MAURY USCG vessel records Sign in
← All vessels

TRINITY

TRINITY is a 1966 tank ship. The Coast Guard has recorded 231 inspections since 1982, most recently in April 2002, along with 212 deficiencies — 1 with no resolution recorded —.

Records from 1982 to 2002. Most recent: inspection, 16 April 2002.

Built
1966
Last inspected
16 April 2002
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

6618213 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
Flag
UNITED STATES
367006000 (licence lapsed)
Maury page id
psix-45362

Inspections, by type

…with no type recorded134
…past their stated due date1
Years with a record 21 calendar years (1982–2002)
The 231 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 24 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it16028 - Regulatory (Subpart C or D), Net Ton
13143 - Convention (Subpart B), Net Ton
20572 - Regulatory (Subpart C or D), Gross Ton
20878 - Convention (Subpart B), Gross Ton
37753 - Dead Weight, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

WRGLMMSI 367006000 · expired · compulsorily equipped · granted 24 March 1998, cancelled 6 November 2004
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspected as a tow unit · 1

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

SEA MUSE Freight Ship · MISLE 225774 · 15 September 1999 · activity 107621

Inspection history · 231

16 April 2002 Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1605650
2 November 2001 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 772124
27 August 2001 Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1451752
29 July 2001 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1435258
4 April 2001 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1064661
28 February 2001 Damage Survey
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1466197
6 January 2001 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 117442
6 January 2001 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 219640
26 July 2000 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1052316
18 May 2000 Type not recorded
No type recorded · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 165143
31 March 2000 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1048291
31 March 2000 Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1050902
5 March 2000 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 184526
24 January 2000 Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1045628
17 December 1999 Type not recorded
No type recorded · Activities Europe · Activity 14687
24 November 1999 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 811506
22 November 1999 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 810328
18 November 1999 Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 810840
19 October 1999 Examination of Repairs · Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1375938
17 October 1999 Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 790007
17 October 1999 Deficiency Check · Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1454728
1 October 1999 Administrative
Administrative · Activities Europe · Activity 1349445
26 September 1999 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 166550
15 September 1999 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 107621
15 September 1999 Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1120552
10 September 1999 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 102586
9 September 1999 Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1361075
8 September 1999 Administrative
Administrative · Activities Europe · Activity 783848
3 August 1999 Type not recorded
No type recorded · Activities Europe · Activity 30776
31 July 1999 Type not recorded
No type recorded · Activities Europe · Activity 176942
9 July 1999 Type not recorded
No type recorded · Activities Europe · Activity 152206
24 June 1999 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 224982
22 June 1999 Examination of Repairs · Deficiency Check
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1401032
18 June 1999 Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 176237
7 June 1999 Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1381607
29 May 1999 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 135683
23 May 1999 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 6619
21 May 1999 Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 799295
6 May 1999 Hull Examination
Physical examination · Activities Europe · Activity 1360824
22 March 1999 Type not recorded
No type recorded · Activities Europe · Activity 792215
7 March 1999 Damage Survey
Physical examination · Activities Europe · Activity 1360752
23 February 1999 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1131271
19 January 1999 Examination of Repairs · Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1420038
29 December 1998 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 97399
22 December 1998 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 808355
15 December 1998 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1418431
25 November 1998 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 41601
29 October 1998 Deficiency Check
Physical examination · Activities Europe · Activity 803775
26 October 1998 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 803080
12 October 1998 Examination of Repairs · Deficiency Check
Physical examination · Activities Europe · Activity 1383948
28 September 1998 Type not recorded
No type recorded · Activities Europe · Activity 139253
23 September 1998 Type not recorded
No type recorded · Activities Europe · Activity 187537
16 September 1998 Type not recorded
No type recorded · Activities Europe · Activity 117257
23 August 1998 Type not recorded
No type recorded · Activities Europe · Activity 1375470
18 July 1998 Type not recorded
No type recorded · Activities Europe · Activity 124930
17 July 1998 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1381295
17 June 1998 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1130161
17 June 1998 Damage Survey
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1470722
10 June 1998 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 797946
5 March 1998 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 784391
20 November 1997 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 509071
3 October 1997 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1334857
29 September 1997 Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1464722
28 August 1997 Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1459343
18 August 1997 Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1439906
6 June 1997 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 116818
30 May 1997 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 492236
13 February 1997 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 520410
17 December 1996 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1091615
5 November 1996 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 438797
21 October 1996 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 848422
16 August 1996 COI Inspection · Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1425785
25 July 1996 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1413027
24 July 1996 Type not recorded
No type recorded · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 147100
2 June 1996 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 466606
12 December 1995 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 537827
20 October 1995 Re-Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 881690
8 September 1995 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 532730
11 March 1995 Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 533221
3 December 1994 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 372899
10 November 1994 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1172761
20 September 1994 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 165974
13 September 1994 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 456452
3 September 1994 Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 370240
22 August 1994 Hull Examination · COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1387570
8 August 1994 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1171347
14 January 1994 Examination of Repairs
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 851060
13 January 1994 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 14469
6 January 1994 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 854756
17 December 1993 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1159291
8 December 1993 Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 439669
6 December 1993 Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1159165
19 November 1993 Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 836181
13 November 1993 Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1150781
25 October 1993 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1135806
8 October 1993 Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 826965
29 June 1993 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 841243
16 June 1993 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1136755
14 June 1993 Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 845572
18 May 1993 Examination of Repairs
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 842153
26 March 1993 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 225364
11 March 1993 Type not recorded
No type recorded · MSD CONCORD · USCG Southwest District (CGD-SW) · Activity 515168
23 February 1993 Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1147291
12 February 1993 Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1144147
24 December 1992 Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1141641
16 November 1992 Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1133008
6 November 1992 Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1260692
4 October 1992 Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 932866
1 October 1992 Administrative
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1267177
12 September 1992 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 440836
5 September 1992 Examination of Repairs · Hull Examination · COI Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1466825
23 July 1992 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 352157
25 June 1992 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 148341
23 June 1992 Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1260473
2 June 1992 Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 947722
31 March 1992 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 214603
11 March 1992 Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1317142
28 February 1992 Examination of Repairs
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 946434
27 February 1992 Type not recorded
No type recorded · COTP LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 349032
20 February 1992 Type not recorded
No type recorded · COTP LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 643583
20 February 1992 Type not recorded
No type recorded · COTP LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 643584
11 February 1992 Type not recorded
No type recorded · COTP LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 41523
11 February 1992 Type not recorded
No type recorded · COTP LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 505570
3 February 1992 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 946805
30 January 1992 Examination of Repairs
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1008609
25 January 1992 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 32054
11 January 1992 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 10793
3 August 1991 Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1251113
12 June 1991 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 344172
8 May 1991 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1237604
3 May 1991 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 908414
6 April 1991 Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1235446
5 March 1991 Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 899524
4 March 1991 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 443182
26 February 1991 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1232387
20 February 1991 Hull Examination · COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 916045
7 November 1990 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 904194
1 November 1990 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1211459
17 September 1990 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1231731
2 September 1990 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 467941
9 August 1990 Examination of Repairs
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1239946
24 July 1990 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1231345
13 June 1990 Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 923022
9 May 1990 Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1228731
20 April 1990 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 905401
12 April 1990 Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 918311
6 April 1990 Re-Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1219340
7 March 1990 Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 518551
7 February 1990 Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 912810
20 December 1989 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1225117
11 November 1989 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 928574
4 November 1989 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 480284
15 September 1989 Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1213714
23 July 1989 Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 500315
20 July 1989 Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 525444
1 April 1989 Deficiency Check
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 889594
25 March 1989 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 473201
13 March 1989 Deficiency Check
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 898541
23 February 1989 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1340968
21 February 1989 COI Inspection · Deficiency Check
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1350543
18 February 1989 Examination of Repairs
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1040732
1 February 1989 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1210612
14 January 1989 Examination of Repairs
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 888467
13 January 1989 Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 509930
6 December 1988 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 898258
12 August 1988 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 482940
26 June 1988 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 892818
15 May 1988 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 441691
16 April 1988 Deficiency Check
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1041556
29 March 1988 Re-Inspection
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 994843
4 March 1988 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 478426
4 February 1988 Administrative
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1024258
8 January 1988 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 509825
4 January 1988 Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 473756
23 December 1987 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1321401
11 December 1987 Hull Examination · Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1013017
7 November 1987 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1330674
31 July 1987 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1333365
13 June 1987 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 496991
2 June 1987 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1027213
15 May 1987 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1335694
16 April 1987 Type not recorded
No type recorded · Marine Safety Center (MSC) · Activity 1023629
3 April 1987 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1329446
2 April 1987 MARPOL Annex II Examination
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1326604
15 March 1987 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1014874
7 March 1987 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1315880
25 February 1987 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1309326
23 February 1987 COI Inspection
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1014154
17 February 1987 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1014501
15 February 1987 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 487652
13 February 1987 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1322149
13 January 1987 Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 461537
13 January 1987 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1313746
4 January 1987 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 466528
26 November 1986 Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 537611
31 October 1986 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1016714
16 September 1986 MARPOL Annex I Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1311942
23 May 1986 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 445009
15 April 1986 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 999940
4 April 1986 Re-Inspection
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1306728
14 February 1986 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 514196
13 February 1986 Examination of Repairs
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1295104
10 February 1986 Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 490099
4 February 1986 Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 997494
14 January 1986 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 994278
27 November 1985 Re-Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 993448
29 September 1985 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 486298
8 September 1985 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 991243
14 August 1985 Examination of Repairs
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1293258
29 July 1985 Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 303360
29 July 1985 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1290565
10 June 1985 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1287439
25 May 1985 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1287438
7 May 1985 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 983464
10 April 1985 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 981374
27 March 1985 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 981758
20 March 1985 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1289034
6 March 1985 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1287188
5 March 1985 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 979361
31 December 1984 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 525068
16 December 1984 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1288544
28 November 1984 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1285450
1 October 1984 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1282556
14 September 1984 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1282976
28 August 1984 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 974995
13 April 1984 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 972550
2 September 1983 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1277919
31 March 1983 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 964879
24 November 1982 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1275348
16 October 1982 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1271723
28 July 1982 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1271357

Deficiency record · 212

Engineering
Issued 27 August 2001 Resolved
COMPLETE REPAIRS TO BOTH STEAM-DRIVEN FEED PUMPS IN THE ENGINEROOM. THIS REQUIREMENT MUST BE CLEARED PRIOR TO LEAVING THE PORT OF PORTLAND, OR.
Condition: Unknown
Due 4 September 2001
Resolved 4 September 2001
Engineering
Issued 27 August 2001 Resolved
REPLACE ALL OUTDATED AND/OR CRACKED NON-METALLIC EXP. JOINTS/46CFR61.15-12.
Condition: Unknown
Due 29 October 2001
Resolved 5 December 2002
Resolution: Vessel no longer in certificated service.
Engineering
Issued 27 August 2001 Resolved
MAKE PERM. REPAIRS TO ALL AUX STEAM DRAIN LINES CURRENTLY WASTED THROUGH ORSOFT-PATCHED IN THE ENGINEROOM.
Condition: Unknown
Due 29 October 2001
Resolved 5 December 2002
Resolution: Vessel no longer in certificated service.
Electrical
Issued 29 July 2001 No resolution recorded
Prove proper operation of #2 ship's service turbine generator.
Condition: Unknown
Due 29 October 2001 — due date passed with no resolution recorded
Lifesaving
Issued 4 April 2001 Resolved
Make permanent repairs to catwalk area port side fwd of pumproom; step at crossover at bow; handrail from fantail to 01 deck.
Condition: Unknown
Due 4 April 2001
Resolved 4 April 2001
Accommodation/Occupational Safety
Issued 4 April 2001 Resolved
Renew/repair potable water piping on the port potable water tank piping at bottom of ladder steering room in way of soft patch.
Condition: Unknown
Due 4 April 2001
Resolved 4 April 2001
Electrical
Issued 28 February 2001 Resolved
PROVE PROPER OPERATION OF EMERGENCY GENERATOR. _x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 28 February 2001
Resolved 28 February 2001
Electrical
Issued 28 February 2001 Resolved
PROVE PROPER OPERATION OF NR.1 & 2 SHIP SERVICE TURBINE GENERATORS. STEAM TURBINE GENERATOR NR.2 WAS DAMAGED WHEN OIL SUMP WAS ALLOWED TO RUN DRY.
Condition: Unknown
Due 28 February 2001
Resolved 28 February 2001
Electrical
Issued 24 January 2000 Resolved
REPAIR FWD TURBOGENERATOR LUBE OIL COOLER._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 24 January 2000
Resolved 24 January 2000
Lifesaving
Issued 17 October 1999 Resolved
Submit repair proposal for port aft davit and make appropriate repair to port aft davit which is exhibiting deterioration at lower davit arm to the satisfaction of the cognizant OCMI not later than 13JAN2000. SEE MI99033899MINS FOR FULL PARTICULARS OF THIS REQUIREMENT.
Condition: Unknown
Due 17 October 1999
Resolved 17 October 1999
Lifesaving
Issued 9 September 1999 Resolved
PROVIDE REPAIR PROPOSAL TO [name withheld] FOR STARBOARD FWD DAVIT ARM FORAPPROVAL PRIOR TO MAKING REPAIRS. PROPOSAL CAN BE FAXED TO HARVEY CANAL DETAIL AT [phone withheld].
Condition: Unknown
Due 9 September 1999
Resolved 9 September 1999
Fire Fighting
Issued 9 September 1999 Resolved
IN ACCORDANCE WITH 46 CFR 35.10-3, SUBMIT FIRE CONTROL PLAN TO THE COGNIZANT OCMI FOR APPROVAL.
Condition: Unknown
Due 9 September 1999
Resolved 9 September 1999
Lifesaving
Issued 9 September 1999 Resolved
PROVIDE SEARCHLIGHT AND STANCHION FOR BOTH LIFEBOATS IN ACCORDANCE WITH 46 CFR 199.175.
Condition: Unknown
Due 9 September 1999
Resolved 9 September 1999
Lifesaving
Issued 9 September 1999 Resolved
PROVE PROPER OPERATION OF STBD EMBARKATION STATION LIGHT.
Condition: Unknown
Due 9 September 1999
Resolved 9 September 1999
Lifesaving
Issued 9 September 1999 Resolved
MAKE ENGINE COMPARTMENTS ON BOTH LIFEBOATS WATERTIGHT AND PROVE SAME IN ACCORDANCE WITH 46CFR160.035-5(A)(2).
Condition: Unknown
Due 9 September 1999
Resolved 9 September 1999
Fire Fighting
Issued 9 September 1999 Resolved
MAKE PROPER REPAIRS TO FIRE MAIN OVERBOARD DISCHARGE THROUGH-HULL FITTING IWO EMERGENCY FIRE PUMP IN SHAFT ALLEY.
Condition: Unknown
Due 9 September 1999
Resolved 9 September 1999
Lifesaving
Issued 9 September 1999 Resolved
MAKE PROPER REPAIRS TO PROT AND STBD GUNWHALES ON THE STERN OF THE STBD LIFEBOAT.
Condition: Unknown
Due 9 September 1999
Resolved 9 September 1999
Lifesaving
Issued 9 September 1999 Resolved
PROVIDE CHECKLIST FOR LIFEBOAT EQUIPMENT IN ACCORDANCW WITH 46 CFR 199.190.
Condition: Unknown
Due 9 September 1999
Resolved 9 September 1999
Lifesaving
Issued 9 September 1999 Resolved
IN ACCORDANCE WITH 46 CFR 189.130, RE-LOCATE THE PORT SIDE LIFERAFT TO A MORE SUITABLE LOCATION FOR MANUAL LAUNCHING.
Condition: Unknown
Due 9 September 1999
Resolved 9 September 1999
Lifesaving
Issued 9 September 1999 Resolved
PROVER PROPER OPERATION OF THE PORT LIFEBOAT ENGINE SHUT-DOWN.
Condition: Unknown
Due 9 September 1999
Resolved 9 September 1999
Electrical
Issued 22 June 1999 Resolved
PROPERLY SUPPORT ELECTRICAL CABLE ON WEATHER DECK (AFT) IN WAY OF EMERGENCYGENERATOR ROOM ACCESS ON POOP DECK.
Condition: Unknown
Due 22 June 1999
Resolved 22 June 1999
Documentation
Issued 7 June 1999 Resolved
PROVIDE COPY OF ISM INTERNAL AUDIT REPORT PERFORMED ON 08JUN99. AC OPY OF THIS REPORT IS NEEDED FOR OVERSIGHT PURPOSES.
Condition: Unknown
Due 7 June 1999
Resolved 7 June 1999
Lifesaving
Issued 7 June 1999 Resolved
MAKE PERMANENT REPAIRS TO STBD LIFEBOAT HULL INDENTATION IN WAY OF THE RUDDER AT AN APPROVED LIFEBOAT REPAIR FACILITY AND TO THE SATISFACTION OF ACG MARINE INSPECTOR.
Condition: Unknown
Due 7 June 1999
Resolved 7 June 1999
Electrical
Issued 7 June 1999 Resolved
PROVE PROPER OPERATION OF #1/#2 LUBE OIL COOLERS, REPLACE IF NECESSARY. COOLERS ARE NOT PROPERLY COOLING EQUIPMENT.
Condition: Unknown
Due 7 June 1999
Resolved 7 June 1999
Documentation
Issued 7 June 1999 Resolved
PROVIDE ACCIDENT REPORT AS PER ISM CODE CONCERNING THE LOSS OF VITAL MACHINERY AND NON-COMPLIANCE WITH INT'L REGULATIONS BOTH PRIOR TO SHIP'S ARRIVAL AND WHILE IN PORT. REPORT MUST INCLUDE ANALYSIS FINDINGS TO PREVENTREOCCURENCE.
Condition: Unknown
Due 7 June 1999
Resolved 7 June 1999
Lifesaving
Issued 7 June 1999 Resolved
MAKE MODIFICATIONS TO THE PORT LIFEBOAT ROTTMER RELEASING GEAR IN WAY OF THE UNIVERSAL JOINT SHEAR PINS. MODIFICATIONS ARE TO MEET MANUFACTURER'S ORIGINAL SPECS. IF THESE SPECS ARE UNAVAILABLE SUBMIT ENGINEERING ANALYSIS OF PRESENT INSTALLATION OF SHEAR PINS.
Condition: Unknown
Due 7 June 1999
Resolved 7 June 1999
Engineering
Issued 6 May 1999 Resolved
Replace the cracked seat to the port boiler blkhd steam stop valve. (crack is btwn 2-3 o-clock position)
Condition: Unknown
Due 6 May 1999
Resolved 6 May 1999
Construction/Loadline
Issued 6 May 1999 Resolved
Prove proper operation of all watertight doors.
Condition: Unknown
Due 6 May 1999
Resolved 6 May 1999
Lifesaving
Issued 6 May 1999 Resolved
Lubricate sheaves & pelican hooks to port/stbd lifeboat falls/pendants.
Condition: Unknown
Due 6 May 1999
Resolved 6 May 1999
Construction/Loadline
Issued 6 May 1999 Resolved
Remove cement patch and properly insert wasted double bottom fuel oil tanktop in way of stbd lube oil pump.
Condition: Unknown
Due 6 May 1999
Resolved 6 May 1999
Deck/Cargo
Issued 6 May 1999 Resolved
Crop & renew wasted knife edge to the no. 1 port cargo tank opening.
Condition: Unknown
Due 6 May 1999
Resolved 6 May 1999
Deck/Cargo
Issued 6 May 1999 Resolved
Provide proper tank venting devices and install at the correct height for all cargo and ballast tanks as per 46 CFR 32.55-20 and 46 CFR 56.50-85, prior to carriage of bulk liquid cargoes.
Condition: Unknown
Due 6 May 1999
Resolved 6 May 1999
Deck/Cargo
Issued 6 May 1999 Resolved
Properly stencil all cargo tanks.
Condition: Unknown
Due 6 May 1999
Resolved 6 May 1999
Accommodation/Occupational Safety
Issued 6 May 1999 Resolved
Crop & renew wasted step (2nd from bottom), to the catwalk ladder in way of5C cargo tank.
Condition: Unknown
Due 6 May 1999
Resolved 6 May 1999
Lifesaving
Issued 6 May 1999 Resolved
Provide and install manufacturers data plate, to include both "A" & "B" weights, to the port/stbd lifeboats.
Condition: Unknown
Due 6 May 1999
Resolved 6 May 1999
Accommodation/Occupational Safety
Issued 6 May 1999 Resolved
Properly install handrail courses in way of 4S cargo tank. (2 opening)
Condition: Unknown
Due 6 May 1999
Resolved 6 May 1999
Documentation
Issued 6 May 1999 Resolved
Submit new "list of authorized cargoes" (LOAC) to USCG Marine Safety Centerfor approval. (delete OPA 90 oil and oil like cargoes from present list)_x001C_ _x001C_ _x001C_
Condition: Unknown
Due 6 May 1999
Resolved 6 May 1999
Engineering
Issued 7 March 1999 Resolved
Provide a copy of the ships log indicating repairs have been made to the blistered boiler tubes as per proposal submitted.
Condition: Unknown
Due 7 March 1999
Resolved 7 March 1999
Navigation
Issued 23 February 1999 Resolved
Make permanent repairs to rudder bearing packing retainer assembly and renew bearings as necessary. Repairs shall be to the satisfaction of ABS and USCG.
Condition: Unknown
Due 23 February 1999
Resolved 23 February 1999
Engineering
Issued 19 January 1999 Resolved
Provide report from class attesting to the readiness of the ship's machinery after sea trials and prior to departure to the [name withheld], Texas.
Condition: Unknown
Due 19 January 1999
Resolved 22 February 1999
Engineering
Issued 19 January 1999 Resolved
Fully man the ship's engineering department for a sixty day period and closely observe the automated control, monitoring and machinery systems prior to requesting consideration for reduced manning as outlined in a letter dated 12JAN99 from [name withheld], Texas.
Condition: Unknown
Due 19 January 1999
Resolved 19 January 1999
Navigation
Issued 15 December 1998 Resolved
Make permanent repairs to rudder bearing packing retainer assembly and renew bearings as necessary. Repairs shall be to the satisfaction of the ABS and USCG.
Condition: Unknown
Due 15 December 1998
Resolved 15 December 1998
Electrical
Issued 15 December 1998 Resolved
MAKE REPAIRS AND PROVE PROPER OPERATION OF FWD AND AFT SHIPS SERVICE TURBINE GENERATOR(S) TO SATIFICATION OF COGNIZANT [name withheld] UNDER OWN POWER.
Condition: Unknown
Due 15 December 1998
Resolved 15 December 1998
Engineering
Issued 12 October 1998 Resolved
Complete proper repairs to leaking superheater tubes in port boiler prior to vessel sailing. All welding is to be done by a qualified welder using qualified procedures. This requirement to be cleared by statement from theMaster and Chief Engineer.
Condition: Unknown
Due 14 October 1998
Resolved 14 October 1998
Electrical
Issued 17 July 1998 Resolved
EVALUATE & SUBMIT TO COGNIZANT [name withheld] / REASON AFT REDUCTION GEAR BEARING ON AFT SSTG IS OPERATING 20 DEGREES FAHRENHEIT HOTTER THAN NORMAL, INCLUDE ANY NEEDED REPAIR PROPOSAL AND TIMELINE.
Condition: Unknown
Due 17 July 1998
Resolved 17 July 1998
Deck/Cargo
Issued 17 July 1998 Resolved
COMPLETE TESTS OF OVERSPEED TRIPS AND EMERGENCY SHUTDOWNS OF ALL CARGO PUMPS PRIOR TO OFFLOADING OF NEXT BULK LIQUID CARGO.
Condition: Unknown
Due 17 July 1998
Resolved 17 July 1998
Engineering
Issued 17 July 1998 Resolved
REPAIR / PROVE PROPER OPERATION OF PORT AND STARBOARD MAIN PROPULSION BOILERS HIGH WATER ALARM AND HIGH-HIGH WATER CUTOUT.
Condition: Unknown
Due 17 July 1998
Resolved 17 July 1998
Deck/Cargo
Issued 17 July 1998 Resolved
PROVIDE STUD FOR VCS MANIFOLD ON STARBOARD SIDE, AFTERMOST LINE.
Condition: Unknown
Due 17 July 1998
Resolved 17 July 1998
Construction/Loadline
Issued 17 July 1998 Resolved
PROVIDE PROPER GASKETING/DOGGING MECHANISMS TO FRESH AIR INTAKES TO FORWARDBOSUN STORES AND PAINT LOCKER; WATERTIGHT DOORS LEADING TO PUMPROOM, BOSUN STORES (FWD) (BOTH DOORS) AND WTD LOCATED ON MAIN DECK, PORT SIDE.
Condition: Unknown
Due 17 July 1998
Resolved 17 July 1998
Electrical
Issued 17 July 1998 Resolved
PROVIDE PROOF THAT EMERGENCY BATTERIES TO BRIDGE ARE IN OPERATING CONDITION.
Condition: Unknown
Due 17 July 1998
Resolved 17 July 1998
Engineering
Issued 17 July 1998 Resolved
UPDATE / REVISE, SUBMIT TO USCG / [name withheld] IN REGARDS TO CORRECT FEEDWATER PUMP PRESSURE.
Condition: Unknown
Due 17 July 1998
Resolved 17 July 1998
Electrical
Issued 17 July 1998 Resolved
LABEL BREAKERS CB-1, 2, 3, 4 IN P&S BOILER CONTROL PANELS.
Condition: Unknown
Due 17 July 1998
Resolved 17 July 1998
Engineering
Issued 17 July 1998 Resolved
INSTALL / PROVIDE GUARDS OVER ROTATING SHAFTS ON PORT AND STBD FORCED DRAFTBLOWERS.
Condition: Unknown
Due 17 July 1998
Resolved 17 July 1998
Accommodation/Occupational Safety
Issued 17 July 1998 Resolved
INSTALL 100 LB RELIEF VALVE ON DOM HOT WATER HEATER.
Condition: Unknown
Due 17 July 1998
Resolved 17 July 1998
Accommodation/Occupational Safety
Issued 17 July 1998 Resolved
SECURE GUARD FOR SANT. PUMP SHAFT.
Condition: Unknown
Due 17 July 1998
Resolved 17 July 1998
Engineering
Issued 17 July 1998 Resolved
REMOVE AND INSTALL APPROVED HOSE FOR FUEL OIL SERVICE ON AFT FUEL PUMP PRIOR TO OPERATION OF PUMP.
Condition: Unknown
Due 17 July 1998
Resolved 17 July 1998
Electrical
Issued 17 July 1998 Resolved
POST OPERATING INSTRUCTIONS FOR EMERGENCY GENERATOR.
Condition: Unknown
Due 17 July 1998
Resolved 17 July 1998
Fire Fighting
Issued 17 July 1998 Resolved
RENEW SEAL FIRE / BUTTERWORTH PUMP.
Condition: Unknown
Due 17 July 1998
Resolved 17 July 1998
Navigation
Issued 17 July 1998 Resolved
REPAIR VENTILATION FAN FOR AFT STEERING.
Condition: Unknown
Due 17 July 1998
Resolved 17 July 1998
Navigation
Issued 17 July 1998 Resolved
RENEW MISSING COOLING FAN STBD HYDRAULIC OIL COOLER, AFT STEERING.
Condition: Unknown
Due 23 July 1998
Resolved 23 July 1998
Navigation
Issued 17 July 1998 Resolved
PROVIDE TRAINING FOR CREW INVOLVED WITH EMERGENCY STEERING.
Condition: Unknown
Due 17 July 1998
Resolved 17 July 1998
Deck/Cargo
Issued 17 July 1998 Resolved
REPAIR OIL SIGHT GLASS & GOVERNOR OIL SUPPLY LINE FOR NO 2 CARGO PUMP PRIORTO NEXT OPERATION OF SAME.
Condition: Unknown
Due 17 July 1998
Resolved 17 July 1998
Construction/Loadline
Issued 17 July 1998 Resolved
MAKE PERMANENT REPAIRS TO PORT SIDE MAIN DECK RAILING AT AFT BULKHEAD OF SUPERSTRUCTURE.
Condition: Unknown
Due 17 July 1998
Resolved 17 July 1998
Engineering
Issued 17 July 1998 Resolved
INSTALL BOILER DATA PLATES ON PORT AND STARBOARD MAIN PROPULSION BOILERS INCOMPLIANCE WITH 46 CFR AND ASTM BOILER CODE.
Condition: Unknown
Due 17 July 1998
Resolved 17 July 1998
Engineering
Issued 17 July 1998 Resolved
REPAIR OR RENEW PACKING / SEALS ON #1, 2, AND 3 FUEL OIL PUMPS.
Condition: Unknown
Due 17 July 1998
Resolved 17 July 1998
Engineering
Issued 17 July 1998 Resolved
REPAIR OR RENEW SEAL ON INBOARD FEEDWATER PUMP.
Condition: Unknown
Due 17 July 1998
Resolved 17 July 1998
Engineering
Issued 17 July 1998 Resolved
RENEW 2 EA NONMETALLIC FLEX HOSES ON L/O PURIFIER.
Condition: Unknown
Due 17 July 1998
Resolved 17 July 1998
Engineering
Issued 17 July 1998 Resolved
REPAIR / RENEW OIL SEAL ON L/O PURIFIER.
Condition: Unknown
Due 17 July 1998
Resolved 17 July 1998
Construction/Loadline
Issued 17 July 1998 Resolved
REPAIR / RENEW RUSTED - LEAKING PIPES (2 EA X 3/4) IN BILGE UNDER FIRE STATION NO 22, SHAFT ALLEY.
Condition: Unknown
Due 17 July 1998
Resolved 17 July 1998
Navigation
Issued 17 July 1998 Resolved
RENEW BROKEN PRESSURE GAUGE PORT HYDRAULIC STEERING PUMP.
Condition: Unknown
Due 17 July 1998
Resolved 17 July 1998
Engineering
Issued 17 July 1998 Resolved
INVESTIGATE & SUBMIT A REPORT TO COGNIZANT [name withheld] RESIDUE IN STBD STEAM HEATER FOR FUEL, COND RTN / DRAIN TO BILGE.
Condition: Unknown
Due 17 July 1998
Resolved 17 July 1998
Engineering
Issued 17 July 1998 Resolved
BOLT INTO PLACE VENTILATION FAN HOUSING, SECURE OR REMOVE FAN MOTOR.
Condition: Unknown
Due 17 July 1998
Resolved 17 July 1998
Navigation
Issued 17 July 1998 Resolved
PROVE PROPER OPERATION OF HIGH FREQUENCY RADIO.
Condition: Unknown
Due 26 July 1998
Resolved 26 July 1998
Lifesaving
Issued 17 July 1998 Resolved
PROVE PROPER OPERATION OF EMBARKATION LIGHT FOR STARBOARD LIFEBOAT.
Condition: Unknown
Due 26 July 1998
Resolved 26 July 1998
Lifesaving
Issued 17 July 1998 Resolved
REPLACE TWO WORN LIFEBUOYS.
Condition: Unknown
Due 26 July 1998
Resolved 26 July 1998
Lifesaving
Issued 17 July 1998 Resolved
PROVE PROPER OPERATION OF TWO MALFUNCTIONING LIFEBUOY WATERLIGHTS.
Condition: Unknown
Due 26 July 1998
Resolved 26 July 1998
Lifesaving
Issued 17 July 1998 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 26 July 1998
Resolved 26 July 1998
Lifesaving
Issued 17 July 1998 Resolved
PROVIDE SIX WATER RATIONS (FOR TOTAL OF 32 IN EACH LIFEBOAT).
Condition: Unknown
Due 26 July 1998
Resolved 26 July 1998
Lifesaving
Issued 17 July 1998 Resolved
SECURE LOOSE COMPRESSED AIR LINE LOCATED FORWARD OF HOUSE AT MAIN DECK.
Condition: Unknown
Due 26 July 1998
Resolved 26 July 1998
Deck/Cargo
Issued 17 July 1998 Resolved
REPAIR / RENEW BROKEN GROUNDING STRAP ON IGS LINE AT FORWARD FLANGE CONNECTION.
Condition: Unknown
Due 26 July 1998
Resolved 26 July 1998
Deck/Cargo
Issued 17 July 1998 Resolved
COMPLETE TESTS OF HIGH LEVEL, HIGH/HIGH LEVEL ALARMS IN CARGO TANKS PRIOR TO LOADING NEXT BULK LIQUID CARGO.
Condition: Unknown
Due 17 July 1998
Resolved 17 July 1998
Lifesaving
Issued 17 July 1998 Resolved
PROVIDE ALL MISSING EQUIPMENT FOR LIFEJACKETS (3 NEED WHISTLES, 1 NEEDS WHISTLE AND WATERLIGHT, 4 NEED WATERLIGHTS, 1 NEEDS NAME STENCILLED ON BACK).
Condition: Unknown
Due 26 July 1998
Resolved 26 July 1998
Deck/Cargo
Issued 17 July 1998 Resolved
SEND EXPLOSIVEMETER TO COMPANY FOR RE-CALIBRATION (DUE 3/19/98).
Condition: Unknown
Due 26 July 1998
Resolved 26 July 1998
Accommodation/Occupational Safety
Issued 17 July 1998 Resolved
PROVIDE OPERATING READING LIGHTS FOR ALL CREW LIVING QUATERS.
Condition: Unknown
Due 26 July 1998
Resolved 26 July 1998
Navigation
Issued 17 July 1998 Resolved
MAKE PERMANENT REPAIRS TO PORT RUNNING LIGHT.
Condition: Unknown
Due 17 July 1998
Resolved 17 July 1998
Fire Fighting
Issued 17 July 1998 Resolved
MAKE PERMANENT REPAIRS TO MACH SPACE FIRE DAMPER - OFFICER'S DECK NEAR THIRD ENGINEER'S QUARTERS.
Condition: Unknown
Due 17 July 1998
Resolved 17 July 1998
Construction/Loadline
Issued 10 June 1998 Resolved
MAKE PERMANET REPAIRS TO THE NUMBER 6 PORT CARGO TANK TO THE SATISFACTION OF THE COGNIZANT OCMI PRIOR TO THE CARRAGE OF CARGO.
Condition: Unknown
Due 10 June 1998
Resolved 10 June 1998
Construction/Loadline
Issued 25 July 1996 Resolved
PROVIDE UNDERWATER SURVEY REPORT OF SHIP'S AFTER BOTTOM ON STARBOARD SIDE TO ASCERTAIN ANY POSSIBLE DAMAGE RESULTING FROM AN UNINTENDED GROUNDING ON 24JUL96. THIS IS TO BE DONE AS PER A.B.S. REQUIREMENT WITH A SURVEYOR PRESENT.
Condition: Unknown
Due 15 August 1996
Resolved 15 August 1996
Construction/Loadline
Issued 14 January 1994 Resolved
REPAIR OR REPLACE THE OVERBOARD DISCHARGE VALVE FOR THE MAIN TURBINE LUBE OIL COOLER.
Condition: Unknown
Due 14 January 1994
Resolved 15 January 1994
Fire Fighting
Issued 8 October 1993 Resolved
DEMONSTRATE PROPER OPERATION OF THE RELIEF VALVE ON THE FIRE/BALLAST PUMP LOCATED IN THE SHAFT KEY.
Condition: Unknown
Due 8 November 1993
Resolved 3 November 1993
Fire Fighting
Issued 8 October 1993 Resolved
PROVE PROPER OPERATION OF THE TIRE/BUTTERWORTH PUMP RELIEF VALVE.
Condition: Unknown
Due 8 November 1993
Resolved 3 November 1993
Engineering
Issued 8 October 1993 Resolved
DEMONSTRATE THE PROPER OPERATION OF THE BOILER SAFETY VALVE HAND RELIEVING GEAR.
Condition: Unknown
Due 8 November 1993
Resolved 3 November 1993
Navigation
Issued 8 October 1993 Resolved
DEMONSTRATE PROPER OPERATION OF THE LOSS OF POWER AND LOW HYDRAULIC OIL LEVEL ALARMS ON THE BRIDGE.
Condition: Unknown
Due 8 November 1993
Resolved 3 November 1993
Lifesaving
Issued 8 October 1993 Resolved
REPAIR OR REPLACE 22 REJECTED LIFEJACKETS.
Condition: Unknown
Due 8 November 1993
Resolved 3 November 1993
Unknown
Issued 8 October 1993 Resolved
REPAIR REPLACE SCUPPERS ON STERN.
Condition: Unknown
Due 8 November 1993
Resolved 3 November 1993
Fire Fighting
Issued 8 October 1993 Resolved
MAKE PERMANENT REPAIRS TO REMOTE PULL ACTAVATOR IN PAINT LOCKER SPACE.
Condition: Unknown
Due 8 November 1993
Resolved 3 November 1993
Deck/Cargo
Issued 8 October 1993 Resolved
MAKE AVAILALBE FOR INSPECTION #5 PORT AND STARBOARD BALLAST TANKS FOR INSPECTION.
Condition: Unknown
Due 8 November 1993
Resolved 3 November 1993
Lifesaving
Issued 8 October 1993 Resolved
REPLACE OR REPAIR WATER LIGHTS ON RING BUOYS.
Condition: Unknown
Due 8 November 1993
Resolved 3 November 1993
Lifesaving
Issued 8 October 1993 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 8 November 1993
Resolved 3 November 1993
Lifesaving
Issued 8 October 1993 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 8 November 1993
Resolved 3 November 1993
Engineering
Issued 8 October 1993 Resolved
PROVIDE [name withheld] ATTESTING TO THE SATISFACTORY TEST OF THE OVERSPEED TRIP ON THE MAIN ENGINE.
Condition: Unknown
Due 8 October 1993
Resolved 8 October 1993
Fire Fighting
Issued 8 October 1993 Resolved
RENEW AS ORIGINAL NUMEROUS SECTIONS OF PIPING ON DISCHARGE SIDE OF FIRE/BUTTERWORTH PUMP LEADING TO BILGES.
Condition: Unknown
Due 8 October 1993
Resolved 8 October 1993
Accommodation/Occupational Safety
Issued 8 October 1993 Resolved
TEST THE CONTROL AIR AND SHIP'S SERVICE AIRE RECEIVERS FOR A COAST GUARD_x001C_ INSPECTOR.
Condition: Unknown
Due 8 October 1993
Resolved 8 October 1993
Construction/Loadline
Issued 8 October 1993 Resolved
REPAIR BATTERY LOCKER DOOR AND REPLACE HANDRAIL ON BULKHEAD ADJACENT TO_x001C_ BATTERY LOCKER.
Condition: Unknown
Due 8 October 1993
Resolved 8 October 1993
Electrical
Issued 8 October 1993 Resolved
PROVE PROPER OPERATION OF THE LOW LUBE OIL SHUT DOWN ON THE EMERGENCY DIESEL GENERATOR.
Condition: Unknown
Due 8 October 1993
Resolved 8 October 1993
Electrical
Issued 8 October 1993 Resolved
DEMONSTRATE THE PROPER OPERATON OF THE LOW LUBE OIL SHUT DOWN ON THE #1 SSG.
Condition: Unknown
Due 8 October 1993
Resolved 8 October 1993
Construction/Loadline
Issued 8 October 1993 Resolved
MAKE PERMANENT REPAIRS TO HOLES IN CLASS A BOUNDARY SURROUNDING EMERGENCY GENERATOR ROOM.
Condition: Unknown
Due 8 October 1993
Resolved 8 October 1993
Deck/Cargo
Issued 8 October 1993 Resolved
STENCIL VAPOR ON VAPOR LINES AT MANIFOLDS.
Condition: Unknown
Due 8 November 1993
Resolved 8 November 1993
Deck/Cargo
Issued 8 October 1993 Resolved
DEMONSTRATE PROPER OPERATION OF IGS SYSTEM IN WAY OF THE SOOT BLOWER INTERLOCK SYSTEM.
Condition: Unknown
Due 8 October 1993
Resolved 8 October 1993
Engineering
Issued 8 October 1993 Resolved
MAKE PERMANENT REPAIRS TO DOUBLE BOTTOM FUEL OIL TANK VENT PORT SIDE AFT WHERE REDHANDED AT DECK.
Condition: Unknown
Due 8 October 1993
Resolved 8 October 1993
Construction/Loadline
Issued 8 October 1993 Resolved
MAKE PERMANENT REPAIRS TO FRAME CRACKS IN THE #5 PORT & STBD BALLAST TANKS.
Condition: Unknown
Due 8 October 1993
Resolved 8 October 1993
Navigation
Issued 8 October 1993 Resolved
CALIBRATE RUDDER ANGLE INDICATOR TO READ SAME AT ALL REPEATERS.
Condition: Unknown
Due 8 November 1993
Resolved 3 November 1993
Engineering
Issued 8 October 1993 Resolved
DEMONSTRATE THE PROPER OPERATION OF THE OILY WATER SEPERATOR. MACHINE SPACEOILY WASTES TO BE RETAINED ONBOARD IN U. S. WATERS UNTIL PROPER OPERATION OF THE OWS DEMONSTRATED TO COGNIZANT OCMI.
Condition: Unknown
Due 8 October 1993
Resolved 8 October 1993
Deck/Cargo
Issued 8 October 1993 Resolved
PERMANENTLY REPAIR MANIFOLD ON STBD SIDE TO INCLUDE 0.5" DIAMETER STUD BY 1.0" LONG AT THE 12 O'CLOCK POSITION ON MAINFOLD PIPING.
Condition: Unknown
Due 8 October 1993
Resolved 8 October 1993
Electrical
Issued 8 October 1993 Resolved
REMOVE DEAD ENDED WIRING FROM OUTLET WHERE LEADING OUT OF BRIDGE HOUSE ON PORT SIDE.
Condition: Unknown
Due 8 October 1993
Resolved 8 October 1993
Engineering
Issued 8 October 1993 Resolved
MAKE PERMANENT REPAIRS TO LUBE OIL SUMP VENT PORT SIDE AFT WHERE REDHANDED AT DECK.
Condition: Unknown
Due 8 October 1993
Resolved 8 October 1993
Navigation
Issued 8 October 1993 Resolved
CALIBRATE RUDDER ANGLE INDICATOR TO READ SAME AT ALL REPEATERS.
Condition: Unknown
Due 8 October 1993
Resolved 8 October 1993
Engineering
Issued 8 October 1993 Resolved
DEMONSTRATE THE HIGH/HIGH WATER LEVEL TRIP ON BOILERS PER APPROVED TEST PROCEDURES.
Condition: Unknown
Due 8 October 1993
Resolved 8 October 1993
Accommodation/Occupational Safety
Issued 8 October 1993 Resolved
RENEW AS ORIGINAL PIPING BETWEEN A/C CONDENSER RELIEF VALVE AND DISCHARGE PIPING.
Condition: Unknown
Due 8 October 1993
Resolved 8 October 1993
Construction/Loadline
Issued 8 October 1993 Resolved
DEMONSTRATE THE PROPER OPERATION OF THE BILGE PUMP LOCATED AFT IN THE _x001C_ THE ENGINE ROOM.
Condition: Unknown
Due 8 October 1993
Resolved 8 October 1993
Construction/Loadline
Issued 8 October 1993 Resolved
REPAIR OR RENEW DECKING BETWEEN MAIN CONDENSER AND CARGO PUMP ON THE PORT SIDE.
Condition: Unknown
Due 8 October 1993
Resolved 8 October 1993
Deck/Cargo
Issued 18 May 1993 Resolved
PROVIDE PROPER TANK VENTING AS PER 46CRF32-55,20,3ii, KEEP ALL ISOLATION VALVES LOCKED IN THE OPEN POSITION UNTIL THE VENTING SYSTEM HAS BEEN CHANGED OR APPROVED.
Condition: Unknown
Due 18 May 1993
Resolved 18 May 1993
Deck/Cargo
Issued 6 November 1992 Resolved
Provide to the Marine Safety Center the bill of materials for the Inert Gassystem pneumatic system that demonstrates compliance with material specifications in 46 CFR 56.60-1 in accordance with comment 2 of MSC approval letter serial # M-20779.
Condition: Unknown
Due 6 November 1992
Resolved 6 November 1992
Lifesaving
Issued 5 September 1992 Resolved
MAKE PROPER REPAIRS TO THE FRACTURED FLOATATION UNIT IN THE PORT BOAT.
Condition: Unknown
Due 16 September 1992
Resolved 16 September 1992
Engineering
Issued 5 September 1992 Resolved
PROPERLY RENEW THE MISSING AND WASTED SUPERHEATER TUBE SUPPORTS IN BOTH BOILERS.
Condition: Unknown
Due 16 September 1992
Resolved 16 September 1992
Construction/Loadline
Issued 5 September 1992 Resolved
MAKE PROPER REPAIRS TO MINOR FRACTURED AND WASTED INTERNAL STRUCTURAL MEMBERS IN THE CARGO TANKS, VOIDS, FUEL TANKS AND BALLAST TANKS, THAT RESULTED FROM THE INTERNAL STRUCTURAL EXAM.
Condition: Unknown
Due 16 September 1992
Resolved 16 September 1992
Deck/Cargo
Issued 5 September 1992 Resolved
PROPERLY INSTALL COAST GUARD APPROVED PRESSURE VACUUM VALVES IN THE VAPOR RECOVERY SYSTEM IN ACCORDANCE WITH APPROVED PLANS. _x001C_
Condition: Unknown
Due 5 September 1992
Resolved 5 September 1992
Deck/Cargo
Issued 5 September 1992 Resolved
PROVE PROPER OPERATION OF THE OVERSPEED TRIPS AND REMOTE SHUTDOWNS ON THE STEAM TURBINE DRIVEN CARGO PUMPS, PRIOR TO PLACING IN SERVICE. _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 5 September 1992
Resolved 5 September 1992
Accommodation/Occupational Safety
Issued 5 September 1992 Resolved
PROPERLY REPAIR THE WASTED LADDER TREADS AT THE FIRST THREE LANDINGS ON THECARGO PUMP ROOM LADDER.
Condition: Unknown
Due 16 September 1992
Resolved 16 September 1992
Engineering
Issued 5 September 1992 Resolved
MAKE PROPER REPAIRS TO THE LOOSE AND MISSING BOILER REFRACTORY IN THE PORT AND STARBOARD BOILERS.
Condition: Unknown
Due 16 September 1992
Resolved 16 September 1992
Accommodation/Occupational Safety
Issued 5 September 1992 Resolved
PROVIDE SECOND REMOTE VENTILATION SHUTDOWN STATION.
Condition: Unknown
Due 16 September 1992
Resolved 16 September 1992
Accommodation/Occupational Safety
Issued 5 September 1992 Resolved
PROPERLY INSTALL AND TEST A REIEF VALVE WITH HAND RELEAVING GEAR ON THE S/SAIR RECEIVER.
Condition: Unknown
Due 16 September 1992
Resolved 16 September 1992
Lifesaving
Issued 5 September 1992 Resolved
RENEW WASTED FASTNERS ON THE ROTTMER GEAR FOR AND AFT ON THE STARBOARD LIFEBOAT.
Condition: Unknown
Due 16 September 1992
Resolved 16 September 1992
Engineering
Issued 5 September 1992 Resolved
PROPERLY REPAIR THE PORT BOILER LEAKING GENERATING TUBES IN WAY OF THE MUD DRUM AND THE LEAKING FLANGE GASKET ON THE SUPERHEATER OUTLET.
Condition: Unknown
Due 16 September 1992
Resolved 16 September 1992
Lifesaving
Issued 5 September 1992 Resolved
MAKE PROPER REPAIRS TO THE FOLLOWING: WASTED FOUNDATION BOLTS/NUTS ON BOTHDAVIT SETS. WASTED GEAR SHIELDS (ALL). WASTED PORT FORWARD KEEL CHOCK. WASTED LOWER TRANSVERSE FOUNDATION BRACE STARBOARD AFT.
Condition: Unknown
Due 16 September 1992
Resolved 16 September 1992
Engineering
Issued 5 September 1992 Resolved
PROPERLY SET THE STARBOARD SUPERHEATER SAFETY VALVE.
Condition: Unknown
Due 16 September 1992
Resolved 16 September 1992
Lifesaving
Issued 5 September 1992 Resolved
MAKE PROPER REPAIR TO THE WASTED SIDE AND GUNWALE ON THE PORT BOAT._x001C_
Condition: Unknown
Due 16 September 1992
Resolved 16 September 1992
Lifesaving
Issued 5 September 1992 Resolved
PROPERLY RENEW THE WASTED LOWER STARBOARD GRAB RAILS_x001C_
Condition: Unknown
Due 16 September 1992
Resolved 16 September 1992
Deck/Cargo
Issued 5 September 1992 Resolved
OBTAIN COAST GUAD APPROVAL FOR THE INSTALLED INERT GAS SYSTEM IN ACCORDANCEWIHT 46 CFR 32.53-15.
Condition: Unknown
Due 5 September 1992
Resolved 5 September 1992
Accommodation/Occupational Safety
Issued 5 September 1992 Resolved
INSTALL GENERAL ALARM BELL OR ROTATING LIGHT THAT CAN BE HEARD OR SEEN FROMTHE ENGINE ROOM OPERATING PLATFORM IN ACCORDANCE WITH 46 CFR 113.25.
Condition: Unknown
Due 5 September 1992
Resolved 5 September 1992
Construction/Loadline
Issued 11 March 1992 Resolved
Gas free the No. 5 Port and the #5 Starboard ballast tanks and make available for USCG inspection.
Condition: Unknown
Due 11 March 1992
Resolved 11 March 1992
Engineering
Issued 28 February 1992 Resolved
CENTER BUNKER TANK FUEL LEVEL IS RESTRICTED TO AN ULLAGE MEASUREMENT OF 23'6" OR GREATER UNTIL SATISFACTORY PERMANENT REPAIRS HAVE BEEN WITNESSED BU A USCG MARINE INSPECTOR.
Condition: Unknown
Due 28 February 1992
Resolved 28 February 1992
Engineering
Issued 28 February 1992 Resolved
AFFECT PERMANENT REPAIR OF CRACKED SEAMWELD IN WAY OF AFT BULKHEAD OF CENTER BUNKER TANK AT THE 30'"6" LEVEL. REPAIRS TO BE COMPLETED UPON ARRIVAL IN HOUSTON TEX, USA, BUT IN NO CASE LATER THAN 13MAR92.
Condition: Unknown
Due 28 February 1992
Resolved 28 February 1992
Electrical
Issued 30 January 1992 Resolved
MAINTAIN 800KW PORTABLE GENERATOR ONBOARD IN AN OPERABLE CONDITION UNTIL PERMENANT REPAIRS HAVE BEEN COMPLETED ON THE #2 SHIP SERVICE GENERATOR AND TESTS AS REQUIRED BY THE COGNIZANT OCMI HAVE BEEN SATISFIED.
Condition: Unknown
Due 30 January 1992
Resolved 30 January 1992
Electrical
Issued 20 February 1991 Resolved
REPAIR AND PROVE PROPER OPERATION OF NO. 1 SHIP'S SERVICE TURBINE GENERATORUPON ARRIVAL AT NORFOLK, VA BUT NOT LATER THAN 2 MARCH 1991. UPON COMPLETION OF OPERATIONAL TESTS TO THE NO. 1 SSTG, THE AGGREKO DECK GENERATOR ELECTRICAL AND FUEL CONNECTIONS ARE TO DISCONNECTED AND SECURED.
Condition: Unknown
Due 20 February 1991
Resolved 20 February 1991
Engineering
Issued 20 February 1991 Resolved
REPAIR AND PROVE AHEAD AND ASTERN THROTTLE CONTROL AUTOMATION SYSTEM.
Condition: Unknown
Due 20 February 1991
Resolved 20 February 1991
Accommodation/Occupational Safety
Issued 20 February 1991 Resolved
REPAIR AND PROVE REMOTE EMERGENCY STOPS FOR ENGINEROOM AND PUMP ROOM._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 February 1991
Resolved 20 February 1991
Deck/Cargo
Issued 20 February 1991 Resolved
REPAIR OR RENEW AND PROVE OVERSPEED TRIPS ON STEAM TURBINE CARGO PUMPS _x001C_PRIOR TO OPERATION OF THE PUMPS.
Condition: Unknown
Due 20 February 1991
Resolved 20 February 1991
Electrical
Issued 20 February 1991 Resolved
REPAIR AND PROVE EMERGENCY DIESEL GENERATOR ALARM SYSTEM._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 February 1991
Resolved 20 February 1991
Engineering
Issued 7 November 1990 Resolved
PROVE PROPER OPERATION OF ENGINE ROOM IOPP SYSTEM. ALL BILGE SLOPS ARE TO REMAIN ONBOARD AND DISCHARGED TO A RECEPTION FACILITY. THE ABOVE REQUIRE-_x001C_MENT IS TO BE COMPLETED TO THE SATISFACTION OF A USCG MARINE INSPECTOR.
Condition: Unknown
Due 7 November 1990
Resolved 7 November 1990
Unknown
Issued 20 April 1990 Resolved
PROVIDE DETAILED DESCRIPTION TO MSO HOUSTON OF STRESS CRACKING PROBLEM IN WAY OF CARGO TANKS, AND YOUR PROPOSAL FOR A SHORT TERM/LONG TERM SOLUTION.
Condition: Unknown
Due 20 April 1990
Resolved 20 April 1990
Lifesaving
Issued 12 April 1990 Resolved
EXAMINE ALL PINS ON BOTH DAVITS.
Condition: Unknown
Due 12 April 1990
Resolved 12 April 1990
Lifesaving
Issued 12 April 1990 Resolved
RENEW PINS ON THE LOWER DAVIT ARM ON THE PORT DAVIT.
Condition: Unknown
Due 12 April 1990
Resolved 12 April 1990
Lifesaving
Issued 6 April 1990 Resolved
CONDUCT BOAT DRILL NOT LATER THAN 13APR90, LOWER STBD LIFEBOAT TO THE MAIN DECK AND TEST DAVIT. CONDUCT LIFEBOAT DRILL WITH THE PORT BOAT AND ALSO TEST DAVIT. SUBJECT TEST MUST BE CONDUCTED TO THE SATISFACTION OF THE COGNIZANT OCMI.
Condition: Unknown
Due 6 April 1990
Resolved 6 April 1990
Engineering
Issued 6 April 1990 Resolved
CONDUCTED INTERNAL INSPECTION OR HYDRO TEST ON THE DC HEATER NOT LATER THANNEXT DRYDOCK.
Condition: Unknown
Due 6 April 1990
Resolved 6 April 1990
Construction/Loadline
Issued 7 February 1990 Resolved
PROVIDE TO G-MVI AND HOUMS A DETAILED REBUILDING PLAN TO PREVENT AND ELIMINATE STRESS CRACKING IN THE LONGITUDINAL AND TRANSVERSE CARGO TANK BULKHEADS, PRIOR TO NEXT SCHEDULED DRYDOCK.
Condition: Unknown
Due 7 February 1990
Resolved 7 February 1990
Electrical
Issued 21 February 1989 Resolved
REMOVE OR ENCLOSE IN A JUNCTION BOX ALL DEAD ENDED ELECTRICAL CABLES IN- CLUDING THE BUNDLE IN WAY OF THE PUMP CONTROLLER FOR DEEPWEEL PUMP #5 LOCATED IN THE ENGINE ROOM. REPAIRS ARE TO BE MADE TO THE SATISFACTION OF THE COGNIZANT OCMI PRIOR TO THE COMPLIANCE DATE.
Condition: Unknown
Due 21 February 1989
Resolved 21 February 1989
Unknown
Issued 21 February 1989 Resolved
(3A CONT.) PROVIDE [name withheld], TX WITH DIMENSIONAL DATA OF 2 3/4" DIA. ANCHOR CHAIN AND 2 11/16" DIA CHAIN AND WILDCAT CHAIN SIZE.
Condition: Unknown
Due 21 February 1989
Resolved 21 February 1989
Deck/Cargo
Issued 21 February 1989 Resolved
MAKE PERMANENT REPAIRS TO #3 CARGO PUMP STEAM TURBINE OVERSPEED TRIP AND PROVE PROPER OPERATION OF THE OVERSPEED TRIP TO THE COGNIZANT [name withheld] OF THE #3 CARGO PUMP FOR THE TRANSFER OF CARGO AND IN NO CASE LATER THAN THE COMPLIANCE DATE.
Condition: Unknown
Due 21 February 1989
Resolved 21 February 1989
Electrical
Issued 21 February 1989 Resolved
EXTEND THE DRAIN LINE FROM THE DRIP PAN OF THE EMERGENCY SWITCHBOARD TO DESK LEVEL TO PREVENT ANY LIQUID IT MIGHT CATCH FROM LEAKING ON TERMINALS. THIS REPAIR IS TO BE MADE TO THE SATISFACTION OF THE COGNIZANT OCMI PRIOR TO THE COMPLIANCE DATE.
Condition: Unknown
Due 21 February 1989
Resolved 21 February 1989
Engineering
Issued 21 February 1989 Resolved
MAKE PERMANENT REPAIRS TO MAIN PROPULSION AUTOMATION ALARMS IN THAT THE THROTTLE VALVE OVER TRAVEL ALARM DID NOT SOUND IN ACCORDANCE WITH THE APPROVED AUTOMATION PROCEDURES. THIS IS TO ACCOMPLISHED TO THE SATISFACTIONOF THE COGNIZANT OCMI PRIOR TO THE COMPLIANCE DATE.
Condition: Unknown
Due 21 February 1989
Resolved 21 February 1989
Deck/Cargo
Issued 21 February 1989 Resolved
MAKE THE QUICK CLOSING VALVE IN WAY OF #3 C.A. CARGO TANK OPERATIONAL PRIORTO CARRYING EPICHLOROHYDRIN BUT NOT LATER THAN THE COMPLIANCE DATE. TO BE COMPLETED TO THE SATISFACTION OF THE COGNIZANT OCMI.
Condition: Unknown
Due 21 February 1989
Resolved 21 February 1989
Lifesaving
Issued 21 February 1989 Resolved
REPAIR PORTABLE MAGAZINE CHEST TO MAKE WEATHER TIGHT OR RENEW TO THE SATISFACTION OF THE COGNIZANT OCMI PRIOR TO THE COMPLIANCE DATE.
Condition: Unknown
Due 21 February 1989
Resolved 21 February 1989
Deck/Cargo
Issued 21 February 1989 Resolved
MAINTAIN TEMPORARY REPAIRS TO STRIPPING BARS ON PORT AND STARBOARD ANCHOR WINDLASS. RESEARCH PROLEM AND MAKE PERMANENT REPAIRS TO ELIMINATE CHAIN BINDING IN WILDCAT. REPAIRS ARE TO BE MADE TO THE SATISFACTION OF THE COG NIZANT OCMI PRIOR TO THE COMPLIANCE DATE.
Condition: Unknown
Due 21 February 1989
Resolved 21 February 1989
Lifesaving
Issued 1 February 1989 Resolved
MAKE PERMANENT REPAIRS TO WASTED FLOOR BOARD AND RELEASING GEAR SUPPORT FRAMES NO.1,2 AND 3 COUNTING FROM BOW AFT IN PORT LIFEBOAT. REPAIRS TO BE COMPLETED AND LIFEBOAT WEIGHT TEST TO THE SATISFACTION OF THE COGNIZANT OCMI PRIOR TO THE COMPLIANCE DATE.
Condition: Unknown
Due 1 February 1989
Resolved 1 February 1989
Lifesaving
Issued 29 March 1988 Resolved
INSTALL AND PROVE OPERATION OF DAVIT LIMIT SWITCHES ON PORT AND STBD LIFE- BOAT DAVITS.
Condition: Unknown
Due 29 March 1988
Resolved 29 March 1988
Engineering
Issued 29 March 1988 Resolved
REMOVE AFT MAIN CIRCULATOR SUCTION LINE (STBD SIDE LOWER LEVEL) IN WAY OF ALL THREE (3) FLANGED BOLT CONNECTIONS AND RENEW THE SAME BACK TO ORIGINAL TO THE SATISFACTION OF THE COGNIZANT [name withheld] TO BE ISOLATED & INSPECTED HOURLY BY THE ENG WATCHSTANDER.
Condition: Unknown
Due 29 March 1988
Resolved 29 March 1988
Lifesaving
Issued 29 March 1988 Resolved
FREE UP AND MAKE REPAIRS AS NECCESSARY TO LIFEBOAT DAVIT PIVOTS PORT AND STBD, ALSO FREE UP FAIRLEADS FOR FALLS ON PORT AND STBD DAVITS. REPAIRS TO BE MADE TO THE SATISFACTION OF THE [name withheld] TO HOUSTON, TX BUT NLT 19APR88
Condition: Unknown
Due 29 March 1988
Resolved 29 March 1988
Lifesaving
Issued 29 March 1988 Resolved
CONDUCT WEIGHT TEST OF PORT AND STBD LIFEBOATS AND DAVITS. THESE TESTS TO BE WITNESSED BY AS CG MARINE INSPECTOR.
Condition: Unknown
Due 29 March 1988
Resolved 29 March 1988
Deck/Cargo
Issued 2 April 1987 Resolved
EFFECT MODIFICATIONS REQUIRED TO BRING VSL INTO FULL COMPLIANCE WITH ANNEX II MARPOL ( PRIMARILY THE INSTALLATION OF THE UNDERWATER DISCHARGE ) AT NEXT SCHEDULED DDX.
Condition: Unknown
Due 2 April 1987
Resolved 2 April 1987
Deck/Cargo
Issued 15 March 1987 Resolved
RENEW MOTOR CONTROLLER FOR PORT MOORING WINCH ON FO'C'SLE DECK.
Condition: Unknown
Due 15 March 1987
Resolved 15 March 1987
Electrical
Issued 23 February 1987 Resolved
INSTALL EXPLOSION PROOF FITTING ON WIRE CONNECTION TO HIGH LEVEL ALARM ON #3CA CARGO TANK
Condition: Unknown
Due 23 February 1987
Resolved 23 February 1987
Deck/Cargo
Issued 23 February 1987 Resolved
PRIOR TO DISCHARGING CARGO REPAIR AND PROVE OPERATION OF EMERCENCY SHUTDOWN AT AFTER END OF CARGO DECK. THIS ITEM TO BE ACCOMPLISHED TO THE SATISFACTION OF AN ATTENDING CG MARINE INSPECTOR.
Condition: Unknown
Due 23 February 1987
Resolved 23 February 1987
Fire Fighting
Issued 23 February 1987 Resolved
MAKE PERMANENT REPAIRS TO WEEPS IN FIRE MAIN AT EXPANSION JOINT AND WELDED CONNECTION LOCATED NEAR KINGPOST ON STBD SIDE OF CARGO DECK.
Condition: Unknown
Due 23 February 1987
Resolved 23 February 1987
Engineering
Issued 23 February 1987 Resolved
CONDUCT FIRE AND WATERSIDE EXAMINATION OF STBD BOILER.
Condition: Unknown
Due 23 February 1987
Resolved 23 February 1987
Engineering
Issued 23 February 1987 Resolved
CONDUCT INTERNAL EXAMINATION OF D.C. HEATER NOT LATER THAN NEXT DRYDOCKING.
Condition: Unknown
Due 23 February 1987
Resolved 23 February 1987
Deck/Cargo
Issued 23 February 1987 Resolved
REMOVE CONCRETE PATCHES AND REPAIR STEAM HEATING LINE AT DECK PENETRATIONS TO #5CP, AT NEXT DRYDOCK.
Condition: Unknown
Due 23 February 1987
Resolved 23 February 1987
Unknown
Issued 23 February 1987 Resolved
REPAIR LEAKS AND DEMONSTRATE SATISFACTORY OPERATION OF ALL EYE WASH STATIONS ON CARGO DECK.
Condition: Unknown
Due 23 February 1987
Resolved 23 February 1987
Deck/Cargo
Issued 23 February 1987 Resolved
RENEW SECTION OF #2CP STRIPPING LINE IN WHICH THE SOFT PATCH IS LOCATED AT NEXT DRYDOCK.
Condition: Unknown
Due 23 February 1987
Resolved 23 February 1987
Lifesaving
Issued 23 February 1987 Resolved
REPLACE OUTDATED ORANGE SMOKE CANISTER ON PORT LIFEBOAT.
Condition: Unknown
Due 23 February 1987
Resolved 23 February 1987
Electrical
Issued 23 February 1987 Resolved
RENEW MOTOR CONTROLLERS TO MOORING WINCHES ON FOC'SLE DECK
Condition: Unknown
Due 23 February 1987
Resolved 23 February 1987
Unknown
Issued 23 February 1987 Resolved
CONDUCT SATISFACTORY BOAT DRILL IN PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 23 February 1987
Resolved 23 February 1987
Engineering
Issued 16 September 1986 Resolved
MAKE OILY WATER SEPARATOR INSTALLATION AVAILABLE FOR EXAMINATION BY A COAST GUARD MARINE INSPECTOR AFTER PLANS ARE APPROVED IN ACCORDANCE WITH 46 CFR 56.95 AND 110.30.
Condition: Unknown
Due 16 September 1986
Resolved 16 September 1986
Engineering
Issued 16 September 1986 Resolved
PROVIDE APPROVED PLANS FOR INSTALLATION OF OILY WATER SEPARATOR IN MACHINERY SPACES INCLUDING ALL ADDED IS MODIFIED WIRING AND PIPING, IN ACCORDANCE WITH 46 CFR 56.01-20 AND 110.25-1.
Condition: Unknown
Due 16 September 1986
Resolved 16 September 1986
Lifesaving
Issued 4 April 1986 Resolved
MAKE PERMANENT REPAIRS TO, OR REPLACE, LIFEBOAT NO.2 WHERE HULL IS HOLED ONOUT BOARD SIDE SHELL. UNTIL REPAIRED OR REPLACED, VESSEL SHALL MAINTAIN ONBOARD TWO ADDITIONAL 20 PERSON INFLATABLE LIFERAFTS.
Condition: Unknown
Due 4 April 1986
Resolved 4 April 1986
Lifesaving
Issued 4 April 1986 Resolved
PLACE ON BOARD ONE SURVIVAL SUIT TO BRING THE TOTAL ON BOARD TO FORTY-TWO.
Condition: Unknown
Due 4 April 1986
Resolved 4 April 1986
Construction/Loadline
Issued 8 September 1985 Resolved
REMOVE TEMPORARY PATCH AND EFFECT PERMANENT REPAIRS TO DAMAGED SIDE SHELL PLATING LOCATED BETWEEN FRAMES 8 & 10, 40 WATERLINE IN AFTER STEERING COMPARTMENT PORT SIDE.
Condition: Unknown
Due 8 September 1985
Resolved 8 September 1985
Accommodation/Occupational Safety
Issued 29 July 1985 Resolved
REPAIR WASTED VENTILATION DUCTWORK IN CARGO PUMPROOM.
Condition: Unknown
Due 29 July 1985
Resolved 29 July 1985
Lifesaving
Issued 29 July 1985 Resolved
CROP AND RENEW WASTED SECTION OF TRIANGULAR TRUSS ON FORWARD DAVITS, PORT AND STBD SIDES.
Condition: Unknown
Due 29 July 1985
Resolved 29 July 1985
Construction/Loadline
Issued 7 May 1985 Resolved
FOR ALL EXPANSION JOINTS INSTALLED AS PER CG-835 , ITEMS NO.1 & 2 ISSUED BYTHIS OFFICE ON 06MAR85 PROVIDE MFGR, MODEL N0., SIZE/PRESS RATING, CERTIFI-CATION COVER MEETS ASTM D1692, 4101 BURST DESIGN + 2 X HYDRO (46CFR56.97-5)
Condition: Unknown
Due 7 May 1985
Resolved 7 May 1985
Construction/Loadline
Issued 27 March 1985 Resolved
REMOVE TEMPORARY PATCH AND EFFECT PERMANENT REPAIRS TO DAMAGED SIDE SHELL PLATING LOCATED BETWEEN FRAMES 8 & 10, 40 WATERLINE IN AFTER STEERING COMPARTMENT PORT SIDE.
Condition: Unknown
Due 27 March 1985
Resolved 27 March 1985
Unknown
Issued 6 March 1985 Resolved
RENEW FOLLOWING NON-METALLIC EXPANSION JOINTS: 1. ATMOSPHERE CONDENSER OVERBOARD 2. ATMOSPHERE CONDENSER SUPPLY 3. MAIN CONDENSER AFT PUMP SUCTION
Condition: Unknown
Due 6 March 1985
Resolved 6 March 1985
Electrical
Issued 5 March 1985 Resolved
LOCATE AND REMOVE GROUND FROM THE 117 VOLT EMERGENCY BUS CIRCUIT.
Condition: Unknown
Due 5 March 1985
Resolved 5 March 1985
Construction/Loadline
Issued 5 March 1985 Resolved
RENEW FOLLOWING NONMETALLIC EXPANSION JOINTS: (1) MAIN CONDENSOR FWD CIRCULATION PUMP SUCTION, (2) MAIN CONDENSOR FWD CIRCULATION PUMP DISCHARGE(3) MAIN CONDENSOR HIGH SUCTION, (4) PORT CONDENSATE PUMP SUCTION, (5) BILGE PUMP OVERBOARD DISCHARGE.
Condition: Unknown
Due 5 March 1985
Resolved 5 March 1985
Electrical
Issued 5 March 1985 Resolved
INSTALL COVERS ON BOILER DRUM LEVEL INDICATOR SENSORS WIRE TERMINAL CONNECTIONS.
Condition: Unknown
Due 5 March 1985
Resolved 5 March 1985
Engineering
Issued 5 March 1985 Resolved
CONDUCT FIRE AND WATERSIDE EXAMINATION ON PORT BOILER.
Condition: Unknown
Due 5 March 1985
Resolved 5 March 1985
Engineering
Issued 5 March 1985 Resolved
CONDUCT TEST OF PORT/STBD BOILERS HIGH AND LOW WATER ALARMS AND CUTOUTS.
Condition: Unknown
Due 5 March 1985
Resolved 5 March 1985
Engineering
Issued 5 March 1985 Resolved
PROVIDE MANUFACTURERS LABLE PLATE FOR FWD DRUM SAFETY VALVE. THE MANUFACTURER SHALL RE-AFFIX A NEW PLATE AS REQUIRED BY 46 CFR 162.001 OR THE VALVE SHALL BE REPLACED WITH AN APPROVED TYPE SAFETY VALVE.
Condition: Unknown
Due 5 March 1985
Resolved 5 March 1985
Fire Fighting
Issued 5 March 1985 Resolved
PROVIDE THREE ADDITIONAL SCBA'S FOR FIREMAN'S/EMERGENCY OUTFITS WITH REQUIRED SPARE AIR BOTTLES.
Condition: Unknown
Due 5 March 1985
Resolved 5 March 1985
Deck/Cargo
Issued 5 March 1985 Resolved
RENEW FRACTURED EXPLOSION PROOF ELECTRICAL CONTACT HEAD TO THE OVERFILL CONTROL ALARM SYSTEM LOCATED INSIDE PUMP SHELTER AT 3 CTR AFT TANK. THE ABOVE REQUIREMENT TO BE ACCOMPLISHED PRIOR TO CARRIAGE OF EPICHLOROHYDRIN.
Condition: Unknown
Due 5 March 1985
Resolved 5 March 1985
Deck/Cargo
Issued 5 March 1985 Resolved
RENEW EXPLOSION PROOF POT HEAD ON FORWARD DECK WENCH MOTOR.
Condition: Unknown
Due 5 March 1985
Resolved 5 March 1985
Documentation
Issued 5 March 1985 Resolved
PROVIDE WELD PROCEDURES AND WELDER QUALIFICATIONS FOR REPAIR/RENEWAL OF DECK CARGO AND PUMPROOM PIPING. IF THE ABOVE REQUIREMENTS ARE NOT SATISFACTORILY COMPLETED, THE SUBJECT PIPING RENEWAL/REPAIRS MUST BE REPLACED.
Condition: Unknown
Due 5 March 1985
Resolved 5 March 1985
Construction/Loadline
Issued 5 March 1985 Resolved
RENEW FOLLOWING NONMETALLIC EXPANSION JOINTS PRIOR TO DEPARTING PORT OF HOUSTON: (1) ATMOSPHERE CONDENSOR OVERBOARD, (2) ATMOSPHERE CONDENSOR SUPPLY, (3) MAIN CIRCULATION AFT PUMP SUCTION.
Condition: Unknown
Due 5 March 1985
Resolved 5 March 1985
Engineering
Issued 5 March 1985 Resolved
CONDUCT INTERNAL EXAMINATION OF DC HEATER TANK AT NEXT DRY DOCKING.
Condition: Unknown
Due 5 March 1985
Resolved 5 March 1985
Electrical
Issued 5 March 1985 Resolved
PROVIDE DOCUMENTATION FROM MOTOR REWIND FACILITY THAT MOTOR FOR THE "LE ROI" AIR COMPRESSOR HAS BEEN REWOUND AND UPGRADED FROM 40 DEGREES C TO 50 DEGREES C TEMPERATURE RATING.
Condition: Unknown
Due 5 March 1985
Resolved 5 March 1985
Unknown
Issued 14 September 1984 Resolved
THE FOLLOWING DEFICIENCIES PERTAIN TO THE VESSEL, VALLEY FORGE, DN505786 AND ARE TO BE COMPLIED WITH BY 22SEP84.
Condition: Unknown
Due 14 September 1984
Resolved 14 September 1984
Construction/Loadline
Issued 14 September 1984 Resolved
PROVIDE AND DEMONSTRATE SATISFACTORY OPERATION OF SHIPS OIL/WATER INTERFACEDETECTOR. THE ABOVE TO BE ACCOMPLISHED NOT LATER THAN 22SEP84.
Condition: Unknown
Due 14 September 1984
Resolved 14 September 1984
Engineering
Issued 14 September 1984 Resolved
PROVIDE DISCHARGE MANIFOLDS FOR ENGINEROOM BILGES IN ACCORDANCE WITH 33 CFR 157.11 AND STANDARD DISCHARGE CONNECTION REQUIRED BY MARPOL REGULA- TIONS 19 TO BE ACCOMPLISHED NOT LATER THAN 30SEP84.
Condition: Unknown
Due 14 September 1984
Resolved 14 September 1984
Unknown
Issued 31 March 1983 Resolved
REMOVE PORT & STBD BOILER BOTTOM BLOW OVERBOARD DISCHARGE VALVES FOR INTERNAL EXAMINATION.
Condition: Unknown
Due 31 March 1983
Resolved 31 March 1983
Unknown
Issued 31 March 1983 Resolved
OPEN MOUNTINGS OF PORT AND STARBOARD BOILERS FOR INTERNAL EXAMINATION.
Condition: Unknown
Due 31 March 1983
Resolved 31 March 1983
Unknown
Issued 31 March 1983 Resolved
MAKE PORT & STBD MAIN PROPULSION BOILERS AVAILABLE FOR THE FOLLOWING: A. FIRE SIDE EXAMINATION, B. WATER SIDE EXAMINATION, C. 1 1/4 MAWP HYDRO-
Condition: Unknown
Due 31 March 1983
Resolved 31 March 1983
Unknown
Issued 31 March 1983 Resolved
OPEN D.C. HEATER FOR INTERNAL EXAMINATION OR CONDUCT A 1 1/4 MAWP HYDRO- STATIC TEST.
Condition: Unknown
Due 31 March 1983
Resolved 31 March 1983

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.