Records from 1997 to 2026. Most recent: inspection, 13 June 2026.
Inspection history · 28
13 June 2026
Type not recorded
No type recorded · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 8407123
26 April 2026
Damage Survey · Administrative Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 8355936
26 April 2026
Type not recorded
No type recorded · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 8375573
13 January 2026
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 8295402
7 January 2025
Periodic Inspection · MTSA Verification · Administrative Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 8059355
22 November 2024
Deficiency Check · Administrative Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8038544
16 November 2023
Deficiency Check · Annual Inspection · Internal Structural Exam · Hull Examination · Drydock Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7826141
4 January 2023
Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7615678
17 June 2022
Administrative Inspection
Administrative · Marine Safety Detachment Humboldt Bay · USCG Southwest District (CGD-SW) · Activity 7484147
11 May 2022
MARPOL Annex VI Survey
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7444401
4 March 2022
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7405757
1 December 2021
Examination of Repairs · MTSA/ISPS Verification · MARPOL Annex VI Survey · COI Inspection · Deficiency Check · Administrative Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7380189
18 October 2021
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7335033
1 October 2021
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7324636
31 July 2021
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7276468
24 March 2021
COI Inspection · MTSA Verification · Administrative Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7148162
10 February 2021
Type not recorded
No type recorded · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 7185617
25 November 2020
Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7102004
20 February 2020
Examination of Repairs · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6912303
1 November 2019
Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6848941
6 May 2019
Annual Inspection · MTSA Verification · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6678211
19 December 2018
Examination of Repairs · Internal Structural Exam · Drydock Exam · Administrative Inspection · Hull Examination
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6601314
10 September 2018
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6563101
8 March 2018
Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6368667
6 November 2017
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6302865
25 October 2017
Examination of Repairs · Administrative Inspection · Periodic Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6308580
24 April 2017
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6131540
2 December 2016
Hull Examination
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6051477
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 26 April 2026
Resolved
A survey, either general or partial, according to the circumstances, shall be made every time an accident occurs or defect is discovered which affects the safety of the vessel. The survey shall be such as to insure that the necessary repairs or renewals have been effectively made, that the material and the workmanship of such repairs or renewals are in all respects satisfactory, and that the vessel complies in all respects with the regulations in this subchapter. Vessel ran aground and is currently leaking oil from stbd Z-drive. Conduct damage assessment and make proper repairs as necessary to the satisfaction of Marine Inspector prior to commercial operatins.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 29 April 2026
Resolution: Repairs complete.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 13 January 2026
Resolved
A minimum of two two-way portable radiotelephone apparatus for each fire party for fire-fighter's communication shall be of an explosion-proof type or intrinsically safe.
02 firefighting outfits were missing radios.
74 SOLAS (2024)
II-2/Reg 11-10.4
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 January 2026
Resolved 23 January 2026
Resolution: Vsl procurred 02 intrinsically safe Standard Horizon VHF radios.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 13 January 2026
Resolved
Oil fuel lines shall be screened or otherwise suitably protected to avoid, as far as practicable, oil spray or oil leakages onto hot surfaces.
Missing SOLAS tape from several fuel lines.
74 SOLAS (1997)
II-2/Reg 15-2.11
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 January 2026
Resolved 23 January 2026
Resolution: Vsl purchased SOLAS tape and installed on engine fuel lines.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 13 January 2026
Resolved
Bulkheads of galleys shall be of "A" Class construction.
"A" class boundaries shall be constructed that if
subjected to the standard fire test, they would be
capable of preventing the passage of flame and smoke for
one hour.
Class "A" boundary in galley not maintained due to
warped gasket and frame.
46 CFR 92.07-5(b)
46 CFR 92.07-10(b)
Action required: 705 - Other - as specified
Due 13 March 2026
Resolved 26 May 2026
Resolution: Vsl sent photos of installation for new door.
01 - Certificates & Documentation › 012 - Crew Certificates › Other (STCW)
Issued 13 January 2026
Resolved
Seafarers employed or engaged on a seagoing ship shall receive approved security-related familiarization training.
02 crewmembers without adequate security familiarization training needed for STCW.
STCW A-VI/6
Action required: 10 - Deficiency Rectified
Resolved 13 January 2026
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 12 December 2023
Resolved
The following automatic shutdowns are required for the emergency generator set: Overspeed. The Periodic Safety Test Procedures dated April 18, 2016 did not include a test procedure for an overspeed shutdown. Provide satisfactory evidence of testing the overspeed shutdown to the satisfaction of the Marine Inspector.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 January 2024
Resolved 9 January 2024
Resolution: Received procedures and certification of testing.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 12 December 2023
Resolved
Periodic Safety tests must demonstrate the proper operation of the primary and alternate controls, alarms, power sources, transfer override arrangements, interlocks, and safety controls. Systems addressed must include electric power generation and distribution. The Periodic Safety Test Procedures dated April 18, 2016 did not include a test procedure for an overspeed shutdown. Submit revised procedures to the Marine Safety Center for approval.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 January 2024
Resolved 10 January 2025
Resolution: PSTP's tested and approved.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 12 December 2023
Resolved
On vessels required by 112.05-5(a) to have a temporary emergency power source, the following emergency lighting and power loads must be arranged so that they can be energized from the temporary emergency power source: (c) lighting for escape trunks in machinery spaces and work spaces sufficient to allow crew to find their way to open decks with all watertight doors and fire doors closed. Emergency escape trunk in upper level of starboard mezzanine not sufficiently illuminated.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 January 2024
Resolved 9 January 2024
Resolution: Accepted photo of installed light.
07 - Fire Safety › N/A - No Subsystem › Personal equipment for fire safety
Issued 12 December 2023
Resolved
For ships constructed on or after 1 July 2014, a minimum of two two-way portable radiotelephone apparatus for each fire party for fire-fighter’s communication shall be carried on board. Those two-way portable radiotelephone apparatus shall be of an explosion -proof type or intrinsically safe. Ships constructed before 1 July 2014 shall comply with the requirements of this paragraph not later than the first survey after 1 July 2018. Vessel was not outfitted with portable radiotelephone apparatus for fire fighters.
SOLAS 74(20) II-2/10.4
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 January 2024
Resolved 23 January 2024
Resolution: Accepted photos for correction.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 12 December 2023
Resolved
The means of control of any fixed gas fire extinguishing system shall be readily accessible and simple to operate and shall be grouped together in as few locations as possible at positions not likely to be cut off by a fire in a protected space. At each location there shall be clear instructions relating to the operation of the system having regard to the safety of personnel. CO2 remote activation on bridge does not contain system operation instructions.
SOLAS 74(97) II-2/5.1.7
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 January 2024
Resolved 9 January 2024
Resolution: Accepted photo of instructions.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Technical files and if applicable, monitoring manual
Issued 31 January 2022
Resolved
The revised NOx Technical Code 2008 shall be applied in the certification, testing and measurement procedures for the standards set forth in this regulation. In accordance with Regulation 13.2.1.1 of MARPOL Annex VI all engines over 130kw placed on board the vessel after 1 January 2000 must meet emission standards set forth by the convention. Chapter 2.1 of the NOx Technical Code 2008 states that this is certified by issuance of an EIAPP Certificate(Engine International Air Pollution Prevention Certificate). The vessel currently does not have EIAPP certificates for the Port and Starboard Jet Pumps. Prior to sailing foreign provide EIAPP and Technical Files for each engine.
MARPOL 73/78 (2011) Annex VI Reg. 13.8
Action required: 50 - Rectify deficiencies w/in 30 days
Due 31 January 2022
Resolved 25 February 2022
Resolution: Vessel recieved EIAPP and Technical Files for port/stbd jet pump engines.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Bunker delivery notes
Issued 1 December 2021
Resolved
For each ship subject to regulations 5 and 6 of this Annex, details of fuel oil for combustion purposes delivered to and used on board shall be recorded by means of a bunker delivery note that shall contain at least the information specified in appendix V to this Annex. The bunker delivery note shall be kept on board the ship in such a place as to be readily available for inspection at all reasonable times. There was no bunker delivery note for the fuel on board the vessel at the time of inspection.
MARPOL 73/78 (2011) Annex VI Reg. 18.5 and Reg. 18.6
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 February 2022
Resolution: Vessel received bunker delivery notes for fuel bunkered.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 1 December 2021
Resolved
The generator set must shut down automatically upon loss of lubricating oil pressure, overspeed, or operation of a fixed fire extinguishing system in the emergency generator room. The emergency generator set did not shut down automatically upon testing of the fixed CO2 in the E-Generator room space. During the test of the CO2 system, all test CO2 was taken up by the engine and blown out of the exhaust stack, without the engine ever shutting off.
46 CFR 112.50-1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 February 2022
Resolution: Vessel installed pressure switch in the fixed CO2 system for the emergency generator room which was tied to the shut down of the E-Gen. Witnessed CO2 test of the system with automatic shutdown of the E-Gen.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 1 December 2021
Resolved
Each panelboard must have: A circuit directory cardholder; and A circuit directory that has: The circuit designation of each circuit; a description of the load of each circuit; and the rating of settin of the overcurrent protective device for each circuit. The forward panel board located in the port hydraulic room contained inaccurate information and was unclear as to which breakers were spares and which were being utilized. Insure all panels on board are updated to reflect the current approved electrical drawings.
46 CFR 111.40-11(b)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 February 2022
Resolution: All panel boards are now updated to match approved drawings and actual operations.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 1 December 2021
Resolved
Navigating bridge, ECC, maneuvering platform, and manual alternate control locations must include- Shaft speed and thrust direction indicators. The RPM gauges for the main engine controls located on the main deck in the engine rooms were not operable.
46 CFR 62.35-5(b)(3)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 February 2022
Resolution: Wiring found crossed on RPM gauges. Witnessed satisfactory operational test once corrected.
04 - Emergency Systems › N/A - No Subsystem › Means of communication between safety centre and other control stations
Issued 1 December 2021
Resolved
Each vessel must be provided with a sound-powered telephone system, complying with subpart 113.30 of this chapter, to communicate between the pilothouse and the steering-gear compartment. The sound-powered phone located in the port engine room had a broken call button.
46 CFR 58.25-15
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 February 2022
Resolution: Button on sound powered phone replaced and tested.
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 1 December 2021
Resolved
A ship must have a fixed container or enclosed deck area under or around each fuel oil or bulk lubricating oil tank vent, overflow, and fill pipe, that: for a ship of 1600 or more gross tons has a capacity of one barrel. There were multiple fixed containments throughout the vessel missing the plug for the containment, not allowing for the full capacity as required.
33 CFR 155.320(a)(2)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 February 2022
Resolution: Drain plugs placed at each small discharge containment.
10 - Safety of Navigation › N/A - No Subsystem › Voyage data recorder (VDR)/Simplified Voyage data recorder(S-VDR)
Issued 25 March 2021
Resolved
To assist in casualty investigations, cargo ships shall be fitted with a VDR which may be a simplified voyage data recorder.
S-VDR battery failed test by technicians and parts are still being sourced. Provide technician report that the battery has been replaced and the system has been tested and certified fully functional.
74 SOLAS (2014) V/20.2
Action required: 60 - Rectify deficiencies prior to movement
Resolved 26 March 2021
Resolution: Submitted VDR Report from Mackay Marine. See documents section.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boat inventory
Issued 25 March 2021
Resolved
The first aid kit in a rescue boat must be approved under approval series 160.041.
First aid kits on board the vessel all had expired medication.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 April 2021
Resolved 31 March 2021
Resolution: Provided pictures of newly purchased first aid kits.
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 25 March 2021
Resolved
All ships, irrespective of size shall have, when the ship's bridge is totally enclosed, a sound reception system, or other means, to enable the officer in charge of the navigational watch to hear sound signals and determine their direction.
No sound reception system was fitted onboard the vessel as required.
74 SOLAS (2014) V/19.2.1.8
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 April 2021
Resolved 10 May 2021
Resolution: Provided a technicians report that the directional microphone was installed, tested, and functions as designed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 25 March 2021
Resolved
The grab line shall be 3/8 inch diameter polyethylene, polypropylene, or other suitable material having a minimum breaking strength of 1,350 pounds.
The grab lines on two of the vessel lifebuoys were found wasted beyond repair. Vessel is to replace the grab lines to the satisfaction of a USCG Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 April 2021
Resolved 31 March 2021
Resolution: Provided pictures of life rings with newly installed grab lines.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 March 2021
Resolved
Electric installations on vessel must ensure: protection of passengers, crew, other persons, and the vessel from electrical hazards.
Vessel had an installed outlet directly above cooking equipment that was accumulating hot oil and grease. Vessel is to remove and replace the outlet to avoid fire and water hazards to the satisfaction of a USCG Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 April 2021
Resolved 26 April 2021
Resolution: Provided images that the galley outlet was moved to a new location.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 March 2021
Resolved
Machinery driving fuel-oil transfer pumps must be fitted with remote controls from a readily accessible position outside the space concerned so that the pumps may be stopped in case of fire in the compartment in which they are located.
There is no remote control to stop the fuel-oil transfer pump for filling the EDG fuel tank. Vessel shall install a means of remote control stop of the fuel-oil transfer pump by next scheduled dry dock.
Action required: 705 - Other - as specified
Due 31 December 2021
Resolved 31 January 2022
Resolution: Witnessed opertaional test of remote fuel shutdown.
Lifesaving › Buoyant Apparatus › Readily Accessible
Issued 22 February 2018
Resolved
Bridge buoys with attached smoke/lights were attached to hand rail on the inboard side so as not to be able to be easily cast loose. Additionally, there was a deck located underneath the drop path of the buoy located on the port side. Issued 835 SOLAS III/7.1.3 (30 days).
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 28 March 2018
Resolved 20 March 2018
Resolution: Proper Bridge buoys were installed.
Lifesaving › Line-Throwing Appliances › Projectiles
Issued 22 February 2018
Resolved
4 Rocket projectiles located on bridge did not have accompanying 2 buoyant type devices. Issued 835 46CFCR160.040-4 (30 days
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 March 2018
Resolved 20 March 2018
Resolution: Verified buoyant type devices were onboard.