Inspection history · 21
7 January 2026
COI Inspection · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8288861
6 August 2025
Administrative Inspection · Drydock Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8203824
10 April 2025
Administrative Inspection · Annual Inspection · Deficiency Check · Internal Structural Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8109633
8 February 2025
Administrative Inspection · Damage Survey
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8076645
8 February 2025
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8230442
27 March 2024
Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7884360
13 September 2023
Drydock Exam · Internal Structural Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7794895
24 May 2023
In-Service Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7700180
12 January 2023
Annual Inspection · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7620425
28 February 2022
Administrative Inspection · Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7402912
17 September 2021
Administrative Inspection · Deficiency Check · Internal Structural Exam · Drydock Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7314598
27 December 2020
Deficiency Check · Administrative Inspection · COI Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7116617
8 June 2020
Annual Inspection · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6971297
30 March 2020
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6933069
2 December 2019
Internal Structural Exam · Administrative Inspection · Drydock Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6865233
10 April 2019
Annual Inspection · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6659459
11 April 2018
DAPI Audit · Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6389418
12 December 2017
Internal Structural Exam · Drydock Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6322760
30 March 2017
Internal Structural Exam · Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6113910
8 December 2016
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6054748
7 December 2016
Deficiency Check · Damage Survey
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6054162
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 January 2026
Resolved
All vessels except non-self-propelled vessels shall be provided with suitable steering apparatus. Hydraulic leak located on the steering hoses in fuel tank space.
46 CFR 182.30-1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 January 2026
Resolved 26 February 2026
Resolution: Steering hoses replace.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 7 January 2026
Resolved
Every vessel subject to Part III of Title III of the Communications Act must have a detailed inspection of the radio installation by an FCC-licensed technician in accordance with § 80.59 once every five years. The Radiotelephony certificate was expired.
47 CFR 80.903
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 January 2026
Resolved 26 February 2026
Resolution: Telephony certificate renewed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 7 January 2026
Resolved
Gauges to indicate engine cooling water discharge temperature and lubricating oil pressure shall be provided for all propulsion engines and located so as to be in view of the operator. Oil pressure gauges were not operational.
46 CFR 182.20-5
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 January 2026
Resolved 26 February 2026
Resolution: Gauge replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 10 April 2025
Resolved
This part is intended to provide a minimum standard of regulations for electrical installations and equipment that will result in a vessel that is reasonably safe from fire caused by and/or originating in electrical equipment, and/or reasonably safe from electrical shock of personnel. MI's observed open wires on the upper deck, aft port side light.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 April 2025
Resolved 18 April 2025
Resolution: Provided picture evidence of cover installed.
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 10 April 2025
Resolved
Each officer employed on any vessel subject to this subchapter must have his or her license or merchant mariner credential onboard and available for examination at all times when the vessel is operating.
MMC onboard did not have original MMC onboard. Was replaced by a master with MMC on board.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 11 April 2025
Resolution: Company was able to find a Master with all credientials
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 8 February 2025
Resolved
A vessel must be provided with a main steering gear what is: 3) Capable of moving the rudder from 35 degrees on one side to 30 degrees on the other side... . Vessel's steering is inoperable. Vessel must make repairs to MIs satisfaction.
46 CFR 182.610(a)(3)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 February 2025
Resolution: All steering checks completed, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 8 February 2025
Resolved
46 cfr 182.410: Gauges to indicate revolutions per minute (RPM), jacket water discharge temperature, and lubricating oil pressure must be provided for all propulsion engines installed in the vessel. Gauges at operating station inoperable, repair to the satisfaction of CG Marin Inspector.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 February 2025
Resolved 25 February 2025
Resolution: Gauges repaired, satisfactorily operated.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 8 February 2025
Resolved
46 CFR 182.200: Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed ...Heat Exchanger is leaking excessively, causing mounting plate, hoses and surrounding components to rust and fill bilge area with oily water.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 February 2025
Resolved 25 February 2025
Resolution: Heat Exchanger replaced, all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 27 March 2024
Resolved
Placards containing instructions for the donning and use of the life jackets aboard the vessel must be posted. MIs observed that vessel currently carries two different types of life jackets, but only have one life jacket placard containing donning instructions for one of the two types. Vessel must either have only the one type of life jacket on-board in which there is a placard for, or post two donning placards.
46 CFR 185.516
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 April 2024
Resolved 18 April 2024
Resolution: MIs received evidence of correction.
09 - Working and Living Conditions › 091 - Living Conditions › Pipes, wires (insulation)
Issued 27 March 2024
Resolved
Protect passengers, crew, other persons, and the vessel from electrical hazards. MIs observed exposed dead-end wire meant to service a lighting fixture. Vessel must either replace lighting fixture or properly cap dead-end wire.
46 183.200(b)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 April 2024
Resolved 18 April 2024
Resolution: MIs received evidence of correction.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 27 March 2024
Resolved
The marine inspector shall examine all accessible parts of the vessel's hull, machinery, and equipment to be assured that they are in a satisfactory condition. MIs observed several spots of concern measuring .070 and .1 inches at worst along the keel in the fuel tank compartment. Vessel must clean and properly seal areas of concern. At next dry-dock vessel should expect further repair requirements.
46 CFR 176.10-5(b)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 April 2024
Resolved 18 April 2024
Resolution: MIs received evidence of correction.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 27 March 2024
Resolved
The construction and arrangement of a vessel must allow the the safe operation of the vessel in accordance with the terms of its COI... . MIs observed that starboard side aft railing had broken welds and was bent. Vessel must repair welds and railing back to original condition.
46 CFR 177.100
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 April 2024
Resolved 18 April 2024
Resolution: MIs received evidence of correction.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 January 2021
Resolved
FUEL SUPPLY PIPING. FLEXIBLE HOSE... SHALL NOT PENETRATE WATERTIGHT BULKHEADS. FUEL SUPPLY FLEX HOSES PENETRATE 2 WATERTIGHT BULKHEADS NOT USING APPROPRIATE METALLIC FITTINGS ATTACHED TO THE BULKHEAD.
46 CFR 182.20-40(a)(2)(i)
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 7 January 2021
Resolved 11 February 2021
Resolution: Fuel supply/return lines have been replaced and proper bulkhead penetration fitting installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 January 2021
Resolved
INTENT. IT IS FURTHER INTENDED THAT ALL MACHINERY BE INSTALLED AND MAINTAINED IN SUCH A MANNER AS TO AFFORD ADEQUATE PROTECTION AGAINST FIRE, EXPLOSION, MACHINERY FAILURE AND PERSONNEL INJURY. PORT AND STBD GENERATOR FUEL LINES AND HYDRAULIC STEERING LINES HAVE LEAKS ON SEVERAL FITTINGS IN SPACE FORWARD OF THE ENGINE COMPARTMENT.
46 CFR 182.01-5
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 7 January 2021
Resolved 11 February 2021
Resolution: Generator fuel and hydraulic steering lines and fittings replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 January 2021
Resolved
INTENT. IT IS FURTHER INTENDED THAT ALL MACHINERY BE INSTALLED AND MAINTAINED IN SUCH A MANNER AS TO AFFORD ADEQUATE PROTECTION AGAINST FIRE, EXPLOSION, MACHINERY FAILURE AND PERSONNEL INJURY. FUEL SOLENOID ON GENERATOR IS LOOSELY SECURED WITH 1 OF 2 MOUNTING BOLTS.
46 CFR 182.01-5
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 7 January 2021
Resolved 11 February 2021
Resolution: Fuel solenoid is properly mounted to generator.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 January 2021
Resolved
INTENT. IT IS FURTHER INTENDED THAT ALL MACHINERY BE INSTALLED AND MAINTAINED IN SUCH A MANNER AS TO AFFORD ADEQUATE PROTECTION AGAINST FIRE, EXPLOSION, MACHINERY FAILURE AND PERSONNEL INJURY. GENERATOR EXHAUST IS NOT SECURELY MOUNTED AND IS SUPPORTED BY A WOOD PLANK.
46 CFR 182.01-5
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 7 January 2021
Resolved 11 February 2021
Resolution: Generator exhaust piping properly mounted and routed through engine compartment.
09 - Working and Living Conditions › 091 - Living Conditions › Pipes, wires (insulation)
Issued 7 January 2021
Resolved
INTENT. IT IS FURTHER INTENDED THAT ALL MACHINERY BE INSTALLED AND MAINTAINED IN SUCH A MANNER AS TO AFFORD ADEQUATE PROTECTION AGAINST FIRE, EXPLOSION, MACHINERY FAILURE AND PERSONNEL INJURY. GENERATOR WIRING IS PULLED FROM FITTING AND PRESENTS ELECTRICAL HAZARD.
46 CFR 182.01-5
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 7 January 2021
Resolved 11 February 2021
Resolution: Gernerator wiring properly routed into panel.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 7 January 2021
Resolved
EACH PENETRATION IS ACCOMPLISHED USING AN ACCEPTABLE METALLIC FITTING, WELDED OR OTHERWISE ATTACHED TO THE BULKHEAD OR DECK BY AN ACCEPTED METHOD. HYDRAULIC STEERING LINE PENETRATIONS ARE NOT USING METALLIC FITTING TO PENETRATE BULKHEADS.
46 CFR 182.40-1
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 7 January 2021
Resolved 11 February 2021
Resolution: Metalic fitting installed on all hydraulic line bulkhead penetrations.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 7 January 2021
Resolved
A VESSEL MUST CARRY ONE FLOATING WATERLIGHT. WATERLIGHT PROVIDED HAS A CRACKED CASE.
46 CFR 180.70(d)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 7 January 2021
Resolved 11 February 2021
Resolution: Waterlight replaced. Test Sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 9 June 2020
Resolved
A vessel must have one or more ring buoys. Replace ring buoys.
46 CFR 180.70
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 June 2020
Resolved 9 June 2020
Resolution: replaced ring buoy.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 9 June 2020
Resolved
03 life preservers have holes. Repair or replace life preservers.
46 CFR 180.75
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 9 June 2020
Resolved 9 June 2020
Resolution: Vsl rep replaced 03 life jackets before inspectors departed.
Engineering › Shafting/Propeller Arrangements › Strut Bearing
Issued 12 December 2017
Resolved
Replace both port side and starboard side aft cutlass bearings prior to credit DD.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 December 2017
Resolution: Replaced both port side and starboard side aft cutlass bearings prior to credit DD.
Construction/Loadline › Penetrations › Pipe Flange
Issued 12 December 2017
Resolved
Grind and fill exterior potable water, bilge, and port generator discharge fittings prior to credit DD.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 December 2017
Resolution: Grinded and filled exterior potable water, bilge, and port generator discharge fittings prior to credit DD.
Engineering › Shafting/Propeller Arrangements › Strut
Issued 7 December 2016
Resolved
Strut housing (barrel) found with broken welds. Grind back welds and renew as original.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 December 2016
Resolution: Strut housing was renewed as original.
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 7 December 2016
Resolved
Renew port strut bearings (2).
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 December 2016
Resolution: All bearing were renewed.
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 7 December 2016
Resolved
Renew port shaft as original.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 December 2016
Resolution: Shaft was replaced inkind.
Engineering › Shafting/Propeller Arrangements › Propeller (fixed pitch)
Issued 7 December 2016
Resolved
Renew propellor as original.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 December 2016
Resolution: New propeller was installed on vessel.