Inspection history · 30
14 November 1993
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 73950
9 June 1993
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1142553
19 February 1993
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 691612
30 January 1993
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 56553
30 January 1993
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 95101
30 January 1993
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 218019
21 January 1993
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1139531
10 April 1992
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1260125
26 March 1992
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 947118
10 March 1992
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 948064
7 February 1992
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 946406
9 December 1991
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1262485
10 April 1991
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 933289
4 February 1991
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1230299
25 April 1990
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1235829
7 February 1990
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1220616
30 January 1990
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1225742
29 December 1989
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1231516
2 October 1989
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 908996
22 June 1989
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1194156
7 November 1988
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1200990
6 October 1988
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1196625
6 October 1988
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1196626
4 December 1987
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1309347
29 October 1987
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1019873
3 April 1987
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1026787
29 October 1986
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1019912
31 October 1985
COI Inspection · Credit Drydock
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 989397
22 May 1985
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1290446
11 December 1984
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1284716
Navigation
Issued 7 February 1992
Resolved
REPLACE CRACKED LENS ON PORT NAVIGATIONAL RUNNING LIGHT.
Condition: Unknown
Due 4 March 1992
Resolved 4 March 1992
Lifesaving
Issued 7 February 1992
Resolved
PROPERLY STENCIL BOUYANT APPARATUS WITH VESSEL NAME AND NUMBER OF PERSONS ALLOWED. STENCILS TO BE 1 1/2 INCHES HIGH AS PER 46CFR180.20-5.
Condition: Unknown
Due 6 March 1992
Resolved 12 March 1992
Accommodation/Occupational Safety
Issued 7 February 1992
Resolved
MAKE PERMANENT REPAIRS TO PORT BRIDGE WING HANDRAIL AND PROVIDE LIFELINES OR CHAIN WHERE REQUIRED IN ACCORDANCE WITH 46CFR177.35.
Condition: Unknown
Due 6 March 1992
Resolved 12 March 1992
Navigation
Issued 7 February 1992
Resolved
PAINT PORT AND STBD NAVIGATION SIDE SCREENS MATTE BLACK.
Condition: Unknown
Due 6 March 1992
Resolved 12 March 1992
Electrical
Issued 7 February 1992
Resolved
PROVIDE ELECTRICAL PLANS TO MSO SAN JUAN FOR INSTALLATION OF STBD SIDE ANCHOR WINDLASS.
Condition: Unknown
Due 6 March 1992
Resolved 12 March 1992
Accommodation/Occupational Safety
Issued 7 February 1992
Resolved
IN PORT SIDE ACCOMODATION, REMOVE PLYWOOD AND INSTALL WINDOW AS ORIGINAL ORINSERT WITH SAME GUAGE STEEL AS SUPER STRUCTURE.
Condition: Unknown
Due 6 March 1992
Resolved 12 March 1992
Engineering
Issued 7 February 1992
Resolved
PROPERLY BRACE AIR COMPRESSOR ON PORT MAIN DIESEL ENGINE TO PREVENT EXCESSIVE VIBRATION.
Condition: Unknown
Due 6 March 1992
Resolved 12 March 1992
Engineering
Issued 7 February 1992
Resolved
INSTALL BELTGUARDS ON ALL PULLEYS AND MOVING MACHINERY IN ENGINEROOM.
Condition: Unknown
Due 6 March 1992
Resolved 12 March 1992
Electrical
Issued 7 February 1992
Resolved
LABEL ALL BREAKERS IN ALL ELECTRICAL PANELS FOR THEIR SERVICE.
Condition: Unknown
Due 6 March 1992
Resolved 12 March 1992
Electrical
Issued 7 February 1992
Resolved
MAKE PROPER CONNECTIONS ON ELECTRICAL WIRING THRU OUT VESSEL USING MARINE CONNECTORS. REMOVE ALL DEADEND WIRES NOT BEING USED. REPLACE ALL WIRING THRU OUT VSL WHOSE INSULATION HAS WORN THRU.
Condition: Unknown
Due 6 March 1992
Resolved 12 March 1992
Engineering
Issued 7 February 1992
Resolved
PROVIDE SPRAY SHIELDS FOR RACOR FILTERS ON MAIN DIESEL ENGINES.
Condition: Unknown
Due 6 March 1992
Resolved 12 March 1992
Engineering
Issued 7 February 1992
Resolved
PROVIDE INSULATION ON EXHAUST PIPE FLANGES FOR MAIN DIESEL ENGINES.
Condition: Unknown
Due 6 March 1992
Resolved 12 March 1992
Electrical
Issued 7 February 1992
Resolved
INSTALL GLASS GLOBES ON ALL ENGINEROOM LIGHTS.
Condition: Unknown
Due 6 March 1992
Resolved 12 March 1992
Electrical
Issued 7 February 1992
Resolved
PROVIDE METAL SUPPORT BRACKETS FOR ALL OVERHEAD WIRING.
Condition: Unknown
Due 6 March 1992
Resolved 12 March 1992
Electrical
Issued 7 February 1992
Resolved
PROVIDE PROPER GUARD FOR KNIFE SWITCH LOCATED ON AFT BULKHEAD OF ENGINEROOM.
Condition: Unknown
Due 6 March 1992
Resolved 12 March 1992
Electrical
Issued 7 February 1992
Resolved
REMOVE ALL DEADEND WIRING THROUGHOUT VESSEL.
Condition: Unknown
Due 4 March 1992
Resolved 4 March 1992
Deck/Cargo
Issued 7 February 1992
Resolved
RE-INSTALL CARGO SHIFTING BUMPERS TO MAIN DECK.
Condition: Unknown
Due 6 March 1992
Resolved 12 March 1992
Lifesaving
Issued 7 February 1992
Resolved
PROVIDE WATERTIGHT CONTAINER FOR PYROS.
Condition: Unknown
Due 6 March 1992
Resolved 12 March 1992
Fire Fighting
Issued 7 February 1992
Resolved
MAKE PERMANENT REPAIRS AND PROVE PROPER OPERATION OF PORT MAIN DECK FIRE HYDRANT VALUE.
Condition: Unknown
Due 6 March 1992
Resolved 12 March 1992
Fire Fighting
Issued 7 February 1992
Resolved
PROVIDE PRESSURE GAUGE ON DISCHARGE SIDE OF FIRE PUMP AND PROVE PROPER OPERATION.
Condition: Unknown
Due 6 March 1992
Resolved 12 March 1992
Unknown
Issued 7 February 1992
Resolved
MARK VESSEL'S HAILING PORT IN 4" LETTERS MINIMUM ON VESSEL'S STERN.
Condition: Unknown
Due 6 March 1992
Resolved 12 March 1992
Documentation
Issued 7 February 1992
Resolved
PROVIDE ORIGINAL STABILITY LETTER AND POST UNDER TRANSPARENT MATERIAL IN VESSELS WHEELHOUSE.
Condition: Unknown
Due 7 February 1992
Resolved 7 February 1992
Lifesaving
Issued 7 February 1992
Resolved
PROVIDE PROPER SIZE WEAK LINK FOR BUOYANT APPARATUS.
Condition: Unknown
Due 6 March 1992
Resolved 12 March 1992
Accommodation/Occupational Safety
Issued 7 February 1992
Resolved
PROVIDE PLUMBING PLANS FOR APPROVAL OF SINK INSTALLATION ON MAIN DECK FORWARD TO US COAST GUARD. THIS PLAN SHALL INCLUDE A MATERIAL LIST.
Condition: Unknown
Due 6 March 1992
Resolved 12 March 1992
Navigation
Issued 7 February 1992
Resolved
PROVIDE COPY OF INTERNATIONAL RULES OF THE ROAD IAW 33CR88.05.
Condition: Unknown
Due 7 February 1992
Resolved 7 February 1992
Lifesaving
Issued 4 February 1991
Resolved
FABRICATE A BOARDING LADDER SUITABLE FOR USE IN A MAN OVERBOARD EVOLUTIONS
Condition: Unknown
Due 4 February 1991
Resolved 4 February 1991
Accommodation/Occupational Safety
Issued 6 October 1988
Resolved
REWIRE BOTH TOILETS AS REQUIRED AND PROVE PROPER OPERATION TO SAME.
Condition: Unknown
Due 6 October 1988
Resolved 6 October 1988
Electrical
Issued 6 October 1988
Resolved
REMOVE UNNECESSARY WIRING FROM ENGINEROOM. RE-SUPPORT OTHER WIRING AS REQUIRED THROUGHOUT ENGINEROOM.
Condition: Unknown
Due 6 October 1988
Resolved 6 October 1988
Engineering
Issued 6 October 1988
Resolved
REPLACE BAD SECTION OF BILGE PIPING LOCATED ON SUCTION SIDE OF BILGE MANIFOLD LOCATED IN ENGINEROOM.
Condition: Unknown
Due 6 October 1988
Resolved 6 October 1988
Electrical
Issued 6 October 1988
Resolved
INSTALL GLOBE COVERS FOR LIGHT FIXTURES THROUGHOUT VESSEL AS REQUIRED.
Condition: Unknown
Due 6 October 1988
Resolved 6 October 1988
Engineering
Issued 6 October 1988
Resolved
INSTALL MAIN ENGINE EXHAUST INSULATION AS REQUIRED ON BOTH MAIN DIESEL ENGINES.
Condition: Unknown
Due 6 October 1988
Resolved 6 October 1988
Electrical
Issued 3 April 1987
Resolved
REPLACE MISSING GLOBES AND GUARDS ON LIGHT FIXTURES.
Condition: Unknown
Due 3 April 1987
Resolved 3 April 1987
Engineering
Issued 3 April 1987
Resolved
INSTALL LAGGING ON EXHAUST AND OTHER AREAS AS REQUIRED.
Condition: Unknown
Due 3 April 1987
Resolved 3 April 1987
Engineering
Issued 3 April 1987
Resolved
REPLACE MISSING INDICATORBULB AND CLEAN UP CONTROL PANEL.
Condition: Unknown
Due 3 April 1987
Resolved 3 April 1987
Electrical
Issued 3 April 1987
Resolved
REMOVE EXTEMPORAINIOUS WIRING.
Condition: Unknown
Due 3 April 1987
Resolved 3 April 1987
Documentation
Issued 3 April 1987
Resolved
REPLACE MISSING STABILITY LETTER AND MARK HULL ACCORDINGLY.
Condition: Unknown
Due 3 April 1987
Resolved 3 April 1987
Construction/Loadline
Issued 3 April 1987
Resolved
MAKE ALL DECK HATCHES WATERTIGHT.
Condition: Unknown
Due 3 April 1987
Resolved 3 April 1987
Accommodation/Occupational Safety
Issued 11 December 1984
Resolved
REPAIR NATURAL VENT FROM PASSENGER AREA TO UPPER DECK PORT SIDE.
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Construction/Loadline
Issued 11 December 1984
Resolved
CROP OUT TO GOOD METAL AND RENEW SCUTTLE SEALING EDGE OF PORT SIDE AFT ENGINE ROOM SCUTTLE. RENEW GASKET AND PROVIDE WING NUTS.
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Construction/Loadline
Issued 11 December 1984
Resolved
REPAIR PORT AND STBD PASSENGER SAFETY GATES.
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Construction/Loadline
Issued 11 December 1984
Resolved
PROCURE AND INSTALL STBD VEHICLE/PASSENGER SAFETY BUMPER WHERE MISSING.
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Construction/Loadline
Issued 11 December 1984
Resolved
RENEW HANDLE FOR REMOTE BILGE VALVE MAIN DECK FORWARD.
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Construction/Loadline
Issued 11 December 1984
Resolved
REPAIR ESCAPE SCUTTLE TO #2 HOLD PORT SIDE.
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Construction/Loadline
Issued 11 December 1984
Resolved
REPAIR ALL PORTHOLES IN PASSENGER AREA; HINGES, DOGS, RENEW GASKETS.
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Accommodation/Occupational Safety
Issued 11 December 1984
Resolved
CROP OUT TO GOOD METAL AND RENEW BULKHEAD WHERE WASTED BETWEEN MEN'S AND LADIES HEADS.
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Accommodation/Occupational Safety
Issued 11 December 1984
Resolved
CROP OUT AND RENEW AFT BLUKHEAD OF MEN'S AND LADIES HEAD FROM DECK UP TO GOOD METAL.
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Construction/Loadline
Issued 11 December 1984
Resolved
CROP OUT TO GOOD METAL AND RENEW WHERE WASTED HULL PLATING UNDER FLAIR OF MAIN DECK.
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Construction/Loadline
Issued 11 December 1984
Resolved
CROP OUT TO GOOD METAL AND RENEW WHEELHOUSE BULKHEAD WHERE WASTED AT DECK AND AROUND WINDOWS.
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Electrical
Issued 11 December 1984
Resolved
INSTALL SWITCH COVER WHERE MISSING IN OVERHEAD.
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Electrical
Issued 11 December 1984
Resolved
RENEW ALL WIRING WHICH FEEDS ELECTRONIC EQUIPMENT IN BRIDGE WITH MARINE APPROVED WIRE. REMOVE ALL WIRING NOT IN USE.
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Construction/Loadline
Issued 11 December 1984
Resolved
CROP OUT TO GOOD METAL AND RENEW TOP AND MIDDLE RUB RAILS PORT AND STBD SIDES AFT AND STERN.
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Construction/Loadline
Issued 11 December 1984
Resolved
CROP OUT AND RENEW ALL BULWARK SUPPORTS PORT AND STBD SIDES OF MAIN DECK
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Construction/Loadline
Issued 11 December 1984
Resolved
CROP OUT AND RENEW BULWARK WHERE HOLED AND/OR WASTED PORT AND STBD MAIN DECK. INSERTS SHALL EXTEND TO BOTH THE FORWARD AND AFTER NEAREST SUPPORT.
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Construction/Loadline
Issued 11 December 1984
Resolved
CROP OUT AND RENEW COMPLETELY BOTH PORT AND STBD MAIN ENGINE EXHAUST VENTS.INSULATE AS NECESSARY TO PROTECT THE PASSENGERS FROM HEAT.
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Construction/Loadline
Issued 11 December 1984
Resolved
CROP OUT TO GOOD METAL AND RENEW PORT AND STBD JOINER DOOR FRAMES FROM PASSENGER AREA TO MAIN DECK.
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Construction/Loadline
Issued 11 December 1984
Resolved
CROP OUT TO GOOD METAL AND RENEW AFT BULKHEAD AND SUPPORTS WHERE WASTED IN PASSENGER SEATING AREA.
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Construction/Loadline
Issued 11 December 1984
Resolved
CROP OUT TO GOOD METAL AND RENEW ALL WASTED METAL IN SUPERSTRUCTURE FROM PORT SIDE OUTBOARD AROUND TO STBD SIDE AS NOTED DURING EXAMINATION.
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984
Construction/Loadline
Issued 11 December 1984
Resolved
CROP OUT AND RENEW HAND RAILING, MAIN DECK AROUND BOW.
Condition: Unknown
Due 11 December 1984
Resolved 11 December 1984