Records from 1984 to 2008. Most recent: inspection, 27 October 2008.
Inspection history · 49
27 October 2008
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3352309
13 March 2008
COI Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3141736
7 November 2007
Hull Examination · Damage Survey · Examination of Repairs · Administrative Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3063622
21 September 2007
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3117039
5 September 2007
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3044421
27 September 2006
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 2771237
10 August 2006
Hull Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 2743418
24 July 2006
Damage Survey
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 2756487
19 July 2006
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 2724473
6 October 2005
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 2508658
26 September 2005
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 2490692
6 December 2004
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 2254530
29 November 2004
Hull Examination · Damage Survey
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 2252714
20 November 2004
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 2250052
26 August 2004
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 2252945
28 June 2004
Deficiency Check · COI Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 2114294
5 April 2004
Hull Examination
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 2012903
19 February 2002
Hull Examination
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1487616
4 October 2001
Re-Inspection
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1460575
26 May 2000
Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1052504
18 February 2000
Hull Examination
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1389246
17 February 2000
COI Inspection
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1439095
1 June 1999
Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 804990
23 April 1999
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 791007
20 March 1998
COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1446613
2 March 1998
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1449015
24 March 1997
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1105804
10 March 1997
Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1413139
31 January 1996
Re-Inspection · Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1367645
20 March 1995
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1135078
1 March 1995
Hull Examination · COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1358684
2 February 1994
Re-Inspection · Deficiency Check · Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1458138
18 February 1993
Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 841931
5 February 1993
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 836814
14 February 1992
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 957154
10 February 1992
COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 956702
23 January 1992
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 956505
25 February 1991
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 923327
21 February 1991
Re-Inspection · Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1226567
22 January 1990
Hull Examination · Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1244450
17 January 1989
COI Inspection · Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1199013
5 January 1989
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1349195
27 January 1988
Deficiency Check · Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1323204
11 January 1988
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1010568
6 January 1987
Hull Examination · Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1314583
2 January 1986
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1307659
11 December 1985
Deficiency Check · COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1297802
7 January 1985
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1284923
15 December 1984
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 977118
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 27 March 2008
Resolved
Provide alcohol testing device on board. Vessel is restricted to routes less than 2 hours away from testing facility until testing device provided.
Action required: 705 - Other - as specified
Due 27 April 2008
Resolved 24 April 2008
Resolution: Vessel owner provided proof of purchase of Testing Kit from the Maritime Consortium.
Documentation › Logs/Records › Drug Test Records
Issued 27 March 2008
Resolved
Conduct Satisfactory DAPI audit.
Action required: 705 - Other - as specified
Due 30 April 2008
Resolved 27 April 2008
Resolution: Conduct Satisfactory DAPI audit.
Lifesaving › Rescue Boat › Embarkation/Disembarkation Capabilities
Issued 13 March 2008
Resolved
Provide rescue boat or platform or other suitable arrangement in accordance with 46CFR180.210.
Action required: 705 - Other - as specified
Due 13 April 2008
Resolved 27 March 2008
Resolution: Vessel has constructed a rescue platform to be used during Man Overboard.
Operations/Management › Drills/Instruction › Not Conducted
Issued 13 March 2008
Resolved
Establish procedure for training and emergency drills IAW 46CFR185.420 and 46CFR185.520.
Action required: 705 - Other - as specified
Due 13 April 2008
Resolved 27 March 2008
Resolution: Vessel provided emergency training and drill logs.
Lifesaving › Hand Flares › Quantity
Issued 13 March 2008
Resolved
Provide correct number of signaling devices in accordance with 46CFR180.68.
Action required: 705 - Other - as specified
Due 13 April 2008
Resolved 27 March 2008
Resolution: vessel is equip with 6 red, and 6 orange flares as required.
Lifesaving › Lifefloat › Painter
Issued 13 March 2008
Resolved
Correct lifefloat arrangement so as to comply with 46CFR180.137 and stencil in accordance with 46CFR185.604.
Action required: 705 - Other - as specified
Due 13 April 2008
Resolved 27 March 2008
Resolution: Vessel corrected lifefloat arrangement and stenciled name of vessel on lifefloats.
Engineering › Bilge Water Management System › Pump
Issued 13 March 2008
Resolved
Repair/replace bilge pump float switch in second lazarette compartment.
Action required: 705 - Other - as specified
Due 13 April 2008
Resolved 27 March 2008
Resolution: Vessel repaired bilge pump float switch in second lazarette compartment.
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 13 March 2008
Resolved
Provide 8 Type I PFDs in accordance with 46CFR180.71. 8 condemned and destroyed during course of COI inspection.
Action required: 705 - Other - as specified
Due 13 April 2008
Resolved 27 March 2008
Resolution: Vessel provided 8 Type I PFDs.
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 13 March 2008
Resolved
Provide proof of implementation of drug testing program in accordance with 46CFR16, 49CFR401, and 33CFR95.
Action required: 705 - Other - as specified
Due 13 April 2008
Resolved 27 March 2008
Resolution: Vessel provided documentation showing that their consortium is Memorial Maritime Clinic.
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 7 November 2007
Resolved
On port side fuel vent, install 30x30 mesh.
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 April 2008
Resolved 13 March 2008
Resolution: Mesh installed.
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 7 November 2007
Resolved
Remove soft patch from the starboard side fuel vent and repair or replace side fuel vent and repair/replace as necessary
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 March 2008
Resolution: Soft patch removed from starboard side fuel vent and necessary repairs made.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Tanks
Issued 7 November 2007
Resolved
Properly mount fixed fire extinguishing system bottle per manufacturer's guidelines.
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 April 2008
Resolved 27 March 2008
Resolution: Vessel mounted fixed fire extinguishing system vertically per manufacturer''s guidelines.
Stability › Weathertight Integrity › General
Issued 7 November 2007
Resolved
Replace broken window on port side aft of the pilot house with marine grade glass IAW 46 CFR 177.1010.
Action required: 705 - Other - as specified
Due 5 April 2008
Resolved 13 March 2008
Resolution: Window replaced with marine grade glass.
Electrical › Electrical Distribution System (service) › Wiring
Issued 7 November 2007
Resolved
In fuel tank space, remove dead end wire on the inboard side, aft end by the fuel tank.
Action required: 705 - Other - as specified
Due 5 April 2008
Resolved 13 March 2008
Resolution: Wire removed.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 7 November 2007
Resolved
Repair or replace minor leak on the fuel valve on the port fuel tank.
Action required: 705 - Other - as specified
Due 5 April 2008
Resolved 13 March 2008
Resolution: Leak repaired.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 7 November 2007
Resolved
Repair or replace the fuel tank support on starboard fuel tank (forward, inboard, top support)
Action required: 705 - Other - as specified
Due 5 April 2008
Resolved 13 March 2008
Resolution: Support renewed.
Construction/Loadline › Hull › Keel
Issued 22 September 2007
Resolved
Keel twisted and fractured due to vessel breaking away from mooring buoy. Conduct damage survey, repairs and hull exam prior to carrying passengers to the satisfaction of a Coast Guard marine inspector prior to getting underway.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 October 2007
Resolved 5 March 2008
Resolution: After having repair proposal approved, portion of keel was replaced, damaged planks were replaced and hull exam was conducted. Dry dock credit given on this date. Check ride to be completed n 13MAR when COI inspection is conducted.
Documentation › Certificates/Documents › FCC SSL
Issued 27 September 2006
Resolved
Provide current FCC Radio Safety Certificate IAW requirements in 47 CFR 80.903 Vessel is limited to operation within 1000ft from the North Shore of Santa Catalina Island between Seal Rocks and Arrow Point.
Action required: 705 - Other - as specified
Due 4 December 2006
Resolved 11 December 2006
Resolution: Received faxed copy of vaild FCC Radio Safety Certificate , expires 17 OCT 2011.
Operations/Management › Drug and Alcohol Testing › EAP Training Requirements
Issued 27 September 2006
Resolved
Provide proof that EAP supervisor has received the one hour training required by 46 CFR 16.
Condition: Unknown
Action required: 705 - Other - as specified
Due 4 December 2006
Resolved 11 December 2006
Resolution: Received faxed copy of EAP supervisor training.
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 27 September 2006
Resolved
Provide proof of participation in active Drug & Alcohol testing program IAW 46 CFR 16.
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 October 2006
Resolved 27 September 2006
Resolution: Received faxed copy from consortium proving enrollment.
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 27 September 2006
Resolved
Provide 9 serviceable type 1 Adult PFD's. Vessel carrying capacity is reduced to 42 persons onboard.
Action required: 705 - Other - as specified
Due 27 October 2006
Resolved 27 September 2006
Resolution: Repairs were made to jackets requiring Retro and additional jackets were provided.
Construction/Loadline › Hull › Keel
Issued 24 July 2006
Resolved
Repair damage to keel, lazarrette bottom planking and rudders, due to grounding to the satisfaction of the attending marine inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 September 2006
Resolved 15 September 2006
Resolution: Repairs completed and satisfactory check-ride completed.
Electrical › Electric Generation Source (service) › Power Requirement
Issued 24 July 2006
Resolved
Submit a single line electrical drawing for approval for the electric submersible bilge pumping system.
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 September 2006
Resolved 15 September 2006
Resolution: Electrical drawing submitted and approved
Engineering › Bilge Water Management System › Valve
Issued 24 July 2006
Resolved
Install shut off valves at the hull for each electric submersible bilge pump discharge as per 46 CFR 182.530
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 September 2006
Resolved 15 September 2006
Resolution: Shut off valves installed iaw 46 CFR 182.530
Engineering › Bilge Water Management System › Manifold
Issued 24 July 2006
Resolved
Repair engine room bilge pump manifold in engine room where repaired with white plastic hose.
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 September 2006
Resolved 15 September 2006
Resolution: System removed.
Engineering › Bilge Water Management System › Pump
Issued 24 July 2006
Resolved
Demonstrate operation of the engine driven bilge pump in all compartments.
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 September 2006
Resolved 15 September 2006
Resolution: Engine driven bilge pump beyond repair and removed from vessel; new electrical submersible bilge pump installed and works satisfactorily.
Electrical › Electrical Distribution System (service) › Wiring
Issued 24 July 2006
Resolved
Electrical Inverter installation must be verified IAW approved plans.
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 September 2006
Resolved 15 September 2006
Resolution: Electrical inverter installation verified iaw approved plan.
Fire Fighting › Fixed Gas Fire Extinguishing System › Tanks
Issued 26 September 2005
Resolved
Provide a fixed gas fire system for the engine room. (The fixed gas fire system had been removed for servicing.) This item must be corrected to the satisfaction of an attending marine inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 October 2005
Resolved 6 October 2005
Resolution: Provided a fixed gas fire system for the engine room.
Communications › Alarms/Indicators › Bilge Alarm
Issued 26 September 2005
Resolved
Demonstrate operation of the bilge alarm system in the forepeak and lazarette. This item must be corrected to the satisfaction of an attending marine inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 October 2005
Resolved 6 October 2005
Resolution: Bilge alarm system was operable in the forepeak and lazarette.
Electrical › Electrical Distribution System (service) › Overcurrent Device
Issued 26 September 2005
Resolved
Provide properly sized circuit protection, at the source of power, for the 12VDC anchor windlass.
Action required: 705 - Other - as specified
Due 27 October 2005
Resolved 6 October 2005
Resolution: Provided properly sized circuit protection, at the source of power, for the 12VDC anchor windlass.
Operations/Management › Drug and Alcohol Testing › Employee Coverage
Issued 26 September 2005
Resolved
Provide evidence of a drug testing program as per 46 CFR 16. This item must be corrected to the satisfaction of an attending marine inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 October 2005
Resolved 6 October 2005
Resolution: Provided evidence of a drug testing program.
Operations/Management › Navigation Safety › Carriage of Charts and Publications
Issued 26 September 2005
Resolved
Make corrections to the navigational charts on the vessel or provide updated/corrected charts.
Action required: 705 - Other - as specified
Due 27 October 2005
Resolved 6 October 2005
Resolution: Provided updated/corrected charts.
Engineering › Sea-water System (primary cooling) › Valve
Issued 26 September 2005
Resolved
Plug the unused sea-cock in the forward hold.
Action required: 705 - Other - as specified
Due 27 October 2005
Resolved 6 October 2005
Resolution: Provided a cap/plug for the unused sea-cock in the forward hold
Engineering › Fuel Oil Service System › Flange
Issued 26 September 2005
Resolved
Provide flame bowls for the RACOR fuel filters on both main engines.
Action required: 705 - Other - as specified
Due 27 October 2005
Resolved 6 October 2005
Resolution: Flame bowls provided for the RACOR fuel filters on both main engines
Engineering › Bilge Water Management System › Valve
Issued 26 September 2005
Resolved
Provide a stop valve at the overboard connection for the electric submersible bilge pump in the after hold.
Action required: 705 - Other - as specified
Due 27 October 2005
Resolved 6 October 2005
Resolution: A stop valve was provided at the overboard connection for the electric submersible bilge pump in the after hold
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 26 September 2005
Resolved
Provide evidence that the annual user fee has been paid.
Action required: 705 - Other - as specified
Due 27 October 2005
Resolved 5 October 2005
Communications › Radio Communications › EPIRB
Issued 26 September 2005
Resolved
Provide updated hydrostatic release for the 406 EPIRB.
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 October 2005
Resolved 6 October 2005
Resolution: Provided updated hydrostatic release for the 406 EPIRB.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 26 September 2005
Resolved
Provide a separate clip and line for the ring buoy waterlight.
Action required: 705 - Other - as specified
Due 27 October 2005
Resolved 26 September 2005
Lifesaving › Lifefloat › Float Free
Issued 26 September 2005
Resolved
Properly secure the seapainters to all lifefloats.
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 October 2005
Resolved 26 September 2005
Electrical › Electric Supply System (service) › Battery Installation
Issued 26 September 2005
Resolved
Provide an approved electrical plan for the 12VDC inverter system in the engine room.
Action required: 705 - Other - as specified
Due 10 September 2006
Resolved 15 September 2006
Resolution: Electrical plan submitted and approved
Operations/Management › Navigation Safety › Requirements for Vessels at Anchor
Issued 26 September 2005
Resolved
Provide an operable anchor light.
Action required: 705 - Other - as specified
Due 27 October 2005
Resolved 6 October 2005
Resolution: Anchor light is operable
Operations/Management › Drills/Instruction › Not Conducted
Issued 26 September 2005
Resolved
Provide a training program for the crew as per 46 CFR 185.420.
Action required: 705 - Other - as specified
Due 27 October 2005
Resolved 6 October 2005
Resolution: Provided a training program for the crew
Electrical › Electrical Distribution System (service) › Conductor
Issued 26 September 2005
Resolved
Replace the primary 12VDC electrical cable to the starboard main engine starter.
Action required: 705 - Other - as specified
Due 27 October 2005
Resolved 6 October 2005
Resolution: Replaced the primary 12VDC electrical cable to the starboard main engine starter
Documentation › Certificates/Documents › Certificate of Inspection
Issued 5 April 2004
Resolved
Owner must conduct a complete certificate of inspection prior to carrying passengers.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 May 2004
Resolved 28 June 2004
Resolution: Resolved by [name withheld]
Documentation › Certificates/Documents › FCC SSL
Issued 4 October 2001
Resolved
Provide valid FCC Safety Certificate prior to carrying passengers.
Condition: Unknown
Due 18 February 2002
Resolved 28 June 2004
Resolution: Resolved by [name withheld]
Documentation › Logs/Records › Drug Test Records
Issued 4 October 2001
Resolved
Provide valid chemical testing program.
Condition: Unknown
Due 18 February 2002
Resolved 28 June 2004
Resolution: Resolved by [name withheld]
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 4 October 2001
Resolved
Repair waterlight for lifering prior to carrying passengers.
Condition: Unknown
Due 18 February 2002
Resolved 28 June 2004
Resolution: Resolved by [name withheld]
Lifesaving › Hand Flares › Not on Board
Issued 4 October 2001
Resolved
Provide distress signals IAW 46CFR180.68 prior to carrying passengers.
Condition: Unknown
Due 18 February 2002
Resolved 28 June 2004
Resolution: Resolved by [name withheld]
Lifesaving › Inflatable Buoyant Apparatus › Not on Board
Issued 4 October 2001
Resolved
Provide life saving apparatus IAW 46CFR180 prior to carrying passengers.
Condition: Unknown
Due 18 February 2002
Resolved 28 June 2004
Resolution: Resolved by [name withheld]
Lifesaving › Buoyant Apparatus › Not on Board
Issued 4 October 2001
Resolved
Provide valid EPIRB registration.
Condition: Unknown
Due 18 February 2002
Resolved 28 June 2004
Resolution: Resolved by [name withheld]
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 4 October 2001
Resolved
Provide annual servicing of fixed and portable fire fighting systems prior to carrying passengers.
Condition: Unknown
Due 18 February 2002
Resolved 28 June 2004
Resolution: Resolved by [name withheld]
Construction/Loadline › Hull › Bottom Plating
Issued 4 October 2001
Resolved
Install bilge level alarm in compartment aft of engineroom.
Condition: Unknown
Due 18 February 2002
Resolved 28 June 2004
Resolution: Resolved by [name withheld]
Lifesaving › Buoyant Apparatus › Not on Board
Issued 4 October 2001
Resolved
Demonstrate satisfactory fire & man overboard drills prior to carrying passengers.
Condition: Unknown
Due 18 February 2002
Resolved 28 June 2004
Resolution: Resolved by [name withheld]
Lifesaving › Lifejacket/PFD (General) › Lights
Issued 4 October 2001
Resolved
Provide lights for 20 PFDs. Vessel restricted to limited coastwise route.
Condition: Unknown
Due 18 February 2002
Resolved 28 June 2004
Resolution: Resolved by [name withheld]
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 4 October 2001
Resolved
Replace retro-reflective tape on liferings prior to carrying passengers.
Condition: Unknown
Due 18 February 2002
Resolved 28 June 2004
Resolution: Resolved by [name withheld]
Construction/Loadline
Issued 18 February 2000
Resolved
Repair port shaft log where rotted in engine room.
Condition: Unknown
Due 18 February 2001
Resolved 26 February 2002
Resolution: Saft log replaced.
Lifesaving
Issued 10 March 1997
Resolved
REPLACE ONE ADULT LIFEJACKET.
Condition: Unknown
Due 10 March 1997
Resolved 10 March 1997
Construction/Loadline
Issued 10 March 1997
Resolved
TREAT SURFACE WOOD ROT AT FLOOR TO FRAME JOINT IN WAY OF PORT SHAFT.
Condition: Unknown
Due 10 March 1997
Resolved 10 March 1997
Fire Fighting
Issued 10 March 1997
Resolved
RE-CHARGE ONE B-II EXTINGUISHER.
Condition: Unknown
Due 10 March 1997
Resolved 10 March 1997
Engineering
Issued 31 January 1996
Resolved
LAG P/S EXHAUST PIPING TO MUFFLER.
Condition: Unknown
Due 14 February 1996
Resolved 24 April 1996
Construction/Loadline
Issued 31 January 1996
Resolved
TREAT E/R FURRING IN FOLLOWING AREAS: (PORT) DECK LONGITUDINAL BEAM, E/R COVER SUPPORT BEAMS, FLOORS FROM SIDESHELL TO FLOOR LONGITUDINAL BEAM, ALL TRANSVERSE BEAMS BETWEEN #2 & #6 FROM FORWARD, #2 & #3 TRANSVERSE DECK BEAMS (FROM FWD), AND FORWARD MOST SIDESHELL TIMBERS; (CONT'D)
Condition: Unknown
Due 14 February 1996
Resolved 24 April 1996
Construction/Loadline
Issued 31 January 1996
Resolved
(CONT'D) (STBD) 2 AFT TRANSVERSE DECK BEAMS, #6 FLOOR TIMBER (FROM FWD), AND DECK LONGITUDINAL BEAM.
Condition: Unknown
Due 14 February 1996
Resolved 24 April 1996
Construction/Loadline
Issued 31 January 1996
Resolved
SEAL DECK AND COVER ABOVE ENGINE ROOM TO REDUCE WATER LEAKAGE INTO ENGINE ROOM.
Condition: Unknown
Due 14 February 1996
Resolved 24 April 1996
Construction/Loadline
Issued 31 January 1996
Resolved
TREAT FURRING IN 1ST COMPARTMENT FORWARD OF STEERING COMPARTMENT (BY BAIT TANKS) ALONG FORWARD BULKHEAD AT TOP BETWEEN TWO DECK LONGITUDINAL BEAMS.
Condition: Unknown
Due 14 February 1996
Resolved 24 April 1996
Construction/Loadline
Issued 31 January 1996
Resolved
TREAT FURRING IN STEERING COMPARTMENT BETWEEN FORWARDMOST TRANSVERSE FRAME AND FORWARD BULKHEAD ON OUTBOARD FLOORS.
Condition: Unknown
Due 14 February 1996
Resolved 24 April 1996
Documentation
Issued 1 March 1995
Resolved
PROVIDE CURRENT COPY OF RULES OF THE ROAD
Condition: Unknown
Due 1 April 1995
Resolved 23 March 1995
Construction/Loadline
Issued 1 March 1995
Resolved
CONDUCT UNDERWAY TRIALS WITH A MARINE INSPECTOR
Condition: Unknown
Due 6 March 1995
Resolved 1 March 1995
Documentation
Issued 1 March 1995
Resolved
PROVIDE CURRENT COPY OF 46CFR166-199
Condition: Unknown
Due 1 April 1995
Resolved 23 March 1995
Construction/Loadline
Issued 1 March 1995
Resolved
TREAT FURIING IN EGINE ROOM AND FUEL TANK SPACE
Condition: Unknown
Due 6 March 1995
Resolved 1 March 1995
Electrical
Issued 1 March 1995
Resolved
PROVIDE GLASS GLOBE FOR LIGHT FIXTURE IN E/R
Condition: Unknown
Due 1 April 1995
Resolved 23 March 1995
Construction/Loadline
Issued 1 March 1995
Resolved
REPLACE HATCH COVERS ON BOW AND STERN, MAINDECK
Condition: Unknown
Due 6 March 1995
Resolved 1 March 1995
Construction/Loadline
Issued 2 February 1994
Resolved
CLEAN AND TREAT FUNGAL FURRING IN VARIOUS LOCATIONS ON ENGINEROOM OVERHEAD AND IN PORT OUTBOARD UPPER CORNER OF NEXT COMPARTMENT AFT, AND OUTBOARD OF FUEL TANKS PORT & STARBOARD LONGITUDINALLY IN NEXT COMPARTMENT FORWARD.
Condition: Unknown
Due 2 March 1994
Resolved 1 March 1994
Navigation
Issued 2 February 1994
Resolved
REPLACE CONDUIT TO MAIN STEERING SYSTEM (CABLE AND CHAIN) LOCATED IN LAZARETTE.
Condition: Unknown
Due 17 March 1994
Resolved 1 March 1994
Documentation
Issued 2 February 1994
Resolved
PROVIDE PROOF OF ENROLLMENT IN A RANDOM DRUG TESTING PROGRAM.
Condition: Unknown
Due 17 March 1994
Resolved 1 March 1994
Lifesaving
Issued 10 February 1992
Resolved
PROVIDE WATER LIGHT TO REPLACE OUT DATED CARBIDE WATER LIGHT ON OR BEFORE 10MAR92.
Condition: Unknown
Due 2 March 1992
Resolved 2 March 1992
Lifesaving
Issued 10 February 1992
Resolved
PROVIDE REPLACEMENT CHILDSIZE LIFE PRESERVERS, 3 TOTAL AND 2 ADULT PFD'S FOR A TOTAL OF 29 ADULT AND THREE CHILD-SIZE PFD'S. ITEM TO BE COMPLETE PRIOR TO CARRYING PASSENGERS.
Condition: Unknown
Due 2 March 1992
Resolved 2 March 1992
Lifesaving
Issued 10 February 1992
Resolved
PROVIDE NEW WEAK LINK FOR BUOYANCY APPARATUS. ITEM TO BE COMPLETED PRIOR TOCARRYING PASSENGERS.
Condition: Unknown
Due 2 March 1992
Resolved 2 March 1992
Construction/Loadline
Issued 23 January 1992
Resolved
TREAT FURRING IN ENGINE ROOM.
Condition: Unknown
Due 10 February 1992
Resolved 11 February 1992
Construction/Loadline
Issued 23 January 1992
Resolved
PROVIDE SECURING DEVICES FOR HATCHES ON DECK.
Condition: Unknown
Due 10 February 1992
Resolved 11 February 1992
Lifesaving
Issued 21 February 1991
Resolved
REPLACE LIFELINES AND GRAB LINES ON BUOYANT APPARATUS BEFORE CARRYING PASSENGERS FOR HIRE.
Condition: Unknown
Due 21 February 1991
Resolved 21 February 1991
Lifesaving
Issued 21 February 1991
Resolved
REPLACE 4 ADULT PFD'S. UNTIL THEY'RE REPLACED, TOTAL PERSONS ALLOWED ABOARDIS 25.
Condition: Unknown
Due 21 February 1991
Resolved 21 February 1991
Engineering
Issued 17 January 1989
Resolved
DRILL AND PIN THROTTLE CONTROL LINKAGES TO BOTH ENGINES AND STBD TRANS- MISSION. ITEMS TO BE COMPLETED TO THE SATISFACTION OF THE COGNIZANT OCMI PRIOR TO 31JAN89
Condition: Unknown
Due 17 January 1989
Resolved 17 January 1989
Navigation
Issued 27 January 1988
Resolved
4 REPAIR LEAK AROUND PACKING GLAND ON STBD RUDDER.
Condition: Unknown
Due 27 January 1988
Resolved 27 January 1988
Construction/Loadline
Issued 27 January 1988
Resolved
1 INSTALL FOUR VALVES ON KEEL COOLER PIPING AS CLOSE AS PRACTICLE TO THROUGH HULL FITTING.
Condition: Unknown
Due 27 January 1988
Resolved 27 January 1988
Accommodation/Occupational Safety
Issued 27 January 1988
Resolved
2 INSTALL A LOCK ON MSD OVERVOARD DISCHARGE VALVE OR POST A SIGN INDICATING VALVE TO REMAIN CLOSED.
Condition: Unknown
Due 27 January 1988
Resolved 27 January 1988
Lifesaving
Issued 27 January 1988
Resolved
3 PROVIDE ONE ADULT PFD.
Condition: Unknown
Due 27 January 1988
Resolved 27 January 1988
Unknown
Issued 11 December 1985
Resolved
CONDUCT OPERATIONAL TESTS OF THE FOLLOWING SYSTEMS: BILGE, STEERING, NAVIGATION, ENGINE.
Condition: Unknown
Due 11 December 1985
Resolved 11 December 1985
Unknown
Issued 11 December 1985
Resolved
REPLACE VENT ELBOW IN FORWARD COMPARTMENT (PORT SIDE)
Condition: Unknown
Due 11 December 1985
Resolved 11 December 1985
Documentation
Issued 11 December 1985
Resolved
PROVIDE VALID FCC STATION PERMIT.
Condition: Unknown
Due 11 December 1985
Resolved 11 December 1985
Lifesaving
Issued 11 December 1985
Resolved
ATTACH PENDANTS ON BOUYANT APPARATUS PER REGS.
Condition: Unknown
Due 11 December 1985
Resolved 11 December 1985
Construction/Loadline
Issued 11 December 1985
Resolved
REMOVE FURRING FROM PLANKING IN ENGINEROOM AND TREAT WITH PRESERVATIVE.
Condition: Unknown
Due 11 December 1985
Resolved 11 December 1985