HAGGAN TASI is a 1997 passenger vessel (inspected). The Coast Guard has recorded 64 inspections since 1997, most recently in April 2026, along with 138 deficiencies — 1 with no resolution recorded —.

Records from 1997 to 2026. Most recent: inspection, 15 April 2026.

Built
1997
Last inspected
15 April 2026
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDK6626
457392
Flag
UNITED STATES
368076410
Maury page id
psix-457392

Inspections, by type

…with no type recorded17
…past their stated due date1
Years with a record 25 calendar years (1997–2026)
The 64 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)75.0 ft × 28.0 ft × 3.0 ft
Registered tonnagegross 30 / net 24
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderCRAIG REYNOLDS · LAKE HAVASU CITY, AZ, UNITED STATES · built 1997
Hull materialAluminum
PropulsionGasoline Outboard
Hull shapeNot recorded
Hull configurationTwin Hull
Hailing portSAIPAN, MP
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 4 February 2026 · expires 28 February 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it30 - Simplified, Gross Ton
24 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDK6626MMSI 368076410 · active · compulsorily equipped · granted 14 February 2019, expires 14 February 2029
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspected as a tow unit · 1

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

PEGASUS Passenger (Inspected) · MISLE 352914 · 28 August 1997 · activity 144494

Inspection history · 64

15 April 2026 Administrative Inspection
Administrative · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 8368343
16 July 2025 Annual Inspection
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 8186962
13 March 2025 Internal Structural Exam · Deficiency Check · Hull Examination
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 8092924
19 July 2024 Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 7961855
5 July 2024 Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7955708
12 March 2023 COI Inspection
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 7649724
20 December 2022 Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 7616072
5 March 2021 Administrative Inspection
Administrative · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 7150653
15 December 2019 Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 6874191
7 July 2019 Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 6739019
11 January 2019 Annual Inspection
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 6609717
26 October 2018 Damage Survey
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 6568547
6 December 2017 DAPI Audit · Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 6321382
16 June 2017 Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 6178816
23 September 2016 Internal Structural Exam · COI Inspection · DAPI Audit
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 6007991
11 December 2015 Internal Structural Exam · DAPI Audit · Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 5780961
22 August 2014 Deficiency Check
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 4961941
29 September 2011 Deficiency Check
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 4156813
28 September 2011 COI Inspection · Deficiency Check
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 4156057
26 August 2011 Deadweight Survey
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 4129531
19 September 2008 Inclining Experiment · Administrative Inspection
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 3327804
15 August 2008 Annual Inspection
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 3298906
24 July 2008 Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 3277361
24 July 2008 Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 3277362
24 July 2008 Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 3277366
22 July 2008 Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 3276386
22 July 2008 Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 3278206
15 November 2007 Deficiency Check · Annual Inspection
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 3098667
8 March 2007 Underwater Inspection in lieu of Drydock
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 2883867
5 October 2006 Deficiency Check · Annual Inspection
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 2793998
8 December 2005 Type not recorded
No type recorded · District 14 (OAX) · USCG Oceania District (CGD-O) · Activity 2548366
9 November 2005 Annual Inspection · Deficiency Check
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 2532036
21 September 2005 Type not recorded
No type recorded · USCGC GALVESTON ISLAND (WPB 1349) · USCG Oceania District (CGD-O) · Activity 2522973
15 March 2005 Hull Examination · Deficiency Check
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 2311111
17 August 2004 COI Inspection
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 2175790
25 April 2003 Hull Examination
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1780175
14 February 2003 Type not recorded
No type recorded · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1744502
3 January 2003 In-Service Inspection
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1724869
21 November 2002 Re-Inspection · MARPOL Annex V Examination
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1708090
15 January 2002 Deficiency Check
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1481216
3 December 2001 MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1376827
21 April 2001 Hull Examination
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1061806
13 September 2000 Examination of Repairs
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1054194
7 September 2000 Type not recorded
No type recorded · MSO GUAM · USCG Oceania District (CGD-O) · Activity 127849
3 April 2000 Deficiency Check
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1047372
25 January 2000 Type not recorded
No type recorded · MSO GUAM · USCG Oceania District (CGD-O) · Activity 815404
18 January 2000 Deficiency Check
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1045421
16 January 2000 Type not recorded
No type recorded · MSO GUAM · USCG Oceania District (CGD-O) · Activity 114237
30 November 1999 MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1361240
3 November 1999 Type not recorded
No type recorded · MSO GUAM · USCG Oceania District (CGD-O) · Activity 804592
6 October 1999 Type not recorded
No type recorded · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1196371
27 September 1999 Plan Review "T" Boat
Administrative · MSO GUAM · USCG Oceania District (CGD-O) · Activity 888836
19 August 1999 Deficiency Check
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 778865
23 July 1999 Hull Examination
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1361014
22 June 1999 Type not recorded
No type recorded · MSO GUAM · USCG Oceania District (CGD-O) · Activity 155102
4 January 1999 Deficiency Check
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 807593
26 November 1998 Re-Inspection · MARPOL Annex V Examination · Deficiency Check
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1372421
9 September 1998 Deficiency Check
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 799334
19 March 1998 Type not recorded
No type recorded · MSO GUAM · USCG Oceania District (CGD-O) · Activity 120882
29 January 1998 Deficiency Check
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1119758
26 December 1997 Initial Certification · Hull Examination
Physical examination · MSO GUAM · USCG Oceania District (CGD-O) · Activity 1120752
28 August 1997 Type not recorded
No type recorded · MSO GUAM · USCG Oceania District (CGD-O) · Activity 144494
26 June 1997 Initial Construction-Excluding Oversight · Plan Review "T" Boat · Hull Examination
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1371954
4 May 1997 Initial Construction-Excluding Oversight
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1105699

Deficiency record · 138

02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 15 April 2026 No resolution recorded
This vessel sustained catastrophic structural damage as a result of Typhoon Sinlaku (April 2026), indcluding forcible separation of all four outboard engines from the transom, structural failure to both hulls, and partial submersion on the starboard side with the port side aground.
Action required: 17 - Rectify deficiencies prior to departure
Due 15 April 2026 — due date passed with no resolution recorded
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 19 July 2024 Resolved
The number and identification of the items stowed inside, and their sizes, must be marked in clearly legible letters and numbers on each container for life jackets and immersion suits. Identification of the items may be in words, or the appropriate symbols in IMO Resolution A.760(18) (incorporated by reference; see 46 CFR 175.600). Letters and numbers must be at least 50 millimeters (2 inches) high. Symbols must be at least 100 mm (4 inches) square. The child life jackets were moved to a different compartment. Identify the location using the appropriate markings for life jackets. 46 CFR 185.604(f)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 August 2024
Resolved 6 October 2024
Resolution: The child life jackets were placed in the aft centerline storage bin and found marked IAW regulations. They are separated from adult life jackets using a plexi glass divider.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 19 July 2024 Resolved
Each vessel that relies on electricity to power the following loads must be arranged so that the loads can be energized from two sources of electricity: (i) The vital systems listed in § 182.710 of this chapter; (ii) Interior lighting except for decorative lights; (iii) Communication systems including a public address system required under § 184.610 of this chapter; and (iv) Navigation equipment and lights. A vessel with batteries of adequate capacity to supply the loads specified in paragraph (a)(1) of this section for three hours, and a generator or alternator driven by a propulsion engine, complies with the requirement in paragraph (a)(1) of this section. The following vital systems: VHF radio, navigation lights, and high water alarms are powered by a single 12 V battery with no second source of power. The electric bilge pump (vital system) for each hull is powered by a single battery power source and inverter with no second source of power. 46 CFR 183.310
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 August 2024
Resolved 6 October 2024
Resolution: The primary source of power is now the alternator on the starboard 250 HP engine. The emergency power is provided by a 12 V battery that is charged by the alternator and a solar panel for additional charging when the engine is off.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 19 July 2024 Resolved
A submersible electric bilge pump may be used as a power bilge pump required by Table 182.520(a) only on a vessel of not more than 19.8 meters (65 feet) in length carrying not more than 49 passengers, other than a ferry, provided that: (1) The pump is listed by an independent laboratory as meeting the requirements in UL 1113 (incorporated by reference; see 46 CFR 175.600); The vessel is greater than 65 feet and carries more than 49 passengers. Two electric submersible bilge pumps were found in the forward void in each hull. The original bilge piping approved diagram shows that a fixed bilge piping system was originally installed in these spaces. 46 CFR 182.520(e)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 August 2024
Resolved 6 October 2024
Resolution: The two electrical submersible pumps in the fwd void were replaced with UL listed 2000 GPH electric submersible pumps.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 19 July 2024 Resolved
All vessels must have navigation lights that are in compliance with the applicable sections of the International and Inland Navigation Rules, except that a vessel of more than 19.8 meters (65 feet) in length must also have navigation lights that meet UL 1104, “Standards for Marine Navigation Lights,” or other standard specified by the Commandant. The starboard running light housing was found fractured. 46 CFR 183.420
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 August 2024
Resolved 6 October 2024
Resolution: The stbd running light housing was replaced like and in kind.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 19 July 2024 Resolved
At each inspection for certification and at every other vessel inspection all observed unsafe practices, fire hazards, and other hazardous situations must be corrected and all required guards and protective devices must be in satisfactory condition. The bilge pump installed on the starboard side was found with a corroded mounting bracket. 46 CFR 176.830
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 August 2024
Resolved 6 October 2024
Resolution: The mounting bracket was replaced like and in kind.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 19 July 2024 Resolved
Conductors in power and lighting circuits must be No. 14 American Wire Gauge (AWG) or larger. Conductors in control and indicator circuits must be No. 22 AWG or larger. 16 AWG conductors were found intstalled throughout the vessel in power and lighting circuits. 46 CFR 183.340(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 August 2024
Resolved 6 October 2024
Resolution: All 16 AWG conductors were removed from the vessel and replaced with 14 AWG or larger.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 19 July 2024 Resolved
Overcurrent protection must be provided for each ungrounded conductor for the purpose of opening the electric circuit if the current reaches a value that causes an excessive or dangerous temperature in the conductor or conductor insulation. Fuses must be of the cartridge type only and be listed by Underwriters Laboratories or another independent laboratory recognized by the Commandant. Each circuit breaker must meet UL 489 (incorporated by reference; see 46 CFR 175.600) or other standard specified by the Commandant. There is no DC primary overcurrent protection on the battery located under the center console used to power the VHF, stereo, navigation lights, and electric bilge pumps located in the fwd void. There is also missing DC overcurrent branch protection for the remaining circuit under the console. There is incorrect primary overcurrent protection (ANL fuse not UL listed) between the batteries and inverters. There is no AC overcurrent protection for the branch circuit after the inverters which power the bilge pumps and AC outlets. 46 CFR 183.380
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 August 2024
Resolved 6 October 2024
Resolution: New primary UL listed overcurrent protection was installed for the DC circuit and branch circuit. New UL listed overcurrent protection was installed for the AC circuit.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 19 July 2024 Resolved
An emergency switch must be provided in the normally ungrounded main supply conductor from a battery. The switch must be accessible and located as close to the battery as practicable. Disconnect means must be provided on the supply side of and adjacent to all fuses for the purpose of de-energizing the fuses for inspection and maintenance purposes. The battery under the center console does not have a battery switch installed on the supply side of the fuse. 46 CFR 183.380(j)
Action required: 17 - Rectify deficiencies prior to departure
Due 19 July 2024
Resolved 19 July 2024
Resolution: The operator installed a battery switch at the center console to cut supply power to all systems in the electrical circuit it services.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 19 July 2024 Resolved
When the cognizant OCMI or the Commanding Officer, Marine Safety Center determines, in accordance with § 178.210, that a vessel must have stability details indicated on its Certificate of Inspection or a stability letter, the owner or operator must submit the information listed in paragraph (b) of this section. A vessel's lightship characteristics form the foundation for calculations that demonstrate its compliance with applicable stability requirements. Changes to a vessel, through the addition, removal, or relocation of items which are included as a part of the vessel's lightship, could jeopardize the accuracy of the lightship characteristics. The MSC will determine whether calculations alone are sufficient, in lieu of a stability test or deadweight survey, based on the accuracy of the calculations and/or the application of appropriate conservative assumptions in vertical center of gravity (VCG). In making this determination, the MSC will consider the summation of all weight changes that have been made since the last stability test. The owner removed two generators previously installed in the vessel after the 2011 stability test. Submit all weight changes to the MSC in accordance with MTN 04-95 Ch-2. Extended deficiency to December 1, 2024 while waiting on calculations from the Naval Architect. (10/7/2024 [name withheld]) 46 CFR 178.230
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 August 2024
Resolved 7 November 2024
Resolution: H1-2404104 after an evaluation of the lightship characteristic weight changes was completed by a third party naval architect for the removal of generators and addition of batteries/inverter, MSC noted that a new stability test is not required.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 19 July 2024 Resolved
Each portable fire extinguisher on a vessel must be of an approved type. The minimum number of portable fire extinguishers required on a vessel must be acceptable to the cognizant Officer in Charge, Marine Inspection, but must not be fewer than the minimum number required by Table 181.500(b) and other provisions of this section. The vessel has an approved OCMI special consideration from Sector Guam in December 26, 1997 to permit a gasoline powered trash pump to be onboard as a primary fire pump. The approval letter requires an addtional two 40 B:C portable fire extinguishers to be onboard. 46 CFR 181.500(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 August 2024
Resolved 6 October 2024
Resolution: Two additional 40 BC portable fire extinguishers were mounted at the transom in the immediate vicinity of the gasoline pump.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 19 July 2024 Resolved
A vessel of more than 19.8 meters (65 feet) in length must carry at least one rescue boat unless the cognizant OCMI determines that: (1) The vessel is sufficiently maneuverable, arranged, and equipped to allow the crew to recover a helpless person from the water; (2) Recovery of a helpless person can be observed from the operating station; and (3) The vessel does not regularly engage in operations that restrict its maneuverability. The vessel acts as its own rescue boat and the crew use a rescue ladder to recover persons overboard. The rescue ladder is not equipped with a platform at the bottom. The crew must hold the ladder with one hand and retrieve the person overboard with the other while balancing on a ladder rung. Provide a platform at the bottom of the rescue ladder. 46 CFR 180.210
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 August 2024
Resolved 6 October 2024
Resolution: A new aluminum rescue platform was constructed and placed into service onboard. The rescue platform attaches to the fwd bulkhead and can be used to retrieve a person overboard.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 12 March 2023 Resolved
Fire pump must be self priming and power driven on a vessel more than 65' in length. Minimum capacity of 50 gallons per minute with not less than 60 PSI at the pump outlet. Pump outlet must be fitted with pressure gauge. Fire pump must be capable of both remote operations from operating station and local operations at the pump. Provide plans for re-fabricating the existing system to meet the fire pump requirements and demonstrate system operations to Coast Guard Marine Inspector.
Action required: 705 - Other - as specified
Resolved 19 April 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 12 March 2023 Resolved
VSL more than 65' length must have 2 fixed power pumps. Minimum Capacity of 50 gallons per minute. pump must be self priming. Provide plans for re-fabricating the existing system to meet the Bilge pumps requirements and demonstrate system operations to Coast Guard Marine Inspector.
Action required: 705 - Other - as specified
Resolved 19 April 2023
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 15 December 2019 Resolved
Remove damaged extra ring life buoy from the vessel.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 December 2019
Resolved 16 December 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 15 December 2019 Resolved
Each dedicated pump is driven by an independent source of power. Show that each pump have independent source of power.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 December 2019
Resolved 16 December 2019
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 26 October 2018 Resolved
80% of the ceiling in passenger accommodation space was displaced during storm. Submit repair plan fro CG approval.
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 October 2018
Resolved 11 January 2019
Resolution: submitted plan repairs approved
Engineering › Fuel Oil Service System › Filter
Issued 6 December 2017 Resolved
Fuel filter must be in serviceable condition as required by 46 CFR 182.455. Replace rusted fuel filter for port and starboard fuel supply lines.
Due 20 December 2017
Resolved 15 December 2017
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 6 December 2017 Resolved
Shutoff valves must be serviceable condition as required by 46 CFR 182.455. Replace rusted fuel shutoff valves on the fuel supply lines.
Due 20 December 2017
Resolved 15 December 2017
Documentation › Markings/Placards › Lifejacket Placard
Issued 6 December 2017 Resolved
Life jacket donning placard must be posted conspicuously on board vessel as required by 46 CFR 185.516. Post placard for life jacket donning.
Due 20 December 2017
Resolved 15 December 2017
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 6 December 2017 Resolved
Vessel must have navigation lights as required by 46 CFR 183.420. Repair inoperable port running light.
Due 20 December 2017
Resolved 7 December 2017
Electrical › Electric Supply System (service) › Battery Installation
Issued 6 December 2017 Resolved
Battery must be installed to provide poser to start generator as required by 46 CFR 183.200. replace weak starting battery for #2 generator.
Due 20 December 2017
Resolved 7 December 2017
Lifesaving › Lifebuoys › Serviceable
Issued 6 December 2017 Resolved
Ring Life buoy must be in serviceable condition as required by 46 CFR 180.70. Replace damaged aft ring life buoy.
Due 20 December 2017
Resolved 7 December 2017
Communications › Public Address System › Announcing Station
Issued 23 September 2016 Resolved
PA must be fixed installation as required by 46 CFR 184.610. Repair inoperable PA system.
Due 28 September 2016
Resolved 26 September 2016
Navigation › Piloting/Steering › Magnetic Compass
Issued 23 September 2016 Resolved
Vessel operating at night time must have illuminated compass as required by 46 CFR 184.402. Repair inoperable compass light.
Due 28 September 2016
Resolved 26 September 2016
Lifesaving › Lifejacket/PFD (Type I) › Marking
Issued 23 September 2016 Resolved
Life jackets must have 31 sq. inches retro- reflective tape front and back as required by 46 CFR 185.604. Replace all identified old/deteriorated retro- reflective tape.
Due 28 September 2016
Resolved 26 September 2016
Lifesaving › Lifebuoys › Serviceable
Issued 23 September 2016 Resolved
Lifebuoy must be in satisfactory condition and one must be attached to 60 foot non-kinking black lifeline as required by 46 CFR 180.70. Replace (03) damaged lifebuoy and proved lifeline to one.
Due 28 September 2016
Resolved 26 September 2016
Engineering › Fuel Oil Storage/Transfer System › Hose
Issued 23 September 2016 Resolved
Replace deteriorated non-metallic hose on fuel tank fill as required by 46 CFR 182.720.
Due 28 September 2016
Resolved 26 September 2016
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 23 September 2016 Resolved
Replace wasted and deteriorated valves on fuel tank supply line as required by 46 CFR 185.608.
Due 28 September 2016
Resolved 26 September 2016
Electrical › Lighting (service) › Lighting Fixture
Issued 23 September 2016 Resolved
Repair inoperable light fixture in heads as required by 46 CFR 183.410
Due 28 September 2016
Resolved 26 September 2016
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 23 September 2016 Resolved
Replace expired eye wash sollution in first aid kit as required by 46 CFR 184.710
Due 28 September 2016
Resolved 26 September 2016
Documentation › Logs/Records › Logbook (official)
Issued 23 September 2016 Resolved
Provide proof of conducted drills/training by crew as required by 46 CFR 185.420
Due 28 September 2016
Resolved 26 September 2016
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 23 September 2016 Resolved
Repair all identified damaged passenger seats as required by 46 CFR 177.820
Due 28 September 2016
Resolved 26 September 2016
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 23 September 2016 Resolved
Vessel must have 2 fixed power bilge pumps as required by 46 CFR 182.520. Demonstrate the proper operation of the port bilge pump.
Due 28 September 2016
Resolved 26 September 2016
Electrical › Electrical Distribution System (service) › Junction Box
Issued 23 September 2016 Resolved
Install missing junction box covers as required by 46 CFR 183.340
Due 28 September 2016
Resolved 26 September 2016
Electrical › Electrical Distribution System (service) › Switchboard
Issued 23 September 2016 Resolved
Electrical equipment exposed to weather must be watertight a required by 46 CFR 183.210. Install weather protect for aft switchboard.
Due 28 September 2016
Resolved 26 September 2016
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 11 December 2015 Resolved
Found installed battery not listed as approved battery. Floating water light must be approved IAW 46 CFR 161.010. Install manufacture approved battery for life buoy light.
Due 28 December 2015
Resolved 11 January 2016
Electrical › Electric Generation Source (service) › Generator
Issued 11 December 2015 Resolved
Locations for Port and STBD generators allows water to enter and accumulate in the space. Generator space must be protected from wet and corrosive environment as required by 46 CFR 183.210. Submit repair proposal for water/weather proofing of the generator spaces.
Due 28 December 2015
Resolved 11 January 2016
Electrical › Electrical Distribution System (service) › Wiring
Issued 11 December 2015 Resolved
Found electrical wires, cables and equipments under control station exposed to sea water. All cable and wire must be protected from the weather as required by 46CFR186.340. Make the area under control station watertight.
Due 28 December 2015
Resolved 11 January 2016
Electrical › Electrical Distribution System (service) › Switchboard
Issued 11 December 2015 Resolved
Found main switch board exposed the weather. Each distribution panel & Main switch board must be in an dry location, protected from splashing water as required by 46 CFR 183.330. Install main switch board weather protection.
Due 28 December 2015
Resolved 11 January 2016
Accommodation/Occupational Safety › Ventilation › General
Issued 11 December 2015 Resolved
Generator compartments are not properly vented. At least two rigid permanent construction natural exhaust and supply ducts for a space containing diesel machinery as required by 46 CFR 182.465. Install rigid permanent ventilation ducts for generator spaces.
Due 15 January 2016
Resolved 2 July 2017
Electrical › Electric Generation Source (service) › Generator
Issued 11 December 2015 Resolved
Port generator is not in operational state. Electrical equipment must be installed and maintain as required by 46 CFR 183.200. Show proper operations of the port generator.
Due 28 December 2015
Resolved 2 July 2017
Accommodation/Occupational Safety › Occupational Safety › Receptacle Outlet
Issued 11 December 2015 Resolved
Found a non marine grade receptacle outlet located 6 inched from main deck. electrical components must be protected from wet and corrosive environment as required by 46 CFR 183.210. Replace all receptacle outlets by passenger seats with marine grade/water proof receptacle outlets.
Due 29 December 2015
Resolved 11 January 2016
Electrical › Electric Supply System (service) › Battery Installation
Issued 11 December 2015 Resolved
Found batteries stored in area that is exposed to weather. Batteries exposed to weather must be watertight as required by 46 CFR 183.210. Make battery storage watertight.
Due 29 December 2015
Resolved 11 January 2016
Engineering › Fuel Oil Service System › Hose
Issued 11 December 2015 Resolved
Found deteriorated flexible nonmetallic hoses on generator fuel system. Hoses must meet SAE standards J-1942, " Marine Applications" as required by 46 CFR 182.720. Replace all identified flexible fuel hoses on port & STBD generator prime movers.
Due 29 December 2015
Resolved 2 July 2017
Electrical › Electrical Distribution System (service) › Wiring
Issued 11 December 2015 Resolved
Found missing metal supports for wires in generator spaces. All cables and wires must be supported with metal brackets as required by 46 CFR 183.340. Install all indentified missing metal supports.
Due 29 December 2015
Resolved 11 January 2016
Accommodation/Occupational Safety › Washroom/Toilet › Toilet
Issued 11 December 2015 Resolved
Found toilet space used as cleaning equipments storage. Toilet space must be serviceable and sanitary condition as required by 46 CFR 176.818. Remove gasoline container, 2- wet vac, and cleaning materials from toilet space.
Due 29 December 2015
Resolved 11 January 2016
Fire Fighting › Portable CO2 Fire Extinguisher › Mounting Bracket
Issued 11 December 2015 Resolved
Found forward CO2 mounting bracket & storage missing break away glass cover. Install missing cover per manufacture requirement.
Due 29 December 2015
Resolved 11 January 2016
Engineering › Freshwater System (jacketwater cooling) › Hose
Issued 11 December 2015 Resolved
Found deteriorated flexible hoses on generator prime mover jacket water cooling system. All machinery installation must meet the standard acceptable to OCMI as required by 46 CFR 176.800. Replace deteriorated hoses as original.
Due 29 December 2015
Resolved 11 January 2016
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 11 December 2015 Resolved
Found disconnected bilge pipe on the cross connect between hulls. Bilge system on catamaran must have permanent cross connect between hulls as required by 46 CFR 182.520. Make permanent repair to bilge pipe.
Due 29 December 2015
Resolved 11 January 2016
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 11 December 2015 Resolved
Each watertight bulkhead and collision bulkheads must remain watertight with the head of the water to the top of the bulkheads as required by 46 CFR 179.320. Install all open man hole covers.
Due 29 December 2015
Resolved 11 January 2016
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 11 December 2015 Resolved
Found electric bilge pump in space forward of collision bulkhead not permanently mounted and no shutoff valve at the hull penetration. Pump must be permanently mounted and with a positive shutoff valve installed at the hull penetration as required by 46 CFR 182.520. Mount the pump and install valve at the hull penetration.
Due 29 December 2015
Resolved 11 January 2016
Electrical › Lighting (service) › Lighting Fixture
Issued 11 December 2015 Resolved
Found deck lights not operational. Light fixtures must meet standards specified in UL 1570 as required by 46 CFR 183.410. Show proper operations of the deck fixture lights.
Due 29 December 2015
Resolved 11 January 2016
Electrical › Electric Supply System (service) › Battery Charger
Issued 11 December 2015 Resolved
Found corroded old bus for battery charger. Remove or repair as original.
Due 29 December 2015
Resolved 11 January 2016
Fire Fighting › Fire Hydrants › Number
Issued 11 December 2015 Resolved
Vessel has one fire hydrant with one fire hose of more that 50 feet in length. Vessel over 65 feet in length and have power driven fire pump must have sufficient number of fire hydrant to reach any part of vessel using single length of fire hose. Each hose be 50 feet in length, conforms to UL 19 as required by 46 CFR 181.310. Submit proposal plan for second fire hydrant.
Due 29 December 2015
Resolved 2 July 2017
Documentation › Markings/Placards › Lifejacket Placard
Issued 28 September 2011 Resolved
Missing lifejacket placard.
Due 5 October 2011
Resolved 29 September 2011
Communications › Public Address System › Loudspeaker
Issued 28 September 2011 Resolved
No PA system on board.
Due 5 October 2011
Resolved 29 September 2011
Communications › Audible Communications › Bell
Issued 28 September 2011 Resolved
Missing bell.
Due 5 October 2011
Resolved 29 September 2011
Accommodation/Occupational Safety › Occupational Safety › Receptacle Outlet
Issued 28 September 2011 Resolved
Found (04) non-watertight electrical receptacle outlet located on the main deck level expose to water splashing.
Due 5 October 2011
Resolved 29 September 2011
Electrical › Electrical Distribution System (service) › Wiring
Issued 28 September 2011 Resolved
Found several unused/dead end wires behind main electrical switchboard.
Due 5 October 2011
Resolved 29 September 2011
Electrical › Electric Supply System (service) › Battery Installation Ventilation
Issued 28 September 2011 Resolved
Missing splash shield on ventilation opening to battery space.
Action required: 705 - Other - as specified
Due 5 October 2011
Resolved 3 October 2012
Electrical › Electrical Distribution System (service) › Wiring
Issued 28 September 2011 Resolved
Found several wires joints using twist - on type connectors.
Due 5 October 2011
Resolved 29 September 2011
Electrical › Electrical Distribution System (service) › Wiring
Issued 28 September 2011 Resolved
Wires in generator space are not supported by metalic support.
Due 5 October 2011
Resolved 29 September 2011
Electrical › Electrical Distribution System (service) › Switchboard
Issued 28 September 2011 Resolved
Missing dripshield on main switchboard.
Action required: 705 - Other - as specified
Due 2 November 2012
Resolved 18 December 2012
Resolution: Installed plexy-glass around electrical panel.
Electrical › Electrical Distribution System (service) › Switchboard
Issued 28 September 2011 Resolved
Missing non-conducting mat or grating on deck in front of switchboard.
Due 5 October 2011
Resolved 29 September 2011
Lifesaving › Hand Flares › Storage
Issued 28 September 2011 Resolved
Missing watertight flare container.
Due 5 October 2011
Resolved 29 September 2011
Fire Fighting › Portable CO2 Fire Extinguisher › Mounting Bracket
Issued 28 September 2011 Resolved
Missing mounting bracket for (02) portable fire extinguishers.
Due 5 October 2011
Resolved 29 September 2011
Fire Fighting › Fire Hoses › Condition
Issued 28 September 2011 Resolved
Found (02) fire hoses with holes.
Due 5 October 2011
Resolved 29 September 2011
Resolution: Two new fire hoses that meets 46CFR181.320
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 28 September 2011 Resolved
Found ring life buoy without lifeline.
Due 5 October 2011
Resolved 29 September 2011
Fire Fighting › Firemans Outfit › Axe
Issued 28 September 2011 Resolved
Missing fire axe.
Due 5 October 2011
Resolved 29 September 2011
Resolution: New axe marked with vessel name.
Electrical › Electric Generation Source (service) › Generator
Issued 28 September 2011 Resolved
Found spring tension clamps on prime mover fuel hose.
Due 5 October 2011
Resolved 29 September 2011
Documentation › Certificates/Documents › Stability Letter
Issued 28 September 2011 Resolved
Pending stability letter from MSC.
Due 29 October 2011
Resolved 29 September 2011
Resolution: Received Stability letter from MSC.
Stability › Incline Test › General
Issued 19 September 2008 Resolved
Issued vessel a CG-835 to conduct a satisfactory incline exam to determine safe pax count.
Condition: Unknown
Action required: 705 - Other - as specified
Due 16 January 2009
Resolved 29 September 2011
Resolution: Vessel now has new stability letter, issued by Marine Safety Center, dated 28 September 2011. New owner completed this requirement. New total persons allowed determined to be 155 and is listed on vessel''s new stability letter.
Stability › Incline Test › General
Issued 19 September 2008 Resolved
Vessel must have an approved & completed incline test by the designated date on the cg-835, or the COI will be pulled on the 16th of Jan 2009.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 January 2009
Resolved 29 September 2011
Resolution: Vessel now has new stability letter, issued by Marine Safety Center, dated 28 September 2011. New owner completed this requirement.
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 15 August 2008 Resolved
Replace short type 1 child and adult life jackets.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 September 2008
Resolved 29 September 2011
Resolution: Vessel has replaced lifejackets.
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 15 August 2008 Resolved
Replace all SOLAS tape on all failed designated life jackets.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 September 2008
Resolved 22 September 2008
Lifesaving › Hand Flares › Not on Board
Issued 15 August 2008 Resolved
Replace missing orange day time flare.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 21 August 2008
Resolved 21 August 2008
Resolution: Vessels reps replaced the missing flare, all sat.
Fire Fighting › Fire Pumps › Suction Valve
Issued 15 August 2008 Resolved
Repair leak on the suction side of the fire pump.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 September 2008
Resolved 22 September 2008
Resolution: Vessels reps repaired the leak on the suction side of the pump.
Engineering › Generator (propulsion-electric) › Generator Voltage Regulator Circuitry
Issued 15 August 2008 Resolved
Adjust loose alternator belt.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 September 2008
Resolved 23 September 2008
Resolution: Vessels reps replaced the loose over sized belt.
Engineering › Sea-water System (primary cooling) › Pump
Issued 15 August 2008 Resolved
Tighten loose salt water pump on the # 1 ssdg.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 September 2008
Resolved 22 September 2008
Resolution: Vessels reps replaced the salt water pump.
Engineering › Bilge Water Management System › Pump
Issued 15 August 2008 Resolved
Repair stbd side head bilge alarm/light; make 15 minute rounds & log till corrected.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 September 2008
Resolved 22 September 2008
Construction/Loadline › Hull › Hull Plating
Issued 15 November 2007 Resolved
Repair 7" fracture port bow.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 November 2007
Resolved 15 November 2007
Resolution: Vessels reps hired a welder who completed repairs during the inspection. All sat
Navigation › Collision/Grounding Avoidance › Danger Messages
Issued 15 November 2007 Resolved
Proof proper operation of horn.
Action required: 705 - Other - as specified
Due 2 December 2007
Resolved 15 November 2007
Engineering › Lubricating Oil Service System › Gauge
Issued 15 November 2007 Resolved
Replace failed oil pressure gauge for #2 generator
Action required: 705 - Other - as specified
Due 2 December 2007
Resolved 7 December 2007
Electrical › Electric Generation Source (service) › Generator
Issued 15 November 2007 Resolved
Replace inlet hose on #1 generator turbo.
Action required: 705 - Other - as specified
Due 2 December 2007
Resolved 7 December 2007
Electrical › Electric Generation Source (service) › Generator
Issued 15 November 2007 Resolved
Replace jacketed water temperature gauge for #1 generator.
Action required: 705 - Other - as specified
Due 2 December 2007
Resolved 7 December 2007
Electrical › Electrical Distribution System (service) › Wiring
Issued 15 November 2007 Resolved
Replace plastic hangers with metal hangers on machinery spaces.
Action required: 705 - Other - as specified
Due 2 December 2007
Resolved 7 December 2007
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 15 November 2007 Resolved
Reduce total persons onboard from165 to 151. Until appropiate number of lifejackets are onboard IAW COI.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 15 November 2007
Resolution: Vessel reps baught new Life Jackets and labelled prior to the completion of the inspection , all sat
Lifesaving › Lifebuoys › Approval
Issued 15 November 2007 Resolved
Vessel had a Canadian non-approved type ring on board.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Resolved 15 November 2007
Resolution: Vessels reps purchased and labelled the new life ring, all sat.
Lifesaving › Lifejacket/PFD (General) › Quantity
Issued 5 October 2006 Resolved
Provide 4 adult life jackets or reduce pax number to 146.
Action required: 705 - Other - as specified
Due 19 October 2006
Resolved 19 October 2006
Electrical › Lighting (service) › Lighting Fixture
Issued 5 October 2006 Resolved
Provide light covers to exposed lights.
Action required: 705 - Other - as specified
Due 19 October 2006
Resolved 19 October 2006
Engineering › Sea-water System (primary cooling) › Piping
Issued 5 October 2006 Resolved
Provide single hose and double clamp on raw water intakes on both generators.
Action required: 705 - Other - as specified
Due 19 October 2006
Resolved 19 October 2006
Electrical › Electrical Distribution System (service) › Cable
Issued 5 October 2006 Resolved
Replace all non-boat cable with the exception of theater lighting.
Action required: 705 - Other - as specified
Due 19 October 2006
Resolved 19 October 2006
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 5 October 2006 Resolved
Provide proof of service for all fire fighting extinquishers.
Action required: 705 - Other - as specified
Due 5 October 2006
Resolved 19 October 2006
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 10 November 2005 Resolved
Provide 2 Child size life jackets.
Condition: Unknown
Action required: 705 - Other - as specified
Due 24 November 2005
Resolved 25 November 2005
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 10 November 2005 Resolved
Conduct man overboard drill and log it.
Condition: Unknown
Action required: 705 - Other - as specified
Due 24 November 2005
Resolved 25 November 2005
Operations/Management › Drills/Instruction › Fire
Issued 10 November 2005 Resolved
Conduct fire drill and log it.
Action required: 705 - Other - as specified
Due 24 November 2005
Resolved 25 November 2005
Documentation › Markings/Placards › Garbage Placard
Issued 10 November 2005 Resolved
Provide MARPOL V Placard.
Condition: Unknown
Action required: 705 - Other - as specified
Due 24 November 2005
Resolved 25 November 2005
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 10 November 2005 Resolved
Provide complete First Aid Kit
Action required: 705 - Other - as specified
Due 24 November 2005
Resolved 25 November 2005
Lifesaving › Lifebuoys › Serviceable
Issued 17 August 2004 Resolved
Replace all life rings on vessel.
Due 31 August 2004
Resolved 25 March 2005
Fire Fighting › Fire Pumps › Arrangement
Issued 17 August 2004 Resolved
Replace "non self-priming" pump with a "self-priming installed fire pump.
Due 31 August 2004
Resolved 25 March 2005
Navigation › Piloting/Steering › Magnetic Compass
Issued 17 August 2004 Resolved
Prove operation of compass light.
Due 31 August 2004
Resolved 25 March 2005
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 17 August 2004 Resolved
Prove operation of stbd, fwd bilge pump.
Due 20 August 2004
Resolved 17 August 2004
Communications › Alarms/Indicators › Bilge Alarm
Issued 17 August 2004 Resolved
Prove operation of all bilge pump indicators and high water alarms.
Due 20 August 2004
Resolved 17 August 2004
Lifesaving › Lifebuoys
Issued 21 November 2002 Resolved
Replace retro-reflective tape on all life rings. LEGACY COMPONENT DESC: Markings (ship name/port)
Due 22 December 2002
Resolved 14 February 2003
Resolution: Replaced DEC02
Documentation › Logs/Records
Issued 21 November 2002 Resolved
Drug testing information not available during inspection. Company to contact unit DAPI for company audit within 30 days. LEGACY COMPONENT DESC: Drug Test Records
Due 22 December 2002
Resolved 14 February 2003
Resolution: Audit conducted DEC02
Fire Fighting › Fire Pumps
Issued 21 November 2002 Resolved
Make repairs to fire pump and prove proper operation. Currently unable to start. Pull mechanism froze.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 November 2002
Resolution: Pump tested satisfactorily.
Personnel › Certificates/Documents/Licenses › License, Master
Issued 21 November 2002 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 November 2002
Resolution: [withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Personnel › Manning/Qualifications
Issued 21 November 2002 Resolved
Lackluster performance for crew during fire drill. Extensive prompting of crew could not evoke actions demonstrating enthusiam and knowledge required to adequately put out store room fire port side. Conduct another fire drill after training of crew.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 November 2002
Resolution: Crew performance better for drill.
Electrical › Electrical Distribution System (service) › Conductor
Issued 21 November 2002 Resolved
Bilge pumps audible and visual alarm panel inoperative. All wires being re strung to the system on date of inspection. Make repairs and test in presence of CG inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 November 2002
Resolution: Tested satisfactory.
Fire Fighting
Issued 3 December 2001 Resolved
Replace missing B-II portable fire extinguisher at starboard bow access area.
Condition: Unknown
Due 17 December 2001
Resolved 15 January 2002
Resolution: Installed.
Navigation
Issued 3 December 2001 Resolved
Reconfigure wiring for stern navigational light and anchor light. These lights are reversed when navigational lights or anchor lights are lit.
Condition: Unknown
Due 17 December 2001
Resolved 15 January 2002
Resolution: Corrected.
Construction/Loadline
Issued 3 December 2001 Resolved
Prove operation of port bow bilge high-level alarm and indicator light, andport water void high bilge audible alarm.
Condition: Unknown
Due 17 December 2001
Resolved 15 January 2002
Resolution: Corrected.
Lifesaving
Issued 3 December 2001 Resolved
Prove operation of ring buoy waterlight. Vessel restricted to daylight operations until such time light is operational.
Condition: Unknown
Due 3 December 2001
Resolved 3 December 2001
Construction/Loadline
Issued 21 April 2001 Resolved
Reweld weld fracture in way of weldment port hull forward outboard side.
Condition: Unknown
Due 25 April 2001
Resolved 25 April 2001
Construction/Loadline
Issued 21 April 2001 Resolved
Reweld weld fracture at aft starboard corner in way of jetdrive housing to main hull connection.
Condition: Unknown
Due 25 April 2001
Resolved 25 April 2001
Construction/Loadline
Issued 30 November 1999 Resolved
INSTALL AUTOMATIC BILGE PUMP INDICATOR LIGHTS TO INDICATE OPERATION OF ALL BILGE PUMPS.
Condition: Unknown
Due 30 November 1999
Resolved 30 November 1999
Fire Fighting
Issued 30 November 1999 Resolved
PROVE OPERATION OF THE GASOLINE FUEL TANK SPACE VAPOR DETECTION AUDIBLE ALARM AND INDICATOR LIGHT.
Condition: Unknown
Due 30 November 1999
Resolved 30 November 1999
Engineering
Issued 30 November 1999 Resolved
INSTALL POWER VENTILATION AND VENT CLOSURES FOR GASOLINE TANK SPACE, OR REMOVE GASOLINE TANK.
Condition: Unknown
Due 30 November 1999
Resolved 30 November 1999
Lifesaving
Issued 30 November 1999 Resolved
OBTAIN TWO (2) MORE CHILD SIZED LIFEJACKETS TO BRING TOTAL COMPLIMENT UP TO17 AS REFLECTED ON THE COI. VESSEL IS RESTRICTED TO NO MORE THAN 15 TOTAL CHILDREN AND/OR PASSENGERS WEIGHING LESS THAN 90 POUNDS UNTIL THE PROPER_x001C_ NUMBER OF CHILD SIZED LIFEJACKETS ARE PUT ON BOARD.
Condition: Unknown
Due 30 November 1999
Resolved 30 November 1999
Engineering
Issued 23 July 1999 Resolved
Provide adequate ventilation with vent blower and vent closures for gas tank space in accordance with 46 CFR 182.460.
Condition: Unknown
Due 23 July 1999
Resolved 23 July 1999
Unknown
Issued 23 July 1999 Resolved
Paint draft loading marks on port and starboard hulls, fore and aft, 1"x 8"
Condition: Unknown
Due 23 July 1999
Resolved 23 July 1999
Construction/Loadline
Issued 23 July 1999 Resolved
Weld fractured joints in center and starboard channel of bow ramp.
Condition: Unknown
Due 23 July 1999
Resolved 23 July 1999
Engineering
Issued 23 July 1999 Resolved
Provide flame impingment bowls for the generator fuel filters.
Condition: Unknown
Due 23 July 1999
Resolved 23 July 1999
Engineering
Issued 23 July 1999 Resolved
Double clamp all bilge, exhaust, and fuel hose connections.
Condition: Unknown
Due 23 July 1999
Resolved 23 July 1999
Navigation
Issued 26 November 1998 Resolved
Place on board a ship's bell.
Condition: Unknown
Due 26 November 1998
Resolved 26 November 1998
Engineering
Issued 26 November 1998 Resolved
Replace hard plastic piping for generator cooling with suitable metal piping.
Condition: Unknown
Due 26 November 1998
Resolved 26 November 1998
Lifesaving
Issued 26 November 1998 Resolved
Place in the vessel's first aid kit; a wire splint and tourniquet.
Condition: Unknown
Due 26 November 1998
Resolved 26 November 1998
Construction/Loadline
Issued 26 December 1997 Resolved
Obtain and carry on board one portable manual hand bilge pump of minimum 20gallon per minute pumping capacity. This pump is required as a condition for the OCMI approved variance for the required bilge pumps.
Condition: Unknown
Due 26 December 1997
Resolved 26 December 1997
Lifesaving
Issued 26 December 1997 Resolved
Obtain an additional eleven (11) adult and two (2) child sized lifejackets to bring total on board capacity to 165 adult and 17 child. Until such time that the lifejackes are on board, vessel carrying capacity shall be limited to no more than 154 persons.
Condition: Unknown
Due 26 December 1997
Resolved 26 December 1997
Engineering
Issued 26 December 1997 Resolved
Replace generator fuel hoses with hoses that meet SAE J-1942 standards.
Condition: Unknown
Due 26 December 1997
Resolved 26 December 1997
Fire Fighting
Issued 26 December 1997 Resolved
Install vent closures on the supply and exhaust vents forthe gasoline fuel tank space. Vent closures to be activated when the fixed fire extinguishingsystem is activated.
Condition: Unknown
Due 26 December 1997
Resolved 26 December 1997
Construction/Loadline
Issued 26 December 1997 Resolved
Install a bilge high level alarm in each bow thruster space, and in the generator space with a visual and audible alarm at the operating station.
Condition: Unknown
Due 26 December 1997
Resolved 26 December 1997
Fire Fighting
Issued 26 December 1997 Resolved
Install flammable vapor detection system in gasoline tank space. System tobe tested on a regular schedule, and such testing logged in the vessel's log.
Condition: Unknown
Due 26 December 1997
Resolved 26 December 1997
Documentation
Issued 26 December 1997 Resolved
Post vessel stability letter and Certificate of Inspection under glass, or other transparent material, on board the vessel.
Condition: Unknown
Due 26 December 1997
Resolved 26 December 1997
Fire Fighting
Issued 26 December 1997 Resolved
Post operating instructions for the use of the fixed fire extinguishing system at the manual pull station. Instructions to include the closing of space ventilation when the system is activated.
Condition: Unknown
Due 26 December 1997
Resolved 26 December 1997
Documentation
Issued 26 December 1997 Resolved
Obtain and post a valid FCC Communications Act Safety Radiotelephony Certificate for vessel's VHF-FM radio.
Condition: Unknown
Due 26 December 1997
Resolved 26 December 1997
Construction/Loadline
Issued 26 December 1997 Resolved
Install an additional vent on the outboard side of the gasoline tank space to allow for cross ventilation of the space. Reposition the after vent on the inboard side to provide better ventilation supply flow.
Condition: Unknown
Due 26 December 1997
Resolved 26 December 1997

Ownership record