Records from 2002 to 2026. Most recent: inspection, 2 June 2026.
Documentation record
Registered dimensions (L × B × D)54.8 ft × 16.0 ft × 3.8 ft
Registered tonnagegross 32 / net 29
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderDUBUQUE BOAT & BOILER CO · DUBUQUE, IA, UNITED STATES · built 1962
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portPITTSBURGH, PA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 14 April 2026 · expires 30 April 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it32 - Regulatory (Subpart C or D), Gross Ton
29 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 33
2 June 2026
Administrative Inspection
Administrative · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 8392558
23 April 2026
Damage Survey · Deficiency Check
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 8355140
23 April 2026
Type not recorded
No type recorded · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 8356605
17 April 2026
Damage Survey
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 8352488
17 April 2026
Type not recorded
No type recorded · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 8354086
25 March 2026
COI Inspection · DAPI Audit · In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 8331577
18 February 2026
Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 8311920
2 October 2025
Administrative Inspection
Administrative · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 8253185
23 June 2025
Administrative Inspection
Administrative · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 8165154
20 April 2024
Damage Survey
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 7899502
19 April 2024
Type not recorded
No type recorded · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 7934248
31 August 2023
Deficiency Check · Damage Survey
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 7781947
25 August 2023
Type not recorded
No type recorded · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 7787044
16 May 2023
MTSA Verification · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 7680198
16 May 2023
DAPI Audit
Administrative · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 7695752
29 August 2022
Deficiency Check
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 7546366
25 July 2022
Deficiency Check
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 7516337
17 May 2022
Annual Inspection
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 7452882
21 March 2022
Deficiency Check · Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 7414237
15 April 2021
MTSA/ISPS Verification · COI Inspection
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 7175825
17 November 2020
Administrative Inspection
Administrative · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 7096810
26 May 2020
Annual Inspection
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 6972910
18 April 2019
Periodic Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 6665520
13 June 2018
Annual Inspection
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 6442995
13 June 2018
Examination of Repairs
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 6443001
7 June 2018
Type not recorded
No type recorded · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 6455020
8 May 2018
Examination of Repairs
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 6411005
31 July 2017
Damage Survey · Deficiency Check
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 6226272
29 July 2017
Type not recorded
No type recorded · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 6226250
17 April 2017
Annual Inspection · Deficiency Check · Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 6127565
16 May 2016
COI Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 5878341
9 May 2016
Examination of Repairs · Damage Survey
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 5873587
25 April 2016
Damage Survey · Examination of Repairs
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 5868126
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 April 2026
Resolved
Auxiliary machinery shall be suitable in type and design for the purpose intended. The generator experienced a failure and needed to be secured. Repair/replace generator.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 22 May 2026
Resolved 8 May 2026
Resolution: Sea chest was relocated and operational test conducted. Generator operated without overheating.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 April 2026
Resolved
Auxiliary machinery shall be suitable in type and design for the purpose intended. The generator experienced a failure and needed to be secured. Repair/replace generator.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 1 May 2026
Resolved 22 April 2026
Resolution: Attended vessel to confirm satisfactory repair. Sea chest grating was obstructed with scale and paint.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 25 March 2026
Resolved
One length of fire hose shall be provided for each fire hydrant required. If garden hose is used, it shall be of a good commercial grade constructed of an inner rubber tube, plies of braided cotton reinforcement and an outer rubber cover. Replace garden fire hose, found to be kinked and deteriorating.
46 CFR 181.20-1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 April 2026
Resolved 22 April 2026
Resolution: Attended vessel and hose was replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 25 March 2026
Resolved
All life preservers shall be of an approved type. 07 life jackets found no longer serviceable and deteriorated
46 CFR 180.25-1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 April 2026
Resolved 22 April 2026
Resolution: Lifejackets have been replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 20 April 2024
Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. Starboard engine suffered fracture of the engine block and unknown degree of internal damage. Repair or replace as required. Upon completion of repairs, conduct operational test in the presence of attending marine inspector.
Action required: 17 - Rectify deficiencies prior to departure
Due 24 April 2026
Resolved 24 April 2026
Resolution: This deficiency is being closed. Vessel has been repowered.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 31 August 2023
Resolved
Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. Generator engine experienced failure. Complete repairs or replace. If replacement is made that is not in-kind, ensure replacement meets new standards IAW 46 CFR 176.700 and 46 CFR 183.320.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 September 2023
Resolution: Replaced generator with new
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 16 May 2023
Resolved
Exhaust gas must not leak from the piping or any connections. The piping must be properly supported by noncombustible hangers or blocks. Exhaust leaks found at both propulsion engine turbo charges and on muffler. Repair exhaust leaks as required.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 May 2023
Resolved 31 August 2023
Resolution: Repaired exhaust leaks
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 25 July 2022
Resolved
Installation of diesel engine exhaust pipe shall be in accordance with §182.15-15. (a) Except as otherwise provided in this paragraph, all engine exhaust pipes shall be water cooled. (1) Dry pipe vertical exhausts are permissible
if suitably insulated. Exhaust pipe insulation found to be not suitable for marine use. Remove and install insulation suitable for marine/engine room use.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 August 2022
Resolved 29 August 2022
Resolution: Applied metal shielding around insulation on exhaust.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 24 May 2022
Resolved
The part of the exhaust system between the point of cooling water injection and the engine manifold must be water-jacketed or effectively insulated and protected in compliance with §§ 177.405(b) and 177.970 of this chapter. Dry exhaust on both propulsion engines between manifold and turbocharger missing insulation. Add insulation as required.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 25 July 2022
Resolution: Installed insulation as required.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 24 May 2022
Resolved
Exhaust gas must not leak from the piping or any connections. Port engine leaking exhaust. Repair as required.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 25 July 2022
Resolution: Exhaust muffler was found to have a hole in it. Welded hole and re-installed with no new leaks.
Construction/Loadline › Structures › Deck Plating
Issued 9 May 2018
Resolved
Crop out to good metal the affected areas identifed by the attending MI and renew deck plating to original condition.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 22 May 2018
Resolved 6 June 2018
Engineering › Steering Gear System › Linkage
Issued 31 July 2017
Resolved
Coupling that links steering shaft to rudder pulley assembly sheered. Remove broken coupling and replace with new to original condition.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 August 2017
Resolution: Replace coupling with new.
Electrical › Electrical Distribution System (service) › Wiring
Issued 17 April 2017
Resolved
Utilization of screw type wire nuts for electrical connections.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 April 2017
Resolved 28 April 2017
Resolution: screw type nuts removed
Electrical › Electrical Distribution System (service) › Grounding Conductor
Issued 17 April 2017
Resolved
Using the hull of the vessel to make a circuit for the bilge alarm system
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 April 2017
Resolved 28 April 2017
Resolution: wired circuit properly
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Exhaust Manifold
Issued 17 April 2017
Resolved
Dry exhaust piping missing lagging.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 May 2017
Resolved 28 April 2017
Resolution: exhaust pipe lagged
Electrical › Electric Supply System (service) › Cable
Issued 17 April 2017
Resolved
Permanently installed extension cords installed in the engine room
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 May 2017
Resolved 28 April 2017
Resolution: removed extention cords
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 17 April 2017
Resolved
110V electrical outlet box lying in the bilge
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 May 2017
Resolved 28 April 2017
Resolution: mounted outlet box properly
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 16 May 2016
Resolved
Battery must be replaced in accordance with annual replacement requirement
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 June 2016
Resolved 20 June 2016
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 16 May 2016
Resolved
Retro reflective tape was inadequate ammount and coverage
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 June 2016
Resolved 20 June 2016
Lifesaving › Lifejacket/PFD (Type I) › Storage
Issued 16 May 2016
Resolved
Lifejackets were stowed in a way that the straps were not readily adjustable. Service and restow
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 20 June 2016
Resolved 22 June 2016
Documentation › Certificates/Documents › Stability Letter
Issued 16 May 2016
Resolved
Reinstall missing bench seating in accordance with approved passenger count.
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Due 20 June 2016
Resolved 22 June 2016
Construction/Loadline › Hull › Bottom Plating
Issued 25 April 2016
Resolved
Repair fracture in way of framing under the port engine
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 April 2016