issued 10 February 2005 Resolved
Provide watertight hatch for lazarrete.
Action required: 705 - Other - as specified
Due 18 February 2005
Resolved 23 February 2005
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 10 February 2005 Resolved
Correct/repair leak on starboard exhaust pipe.
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 February 2005
Resolved 23 February 2005
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 10 February 2005 Resolved
Properly install and route fuel lines for all engines. Flex hose greater than 30" must be installed with high pressure type fittings - all hose must meet SAE J-1942, see 46 CFR 182.455 and 46 CFR 182.720.
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 February 2005
Resolved 23 February 2005
Engineering › Bilge Water Management System › Pump
Issued 10 February 2005 Resolved
Prove proper operation of bilge pump in lazarette.
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 February 2005
Resolved 10 February 2005
Engineering › Sea-water System (primary cooling) › Piping
Issued 2 February 2005 Resolved
Repair starboard muffler and support properly. Repair or renew muffler support.
Action required: 701 - Prior to carriage of passengers/cargo
Due 11 February 2005
Resolved 10 February 2005
Engineering › Bilge Water Management System › Pump
Issued 2 February 2005 Resolved
Prove proper operation of all bilge pumps and alarms.
Action required: 701 - Prior to carriage of passengers/cargo
Due 11 February 2005
Resolved 23 February 2005
Electrical › Electric Generation Source (service) › Generator
Issued 2 February 2005 Resolved
Prove proper operation of the generator.
Action required: 701 - Prior to carriage of passengers/cargo
Due 11 February 2005
Resolved 23 February 2005
Electrical › Electric Supply System (service) › Cable
Issued 2 February 2005 Resolved
Repair starboard engine starter wiring.
Action required: 701 - Prior to carriage of passengers/cargo
Due 11 February 2005
Resolved 23 February 2005
Operations/Management › Navigation Safety › Navigation Underway, General
Issued 2 February 2005 Resolved
Prepare vessel for a complete CG inspection.
Action required: 701 - Prior to carriage of passengers/cargo
Due 11 February 2005
Resolved 23 February 2005
Operations/Management › Casualty Reporting/Post-Casualty Actions › Filing Written Report of Marine Casualty
Issued 2 February 2005 Resolved
Provide CG-2692 to MSD FT Myers by 07 FEB 2005.
Action required: 701 - Prior to carriage of passengers/cargo
Due 7 February 2005
Resolved 7 February 2005
Engineering › Fuel Oil Service System › Hose
Issued 2 February 2005 Resolved
RENEW STARBOARD ENGINE FUEL SUPPLY HOSE.
Action required: 701 - Prior to carriage of passengers/cargo
Due 23 March 2005
Resolved 25 March 2005
Engineering › Fuel Oil Storage/Transfer System › Hose
Issued 2 February 2005 Resolved
RENEW GENSET FUEL TANK FILL HOSE AND SUPPORT PROPERLY.
Action required: 701 - Prior to carriage of passengers/cargo
Due 23 March 2005
Resolved 25 February 2005
Engineering › Shafting/Propeller Arrangements › Stern Gland
Issued 2 February 2005 Resolved
DOUBLE CLAMP PORT AND STARBOARD SHAFT PACKING GLANDS AT EACH END.
Action required: 701 - Prior to carriage of passengers/cargo
Due 23 March 2005
Resolved 25 February 2005
Lifesaving › Hand Flares › Quantity
Issued 9 December 2004 Resolved
PROVIDE 2 ADDITIONAL RED OR ORANGE SMOKE SIGNALING DEVICES ONBOARD.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 January 2005
Resolved 10 January 2005
Documentation › Markings/Placards › Warning Signs
Issued 9 December 2004 Resolved
POST AN EMERGENCY BROADCAST PLACARD NEAR THE VHF-FM RADIO.
Due 9 January 2005
Resolved 10 January 2005
Lifesaving › Lifefloat › Float-free Link
Issued 9 December 2004 Resolved
PROVIDE A WEAK LINK FOR THE 11 PERSON BOUYANT APPARATUS.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 January 2005
Resolved 10 January 2005
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Number
Issued 9 December 2004 Resolved
PROVIDE AN ADDITIONAL B-II PORTABLE FIRE EXTINGUISHER ONBOARD VESSEL.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 January 2005
Resolved 10 January 2005
Construction/Loadline › Penetrations › Pipe Flange
Issued 28 June 2004 Resolved
PROPERLY REPAIR STARBOARD STERN EXHAUST PENETRATION.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 September 2004
Resolved 29 November 2004
Engineering › Shafting/Propeller Arrangements › Strut Bearing
Issued 28 June 2004 Resolved
RENEW PORT STRUT BUSHING.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 September 2004
Resolved 29 November 2004
Construction/Loadline › Hull › Bottom Plating
Issued 28 June 2004 Resolved
CROP OUT LOOSE FIBERGLASS AND PLYWOOD IN WAY OF PORT PROP SHAFT FOR FURTHER INSPECTION.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 September 2004
Resolved 29 November 2004
Construction/Loadline › Hull › Side Shell
Issued 28 June 2004 Resolved
CROP OUT LOOSE FIBERGLASS AND PLYWOOD IN WAY OF MARKED SIDESHELL AREAS PORT AND STARBOARD SIDES FOR FURTHER INSPECTION.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 September 2004
Resolved 29 November 2004
Construction/Loadline › Hull › Collision Strap
Issued 28 June 2004 Resolved
REPAIR RUB RAIL WHERE FRACTURED ON PORT AND STARBOARD SIDES OF VESSEL.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 September 2004
Resolved 29 November 2004
Construction/Loadline › Hull › Side Shell
Issued 28 June 2004 Resolved
REMOVE EXPOSED NAILS AND SCREWS IN SIDESHELL AND INSTALL/SEAL PROPERLY.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 September 2004
Resolved 29 November 2004
Construction/Loadline › Hull › Transverse Frame
Issued 28 June 2004 Resolved
REMOVE IMPROPER FRAME REPAIR AND INSTALL PROPER SISTER REPAIR PORT SIDE 1ST TRANSVERSE FRAME FROM FORWARD BULKHEAD IN #2 HOLD.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 September 2004
Resolved 29 November 2004
Construction/Loadline › Structures › Transverse Bulkhead
Issued 28 June 2004 Resolved
PROPERLY REPAIR/REPLACE LOOSE COLLISION BULKHEAD; PROVIDE REPAIR PROPOSAL PRIOR TO COMMENCING REPAIR.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 September 2004
Resolved 29 November 2004
Construction/Loadline › Hull › Transverse Frame
Issued 28 June 2004 Resolved
PROPERLY REPAIR LOOSE TRANVERSE FRAMES AFT PORTSIDE OF #2 HOLD.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 September 2004
Resolved 29 November 2004
Construction/Loadline › Hull › Transverse Frame
Issued 28 June 2004 Resolved
RE-ATTACH ALL LOOSE TRANSVERSE FRAMES THROUGHOUT VESSEL.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 September 2004
Resolved 29 November 2004
Construction/Loadline › Hull › Side Shell
Issued 28 June 2004 Resolved
RENEW ALL MARKED ROTTED PLANKS IN #2 HOLD.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 September 2004
Resolved 29 November 2004
Construction/Loadline › Hull › Transverse Frame
Issued 28 June 2004 Resolved
REMOVE IMPROPER REPAIRED FRAMES PORTSIDE AFT END OF FOREPEAK SPACE AND INSTALL NEW FRAMES.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 September 2004
Resolved 29 November 2004
Construction/Loadline › Hull › Transverse Frame
Issued 28 June 2004 Resolved
PROPERLY FASTEN REPAIRED SISTER FRAMES TO SIDESHELL PLANKS.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 September 2004
Resolved 29 November 2004
Construction/Loadline › Hull › Transverse Frame
Issued 28 June 2004 Resolved
RENEW FRACTURED AFTERMOST PORT TRANSVERSE FRAME IN #3 HOLD.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 September 2004
Resolved 29 November 2004
Construction/Loadline › Hull › Bottom Plating
Issued 28 June 2004 Resolved
RENEW ROTTED BOTTOM PLANK PORT SIDE AFT IN ENGINE ROOM.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 September 2004
Resolved 29 November 2004
Construction/Loadline › Hull › Transverse Frame
Issued 28 June 2004 Resolved
RENEW SPLIT OVERHEAD TRANSVERSE DECK FRAME LOCATED BEHIND THE VESSELS OFFICIAL NUMBER.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 September 2004
Resolved 29 November 2004
Engineering › Bilge Water Management System › Valve
Issued 28 June 2004 Resolved
PROVIDE A POSITIVE CLOSURE VALVE FOR ALL BILGE PUMP OVERBOARD HOSES AT THE HULL CONNECTION.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 September 2004
Resolved 29 November 2004
Construction/Loadline › Structures › Transverse Bulkhead
Issued 28 June 2004 Resolved
RE-ATTACH AFT ENGINE ROOM BULKHEAD TO HULL PLANKS.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 September 2004
Resolved 29 November 2004
Construction/Loadline › Hull › Bottom Plating
Issued 28 June 2004 Resolved
RENEW ROTTED BOTTOM PLANK PORT SIDE 3RD PLANK AFT OF FORWARD BULKHEAD IN THE LAZERETTE.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 September 2004
Resolved 29 November 2004
Construction/Loadline › Structures › Transverse Bulkhead
Issued 28 June 2004 Resolved
RE-ATTACH FORWARD BULKHEAD TO SIDE PLANKS IN #3 HOLD.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 September 2004
Resolved 29 November 2004
Construction/Loadline › Hull › Transverse Frame
Issued 28 June 2004 Resolved
RE-ATTACH LOOSE FRAME TO SIDESHELL PLANKS PORT SIDE FORWARD IN #3 HOLD.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 September 2004
Resolved 29 November 2004
Electrical › Electrical Distribution System (service) › Wiring
Issued 28 June 2004 Resolved
REMOVE ALL DEAD-END/UNUSED ELECTRICAL WIRING IN ENGINEROOM.
Due 15 September 2004
Resolved 9 December 2004
Electrical › Electrical Distribution System (service) › Wiring
Issued 28 June 2004 Resolved
PROPERLY SUPPORT WIRING IN ENGINEROOM.
Due 15 September 2004
Resolved 9 December 2004
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 28 June 2004 Resolved
REPAIR LOOSE DECK HANDRAIL ON PORT SIDE OF MAIN DECK.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 September 2004
Resolved 29 November 2004
Accommodation/Occupational Safety › Occupational Safety
Issued 1 July 2003 Resolved
Properly repair stbd bridge bulwark. Install chain/barrier to retrict passengers from area. LEGACY COMPONENT DESC: Deck Rail
Due 1 August 2003
Resolved 25 August 2003
Lifesaving › Lifejacket/PFD (General)
Issued 1 July 2003 Resolved
Provide placard for donning jacket style PFDs.
Due 1 August 2003
Resolved 25 August 2003
Accommodation/Occupational Safety › Medical/First Aid
Issued 1 July 2003 Resolved
Provide CG approved (46CFR 160.041) 1st aid kit onboard vessel. LEGACY COMPONENT DESC: Medicine Chest
Due 1 August 2003
Resolved 25 August 2003
Engineering › Bilge Water Management System
Issued 1 July 2003 Resolved
Properly support, re-hose, and double clamp port sink overboard drain in way of #3 hold. LEGACY COMPONENT DESC: Piping
Due 1 August 2003
Resolved 17 September 2003
Engineering › Fuel Oil Service System › Valve, Control
Issued 1 July 2003 Resolved
Make port and starboard fuel remote shutoff valve operational.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 August 2003
Resolved 1 July 2003
Engineering › Steering Gear System
Issued 1 July 2003 Resolved
Tighten port and starboard rudder packing glands. LEGACY COMPONENT DESC: Rudder Stock
Due 1 August 2003
Resolved 25 August 2003
Lifesaving › Lifebuoys
Issued 1 July 2003 Resolved
Provide proper UV resistant, non-kinking, floating line (6') for ring bouy light. LEGACY COMPONENT DESC: Buoyant Lifeline
Due 1 August 2003
Resolved 25 August 2003
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 11 September 2002 Resolved
Relocate PA Speaker partially blocking stern nav light.
Action required: 17 - Rectify deficiencies prior to departure
Due 11 September 2002
Resolved 11 September 2002
Lifesaving › Buoyant Apparatus
Issued 11 September 2002 Resolved
Apply retro-reflective tape to both bouyant apparatus.
Due 11 October 2002
Resolved 8 October 2002
Lifesaving › Buoyant Apparatus
Issued 11 September 2002 Resolved
Provide floating polypropylene sea painter for bouyant apparatus.
Due 11 October 2002
Resolved 8 October 2002
Lifesaving › Lifebuoys
Issued 11 September 2002 Resolved
Renew lifering.
Due 11 October 2002
Resolved 8 October 2002
Engineering › Fuel Oil Storage/Transfer System
Issued 11 September 2002 Resolved
Provide flame screens for fuel tank vents.
Due 11 October 2002
Resolved 8 October 2002
Engineering › Fuel Oil Service System
Issued 11 September 2002 Resolved
Label remote fuel and ventilation shutdowns.
Due 11 October 2002
Resolved 8 October 2002
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 11 September 2002 Resolved
Tighten all main engine mounting bolts. LEGACY COMPONENT DESC: Bedplate
Due 11 October 2002
Resolved 8 October 2002
Engineering › Bilge Water Management System
Issued 11 September 2002 Resolved
Clean engineroom, make engines and bilges oil free.
Due 11 October 2002
Resolved 8 October 2002
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 11 September 2002 Resolved
Remove plastic hose sight glass installed on all three fuel tanks.
Due 8 October 2002
Resolved 8 October 2002
Construction/Loadline › Hull › Keel
Issued 28 June 2002 Resolved
SCARF OUT & REPAIR 6" OF DAMAGED SKEG APPROX 4' FWD OF STERN. SCARF OUT AT LEAST 3" AROUND AREA OF DAMAGE.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 June 2002
Engineering › Shafting/Propeller Arrangements
Issued 28 June 2002 Resolved
REPAIR/RENEW STBD PROPELLER.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 June 2002
Engineering › Steering Gear System › Rudder
Issued 28 June 2002 Resolved
REPAIR BENT STBD RUDDER.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 June 2002
Engineering › Shafting/Propeller Arrangements › Strut
Issued 28 June 2002 Resolved
RENEW STBD PROP SHAFT STRUT BUSHING.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 June 2002
Engineering › Shafting/Propeller Arrangements › Strut
Issued 28 June 2002 Resolved
REPAIR STBD PROP SHAFT STRUT CONNECTION TO HULL.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 June 2002
Engineering › Sea-water System (primary cooling) › Valve
Issued 28 June 2002 Resolved
OPEN ALL SEA VALVES FOR INSPECTION.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 June 2002
Construction/Loadline › Hull › Transverse Frame
Issued 28 June 2002 Resolved
REPAIR FRACTURED FRAME PORT SIDE 4TH AFT FROM FWD BULKHEAD IN #2 HOLD. SISTER FRAMING ACCEPTABLE.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 June 2002
Accommodation/Occupational Safety
Issued 19 June 2000 Resolved
MARK ENTRANCE TO UPPER DECK WITH MAX CAPACITY OF PASSENGERS ALLOWED.
Condition: Unknown
Due 19 June 2000
Resolved 19 June 2000
Documentation
Issued 19 June 2000 Resolved
PROVIDE AND POST FCC SAFETY CERTIFICATE, ORIGINAL IS FADED BEYOND LEGIBILITY.
Condition: Unknown
Due 29 June 2000
Resolved 29 June 2000
Lifesaving
Issued 19 June 2000 Resolved
PROVIDE RESCUE LADDER AND PLATFORM.
Condition: Unknown
Due 19 June 2000
Resolved 19 June 2000
Navigation
Issued 19 June 2000 Resolved
INSTALL INLINE FUSE ON VHF RADIO LOCATED IN PILOT HOUSE.
Condition: Unknown
Due 19 June 2000
Resolved 19 June 2000
Navigation
Issued 19 June 2000 Resolved
TIGHTEN PACKING GLAND ON STARBOARD RUDDER POST.
Condition: Unknown
Due 29 June 2000
Resolved 29 June 2000
Construction/Loadline
Issued 19 June 2000 Resolved
MAKE COAMING AROUND FORWARD HATCH AND 2ND HATCH WATERTIGHT THE REQUIRED 12 INCHES.
Condition: Unknown
Due 19 June 2000
Resolved 19 June 2000
Construction/Loadline
Issued 15 June 1999 Resolved
MAKE FORE PEAK HATCH WATERTIGHT._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 15 June 1999
Resolved 15 June 1999
Engineering
Issued 15 June 1999 Resolved
DOUBLE CLAMP ALL RAW WATER HOSES IN ENGINE ROOM._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 15 June 1999
Resolved 15 June 1999
Documentation
Issued 15 June 1999 Resolved
PROVIDE FCC OPERATOR'S PERMIT FOR RADIO OPERATOR._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 15 June 1999
Resolved 15 June 1999
Electrical
Issued 15 June 1999 Resolved
INSTALL COVERS ON LIGHT FIXTURES IN MACHINERY ROOM._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 15 June 1999
Resolved 15 June 1999
Lifesaving
Issued 15 June 1999 Resolved
INSTALL 60' DARK BUOYANT LINE ON RING BUOY._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 15 June 1999
Resolved 15 June 1999
Lifesaving
Issued 15 June 1999 Resolved
INSTALL 1 ADDITIONAL WATERLIGHT ON LIFEFLOAT._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 15 June 1999
Resolved 15 June 1999
Lifesaving
Issued 15 June 1999 Resolved
LABEL ADULT AND CHILD PFD STOWAGE._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 15 June 1999
Resolved 15 June 1999
Construction/Loadline
Issued 26 May 1998 Resolved
EFFECT PERMANENT REPAIRS TO THE #2 AND #3 VERTICAL FRAMES, PORT SIDE, IN THE #1 VOID.
Condition: Unknown
Due 26 May 1998
Resolved 26 May 1998
Engineering
Issued 26 May 1998 Resolved
PROVIDE ADEQUATE GUARDS/ PROTECTION FOR THE INSTALLED ROTATING MACHINERY INTHE ENGINE ROOM.
Condition: Unknown
Due 3 August 1998
Resolved 7 August 1998
Construction/Loadline
Issued 26 May 1998 Resolved
CAP THE UNUSED OVERBOARD DISCHARGE LINE STARBOARD SIDE.
Condition: Unknown
Due 3 August 1998
Resolved 7 August 1998
Navigation
Issued 26 May 1998 Resolved
TIGHTEN THE STARBOARD RUDDER POST SHAFT CONNECTION.
Condition: Unknown
Due 3 August 1998
Resolved 7 August 1998
Construction/Loadline
Issued 26 May 1998 Resolved
PORT SIDE DECK CLAMP, FASTEN THE FORWARD END AND SCARF BLOCK NEXT BAY AFT.
Condition: Unknown
Due 15 July 1998
Resolved 7 August 1998
Construction/Loadline
Issued 26 May 1998 Resolved
BAY #2 STARBOARD SIDE, REMOVE FASTENER TREAT AND BUTT BLOCK.
Condition: Unknown
Due 15 July 1998
Resolved 7 August 1998
Construction/Loadline
Issued 26 May 1998 Resolved
BAY #3 STARBOARD SIDE REMOVE FASTENER TREAT AND PROPERLY BUTT BLOCK AFFECTED PLANK.
Condition: Unknown
Due 15 July 1998
Resolved 7 August 1998
Construction/Loadline
Issued 26 May 1998 Resolved
#2 VOID, TIGHTEN THE THIRD FRAME AFT OF COLLISION BULKHEAD STARBOARD SIDE.
Condition: Unknown
Due 15 July 1998
Resolved 7 August 1998
Construction/Loadline
Issued 26 May 1998 Resolved
#2 VOID, STARBOARD SIDE FRAME IN WAY OF FORWARD BULKHEAD REMOVE BOTTOM END OF SUPPORT FRAME, INSERT VERTICAL SUPPORT AND BOLT THROUGH.
Condition: Unknown
Due 15 July 1998
Resolved 7 August 1998
Construction/Loadline
Issued 26 May 1998 Resolved
PROPERLY SEAL AND MAKE WATERTIGHT BULKIHEAD PENETRATIONS AND PORT AND STARBOARD SIDE SCANTLING JOINTS.
Condition: Unknown
Due 15 July 1998
Resolved 7 August 1998
Construction/Loadline
Issued 26 May 1998 Resolved
#2 VOID, PROPERLY SEAL BOTTOM LONGITUDINALS IN WAY OF AFTER BULKHEAD.
Condition: Unknown
Due 15 July 1998
Resolved 7 August 1998
Construction/Loadline
Issued 26 May 1998 Resolved
ENGINE ROOM SPACE, 1ST BAY PORTS SIDE, REMOVE FASTENER AND PROPERLY BUTT BLOCK.
Condition: Unknown
Due 15 July 1998
Resolved 7 August 1998
Electrical
Issued 26 May 1998 Resolved
ENGINE ROOM, PROVIDE PROPER ELECTRICAL CONNECTION BOXES AND CRIMPS FOR INSTALLED STARTER WIRES.
Condition: Unknown
Due 15 July 1998
Resolved 7 August 1998
Construction/Loadline
Issued 26 May 1998 Resolved
REFASTEN THE #2 BULKHEAD PORT SIDE.
Condition: Unknown
Due 26 May 1998
Resolved 26 May 1998
Lifesaving
Issued 26 May 1998 Resolved
PROVIDE RETROREFLECTIVE TAPE FOR THE INSTALLED LIFERING.
Condition: Unknown
Due 26 May 1998
Resolved 26 May 1998
Construction/Loadline
Issued 26 May 1998 Resolved
FWD OF COLLISION BULKHEAD, TREAT THE #2, #6, PLANK STBD AND #& PORT SIDE PLANKS.
Condition: Unknown
Due 15 July 1998
Resolved 7 August 1998
Lifesaving
Issued 24 July 1997 Resolved
Replace reflective tape on 15 adult PFDS.
Condition: Unknown
Due 24 July 1997
Resolved 25 July 1997
Navigation
Issued 24 July 1997 Resolved
Repair port running light.
Condition: Unknown
Due 24 July 1997
Resolved 25 July 1997
Lifesaving
Issued 24 July 1997 Resolved
Provide guard to cover conveyor belt on emergency generator.
Condition: Unknown
Due 24 July 1997
Resolved 25 July 1997
Construction/Loadline
Issued 23 May 1996 Resolved
Conduct internal exam of all spaces with a Marine Inspector in attendance.
Condition: Unknown
Due 3 June 1996
Resolved 6 August 1996
Construction/Loadline
Issued 2 July 1995 Resolved
RENEW FRAMES 2 AND 3 PORT AND 2 STARBOARD FROM AFT IN MID BODY COMPARTMENT
Condition: Unknown
Due 2 July 1995
Resolved 2 July 1995
Construction/Loadline
Issued 2 July 1995 Resolved
GET VESSEL UNDERWAY WITH MARINE INSPECTOR
Condition: Unknown
Due 31 July 1995
Resolved 31 July 1995
Construction/Loadline
Issued 2 July 1995 Resolved
REMOVE FASTENERS AS DIRECTED BY MARINE INSPECTOR FOR INSPECTION
Condition: Unknown
Due 31 July 1995
Resolved 31 July 1995
Construction/Loadline
Issued 2 July 1995 Resolved
RENEW KEELSON
Condition: Unknown
Due 31 July 1995
Resolved 31 July 1995
Construction/Loadline
Issued 2 July 1995 Resolved
MAKE ALL SUBDIVISION BULKHEADS WATERTIGHT
Condition: Unknown
Due 31 July 1995
Resolved 31 July 1995
Construction/Loadline
Issued 2 July 1995 Resolved
RENEW SHIRT CHINE CLAMPS IN LAZARETTE PORT AND STARBOARD
Condition: Unknown
Due 31 July 1995
Resolved 31 July 1995
Construction/Loadline
Issued 2 July 1995 Resolved
REFASTEN ALL LOOSE PLANKS
Condition: Unknown
Due 31 July 1995
Resolved 31 July 1995
Engineering
Issued 2 July 1995 Resolved
RENEW MAIN ENGINE AND GENERATOR FUEL HOSES WITH APPROVED HOSES
Condition: Unknown
Due 31 July 1995
Resolved 31 July 1995
Engineering
Issued 2 July 1995 Resolved
RENEW STARBOARD SHAFT
Condition: Unknown
Due 27 July 1995
Resolved 27 July 1995
Engineering
Issued 2 July 1995 Resolved
RENEW STARBOARD SHAFT CUTLASS BEARING.
Condition: Unknown
Due 27 July 1995
Resolved 27 July 1995
Construction/Loadline
Issued 2 July 1995 Resolved
RENEW FIRE PUMP THRU HULL FITTING
Condition: Unknown
Due 27 July 1995
Resolved 27 July 1995
Engineering
Issued 2 July 1995 Resolved
REALIGN STARBOARD ENGINE AND STRUTS
Condition: Unknown
Due 27 July 1995
Resolved 27 July 1995
Engineering
Issued 2 July 1995 Resolved
TIGHTEN All MAIN ENGINE MOUNT BOLTS
Condition: Unknown
Due 27 July 1995
Resolved 27 July 1995
Construction/Loadline
Issued 2 July 1995 Resolved
IN ENGINEROOM RENEW FRAMES 3,4,5,6,7 STARBOARD SIDE AND 3 PORT SIDE
Condition: Unknown
Due 27 July 1995
Resolved 27 July 1995
Construction/Loadline
Issued 2 July 1995 Resolved
RENEW CHINE CLAMP STARBOARD SIDE IN ENGINEROOM
Condition: Unknown
Due 27 July 1995
Resolved 27 July 1995
Construction/Loadline
Issued 2 July 1995 Resolved
REMOVE CIELINGS TO ALLOW ACCESS FOR MARINE INSPECTOR TO CHECK FRAMES
Condition: Unknown
Due 31 July 1995
Resolved 31 July 1995
Engineering
Issued 2 July 1995 Resolved
REPAIR PORT ENGINE, AFT ENGINE BED
Condition: Unknown
Due 27 July 1995
Resolved 27 July 1995
Construction/Loadline
Issued 2 July 1995 Resolved
REPLACE BOTTOM PLANK AFT OF STARBOARD ENGINE IN WAY OF ROT.
Condition: Unknown
Due 27 July 1995
Resolved 27 July 1995
Electrical
Issued 2 July 1995 Resolved
RENEW PORT MAIN ENGINE BATTERY CABLE TO MAIN DISCONNECT SWITCH
Condition: Unknown
Due 27 July 1995
Resolved 27 July 1995
Construction/Loadline
Issued 2 July 1995 Resolved
INSTALL BUTT BLOCKS OVER ALL OLD THRU HULL PLUGS
Condition: Unknown
Due 27 July 1995
Resolved 27 July 1995
Construction/Loadline
Issued 2 July 1995 Resolved
RENEW CHINE CLAMP PORT SIDE ENGINEROOM
Condition: Unknown
Due 27 July 1995
Resolved 27 July 1995
Construction/Loadline
Issued 2 July 1995 Resolved
RENEW OUTBOARD FORWARD BOTTOM LONGITUDINAL PORT SIDE IN MIDBODY COMPARTMENT
Condition: Unknown
Due 27 July 1995
Resolved 27 July 1995
Construction/Loadline
Issued 2 July 1995 Resolved
RENEW SIDE PLANK STARBOARD SIDE BY #2 FRAME IN WAY OF BREAK
Condition: Unknown
Due 2 July 1995
Resolved 2 July 1995
Construction/Loadline
Issued 2 July 1995 Resolved
RENEW BOTTOM PLANK STARBOARD SIDE IN FORWARD COMPARTMENT IN WAY OF BREAK
Condition: Unknown
Due 2 July 1995
Resolved 2 July 1995
Construction/Loadline
Issued 2 July 1995 Resolved
RENEW STARBOARD TOP PLANK IN COLLISION COMPARTMENT DUE TO ROT
Condition: Unknown
Due 2 July 1995
Resolved 2 July 1995
Construction/Loadline
Issued 2 July 1995 Resolved
RENEW ROTTED DECK AT COLLISION COMPARTMENT AND HATCH COVER
Condition: Unknown
Due 31 July 1995
Resolved 31 July 1995
Construction/Loadline
Issued 2 July 1995 Resolved
RENEW ATHWARTSHIPS BOTTOM BEAM IN LAZARETTE
Condition: Unknown
Due 31 July 1995
Resolved 31 July 1995
Construction/Loadline
Issued 2 July 1995 Resolved
RENEW PLANK STARBOARD SIDE IN ENGINEROOM AT CHINE, ROTTED BETWEEN FRAMES 10AND 11
Condition: Unknown
Due 27 July 1995
Resolved 27 July 1995
Construction/Loadline
Issued 2 July 1995 Resolved
RENEW 4 AND 5 FRAMES PORT SIDE AND 6 STARBOARD SIDE IN LAZARETTE
Condition: Unknown
Due 31 July 1995
Resolved 31 July 1995
Construction/Loadline
Issued 2 July 1995 Resolved
RENEW STARBOARD SIDE TRANSOM FRAMES 1 AND 2
Condition: Unknown
Due 31 July 1995
Resolved 31 July 1995
Electrical
Issued 28 July 1994 Resolved
MAKE WATERTIGHT THE OUTSIDE STARBOARD FORWARD DECK LIGHT IN ACCORDANCE WITH46 CFR 183.05-35(B).
Condition: Unknown
Due 28 July 1994
Resolved 28 July 1994
Lifesaving
Issued 28 July 1994 Resolved
REPLACE BROKEN WEAK LINK FOR BUOYANT APPARATUS.
Condition: Unknown
Due 28 July 1994
Resolved 28 July 1994
Lifesaving
Issued 28 July 1994 Resolved
PROVIDE 15 ADDITIONAL ADULT PFD'S. NUMBER OF PASSENGERS IS LIMITED TO 60 UNTIL THIS REQUIREMENT IS CORRECTED.
Condition: Unknown
Due 29 July 1994
Resolved 29 July 1994
Fire Fighting
Issued 28 July 1994 Resolved
REPAIR LOOSE BRACKETS FOR ALL BII PORTABLE FIRE EXTINGUISHERS.
Condition: Unknown
Due 29 July 1994
Resolved 29 July 1994
Construction/Loadline
Issued 18 September 1989 Resolved
MAKE COLLISION BULKHEAD WATERTIGHT.
Condition: Unknown
Due 18 September 1989
Resolved 18 September 1989
Navigation
Issued 18 September 1989 Resolved
REBUSH RUDDER CROSS-LINK.
Condition: Unknown
Due 18 September 1989
Resolved 18 September 1989
Fire Fighting
Issued 18 September 1989 Resolved
RENEW FIRE PUMP SUCTION HOSE TO THRU HULL WHERE FRAYED.
Condition: Unknown
Due 18 September 1989
Resolved 18 September 1989

Casualty record · 1

2 February 2005Routine · role: Involved in a Marine Casualty · activity 2285785
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.