Records from 2002 to 2025. Most recent: inspection, 12 September 2025.
Documentation record
Registered dimensions (L × B × D)76.1 ft × 19.3 ft × 6.9 ft
Registered tonnagegross 64 / net 43
ITC dimensions (L × B × D)76.1 ft × 19.3 ft × 6.9 ft
ITC tonnagegross 105 / net 45
BuilderSEAARK MARINE INC · MONTICELLO, AR, UNITED STATES · built 1996
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portPEORIA, AZ
Trade endorsementsCoastwise, unrestricted
DocumentationExpired · issued 30 June 2004
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it64 - Regulatory (Subpart C or D), Gross Ton
105 - Convention (Subpart B), Gross Ton
43 - Regulatory (Subpart C or D), Net Ton
45 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 16
12 September 2025
Administrative Inspection
Administrative · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 8235012
3 September 2024
Deficiency Check
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7995494
22 April 2024
COI Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7888671
28 February 2023
Administrative Inspection
Administrative · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7649650
8 June 2022
Annual Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7476797
26 May 2021
Annual Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7201179
20 May 2020
COI Inspection · Deficiency Check
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6952803
19 September 2019
Damage Survey · Examination of Repairs
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6815980
18 September 2019
Type not recorded
No type recorded · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6826687
31 July 2019
Type not recorded
No type recorded · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6769014
22 February 2019
Annual Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6630709
3 May 2018
Annual Inspection · Administrative Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6395192
21 February 2018
Hull Examination
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6359115
29 August 2017
Examination of Repairs · Administrative Inspection · Damage Survey
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6255453
8 March 2017
DAPI Audit · Administrative Inspection · Annual Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6101033
21 April 2016
Hull Examination · Deficiency Check · Annual Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 5859724
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 12 September 2025
No resolution recorded
Vessel is past due for its Annual Inspection. Complete Annual Inspection or surrender COI prior to carrying passengers.
Cite: 46 CFR 176.500
Action required: 701 - Prior to carriage of passengers/cargo
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 22 April 2024
Resolved
Crop and renew 02 marked areas on forward / stbd side-shell where hull plating was gouged. Minimum 18" by 18" per an insert, with radius'd corners and welded to at least one frame. New aluminum plating shall be 5086 plating. Conduct non-destructive testing to prove watertight integrity of full penetration welds.
Action required: 705 - Other - as specified
Resolved 28 August 2024
Resolution: Photo's of repairs were sent to SSD.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 22 April 2024
Resolved
Crop and renew 01 marked area on forward / stbd bottom plating where hll plating was gouged. Minimum 18" by 18" insert, with radius'd corners and welded to at least one frame. New aluminum plating shall be 5086 plating. Conduct non-destructive testing to prove watertight integrity of full penetration welds.
Action required: 705 - Other - as specified
Resolved 16 September 2024
Resolution: Photo's of repairs were sent to SSD.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 26 May 2021
Resolved
Engine space cableway penetrations are not properly sealed. These penetrations will allow activated CO2 to leak out of protected space and into passenger acommodation spaces and allow vapors to escape.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 June 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 20 May 2020
Resolved
Make fixed bilge pump operable.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 June 2020
Resolved 31 July 2020
Resolution: Received video via text message of pump pulling suction.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 20 May 2020
Resolved
REPLACE BOTH FIRE HOSES.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 June 2020
Resolved 31 July 2020
Resolution: Received pictures of new fire hoses.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 20 May 2020
Resolved
COMPLETE ANNUAL SERVICE FOR PORTABLE FIRE EXTINGUISHERS AND FIXED CO2 FIRE FIGHTING SYSTEM.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 June 2020
Resolved 1 June 2020
Resolution: Recieved service report.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 19 September 2019
Resolved
Provide pictures of damage to rudder. Perform internal inspection of rudder supports and hull in way of damage. Provide 3rd party report or statement from licensed mariner of condition of hull/rudder/propulsion.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 19 October 2019
Resolved 20 September 2019
Resolution: Master statement provided, saved to Def Docs and vessel file.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 27 February 2019
Resolved
Provide working and accurate gauge on unfired pressure vessel underneath pilothouse console.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 March 2019
Resolved 1 April 2019
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 February 2019
Resolved
Remove dead ended wire underneath pilothouse console near the air compressor.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 March 2019
Resolved 1 April 2019
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 27 February 2019
Resolved
Provide a repair plan for USCG approval for 3" crack on the portside hull in the #2 void. Crop and renew steel to original in accordance with repair plan.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 March 2019
Resolved 1 April 2019
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 27 February 2019
Resolved
Renew starboard main engine stop button.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 March 2019
Resolved 1 April 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 27 February 2019
Resolved
Ensure postive valves at the overboard discharge on all electric submersible pumps
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 March 2019
Resolved 1 April 2019
Construction/Loadline › Hull › Side Shell
Issued 3 May 2018
Resolved
Lazzarette interior; weld port side aft corner from inside IVO overhead at main deck
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 June 2018
Resolved 1 June 2018
Construction/Loadline › Hull › Hull Plating
Issued 3 May 2018
Resolved
Lazzarette interior; remove tmeporary repair plate and make perminante repair of STBD corner IVO upper overhead at main deck.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 1 June 2018
Pollution Prevention/Response › Prevention Equipment › Sewage System Piping
Issued 3 May 2018
Resolved
Provide blank flange for open pipe located in sewage room.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 June 2018
Resolved 1 June 2018
Engineering › Diesel Engine (propulsion-reduction gear) › Exhaust Manifold
Issued 3 May 2018
Resolved
Provide permanent support for exhaust on port engine.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 June 2018
Resolved 1 June 2018
Engineering › Shafting/Propeller Arrangements › Stern Gland
Issued 3 May 2018
Resolved
Renew shaft packing for both port and starboard shafts.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 June 2018
Resolved 1 June 2018
Engineering › Bilge Water Management System › Not Installed
Issued 3 May 2018
Resolved
Provide means of removing water from collision compartment.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 June 2018
Resolved 1 June 2018
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 3 May 2018
Resolved
Properly mount bridge fire extinguisher.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 June 2018
Resolved 1 June 2018
Engineering › Steering Gear System › Linkage
Issued 29 August 2017
Resolved
Repair fractured turnbuckle rod end.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 August 2017
Electrical › Electrical Distribution System (emergency) › Wiring
Issued 21 April 2016
Resolved
Cover bow thruster electrical terminals to remove electrical hazard
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 27 May 2016
Resolved 25 May 2016
Electrical › Lighting (service) › Lighting Fixture
Issued 21 April 2016
Resolved
Install cover on lighting fixture in portside engine room vestibule.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 27 May 2016
Resolved 25 May 2016
Resolution: Light fixture installed.
Engineering › Engine Controls (Electric/Electronic) › Circuit Board
Issued 21 April 2016
Resolved
Install required generator gauges; ammeter, hertz meter
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 27 May 2016
Resolved 25 May 2016
Resolution: Gauges installed
Engineering › Fuel Oil Service System › Filter
Issued 21 April 2016
Resolved
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 27 May 2016
Resolved 25 May 2016
Resolution: Install flame screen on generator fuel filter.