Records from 2000 to 2025. Most recent: inspection, 22 June 2025.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 22 June 2025
Resolved
Each lifebuoy must be marked in block capital letters with the name of the vessel and the name of the port. During the hull walk, the Port and Starboard ring buoy(s) were discovered missing the name of the vessel and the home port of the vessel.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 July 2025
Resolved 29 July 2025
Resolution: Received adequate documentation attesting to proper marking of the ring buoys.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 22 June 2025
Resolved
Before the vessel leaves port and at all times during the voyage each lifesaving appliance must be in working order and ready for immediate use. The ring life buoy on the bridge needs grab lines replaced, markings renewed & retro reflective material renewed.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 29 July 2025
Resolution: Received statement from the master with photos attesting to the renewal of the ring buoy grablines, and associated markings.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 22 June 2025
Resolved
Each life raft or group of life rafts must be arranged for float free launching. During the inspection of the HRU unit it was discovered that the expiry date (2 years past the date of install) was not properly marked on the unit.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 29 July 2025
Resolution: HRU is properly marked.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 18 June 2024
Resolved
Vessel navigational charts are currently not up do date.
Ensure updated paper charts are provided at minimum
within 6 months of USCG inspection.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 26 November 2024
01 - Certificates & Documentation › 011 - Ships Certificates › Cargo Ship Safety Radio (including exemption)
Issued 18 June 2024
Resolved
Vessel shall provide proof of safety radio certificate.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 26 November 2024
01 - Certificates & Documentation › 012 - Crew Certificates › Medical certificate
Issued 18 June 2024
Resolved
Vessel Master shall provide medical certificate in conjunction with his license.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 26 November 2024
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 23 January 2024
Resolved
Immediately after the addressing of resultant safety concerns, the owner, agent, master, operator, or person in charge, shall notify the nearest Sector Office, Marine Inspection Office or Coast Guard Group Office whenever a vessel is involved in a marine casualty consisting in a loss of main propulsion, primary steering, or any associated component or control system that reduces the maneuverability of the vessel. The owner/operator failed to notify Sector New York that the vessels shaft and broke. Owner/operator to submit a CG2692 prior to 28 January 2024, as a result of the shaft break.
Action required: 705 - Other - as specified
Resolved 2 February 2024
Resolution: Provided CG2692 within 5 days
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 January 2024
Resolved
It was discovered that the vessel was hauled out at North River Shipyard, to have a shaft replaced. The local Officer in Charge, Marine Inspection (OCMI) was never notified of the haul-out or of the damaged shaft. The master, owner, operator, or agent of the vessel shall notify the OCMI whenever the vessel is to be dry-docked regardless of the reason for dry-docking, the OCMI, upon notification, will determine whether to assign a marine inspector to examine the underwater hull of the vessel.No repairs affecting the safety of the vessel shall be made without the knowledge of the Officer in Charge, Marine Inspection (OCMI), when necessary, the repairs or alterations must be inspected by a marine inspector.
**Prior to going back in the water**
(a) A USCG Marine Inspector is to attend the vessel to examine the installation of the repairs or replacement made to the vessel shaft. **MUST CALL TO SCHEDULED**
(b) Provide to the OCMI the following:
1) What was the cause of the need to replace the tail shaft
2) The date, time and location when damage to the tail shaft was discovered.
3) The name of the Master of the vessel when the damage occurred.
Action required: 705 - Other - as specified
Resolved 2 February 2024
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - cracking
Issued 27 June 2022
Resolved
Existing structure previously approved will remain satisfactory so long as it is maintained in good condition. Minor repairs and alterations may be made to
the same standard as the original construction. Four small portholes above engine room have missing wing nuts required for tightening and closure against the weather elements. Additionally, the porthole frame starboard side aft has separated from the steel substructure.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 1 August 2022
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 27 June 2022
Resolved
No means shall be provided for locking doors giving access to either of the two required means of escape. Observed a slide bolt type lock on the emergency escape door from the engine room to the wheel house. Remove lock to ensure accessibility for escape from engine room.
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 1 August 2022
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 27 June 2022
Resolved
The inspector shall examine all accessible parts of the vessel's hull to be assured that it is in a satisfactory condition. In the inspection of hulls the standards established by the American Bureau of Shipping apply. During next dry dock, descale and treat forward peak, void space #1 and lazerette/steering space.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 May 2023
Resolved 8 June 2023
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 18 June 2019
Resolved
Logbook must include information on emergency training drills. Logbook entries must include date & time of drill, survival craft & fire extinguishing equipment used in the drills, inoperative or malfunctioning equipment & the corrective action taken, identify crew members that participated, & the subject of the drill. Log book entries do not provide sufficient details aside from date & name.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 July 2019
Resolved 19 June 2019
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 18 June 2019
Resolved
On vessels less than 20m in length, sidelights shall be fitted with matt black inboard screens. Vessel navigation lights are set against a white background.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 July 2019
Resolved 24 June 2019
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 21 June 2017
Resolved
1. Submit plan addressing how vessel will recover "helpless" man overboard.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 20 July 2017
Resolved 19 July 2017
Resolution: Installed approved sling and man overboard device, demonstrated proper use to attending USCG MI during annual inspection
Lifesaving › Lifebuoys › Approval
Issued 21 June 2016
Resolved
Worn and faded type I retro-reflective material.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 June 2016
Resolved 29 June 2016
Resolution: Replaced reflective tape.
Documentation › Certificates/Documents › FCC SSL
Issued 21 June 2016
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Invalid
Action required: 705 - Other - as specified
Due 30 June 2016
Resolved 29 June 2016
Resolution: Provided proof of updated certificates.
Documentation › Certificates/Documents › Permit, Other
Issued 21 June 2016
Resolved
Ship has no member with a valid radio operators permit.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 June 2016
Resolved 29 June 2016
Resolution: Provided proof of current operators permit.
Electrical › Lighting (service) › Lighting Fixture
Issued 3 June 2014
Resolved
Repair lighting fixtures in second void.
Action required: 705 - Other - as specified
Due 17 June 2014
Resolved 20 June 2017
Stability › Watertight Integrity › Weathertight Enclosure
Issued 3 June 2014
Resolved
Replace gaskets on water tight hatches.
Action required: 705 - Other - as specified
Due 17 June 2014
Resolved 18 June 2015
Navigation › Collision/Grounding Avoidance › Radar
Issued 16 May 2007
Resolved
Vessel's radar is not functioning. Repair and prove proper operation to attending USCG Marine Inspector.
Condition: Unknown
Due 23 May 2007
Resolved 18 May 2007
Resolution: Radar repaired and tested sat.
Engineering › Lubricating Oil Service System › Hose
Issued 16 May 2007
Resolved
Reduction gear oil hose wasted to wire reinforcement. Replace IAW 46CFR56.60-25(b).
Condition: Improper/Lack of Maintenance
Due 23 May 2007
Resolved 18 May 2007
Resolution: Hose replaced.
Lifesaving › Inflatable Liferafts › Hydrostatic Release Unit
Issued 16 May 2007
Resolved
Liferaft hydrostatic release missing expiration date, provide proof of installation/expiration date or replace unit.
Condition: Unknown
Due 23 May 2007
Resolved 18 May 2007
Resolution: Unit replaced.
Engineering › Fuel Oil Service System › Piping
Issued 9 June 2006
Resolved
F/O return piping on main engine weaping fuel. Repair/replace.
Condition: Improper/Lack of Maintenance
Due 12 June 2006
Resolved 12 June 2006
Resolution: Piping replaced.
Lifesaving › Lifejacket/PFD (General) › Marking
Issued 23 May 2006
Resolved
Mark lifejacket storage IAW 46CFR199.70
Condition: Improper/Lack of Maintenance
Due 23 June 2006
Resolved 9 June 2006
Resolution: Stowage properly marked.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 23 May 2006
Resolved
Provide lifjacket donning instructions.
Condition: Improper/Lack of Maintenance
Due 23 June 2006
Resolved 9 June 2006
Resolution: Instructions provided.
Lifesaving › Lifebuoys › Not on Board
Issued 23 May 2006
Resolved
Provide lifering buoys IAW COI.
Condition: Improper/Lack of Maintenance
Due 23 May 2006
Resolved 23 May 2006
Resolution: Completed.
Engineering › Lubricating Oil Service System › Hose
Issued 23 May 2006
Resolved
AA-04 Reduction gear oil hoses to cooler is of improper material. Replace IAW 46CFR56.60-25
Condition: Improper Installation
Due 23 June 2006
Resolved 9 June 2006
Resolution: Hoses replaced.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 23 May 2006
Resolved
Properly insulate dry exhaust pipe IAW 46CFR58.10-10
Condition: Improper/Lack of Maintenance
Due 23 June 2006
Resolved 9 June 2006
Resolution: Completed.
Documentation › Certificates/Documents › FCC SSL
Issued 23 May 2006
Resolved
Provide FCC radio station licsens.
Condition: Improper/Lack of Maintenance
Due 23 June 2006
Resolved 9 June 2006
Resolution: Licsens provided.
Engineering › Lubricating Oil Service System › Hose
Issued 1 June 2005
Resolved
Remove rubber hose to L/O gauge in wheelhouse & install tubing.
Action required: 705 - Other - as specified
Due 21 June 2005
Resolved 17 June 2005
Engineering › Freshwater System (jacketwater cooling) › Piping
Issued 1 June 2005
Resolved
Repair the leak on the salt water ovbd pipe check valve.
Action required: 705 - Other - as specified
Due 21 June 2005
Resolved 10 June 2005
Engineering › Freshwater System (jacketwater cooling) › Piping
Issued 1 June 2005
Resolved
Install support bracket on teh salt water discharge pipe on the MDE.
Action required: 705 - Other - as specified
Due 21 June 2005
Resolved 17 June 2005
Engineering › Diesel Engine (propulsion-direct drive) › Piping (exhaust)
Issued 1 June 2005
Resolved
Remove duct tape from the MDE exhaust lagging.
Action required: 705 - Other - as specified
Due 21 June 2005
Resolved 10 June 2005
Engineering › Bilge Water Management System › Piping
Issued 1 June 2005
Resolved
Remove the non-mettalic flex hose from the bilge/firemain system and mount the piping.
Action required: 705 - Other - as specified
Due 21 June 2005
Resolved 10 June 2005
Electrical › Electric Generation Source (service) › Power Requirement
Issued 1 June 2005
Resolved
Prove proper operation of the A/C generator to the satisfaction of attending Marine Inspector.
Action required: 705 - Other - as specified
Due 21 June 2005
Resolved 16 May 2007
Resolution: Converted item to special note.
Engineering › Steering Gear System › Follow-up Assembly
Issued 1 June 2005
Resolved
Renew steering cable
Action required: 705 - Other - as specified
Due 21 June 2005
Resolved 10 June 2005
Engineering › Steering Gear System › Chain
Issued 1 June 2005
Resolved
Renew line on the block and tackle for the emergency steering tiller.
Action required: 705 - Other - as specified
Due 21 June 2005
Resolved 10 June 2005
Electrical › Electrical Distribution System (service) › Cable
Issued 1 June 2005
Resolved
Install cable raceway & metalic cable hangers in the E/R to get all the electrical cable off the piping.
Action required: 705 - Other - as specified
Due 21 June 2005
Resolved 21 June 2005
Electrical › Electrical Distribution System (service) › Cable
Issued 1 June 2005
Resolved
Make all cable splices IAW 46CFR111.
Action required: 705 - Other - as specified
Due 21 June 2005
Resolved 21 June 2005
Resolution: Most splices were corrected, vessel will continue to repair as necessary.
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 1 June 2005
Resolved
Provide blank covers in the 32 VDC distribution panel.
Action required: 705 - Other - as specified
Due 21 June 2005
Resolved 10 June 2005
Fire Fighting › Combustible Materials › Partial Bulkheads/Decks
Issued 1 June 2005
Resolved
Remove the wooden deck plates from compartment #2
Action required: 705 - Other - as specified
Due 21 June 2005
Resolved 10 June 2005
Fire Fighting › Portable CO2 Fire Extinguisher › Mounting Bracket
Issued 1 June 2005
Resolved
Proper mount the portable fire extinguishers below decks.
Action required: 705 - Other - as specified
Due 21 June 2005
Resolved 10 June 2005
Engineering › Fuel Oil Service System › Hose
Issued 1 June 2005
Resolved
Remove the rubber hose on the F/O return line & install hard pipe as discussed.
Action required: 705 - Other - as specified
Due 21 June 2005
Resolved 17 June 2005
Lifesaving › Inflatable Liferafts › Float Free
Issued 1 June 2005
Resolved
Properly install inflatable raft.
Action required: 705 - Other - as specified
Due 21 June 2005
Resolved 10 June 2005
Lifesaving › Inflatable Liferafts › Hydrostatic Release Unit
Issued 1 June 2005
Resolved
Install hydrostatic release on inflatable raft.
Action required: 705 - Other - as specified
Due 21 June 2005
Resolved 10 June 2005
Stability › Weathertight Integrity › General
Issued 1 June 2005
Resolved
Make top of house weathertight.
Action required: 705 - Other - as specified
Due 21 June 2005
Resolved 10 June 2005
Electrical › Electrical Distribution System (service) › Junction Box
Issued 1 June 2005
Resolved
Make all junction boxes weathertight
Action required: 705 - Other - as specified
Due 21 June 2005
Resolved 11 August 2005
Electrical › Lighting (service) › Lighting Fixture
Issued 1 June 2005
Resolved
Make repairs to port flood light
Action required: 705 - Other - as specified
Due 21 June 2005
Resolved 10 June 2005
Electrical › Lighting (service) › Lighting Fixture
Issued 1 June 2005
Resolved
Make repairs to stbd flood light
Action required: 705 - Other - as specified
Due 21 June 2005
Resolved 10 June 2005
Documentation › Certificates/Documents › Certificate of Inspection
Issued 1 June 2005
Resolved
Post COI with all pages visible.
Action required: 705 - Other - as specified
Due 21 June 2005
Resolved 10 June 2005
Documentation › Certificates/Documents › Stability Letter
Issued 1 June 2005
Resolved
Post stability letter.
Action required: 705 - Other - as specified
Due 21 June 2005
Resolved 10 June 2005
Navigation › Piloting/Steering › Magnetic Compass
Issued 1 June 2005
Resolved
Make repairs to magnetic compass light.
Action required: 705 - Other - as specified
Due 21 June 2005
Resolved 17 June 2005
Stability › Watertight Integrity › General
Issued 1 June 2005
Resolved
Provide gaskets for all three (3) deck hatches.
Action required: 705 - Other - as specified
Due 21 June 2005
Resolved 10 June 2005
Construction/Loadline › Structures › Manhole
Issued 1 June 2005
Resolved
Prove proper operation of aft deck watertight hatch.
Action required: 705 - Other - as specified
Due 11 July 2005
Resolved 11 August 2005
Construction/Loadline › Hull › Hull Plating
Issued 13 May 2003
Resolved
Port stern qtr hull plating at shear strake holed and wasted. C/R for credit hull exam.
Action required: 705 - Other - as specified
Due 30 June 2003
Resolved 30 June 2003
Resolution: Permanent repairs made.
Construction/Loadline › Hull › Transverse Frame
Issued 13 May 2003
Resolved
ID'd various transverse framing in lazarette wasted. C/R for credit hull exam.
Action required: 705 - Other - as specified
Due 30 June 2003
Resolved 30 June 2003
Resolution: Framing replaced.
Construction/Loadline › Hull › Hull Plating
Issued 13 May 2003
Resolved
Replace wasted deck plating on port quarter.
Action required: 705 - Other - as specified
Due 30 June 2003
Resolved 30 June 2003
Resolution: Replaced.
Navigation
Issued 28 August 2001
Resolved
Replace Port, aft bridge Window.
Condition: Unknown
Due 28 August 2001
Resolved 28 August 2001
Construction/Loadline
Issued 28 August 2001
Resolved
Remove repair protruding steel where the bulwark is wasted.
Condition: Unknown
Due 28 August 2001
Resolved 28 August 2001
Construction/Loadline
Issued 28 August 2001
Resolved
Renew/replace gaskets on deck hatches and make water tight.
Condition: Unknown
Due 28 August 2001
Resolved 28 August 2001
Construction/Loadline
Issued 28 August 2001
Resolved
Label heavy load area on main deck.
Condition: Unknown
Due 28 August 2001
Resolved 28 August 2001
Construction/Loadline
Issued 28 August 2001
Resolved
Label main deck to restrict crew from going fwd of the pilot house while underway.
Condition: Unknown
Due 28 August 2001
Resolved 28 August 2001
Construction/Loadline
Issued 28 August 2001
Resolved
Replace and make weather tight, the port, aft, port hole.
Condition: Unknown
Due 28 August 2001
Resolved 28 August 2001
Lifesaving
Issued 28 August 2001
Resolved
Prove proper inspection of the cold water liferaft prior to sailing on or after 15OCT01.
Condition: Unknown
Due 28 August 2001
Resolved 28 August 2001
Electrical
Issued 28 August 2001
Resolved
Remove or properly terminate, dead end wires under bridge console.
Condition: Unknown
Due 28 August 2001
Resolved 28 August 2001
Electrical
Issued 28 August 2001
Resolved
Do not operate generator until repaired to the satisfaction of the attending MI.
Condition: Unknown
Due 28 August 2001
Resolved 28 August 2001
Accommodation/Occupational Safety
Issued 28 August 2001
Resolved
Prior to installing bridge heater, submit plans to USCG for review.
Condition: Unknown
Due 28 August 2001
Resolved 28 August 2001
Construction/Loadline
Issued 28 August 2001
Resolved
Repair and make weather tight engine room vent covers, stbd side aft and ontop of cabin.
Condition: Unknown
Due 28 August 2001
Resolved 28 August 2001
Engineering
Issued 28 August 2001
Resolved
Renew/repair shaft packing on main propulsion shaft.
Condition: Unknown
Due 28 August 2001
Resolved 28 August 2001
Accommodation/Occupational Safety
Issued 28 August 2001
Resolved
Complete work to hand rails on stbd side of vessel.
Condition: Unknown
Due 28 August 2001
Resolved 28 August 2001
Electrical
Issued 28 August 2001
Resolved
Mount shore tie cable, make secure from tension and provide bracket, make weathertight.
Condition: Unknown
Due 28 August 2001
Resolved 28 August 2001
Engineering
Issued 28 August 2001
Resolved
Label fuel oil cut off valve on deck.
Condition: Unknown
Due 28 August 2001
Resolved 28 August 2001
Construction/Loadline
Issued 28 August 2001
Resolved
Label fire/bilge manifold.
Condition: Unknown
Due 28 August 2001
Resolved 28 August 2001
Construction/Loadline
Issued 28 August 2001
Resolved
Weld aft 2 deck griders in compartment #3
Condition: Unknown
Due 28 August 2001
Resolved 28 August 2001
Electrical
Issued 28 August 2001
Resolved
Permenantly mount overhead lights in compartment #3 with approved wiring, submit plans if new installation.
Condition: Unknown
Due 28 August 2001
Resolved 28 August 2001
Construction/Loadline
Issued 28 August 2001
Resolved
Provide full penatration welds in compartment #3 where hatch was removed.
Condition: Unknown
Due 28 August 2001
Resolved 28 August 2001
Construction/Loadline
Issued 31 May 2000
Resolved
Repair / replace gasket & closure dogs on engine room overhead hatch cover.
Condition: Unknown
Due 31 May 2000
Resolved 31 May 2000
Engineering
Issued 31 May 2000
Resolved
Repair leak on main engine raw water pump.
Condition: Unknown
Due 31 May 2000
Resolved 31 May 2000
Construction/Loadline
Issued 31 May 2000
Resolved
Permanently label bilge/fire main manifold.
Condition: Unknown
Due 31 May 2000
Resolved 31 May 2000
Navigation
Issued 31 May 2000
Resolved
Make emergency steering arrangement on deck watertight.
Condition: Unknown
Due 31 May 2000
Resolved 31 May 2000
Construction/Loadline
Issued 31 May 2000
Resolved
Install proper stuffing tubes on engine room cable penetrations as needed.
Condition: Unknown
Due 31 May 2000
Resolved 31 May 2000
Lifesaving
Issued 31 May 2000
Resolved
Provide 1 assitional ring bouy IAw 46 CFR 199.640(i).
Condition: Unknown
Due 31 May 2000
Resolved 31 May 2000
Fire Fighting
Issued 31 May 2000
Resolved
Provide 1 additional BII fire extinguisher for machinery space IAW 46 CFR 95.50-10(a).
Condition: Unknown
Due 31 May 2000
Resolved 31 May 2000
Electrical
Issued 31 May 2000
Resolved
Install clamps / secure cables on mast, minimum every 24 inches.
Condition: Unknown
Due 31 May 2000
Resolved 31 May 2000
Lifesaving
Issued 31 May 2000
Resolved
Provide sufficient liferaft on board vessel IAW 46 CFR 199.640 prior to 31OCT00.
Condition: Unknown
Due 31 May 2000
Resolved 31 May 2000
Documentation
Issued 31 May 2000
Resolved
Provide up to date log book for vessel. Show logging of required fire and man overboard drills.
Condition: Unknown
Due 31 May 2000
Resolved 31 May 2000
Documentation
Issued 31 May 2000
Resolved
Provide garbage pollution placard.
Condition: Unknown
Due 31 May 2000
Resolved 31 May 2000
Construction/Loadline
Issued 31 May 2000
Resolved
Repair aft bulkhead in wheelhouse; ensure compliance with structural fire protection IAW 46 CFR 92.07-10.
Condition: Unknown
Due 31 May 2000
Resolved 31 May 2000
Lifesaving
Issued 31 May 2000
Resolved
complete all worklist items from plan review worklist.
Condition: Unknown
Due 31 May 2000
Resolved 31 May 2000
Electrical
Issued 31 May 2000
Resolved
Replace missing cover on generator connection box.
Condition: Unknown
Due 31 May 2000
Resolved 31 May 2000
Electrical
Issued 31 May 2000
Resolved
Install voltmeter and ammeter for generator.
Condition: Unknown
Due 31 May 2000
Resolved 31 May 2000
Construction/Loadline
Issued 30 May 2000
Resolved
Replace A/C electric sub-pump with hand operated portable pump.
Condition: Unknown
Due 30 May 2000
Resolved 30 May 2000
Electrical
Issued 30 May 2000
Resolved
Mount ammeter between alternator and 32V battery bank.
Condition: Unknown
Due 30 May 2000
Resolved 30 May 2000
Electrical
Issued 30 May 2000
Resolved
Hard mount 12V charger for generator starting battery.
Condition: Unknown
Due 30 May 2000
Resolved 30 May 2000
Electrical
Issued 30 May 2000
Resolved
Replace #12 AWG cable from 32V battery bank to 12V house panel with #5 AWG conductors.
Condition: Unknown
Due 30 May 2000
Resolved 30 May 2000
Electrical
Issued 30 May 2000
Resolved
Install interlock between generator and shore tie breakers.
Condition: Unknown
Due 30 May 2000
Resolved 30 May 2000
Deck/Cargo
Issued 30 May 2000
Resolved
Submit plans for diesel cabin heater prior to installation or operation.
Condition: Unknown
Due 30 May 2000
Resolved 30 May 2000
Electrical
Issued 30 May 2000
Resolved
Mount shore tie connection from power panel.
Condition: Unknown
Due 30 May 2000
Resolved 30 May 2000
Engineering
Issued 30 May 2000
Resolved
Install remote f/o cut-out-valve in supply line to generator, capable of being closed from outside compartment.
Condition: Unknown
Due 30 May 2000
Resolved 30 May 2000
Construction/Loadline
Issued 30 May 2000
Resolved
Provide means of closing lower compartment vents IAW 95.15-10
Condition: Unknown
Due 14 July 2000
Resolved 5 June 2000