Inspection history · 23
13 January 2025
Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8062866
31 August 2023
Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7781540
13 June 2022
COI Inspection · MTSA Verification
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7460367
13 October 2021
Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7331620
23 August 2021
Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7296041
2 August 2021
Annual Inspection · MTSA Verification
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7289067
17 September 2020
Annual Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7062746
3 July 2020
Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6997943
1 June 2020
Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6965129
5 September 2019
MTSA Verification · DAPI Audit · Annual Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6807140
14 November 2018
Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6580576
24 September 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6547436
19 September 2018
MTSA Verification · Annual Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6544512
17 October 2017
Liferaft Servicing
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 6290990
5 September 2017
Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6260221
17 July 2017
COI Inspection · Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6211892
25 May 2017
Hull Examination
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6158333
28 April 2017
Damage Survey
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6148112
13 April 2017
Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6123986
25 January 2017
Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6077040
25 November 2016
In-Service Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6050188
11 October 2016
Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6022076
29 September 2016
Deficiency Check · Annual Inspection · MTSA Verification
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6016161
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 22 June 2022
Resolved
4 adult PFDs rejected, must be replaced.
Action required: 10 - Deficiency Rectified
Due 22 June 2022
Resolved 22 June 2022
Resolution: Replaced same day with new, properly marked PFDs.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 22 June 2022
Resolved
Engine room intake ventilation fan inop, must be reapired/replaced & secured at the breaker, locked/tagged out until completed.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 July 2022
Resolved 31 August 2023
Resolution: Vessel COI deactivated. Per Inspection Activity 7781540: Once vessel repairs & upgrades are completed to include an inclining experiment an inspection for certification and new full term COI will be issued.
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 22 June 2022
Resolved
Engine room deck plates loose (outboard port MDE & #1 genset), not safe for foot traffic, temp hardware installed to make safe. Permanent repairs required.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 July 2022
Resolved 31 August 2023
Resolution: Vessel COI deactivated. Per Inspection Activity 7781540: Once vessel repairs & upgrades are completed to include an inclining experiment an inspection for certification and new full term COI will be issued.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 22 June 2022
Resolved
GPS requires update.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 July 2022
Resolved 31 August 2023
Resolution: Vessel COI deactivated. Per Inspection Activity 7781540: Once vessel repairs & upgrades are completed to include an inclining experiment an inspection for certification and new full term COI will be issued.
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 22 June 2022
Resolved
Main deck sprinkler system newly installed diffuser heads are not compatible with system, must be replaced with acceptable diffusers.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 July 2022
Resolved 31 August 2023
Resolution: Vessel COI deactivated. Per Inspection Activity 7781540: Once vessel repairs & upgrades are completed to include an inclining experiment an inspection for certification and new full term COI will be issued.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 22 June 2022
Resolved
Pilothouse main engine oil pressure gauges are faulty/inaccurate, must be repaired/replaced.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 July 2022
Resolved 31 August 2023
Resolution: Vessel COI deactivated. Per Inspection Activity 7781540: Once vessel repairs & upgrades are completed to include an inclining experiment an inspection for certification and new full term COI will be issued.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 22 June 2022
Resolved
Rescue davit line is deteriorated, must be replaced.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 July 2022
Resolved 31 August 2023
Resolution: Vessel COI deactivated. Per Inspection Activity 7781540: Once vessel repairs & upgrades are completed to include an inclining experiment an inspection for certification and new full term COI will be issued.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 22 June 2022
Resolved
Main deck fire station shut-off valve leaks excessively, must be repaired/replaced.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 July 2022
Resolved 31 August 2023
Resolution: Vessel COI deactivated. Per Inspection Activity 7781540: Once vessel repairs & upgrades are completed to include an inclining experiment an inspection for certification and new full term COI will be issued.
10 - Safety of Navigation › N/A - No Subsystem › Navigation bridge visibility
Issued 13 June 2022
Resolved
Forward corner pilothouse windows impeding visibility, must be replaced.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 July 2022
Resolved 31 August 2023
Resolution: Vessel COI deactivated. Per Inspection Activity 7781540: Once vessel repairs & upgrades are completed to include an inclining experiment an inspection for certification and new full term COI will be issued.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 13 June 2022
Resolved
Excessive corrosion sighted in multiple voids and areas of the main deck. Must be de-scaled and made available for close inspection during up-coming hull exam.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2022
Resolved 31 August 2023
Resolution: Vessel COI deactivated. Per Inspection Activity 7781540: Once vessel repairs & upgrades are completed to include an inclining experiment an inspection for certification and new full term COI will be issued.
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 2 August 2021
Resolved
5 main deck bench seats are a hazard to passengers, require repair. Make inaccessible to passengers until properly repaired.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 September 2021
Resolved 22 June 2022
Resolution: corrected.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 2 August 2021
Resolved
Vessel is 23 adult PFDs short. corrected prior to completing inspection.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 August 2021
Resolved 2 August 2021
Resolution: corrected.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 2 August 2021
Resolved
5 BA's need refurbishment (paint & retro-reflective tape).
Action required: 705 - Other - as specified
Due 2 November 2021
Resolved 23 August 2021
Resolution: completed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 2 August 2021
Resolved
Stbd MDE has oil leak, exhaust leak and loose exhaust lagging at turbo, repairs required.
MDE & genset exhaust blanketing on second deck has deteriorated and come loose, clean the area around the exhaust tubes and re-apply blanketing.
Non-approved fuel lines installed on genset, replace with approved fuel line.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 September 2021
Resolved 23 August 2021
Resolution: repaired/corrected.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 5 September 2019
Resolved
Replace missing stern light and adjust Nav Light configuration IAW Inland Navigation Rules.
46 CFR 120.420
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 October 2019
Resolved 1 June 2020
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 5 September 2019
Resolved
Replace missing flashlight at operating station.
46 CFR 120.430
Action required: 10 - Deficiency Rectified
Due 5 September 2019
Resolved 5 September 2019
Resolution: Corrected
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 5 September 2019
Resolved
Repair cracks on port and starboard rubrails.
46 CFR 115.802(a)(1)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 October 2019
Resolved 3 July 2020
Resolution: Craxks repaired.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 5 September 2019
Resolved
Replace exhaust lagging on maindeck.
46 CFR 116.430
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 October 2019
Resolved 3 July 2020
Resolution: Corrected.
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 5 September 2019
Resolved
Calibrate port tachometer to function correctly.
46 CFR 119.410(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 October 2019
Resolved 3 July 2020
Resolution: Removed tach.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 24 September 2018
Resolved
The vessel is currently broadcasting (1) Improper MMSI Number, (2) Improper Call Sign, (3) Zero Draft.
Condition: Invalid
Action required: 705 - Other - as specified
Due 24 October 2018
Resolved 15 July 2019
Resolution: Verified information is updated.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 19 September 2018
Resolved
Openings in weather deck must be watertight. Access scuttle to forepeak is not watertight, no gasket or securing devices are provided. Make access scuttle to forepeak watertight prior to operating in 2019 and before 31MAY2019.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 May 2019
Resolved 5 September 2019
Resolution: corrected.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 19 September 2018
Resolved
Openings in weather deck must be watertight. Access hatch to lazarette is not watertight, no gasket or securing devices are provided. Make hatch to lazarette watertight prior to operating in 2019 and before 31MAY2019.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 May 2019
Resolved 5 September 2019
Resolution: corrected.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 19 September 2018
Resolved
Bilge Suctions must have a strainer with an open area at least 3 times the open are of the suction piping. Suction strainer in void#3 is wasted, must be replaced before 19OCT2018 to satisfaction of the attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 October 2018
Resolved 17 January 2019
Resolution: corrected.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 19 September 2018
Resolved
Exposed hazards must be properly protected. Rotating machinery at front of port propulsion engine is exposed. Install proper guard as to prevent entanglement, to the satisfaction of the attending marine inspector, before 19OCT2018.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 October 2018
Resolved 14 November 2018
Resolution: Guards installed around rotating machinery.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 19 September 2018
Resolved
A pressure gauge is required at the fire pump discharge. The engine-driven fire pump has no pressure guage. Install a pressure gauge in the fire pump discharge piping as to indicate discharge pressure for either fire pumps and demonstrate proper function of same to the satisfaction of the attending marine inspector, before 19OCT2018.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 October 2018
Resolved 14 November 2018
Resolution: Pressure gauge installed in the fire pump discharge piping.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 19 September 2018
Resolved
EPIRB must automatically float free and activate. Hydrostatic Release Unit is expired and must be replaced, to the satisfaction of the attending marine inspector, prior to operating more than 3 miles from land and before 19OCT2018.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 19 October 2018
Resolved 17 January 2019
Resolution: corrected.
04 - Emergency Systems › N/A - No Subsystem › Muster list
Issued 19 September 2018
Resolved
Station Bill must be provided on vessel having more than 4 crewmembers including master. Vessel has only Emergency Instruction Placards. Develop and post Station Bills at the operating station and in crew areas, to the satifaction of the attending marine inspector, and before 19OCT2018.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 October 2018
Resolved 17 January 2019
Resolution: rescinded.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 19 September 2018
Resolved
Penetrations in watertight bulkheads must have a means to make them watertight. Open-ended 2" pipe penetrating aft bulkhead in 4th void space inboard of outboard deck stringer must be made watertight, prior to 19OCT2018 to the satisfaction of the attending marine inspector.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 October 2018
Resolved 21 September 2018
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Block
Issued 10 August 2017
Resolved
Repair oil leak from forward ship service generator drive engine and prove proper operation.
Condition: Improper/Lack of Maintenance
Due 10 September 2017
Resolved 5 September 2017
Fire Fighting › Fire Pumps › Pressure
Issued 10 August 2017
Resolved
Replace and demonstrate proper operation of fire pump discharge pressure gauge.
Condition: Improper/Lack of Maintenance
Due 17 August 2017
Resolved 15 August 2017
Construction/Loadline › Structures › Superstructure
Issued 20 June 2017
Resolved
Repair wastage on lower portions of the bulkheads in both heads and stbd head bulwarks forward corner.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 July 2017
Resolved 10 August 2017
Construction/Loadline › Hull › Weld
Issued 28 April 2017
Resolved
O/O noticed pinhole in weld and inset stbd side of fuel tank compartment.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 12 July 2017
Resolved 25 May 2017
Resolution: Sighted proper permanent repairs.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 29 September 2016
Resolved
Post emergency procedures at operating station.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 13 October 2016
Resolved 11 October 2016
Resolution: EP's posted in wheelhouse.
Engineering › Steering Gear System › Linkage
Issued 29 September 2016
Resolved
Tighten all steering couplings and gears.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 October 2016
Resolved 11 October 2016
Resolution: Witnessed proper operation of steering gears and linkage, all sat.