MAURY USCG vessel records
← All vessels

D.B. GENERAL

Built
1996
Last inspected
18 October 2017
Documentation
No record in the NVDC file of 10 August 2026
Controls
None recorded without a removal date

This record may be incomplete: the most recent inspection recorded for this vessel was 9 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.

Inspection record

Last inspected 18 October 2017
…with no type recorded10
Operational controls None recorded without a removal date
Years with a record 20 calendar years (1996–2017)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WRP5640
440018
Flag
UNITED STATES
Maury page id
psix-440018

Documentation record

Tonnage as PSIX records it4040 - Convention (Subpart B), Gross Ton
1212 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Professional
The full record for this vessel

Behind this panel: 43 inspections, each with its date, unit and type; 57 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; 4 other vessels inspected with it; no other recorded names; no NVDC documentation record for this Official Number. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 4

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

KELLY C Towing Vessel · MISLE 92482 · 17 February 2005 · activity 2302958SOLANA Towing Vessel · MISLE 138271 · 17 February 2005 · activity 2302958MADISON BAY Freight Barge · MISLE 55150 · 23 January 2001 · activity 56891ALYSSA ANN Towing Vessel · MISLE 88937 · 23 January 2001 · activity 56891

Inspection history · 43

18 October 2017 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6290370
6 December 2016 Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6053718
18 July 2016 Internal Structural Exam · Drydock Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5947395
7 June 2016 Drydock Extension · Administrative Inspection · Internal Structural Exam
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5900532
7 January 2016 Annual Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5792607
20 August 2015 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5225888
3 November 2014 Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5017071
31 October 2014 COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5015917
14 February 2014 Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5017038
9 July 2013 Drydock Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4649507
6 November 2012 Annual Inspection · Deficiency Check · Drydock Extension
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4479346
22 November 2011 Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4208383
2 July 2008 Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3240893
1 April 2008 Drydock Exam · Internal Structural Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3170012
13 September 2007 Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3056635
23 August 2007 Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3036581
11 July 2007 Annual Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 2990323
10 May 2006 Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 2645618
11 April 2006 Internal Structural Exam · Hull Examination
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 2619624
16 August 2005 Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 2468128
28 July 2005 COI Inspection · Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 2424633
17 February 2005 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 2302958
29 July 2004 Annual Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 2260502
12 April 2004 Hull Examination · Internal Structural Exam
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 2112049
26 August 2003 Periodic Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1874211
12 September 2002 Annual Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1671944
23 August 2001 Re-Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1399701
12 June 2001 Hull Examination
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1462273
23 January 2001 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 56891
1 August 2000 COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1373115
10 November 1999 Administrative
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 810500
10 November 1999 Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1416982
8 July 1999 Hull Examination
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1423214
13 August 1998 Deficiency Check · COI Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1388603
16 July 1998 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 207883
16 July 1998 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 769779
14 November 1997 Re-Inspection
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1368598
28 March 1997 Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1433193
10 January 1997 Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 763759
8 January 1997 Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 208766
12 August 1996 COI Inspection
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1421184
17 July 1996 Deadweight Survey
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1377783
28 May 1996 Initial Certification · Deadweight Survey · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1458305

Deficiency record · 57

Electrical › Electric Supply System (service) › Cable
Issued 6 December 2016 Resolved
1. Remove unauthorized extension cord that has been hardwired into 220 volt panel located near #2 Main Breaker. IAW 46 CFR 111.60
Action required: 705 - Other - as specified
Due 6 January 2017
Resolved 3 January 2017
Resolution: Temp. extension cord removed.
Electrical › Electrical Distribution System (service) › Conductor
Issued 6 December 2016 Resolved
2. Remove, properly terminate or replace exposed wire behind 220 volt panel. IAW 46CFR111.60
Action required: 705 - Other - as specified
Due 6 January 2017
Resolved 3 January 2017
Resolution: Dead end wires removed.
Electrical › Electrical Distribution System (service) › Conductor
Issued 6 December 2016 Resolved
3. Remove or properly terminate dead end wire passing through deck under starter relay located near #2 Main Breaker. IAW 46CFR111.60-1
Action required: 705 - Other - as specified
Due 6 January 2017
Resolved 3 January 2017
Resolution: Dead end wire removed.
Electrical › Electrical Distribution System (service) › Conductor
Issued 6 December 2016 Resolved
4. Remove or properly terminate dead end wire located under generator transfer switch. IAW 46CFR111.60-1
Action required: 705 - Other - as specified
Due 6 January 2017
Resolved 3 January 2017
Resolution: Dead end wire removed.
Engineering › Fuel Oil Service System › Hose
Issued 6 December 2016 Resolved
5. Install approved SAE J-1942 hoses on fuel/oil supply for generators/prime movers. IAW 46CFR56.60-25
Action required: 705 - Other - as specified
Due 6 January 2017
Resolved 3 January 2017
Resolution: J1942 hose installed on all F.O. service hoses that were identified to replace.
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 6 December 2016 Resolved
6. Install lagging on hot sections of exhaust on generators/prime movers. IAW 46CFR56.50-1(k)
Action required: 705 - Other - as specified
Due 6 January 2017
Resolved 10 January 2017
Resolution: Lagging install on all exhaust hot surfaces.
Engineering › Pressure Vessel › Relief Valve
Issued 6 December 2016 Resolved
7. Replace faulty relief valve on air receiver. IAW 46CFR54.15-10(a)
Action required: 705 - Other - as specified
Due 6 January 2017
Resolved 3 January 2017
Resolution: New relief valve installed.
Construction/Loadline › Hull › Hull Plating
Issued 7 June 2016 Resolved
Barge must undergo drydock & internal structural examination twice w/in five years (no more than three years between any two exams). Drydock was missed/due May 16, 2016 (last was July 09, 2014 & prior was May 16, 2011) & internal structural exam was missed/due Apr 25, 2016 (last was April 25, 2013 & prior was May 16, 2011).
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 7 June 2016
Resolved 18 July 2016
Resolution: DDX/ISE completed on 18July16
Communications › Radio Communications › EPIRB
Issued 7 January 2016 Resolved
Replace and mark expiration of hydrostatic release on EPIRB. Place valid NOAA sticker on EPIRB.
Action required: 705 - Other - as specified
Due 7 February 2016
Resolved 8 January 2016
Resolution: Received documentation of correction
Electrical › Electric Supply System (service) › Cable
Issued 7 January 2016 Resolved
Properly terminate dead end wires in crane house machinery space
Action required: 705 - Other - as specified
Due 7 February 2016
Resolved 22 January 2016
Resolution: Received photo documentation of correction
Lifesaving › Inflatable Liferafts › Not on Board
Issued 31 October 2014 Resolved
Provide inflatable liferaft IAW 46 CFR 199.261.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 November 2014
Resolution: New liferaft was ordered and installed to replace the stolen liferaft.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 31 October 2014 Resolved
Permanently affix the floating waterlight lanyard around the body of the life buoy IAW 46 CFR 199.70(3)(ii).
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 November 2014
Resolution: Corrosion resistant clip was removed and line was spliced around the body of the lifebuoy.
Engineering › Pressure Vessel › Relief Valve
Issued 31 October 2014 Resolved
Demonstrate relief valve pressures on all air receivers IAW 46 CFR 54.15-10.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 November 2014
Resolution: New relief valves were installed with ASME certification.
Fire Fighting › Portable CO2 Fire Extinguisher › Location
Issued 31 October 2014 Resolved
Place missing fire extinguishers back in brackets IAW 46 CFR 95.50-10.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 November 2014
Resolution: Fire extinguishers were placed back in brackets in the required locations.
Electrical › Electrical Distribution System (service) › Non-conducting Deck Covering
Issued 31 October 2014 Resolved
Install non-conducting matting in vicinity of switchboards and high voltage areas IAW 46 CFR 111.30-11.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 November 2014
Resolution: Non-conductive matting was installed.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 28 October 2014 Resolved
Vessel is required to complete an annual inspection within 3 months before or after each anniversary date. Vessel failed to complete their 4th annual inspection no later than February 13, 2014. Vessel shall complete an Inspection for Certification prior to conducting operations IAW 46 CFR 91.27-1(a).
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 31 October 2014
Resolution: Inspection for Certification completed. New COI issued.
Engineering › Compressed Air System (control) › Receiver/Bottle
Issued 6 November 2012 Resolved
Prove air receiver main service Langrange products at 150psi prior to cargo operations.
Due 7 November 2012
Resolved 7 November 2012
Resolution: Witnessed satisfactory test of relief valve.
Communications › Radio Communications › EPIRB
Issued 6 November 2012 Resolved
Make EPIRB accessible for testing.
Due 7 November 2012
Resolved 7 November 2012
Resolution: Lowered EPIRB unit to accessible height for testing.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 6 November 2012 Resolved
Properly install portable fire extinguisher brackets as indicated X2.
Due 7 November 2012
Resolved 7 November 2012
Resolution: Mounting brackets properly installed.
Engineering › Compressed Air System (control) › Piping
Issued 6 November 2012 Resolved
Properly secure air receiver piping support brackets as indicated.
Due 7 November 2012
Resolved 7 November 2012
Resolution: Air receiver piping support brackets properly secured or removed due to disuse.
Communications › Radio Communications › VHF Radiotelephone
Issued 6 November 2012 Resolved
Provide proof of updated Radio Station Authorization Certificates.
Due 7 November 2012
Resolved 7 November 2012
Resolution: Provided updated Radio Station Authorization Certificates.
Fire Fighting › Miscellaneous Items › A Class Division Penetrations
Issued 6 November 2012 Resolved
Cap off stuffing tubes.
Due 7 November 2012
Resolved 7 November 2012
Resolution: Stuffing tubes capped.
Lifesaving › Inflatable Liferafts › Float Free
Issued 22 November 2011 Resolved
Ensure 16 person liferaft is in a float free arrangement.
Due 20 December 2011
Resolved 14 December 2011
Resolution: The 16 person liferaft has been arranged to float free.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 22 November 2011 Resolved
Prove proper operation and arrangement of navigational lights.
Due 20 December 2011
Resolved 14 December 2011
Resolution: The vessel''s navigation lights are operational and properly arranged.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 22 November 2011 Resolved
Prove proper arrangement, serviceability, and inspection of required fire extinguishers.
Due 20 December 2011
Resolved 14 December 2011
Resolution: The required portable fire extinguishers have been properly arranged, serviced, and inspected.
Communications › Radio Communications › EPIRB
Issued 22 November 2011 Resolved
Prove validity of EPIRB battery and hydrostatic release unit.
Due 20 December 2011
Resolved 14 December 2011
Resolution: Battery and hydrostatic release unit on EPIRB have been replaced.
Lifesaving › Lifebuoys › Quantity
Issued 22 November 2011 Resolved
Provide lifebuoy where designated at boom rest.
Due 20 December 2011
Resolved 14 December 2011
Resolution: Lifebuoy has been provided where designated at the boom rest.
Lifesaving › Lifebuoys › Serviceable
Issued 11 July 2007 Resolved
Properly outfit barge with correct number of serviceable lifebuoys. Barge currently has 12 lifebuoys with three of them having self activating lights. Vessel is required to have a total of eight with four being lighted. all lifebuoys need to be IAW 46CFR 199.70. Lifebuoys were not mounted and had large gouges in them from being on the deck.
Action required: 705 - Other - as specified
Due 11 August 2007
Resolved 21 August 2007
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 11 July 2007 Resolved
Provide protective shielding from heat in way of exhaust manifolds and turbo on generator.
Action required: 705 - Other - as specified
Due 11 August 2007
Resolved 21 August 2007
Electrical › Electrical Distribution System (service) › Conductor
Issued 10 May 2006 Resolved
Provide copy of original or any other "approved" electrical plans as required during the vessels rebuild, submitted plans are required to match existing electrical installations.
Action required: 705 - Other - as specified
Due 31 October 2007
Resolved 13 September 2007
Resolution: IAW discussion w/ O/O rep, a letter from the electrical company making the temporary subpanel installation received.
Lifesaving › Inflatable Liferafts › Servicing
Issued 10 May 2006 Resolved
Service vessel liferaft at approved liferaft facility and provide service report.
Action required: 705 - Other - as specified
Due 17 May 2006
Resolved 11 July 2007
Construction/Loadline › Hull › Transverse Frame
Issued 11 April 2006 Resolved
Make permanent repair to fractured weld in #3C void IWO aftmost frame bay at bottom plate.
Due 11 April 2006
Resolved 11 April 2006
Electrical › Electrical Distribution System (service) › Panelboard
Issued 28 July 2005 Resolved
Replace missing circuit breaker, or blank opening in electrical panel on fwd side of house, main deck.
Due 28 July 2005
Resolved 28 July 2005
Resolution: Blanked off sat.
Lifesaving › Inflatable Liferafts › Hydrostatic Release Unit
Issued 28 July 2005 Resolved
Properly attach hydrosatic release unit to life raft/cradle.
Due 28 July 2005
Resolved 28 July 2005
Resolution: Properly attached so raft will release sat
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 28 July 2005 Resolved
Replace cracked ring buoy water light, port side main deck aft.
Due 15 August 2005
Resolved 16 August 2005
Documentation › Certificates/Documents › Certificate of Inspection
Issued 28 July 2005 Resolved
Provide originals of the following documents on board: a) Certificate of Inspection, b) Certificate of Documentation, c) Certificate of Financial Responsibility.
Due 15 August 2005
Resolved 16 August 2005
Lifesaving › Immersion Suits
Issued 26 August 2003 Resolved
Remove two Type III anti-exposure PFD's from immersion suit storage locker and correct quantity marked on locker.
Due 26 August 2003
Resolved 26 August 2003
Lifesaving › Lifejacket/PFD (Type III) › Storage
Issued 26 August 2003 Resolved
Either remove and store in a different location or add lights and whistles to the 8 PFD's without lights and whistles. If relocating the PFD's, change the container label to correctly identify the number of PFD's stored inside.
Due 26 August 2003
Resolved 26 August 2003
Resolution: The 8 identified PFD''s were removed, placed in a bag, and relocated to a secured storage space.
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 26 August 2003 Resolved
Service or remove from the vessel the following extra portable fire extinguishers: 1 ABC I, 2 ABC II, 1 B V. LEGACY COMPONENT DESC: Condition
Due 26 September 2003
Resolved 29 July 2004
Resolution: extingushers properly serviced.
Engineering › Pressure Vessel › Pressure Gauge
Issued 26 August 2003 Resolved
Repair & recalibrate or replace the pressure gauge on the large air receiver located in the machinery space. LEGACY COMPONENT DESC: Pressure Gauge
Due 26 September 2003
Resolved 29 July 2004
Resolution: Pressure gauge renewed.
Fire Fighting › Combustible Materials › Paints/Varnishes/Other Finishes
Issued 26 August 2003 Resolved
Relocate all flammables not properly stored to the exterior flammable lockers.
Due 26 August 2003
Resolved 26 August 2003
Lifesaving › Lifebuoys › Stowage
Issued 26 August 2003 Resolved
Properly mount aft ring buoy.
Due 26 September 2003
Resolved 26 August 2003
Lifesaving › Lifebuoys › Stowage
Issued 26 August 2003 Resolved
Either provide a corrosion-resistant clip for the waterlight line attached to the two ring buoys with lifelines, remove the lines or remove one waterlight and one lifeline.
Due 26 September 2003
Resolved 26 August 2003
Resolution: One waterlight removed, one lifeline removed.
Documentation › Safety/Response Plans/Programs
Issued 26 August 2003 Resolved
Provide annual update for SOPEP. LEGACY COMPONENT DESC: SOPEP
Due 26 September 2003
Resolved 28 August 2003
Resolution: Viewed revision #3 dated 27AUG03.
Fire Fighting
Issued 13 August 1998 Resolved
Install fixed fire extinguishing system in flammable/paint lockers or remove same.
Condition: Unknown
Due 10 September 1998
Resolved 10 September 1998
Electrical
Issued 13 August 1998 Resolved
Properly mount and install battery boxes through-out the vessel.
Condition: Unknown
Due 10 September 1998
Resolved 10 September 1998
Engineering
Issued 13 August 1998 Resolved
Provide oil transfer procedures that are specific to the barge.
Condition: Unknown
Due 10 September 1998
Resolved 10 September 1998
Construction/Loadline
Issued 13 August 1998 Resolved
Repaint draft marks for the vessel.
Condition: Unknown
Due 10 September 1998
Resolved 10 September 1998
Documentation
Issued 13 August 1998 Resolved
Provide valid FCC certificates as required.
Condition: Unknown
Due 2 October 1998
Resolved 2 October 1998
Lifesaving
Issued 13 August 1998 Resolved
Provide and install PFD donning placards for both types of PFDs.
Condition: Unknown
Due 10 September 1998
Resolved 10 September 1998
Lifesaving
Issued 13 August 1998 Resolved
Bring vessel into compliance with 46 CFR 94, then bring into compliance with 46 CFR 199(Subchapter W) where applicable. Obtain exemption certificate/letter from District 13 Commander for those items that may be satisfied with tug along side.
Condition: Unknown
Due 10 September 1998
Resolved 10 September 1998
Deck/Cargo
Issued 13 August 1998 Resolved
CONDUCT APPLICABLE INSPECTIONS AND TEST OF DECK CARGO/HEAVY LIFT CRANE AND EQUIPMENT IN ACCORDANCE WITH 46 CFR 91.37. TEST AND INSPECTIONS TO BE CONDUCTED IN PRESENCE OF COAST GUARD MARINE INSPECTOR, PRIOR TO CONDUCTING CARGO OPERATIONS OR HEAVY LIFTS.
Condition: Unknown
Due 13 August 1998
Resolved 13 August 1998
Engineering
Issued 14 November 1997 Resolved
Hydro test to 1.5 times max working pressure the equipment fueling hose._x001C_
Condition: Unknown
Due 14 November 1997
Resolved 14 November 1997
Engineering
Issued 14 November 1997 Resolved
Reinstall equipment fuel transfer pump and engine as per approved plans. The pump engine can not be located in the same containment as a fuel vent._x001C_
Condition: Unknown
Due 14 November 1997
Resolved 14 November 1997
Documentation
Issued 28 March 1997 Resolved
Provide and post original COI._x001C_
Condition: Unknown
Due 13 May 1997
Resolved 13 May 1997
Documentation
Issued 28 March 1997 Resolved
Provide and post a copy of stability letter._x001C_
Condition: Unknown
Due 13 May 1997
Resolved 13 May 1997
Documentation
Issued 28 March 1997 Resolved
Provide copy of current load line certificate._x001C_
Condition: Unknown
Due 13 May 1997
Resolved 13 May 1997

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.