MAURY USCG vessel records
← All vessels

SAFARI EXPLORER

Built
1998
Last inspected
19 June 2026
Documentation
Valid · NVDC file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 19 June 2026
…with no type recorded3
Operational controls None recorded without a removal date
Years with a record 11 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

8964654
WCY5674
478321
Flag
UNITED STATES
Maury page id
psix-478321

Documentation record

Registered dimensions (L × B × D)126.7 ft × 36.0 ft × 11.8 ft
Registered tonnagegross 97 / net 65
ITC dimensions (L × B × D)126.7 ft × 36.0 ft × 11.8 ft
ITC tonnagegross 695 / net 213
BuilderFREEPORT SHIPBUILDING INC · FREEPORT, FL, UNITED STATES · built 1998
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portJUNEAU, AK
Endorsements, as the file codes themcw_un, reg
DocumentationValid · issued 28 January 2026 · expires 28 February 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it97 - Regulatory (Subpart C or D), Gross Ton
695 - Convention (Subpart B), Gross Ton
65 - Regulatory (Subpart C or D), Net Ton
213 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel

Behind this panel: 38 inspections, each with its date, unit and type; 47 deficiencies with the resolution recorded against each, 4 without one; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 38

19 June 2026 Deficiency Check · Administrative Inspection
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 8408336
27 March 2026 Administrative Inspection
Administrative · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8344451
24 March 2026 Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8339087
6 November 2025 Administrative Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8265405
24 September 2025 Internal Structural Exam · Vessel Attendance · Examination of Repairs · Drydock Exam · Administrative Inspection · Inclining Experiment
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8240737
16 September 2025 Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8203009
22 July 2025 Deficiency Check · Administrative Inspection · Damage Survey
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 8191915
29 June 2025 Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8170821
22 November 2024 Type not recorded
No type recorded · USCGC OLIVER BERRY (WPC 1124) · USCG Oceania District (CGD-O) · Activity 8039275
24 September 2024 Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8130561
20 May 2024 Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7916411
12 April 2024 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7894655
28 September 2023 Drydock Exam · Internal Structural Exam · Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7796749
17 August 2023 In-Service Inspection · Damage Survey · Administrative Inspection · Examination of Repairs
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7770504
17 August 2023 Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7890255
21 June 2023 Damage Survey
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7720159
11 May 2023 Damage Survey · Administrative Inspection · Examination of Repairs
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7686464
20 April 2023 Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7672013
24 February 2023 Deficiency Check · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7641749
3 November 2022 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7588672
24 October 2022 Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7582732
18 March 2022 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7420964
21 October 2021 Administrative Inspection · COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7337008
24 September 2021 Drydock Exam · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7321289
28 April 2021 COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7184595
31 August 2020 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7084621
10 October 2019 Administrative Inspection · In-Service Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6832932
16 September 2019 Drydock Exam · Deficiency Check · Internal Structural Exam · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6807603
11 September 2019 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6809645
15 April 2019 Administrative Inspection · Deficiency Check · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6663244
22 June 2018 Deficiency Check · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6453151
19 June 2018 In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6449902
11 May 2018 COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6412252
22 September 2017 Deficiency Check · Internal Structural Exam · Administrative Inspection · Drydock Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6272765
11 May 2017 Deficiency Check · Annual Inspection · DAPI Audit
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6136638
19 October 2016 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6032394
27 May 2016 In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5896564
11 May 2016 DAPI Audit · Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5876561

Deficiency record · 47

01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 31 March 2026 No resolution recorded
Each vessel must, in each condition of loading and operation, comply with the applicable requirements of part 170 of this chapter. Each vessel must have a stability letter issued by the Coast Guard before the vessel is placed into service. Vessel completed required stability test following repower and modifications during 2025 drydock. Supporting stability calculations were Returned for Revision by the Marine Safety Center (MSC Letter, Serial no. H1-2503553). Vessel is permitted to operate within the Sector Western Alaska and U.S. Arctic [name withheld] until 01 October 2026 but must follow the following additional loading restrictions at all times: (1) Fuel tanks shall be loaded to no more than 70% (15,888 gal on board) and (2) sewage tank shall be loaded to no more than 80%. After 01 October 2026, the vessel is not permitted to operate in commercial service until stability calculations are approved with an updated Stability Letter issued by the Marine Safety Center.
Action required: 705 - Other - as specified
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 27 March 2026 No resolution recorded
Each vessel must, in each condition of loading and operation, comply with the applicable requirements of part 170 of this chapter. Each vessel must have a stability letter issued by the Coast Guard before the vessel is placed into service. Vessel completed required stability test following repower and modifications during 2025 drydock. Supporting stability calculations were Returned for Revision by the Marine Safety Center (MSC Letter, Serial no. H1-2503553). Vessel is permitted to operate within the Sector Western Alaska and U.S. Arctic [name withheld] until 01 October 2026 but must follow the following additional loading restrictions at all times: (1) Fuel tanks shall be loaded to no more than 70% (15,888 gal on board) and (2) sewage tank shall be loaded to no more than 80%. After 01 October 2026, the vessel is not permitted to operate in commercial service until stability calculations are approved with an updated Stability Letter issued by the Marine Safety Center. 46 CFR 178.310(a)/46 CFR 170.120(a)
Action required: 705 - Other - as specified
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 17 February 2026 No resolution recorded
Each vessel must, in each condition of loading and operation, comply with the applicable requirements of part 170 of this chapter. Each vessel must have a stability letter issued by the Coast Guard before the vessel is placed into service. Vessel completed required stability test following repower and modifications during 2025 drydock. Supporting stability calculations were Returned for Revision by the Marine Safety Center (MSC Letter, Serial no. H1-2503553). Vessel is permitted to operate within the Sector Honolulu [name withheld] until 01 October 2026 but must follow the following additional loading restrictions at all times: (1) Fuel tanks shall be loaded to no more than 70% (15,888 gal on board) and (2) sewage tank shall be loaded to no more than 80%. After 01 October 2026, the vessel is not permitted to operate in commercial service until stability calculations are approved with an updated Stability Letter issued by the Marine Safety Center. 46 CFR 178.310(a) 46 CFR 170.120(a)
Action required: 705 - Other - as specified
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 6 November 2025 Resolved
Each vessel must, in each condition of loading and operation, comply with the applicable requirements of part 170 of this chapter. Each vessel must have a stability letter issued by the Coast Guard before the vessel is placed into service. Vessel completed required stability test and is awaiting approval from the Marine Safety Center (MSC) along with issuance of new stability letter. The vessel is prohibited from departing the pier with passengers on board until the vessel receives an updated stability letter from the MSC and the conditions of that letter are verified by the local OCMI. 46 CFR 178.310(a) 46 CFR 170.120(a)
Action required: 705 - Other - as specified
Resolved 14 November 2025
Resolution: Mitigating measures put in place and outlined in new deficiency issued 14NOV25.
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 6 November 2025 Resolved
Each vessel must, in each condition of loading and operation, comply with the applicable requirements of part 170 of this chapter. Each vessel must have a stability letter issued by the Coast Guard before the vessel is placed into service. Vessel completed required stability test and is awaiting a approval from the Marine Safety Center (MSC) along with issuance of new stability letter. Vessel is prohibited from carrying more than 15,888 gallons of fuel oil and is required to submit bunker receipts and daily tank soundings to [email withheld] weekly. In addition, sewage tank is limited to 80% capacity. 46 CFR 178.310(a) 46 CFR 170.120(a)
Action required: 705 - Other - as specified
Resolved 17 February 2026
Resolution: Vessel installed neans to prevent overfilling. Cleared deficiency and reissued new deficiency allowing operation in Sector Hono until 01 Oct 2026.
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 24 September 2025 Resolved
Each vessel must, in each condition of loading and operation, comply with the applicable requirements of part 170 of this chapter. Each vessel must have a stability letter issued by the Coast Guard before the vessel is placed into service. MSC approved incline survey procedures were conducted on 14OCT25 with marine inspectors present; vessel is required to have an MSC approved and local OCMI verified stability letter based on the 14OCT25 incline survey before being placed into service. 46 CFR 178.310(a) 46 CFR 170.120(a)
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 November 2025
Resolved 6 November 2025
Resolution: Issued 835 changing deficiency from 701 to 705. Vessel will be tied to pier but permitted to carry passengers until new stability letter received from MSC.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 24 September 2025 Resolved
A propulsion engine control system, including pilothouse control, must be designed so that a loss of power to the control system does not result in an increase in shaft speed or propeller pitch. New electronic propulsion control systems were installed during Sep-Oct 2025 Drydock. Newly installed electronic propulsion control systems shall be tested according to MSC accepted and reviewed testing protocol to be witnessed by USCG marine inspectors.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 November 2025
Resolved 17 November 2025
Resolution: Received approval letter from MSC regarding ZF Marine Propulsion Systems - 785CE Qualitiative Failure Analysis & Design Verification Test Procedure and Periodic Safety Test. Witnessed DVTPs during the sea trials.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 24 September 2025 Resolved
Alterations to equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI, except during an emergency. Repairs or alterations that affect the safety of the vessel include, but are not limited to: propulsion and power supply systems. The owner or managing operator shall submit drawings, sketches, or written specifications describing the details of any proposed alterations. The OCMI may require an inspection and testing whenever a repair or alteration is undertaken. A re-power of the vessel was performed during their Sep-Oct 2025 Drydock. The drawing for “Seawater Cooling Modifications” were submitted to MSC and approved under MSC letter E1-2502749, dated 08/22/25. An onboard verification/inspection of drawing: EBDG Dwg. No. 24099-256-0, Rev. A, was conducted by Sector Puget Sound. SPS found the new installation did not correspond to the approved plan. Multiple discrepancies were identified including bill of materials and clean out deletes were found between the MSC approved plan and the actual onboard installation. Make revisions to plans and/or onboard installations so that the two correspond. Any revised plans shall be submitted to and approved by MSC as follow-up to letter E1-2502749. Follow-on verification by local OCMI may be required once revised approved plans are received.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 November 2025
Resolved 16 January 2026
Resolution: Revised plans approved by MSC (E1-2503544), verified installation
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 24 September 2025 Resolved
Alterations to equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI, except during an emergency. Repairs or alterations that affect the safety of the vessel include, but are not limited to: propulsion and power supply systems;. The owner or managing operator shall submit drawings, sketches, or written specifications describing the details of any proposed alterations. The OCMI may require an inspection and testing whenever a repair or alteration is undertaken. A re-power of the vessel was performed during their Sep-Oct 2025 Drydock. The drawing for “Exhaust System Modifications” were submitted to MSC and approved under MSC letter E1-2502749, dated 08/22/25. An onboard verification/inspection of drawing: EBDG Dwg. No. 24099-259-1, Rev. A was conducted by Sector Puget Sound. SPS found the new installation did not correspond to the approved plan. Multiple discrepancies were identified including bill of materials, sea chest cross connect, strainer type, sea chest installation and skin valve handle location were found between the MSC approved plan and the actual onboard installation. Make revisions to plans and/or onboard installations so that the two correspond. Any revised plans shall be submitted to and approved by MSC as follow-up to letter E1-2502749. Follow-on verification by local OCMI may be required.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 November 2025
Resolved 16 January 2026
Resolution: Revised plans approved by MSC (E1-2503544), verified installation.
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 24 September 2025 No resolution recorded
A vessel must be operated in accordance with applicable laws and regulations and in such a manner as to afford adequate precaution against hazards that might endanger the vessel and the persons being transported. After conducting ultrasonic testing, significant corrosion and pinholes were identified in the tank top and structural members of the sewage tank. The tank top serves as the passenger deck in the lounge area. Due to operational limitations, SPS authorized a temporary repair. The vessel is required to permanently repair, to local OCMI satisfaction, the tank top and structural members of the sewage tank no later than 30 September 2026. No further extensions will be permitted.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 September 2026
Resolution: Permanent repair by 30SEP2026
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 16 September 2025 Resolved
...DOORS OR PASSAGEWAYS USED SOLELY BY CREW MEMBERS MUST HAVE A CLEAR OPENING NOT LESS THAN 28 INCHES...VESSEL HAS TABLES AND CHAIRS IN THE PASSAGEWAY ON THE MAIN DECK FROM THE CREW ACCOMMODATIONS TO THE DINING AREA, NARROWING THE PASSAGEWAY TO 23 INCHES IN WIDTH. VESSEL TO ALTER TABLE CONFIGURATION TO EXPAND WIDTH OF PASSAGEWAY TO 28 INCHES. 46CFR177.500(f)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 October 2025
Resolved 14 October 2025
Resolution: Vessel altered tables in main deck crew passageway to 28"
09 - Working and Living Conditions › 091 - Living Conditions › Pipes, wires (insulation)
Issued 16 September 2025 Resolved
ELECTRICAL EQUIPMENT ON A VESSEL MUST BE INSTALLED AND MAINTAINED TO...PROTECT PASSENGERS, CREW, OTHER PERSONS, AND THE VESSEL FROM ELECTRICAL HAZARDS, INCLUDING FIRE, CAUSED BY OR ORIGINATING IN ELECTRICAL EQUIPMENT, AND ELECTRICAL SHOCK. VSL WAS UTILIZING MULTIPLE "DAISY CHAINED" EXTENSION CORDS NEAR CREW BERTHING. IN ADDITION, MULTIPLE DEAD END WIRES WERE FOUND IN THE ENGINE ROOM. VSL TO REMOVE ANY EXCESS DEAD END WIRES AND DISCONNECT ANY DAISY CHAINED EXTENSION CORDS/POWER STRIPS. 46CFR183.200(b)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 October 2025
Resolved 24 October 2025
Resolution: During sea trials verified dead end wires had been removed from the engine room and all daisy chained extensions cords/power strips had been removed.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 16 September 2025 Resolved
ALL CABLE AND WIRE MUST...BE INSTALLED WITH METAL SUPPORTS SPACED NOT MORE THAN 24 INCHES APART. MULTIPLE POWER DISTRIBUTION CABLES COMING FROM EACH GENERATOR ARE SUPPORTED BY ONLY PLASTIC ZIP TIES FOR THE FIRST 5'. VESSEL TO ADEQUATELY SUPPORT CABLES WITH APPROPRIATELY SPACED METAL SUPPORTS. 46CFR183.340(b)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 October 2025
Resolved 24 October 2025
Resolution: During sea trials verified distribution cables coming from each generator had been adequately supported with appropriately spaced metal supports.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 16 September 2025 Resolved
Make revisions to plans and/or onboard installations so that the two correspond. Any revised plans shall be submitted to and approved by MSC as follow-up to letter E2- 2303615 . Follow- on verification by local OCMI may be required once revised approved plans are received .
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 October 2025
Resolved 17 November 2025
Resolution: Obtained approval letter from MSC for Fire Detection.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 12 April 2024 Resolved
The minimum clear opening of a door or passageway used as a means of escape must not be less than 810 millimeters (32 inches) in width, however, doors or passageways used solely by crew members must have a clear opening not less than 710 millimeters (28 inches). Passenger and crew cabin doors measure less than the minimum requirement for means of escape. When more than six passengers are carried, passengers are prohibited access to overnight accommodation spaces.
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 May 2024
Resolved 8 May 2024
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 12 April 2024 Resolved
Vessels described by 46 CFR 114.110(e) must have an interconnected fire detection system in compliance with 46 CFR 181.450 installed in all enclosed areas where passengers and crew have routine access, including accommodation spaces and machinery spaces. Vessel's existing fire detection system does not produce audible alarms within passenger accommodation spaces. When more than six passengers are carried, the vessel may not operate on a coastwise or oceans route and passengers are prohibited access to overnight accommodation spaces.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 13 May 2024
Resolved 24 September 2024
Resolution: Vessel has temporary interconnected fire detection system in accordance with 46 CFR 181.405(c). Approved system to be installed at next DDX.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 23 October 2023 Resolved
The fire detection and alarm system must be capable of immediate operation at all times that the vessel is in service. Newly installed fire detection system indicated a panel fault with incomplete wiring. Vessel to provide technician servicing report.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 October 2023
Resolved 24 October 2023
Resolution: O/O provided AGOW report for satisfactory installation and operation of Fire detection panel.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 24 February 2023 Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. The starboard main engine experienced knocking and heavy black exhaust smoke while under load. Vessel rep to submit repair plan proposal to [name withheld] repairs are made, attending marine inspector must witness operational tests to ensure engine operates as designed. Vessel must secure the starboard engine while underway enroute to disembark passengers at Kailua Pier. After passengers are disembarked, vessel is not authorized to operate underway with passengers until deficiency is rectified and cleared by attending marine inspector.
Condition: Design Flaw
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 March 2023
Resolved 26 February 2023
Resolution: replaced valve in the #1 cylinder, tested all sat.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 24 October 2022 Resolved
Passageways used solely by crewmembers are required to have clear opening not less than 28 inches. Passageway at entrance of galley space to access hatch to outer deck is less than 28 inches.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 November 2022
Resolved 27 October 2022
Resolution: Marine Inspectors attended vessel to verify the correction of required clearance at the entrance of the galley space.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 24 October 2022 Resolved
Each ladder used as a means of escape must be mounted at least 7 inches from the nearest permanent object. The escape ladder from the crew accommodation space is mounted less than 7 inches from the bulkhead.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 November 2022
Resolved 25 October 2022
Resolution: Vessel representative provided photographic evidence of deficiency correction.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 24 October 2022 Resolved
A generator designed for 40 C (104 F) may be used provide the generator is derated to 80% of full load rating and overcurrent devices reduced accordingly. Overcurrent devices were not reduced accordingly.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 November 2022
Resolved 28 October 2022
Resolution: Vessel representative provided photographic evidence of deficiency correction.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 24 October 2022 Resolved
Each bulkhead penetration by nonmetallic piping must be accomplished using metallic bulkhead fitting with one or more metallic shutoff valves. Hose penetration on port side of engineroom forward bulkhead did not have acceptable fittings or shutoff valves.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 November 2022
Resolved 27 October 2022
Resolution: Marine Inspectors attended vessel to verify the installation of proper bulkhead fittings and shutoff valves.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 5 May 2021 Resolved
All escape hatches and other emergency exits used as means of escape must be marked on both sides. Escape hatch exit in salon not properly marked. Ensure proper marking for escape hatch.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 May 2021
Resolved 5 May 2021
Resolution: Crew marked hatch.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 5 May 2021 Resolved
Portable and semi portable extinguishers must be inspected and maintained IAW NFPA 10 (Incorporated by reference). Found 03 portable fire extinguishers onboard with excessive corrosion. Replace extinguishers 3, 3A and 5.
Action required: 10 - Deficiency Rectified
Due 5 May 2021
Resolved 19 May 2021
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 5 May 2021 Resolved
If more than one ring life buoy is carried, at least one must not have a lifeline attached. All ring life buoys onboard had lifeline attached. Ensure that at leaset one ring buoy does not have a lifeline attached.
Action required: 10 - Deficiency Rectified
Due 5 May 2021
Resolved 19 May 2021
01 - Certificates & Documentation › 011 - Ships Certificates › Load Lines (including Exemption)
Issued 5 May 2021 Resolved
Vessel with a load line is required to have a valid load line certificate. Vessel does not have valid load line certificate. Ensure load line is painted over prior to getting underway and removed at next drydock.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 6 May 2021
Resolved 19 May 2021
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 5 May 2021 Resolved
The number of penetrations in a watertight bulkhead must be minimized and made watertight. Cable penetrations were modified. Seal all cable penetrations to ensure watertightness.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 May 2021
Resolved 19 May 2021
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 5 May 2021 Resolved
Prove proper operation of CO2 shutdown. When demonstrated failed to operate as designed.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 May 2021
Resolved 19 May 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 5 May 2021 Resolved
Repair all fuel oil and lube oil leaks on #3 SSDG. Oil saturated engines turbo and fuel oil leaking from filter bank. Rectify prior to operation of #3 SSDG.
Action required: 705 - Other - as specified
Due 5 May 2021
Resolved 19 May 2021
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 5 May 2021 Resolved
Replace flexible hose in discharge piping on #2 fire pump.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 June 2021
Resolved 19 May 2021
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 5 May 2021 Resolved
Provide CO2 placard next to audible alarm.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 5 May 2021
Resolved 5 May 2021
Resolution: Placard installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 May 2021 Resolved
Replace flexible hose fitted in HVAC cooling line, #2 ME cooling water discharge line, and add a hose clamp to #1 ME cooling line.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 June 2021
Resolved 19 May 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 May 2021 Resolved
Repair salt water flushing line for forward blackwater tank. Line had a hole in it.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 May 2021
Resolved 19 May 2021
08 - Alarms › N/A - No Subsystem › General alarm
Issued 5 May 2021 Resolved
Provide general alarm placard in engine room.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 5 May 2021
Resolved 5 May 2021
Resolution: Placard installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 May 2021 Resolved
Make all electrical enclosures in engine room and steering compartment splash proof. Enclosures were found missing stuffing tubes, open, and missing knockouts.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 June 2021
Resolved 19 May 2021
09 - Working and Living Conditions › 092 - Working Conditions › Holds and tanks safety
Issued 5 May 2021 Resolved
Repair leaking type 2 MSD located in engine room.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 5 May 2021
Resolved 5 May 2021
Resolution: Fixed leaking hatch.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 5 May 2021 Resolved
Provide insulation for EDG turbocharger.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 5 May 2021
Resolved 5 May 2021
Resolution: Insulation provided.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 5 May 2021 Resolved
Provide ventilation for tank void space at next drydock.
Condition: Invalid
Action required: 705 - Other - as specified
Due 30 September 2021
Resolved 21 October 2021
Resolution: Ventilation provided.
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 5 May 2021 Resolved
Vessel did not have crew onboard at time of inspection. Marine Inspector must witness drills at a later date.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 May 2021
Resolved 19 May 2021
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 5 May 2021 Resolved
Gasoline canisters are stored in an open rack on the upper passenger deck creating a hazardous area accessible to passengers. Remove all gasoline canisters from passenger deck until suitable storage is provided.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 May 2021
Resolved 19 May 2021
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 28 April 2021 Resolved
The number and identification of the items stowed inside, and their sizes must be marked in clearly legible letters and numbers on each container for life jackets and immersion suits. Life jacket stowage not properly labeled. Ensure proper labelling for life jacket stowage.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 May 2021
Resolved 5 May 2021
Resolution: Crew installed label.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 28 April 2021 Resolved
Placards containing instructions for donning and use of life jackets aboard the vessel must be posted in conspicuous places regularly accessible to crew and passengers. Placards not posted in conspicuous places. Ensure placards are posted in conspicuous places and readily accessible to crew and passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 May 2021
Resolved 5 May 2021
Resolution: Placard installed.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 15 April 2019 Resolved
A vessel of more than 65ft in length must carry at least one rescue boat; Vessel is required by COI to have (02) rescue boats onboard. Only one boat is operational due to other boat not having pontoon. Repair other rescue boat.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 May 2019
Resolution: Vessel rep replaced pontoon on the rescue boat.
Pollution Prevention/Response › Prevention Equipment › Sewage System Tank
Issued 25 October 2016 Resolved
Vessel completed alterations to grey water and sewage piping systems, to include modifications of tanks and electrical systems, without receiving OCMI approval. Title 46 CFR 176.700(a) requires that alterations to the machinery or equipment that affect the safety of the vessel to be made w/ OCMI approval. You must submit plans to the USCG for approval & make vessel available for inspection.
Condition: Invalid
Action required: 705 - Other - as specified
Due 30 November 2016
Resolved 11 May 2017
Resolution: Vessel has submitted and obtained approval from OCMI of grey water tank/piping installations. Piping traced and looked at while onboard. All sat.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Location
Issued 27 May 2016 Resolved
Remove or properly secure loose items in CO2 space, which include crutches, e-board, vacuum, etc. and train crew on new location.
Action required: 17 - Rectify deficiencies prior to departure
Due 27 May 2016
Resolved 27 May 2016
Resolution: items removed or secured and crew trained.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 27 May 2016 Resolved
Remove and properly store oil spill response equipment in location other than emergency generator room and train crew on new location.
Action required: 17 - Rectify deficiencies prior to departure
Due 27 May 2016
Resolved 27 May 2016
Resolution: equipment moved and crew trained.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 11 May 2016 Resolved
Floating light was barely able to maintain floatation while thrown overboard during drill. Discovered unapproved battery spec number. Approved replacement battery required with float test.
Action required: 705 - Other - as specified
Due 16 May 2016
Resolved 13 May 2016
Resolution: Installed an approved battery and float test was successful. Battery spec #: EVEREADY NO. 510S

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.