Records from 1985 to 2018. Most recent: inspection, 25 June 2018.
Inspection history · 133
25 June 2018
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6455141
7 August 2017
Re-Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6233829
4 April 2017
MTSA Verification · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6117296
27 July 2016
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 5954841
25 July 2016
Re-Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5952656
25 May 2016
Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5886262
11 April 2016
MTSA Verification · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5851188
23 October 2015
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 5749315
31 August 2015
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 5233887
2 October 2014
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 4997230
21 July 2011
MTSA Verification · Re-Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4088058
16 November 2010
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 3892372
16 February 2010
Drydock Exam · Internal Structural Exam · Examination of Repairs · COI Inspection · DAPI Audit
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3680496
10 March 2009
MTSA Verification · Re-Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3430454
10 December 2008
MTSA Verification · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3377003
23 September 2008
Re-Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3332217
17 June 2008
Re-Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3239839
18 March 2008
Re-Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3166226
11 January 2008
Deficiency Check · Internal Structural Exam · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3128778
12 December 2007
COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3114040
20 September 2007
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 3062061
20 September 2007
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 3062065
11 September 2007
Re-Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3054849
15 June 2007
Re-Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2962334
13 March 2007
Re-Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2887088
16 January 2007
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2856526
13 September 2006
Re-Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2777122
14 June 2006
Re-Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2679424
24 April 2006
Plan Review (Other than "T")
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 2632038
29 March 2006
Plan Review (Other than "T")
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 2612233
17 March 2006
Re-Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2604093
11 January 2006
COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2564739
19 October 2005
Re-Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2517435
27 July 2005
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 2442103
20 July 2005
Re-Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2432920
26 June 2005
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 2403414
9 May 2005
Deficiency Check · Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2332416
18 January 2005
Hull Examination · Internal Structural Exam
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2276285
10 January 2005
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2272227
19 July 2004
Re-Inspection · MTSA Verification
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2137899
15 April 2004
Quarterly Examination · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2044362
13 January 2004
Deficiency Check · COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1982755
25 November 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1954806
10 September 2003
Quarterly Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1901407
6 June 2003
Quarterly Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1810969
20 February 2003
Hull Examination · Internal Structural Exam
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1745759
13 January 2003
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1729341
22 October 2002
Quarterly Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1694963
29 July 2002
Quarterly Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1655048
18 July 2002
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1648120
23 April 2002
Quarterly Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1608322
29 January 2002
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1483034
7 November 2001
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1457028
2 October 2001
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1075304
6 September 2001
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1071484
21 August 2001
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1071927
14 August 2001
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1069691
22 May 2001
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 134098
22 May 2001
Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1417286
6 May 2001
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1067907
7 February 2001
Deficiency Check · COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1459661
15 August 2000
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1452704
8 May 2000
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1049566
4 April 2000
Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 816605
3 February 2000
Hull Examination · COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1464251
30 December 1999
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 812455
15 December 1999
Plan Review "T" Boat
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 812919
26 October 1999
Re-Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1128800
20 July 1999
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1102125
5 May 1999
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1130294
22 April 1999
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1125338
9 March 1999
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 808516
26 January 1999
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1124417
9 November 1998
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 803401
3 August 1998
MARPOL Annex V Examination · Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1130910
28 May 1998
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1473016
11 May 1998
Re-Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1125821
18 February 1998
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 779426
3 February 1998
MARPOL Annex V Examination · COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1109284
12 November 1997
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1120469
10 October 1997
Plan Review "T" Boat
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1113436
18 September 1997
MARPOL Annex V Examination · Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 779496
23 June 1997
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1114770
21 March 1997
MARPOL Annex V Examination · COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1106536
7 October 1996
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 841972
30 July 1996
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1088653
18 June 1996
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1079394
14 March 1996
COI Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 885464
9 November 1995
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1186221
21 July 1995
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1192372
23 June 1995
Re-Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1193362
5 April 1995
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1078842
31 March 1995
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 846202
24 March 1995
COI Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1138339
13 January 1995
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 829002
29 September 1994
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1170873
8 July 1994
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 864968
10 March 1994
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 856512
2 March 1994
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 854868
30 July 1993
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1155914
30 June 1993
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 842828
25 March 1993
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 841975
20 January 1993
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1136185
6 January 1993
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 828737
7 July 1992
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1251218
29 June 1992
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1263376
3 March 1992
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 958845
4 March 1991
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 904164
27 August 1990
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1219402
2 May 1990
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 906466
2 February 1990
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 905154
28 November 1989
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1240036
27 November 1989
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 922754
3 August 1989
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1210444
24 February 1989
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1194721
18 November 1988
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 894277
26 August 1988
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1350835
3 June 1988
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1198430
26 February 1988
Deficiency Check · COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1024016
6 January 1988
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1320996
6 November 1987
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1026567
13 August 1987
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1336925
22 April 1987
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1314595
10 April 1987
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1022550
20 February 1987
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1000198
16 December 1986
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1000404
24 October 1986
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1012834
18 July 1986
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 994672
22 May 1986
Examination of Repairs
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 986702
11 March 1986
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 993262
5 December 1985
Credit Drydock
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1298503
1 November 1985
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1294744
29 March 1985
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 981526
Engineering › Pressure Vessel › Coast Guard Symbol
Issued 27 July 2016
Resolved
Vessel is required to provide documentation that their 30 gallon pressure vessel is ASME approved.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 15 August 2016
Resolved 26 September 2016
Resolution: Documentation was submitted to prove pressure vessel was ASME approved.
Engineering › Diesel Engine (propulsion-direct drive) › Governor
Issued 27 July 2016
Resolved
Vessel is required to perform over speed test
Condition: Invalid
Action required: 705 - Other - as specified
Due 15 August 2016
Resolved 26 September 2016
Resolution: Vessel submitted tech report of overspeed test.
Fire Fighting › Structural - A Class Divisions › Doors
Issued 11 April 2016
Resolved
Fire screen door on main deck stirwell did not close properly.
Action required: 705 - Other - as specified
Due 21 April 2016
Resolved 21 April 2016
Resolution: Door was proeprly repaired and closes as designed.
Electrical › Electric Supply System (service) › Battery Installation
Issued 11 April 2016
Resolved
Battery box for navigation radio emergency power not properly installed.
Action required: 705 - Other - as specified
Due 21 April 2016
Resolved 21 April 2016
Resolution: Battery box cover was installed properly to maintain weathertight boundary.
Operations/Management › Drills/Instruction › Not Conducted
Issued 11 April 2016
Resolved
Vessel's crew was unable to satisfactorily perform fire, man overbaord, and security drills as required.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 April 2016
Resolution: Witnessed satisfactory performance of crew for fire, amn overbaord, adn security drills.
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Overspeed Device
Issued 11 April 2016
Resolved
Vessel was unable to conduct low oil pressure and overspeed tests as required.
Action required: 705 - Other - as specified
Due 17 June 2016
Resolved 26 July 2016
Engineering › Compressed Air System (control) › Receiver/Bottle
Issued 11 April 2016
Resolved
Vessel's 30 gallon air receiver is not ASME approved IAW 46 CFR 54.01-5(c)(4)
Action required: 705 - Other - as specified
Due 17 June 2016
Resolved 26 July 2016
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 11 April 2016
Resolved
One life ring had markings not clearly legible.
Action required: 705 - Other - as specified
Due 21 April 2016
Resolved 21 April 2016
Resolution: Life bouy markings correctd properly.
Lifesaving › Lifefloat › Serviceable
Issued 16 February 2010
Resolved
Lifefloats found with rotten floor boards. Lifefloats replaced while onboard.
Due 13 April 2010
Resolved 13 April 2010
Lifesaving › Lifefloat › Paddle
Issued 16 February 2010
Resolved
One lifefloat paddle and one boat hook was found broken. Replaced while onboard.
Due 13 April 2010
Resolved 13 April 2010
Construction/Loadline › Hull › Side Shell
Issued 11 January 2008
Resolved
Crop and renew sideshell plating iwo aft steering compartment which is holed.
Condition: Improper/Lack of Maintenance
Due 15 January 2008
Resolved 15 January 2008
Communications › Alarms/Indicators › Engineers' Assistance-needed Alarm
Issued 12 December 2007
Resolved
Port side engine alarms are inoperable in the operating station/bridge.
Condition: Improper/Lack of Maintenance
Due 31 January 2008
Resolved 16 January 2008
Engineering › Sea-water System (primary cooling) › Piping
Issued 12 December 2007
Resolved
A/C generator cooling water system (flexible hose) needs to be replaced with new and approved re-inforced flexible hose or with permanent piping.
Condition: Placed in Improper Service
Due 16 January 2008
Resolved 15 January 2008
Personnel › Training › Familiarization Training
Issued 14 June 2006
Resolved
Vessel familiarization training is not beign conducted or logged. Conduct and log training.
Condition: Improper/Lack of Maintenance
Due 14 July 2006
Resolved 13 September 2006
Engineering › Fuel Oil Service System › Piping
Issued 14 June 2006
Resolved
F/O Piping from stbd fuel storage tank is leakingIWO union near tank penetration. Repair.
Condition: Improper/Lack of Maintenance
Due 14 July 2006
Resolved 13 September 2006
Engineering › Diesel Engine (propulsion-reduction gear) › Governor
Issued 24 April 2006
Resolved
Submit plans for approval for the MDE and propulsion control system for the newly installed MDE's. Plans must be submitted IAW 46 CFR 62.20. Vessel is restricted from carrying passengers until design verification test have been witnessed by the Coast Guard.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 May 2006
Engineering › Diesel Engine (propulsion-reduction gear) › Governor
Issued 24 April 2006
Resolved
Provide a copy of the document from the manufacture that the automation system meets the environmental design standards IAW 46CFR62.25-30
Due 26 June 2006
Resolved 22 June 2006
Engineering › Diesel Engine (propulsion-reduction gear) › Governor
Issued 24 April 2006
Resolved
Failure of the engine speed sensor is not alarmed in the engine room or bridge. Install & prove proper operation IAW the approved DVTP's.
Due 26 June 2006
Resolved 14 June 2006
Resolution: Alarm sounds when DVTP followed.
Electrical › Electric Generation Source (emergency) › Switch
Issued 24 April 2006
Resolved
Label the battery paralleling switch as per the notes on the approved DVTP's.
Due 26 June 2006
Resolved 14 June 2006
Resolution: labeled.
Communications › Audible Communications › SPD (Other)
Issued 24 April 2006
Resolved
Power supply failure has no audible alarm in the engine room. Install audible alarm
Due 26 June 2006
Resolved 14 June 2006
Resolution: Corrected.
Engineering › Diesel Engine (propulsion-reduction gear) › Governor
Issued 24 April 2006
Resolved
Throttle potentiometer does not fail safe IAW approved DVTP's. Make repairs and prove proper operation prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 June 2006
Resolution: Observed satisfactory demonstration of trottle potentiometer signal failure simulation on both main engines.
Engineering › Diesel Engine (propulsion-reduction gear) › Governor
Issued 24 April 2006
Resolved
Show proof the emergency stops on the bridge are independent and physically separate IAW 46 CFR 62.30-5(b)(3)
Due 26 June 2006
Resolved 14 June 2006
Resolution: Item corrected.
Communications › Alarms/Indicators › General Alarm
Issued 9 May 2005
Resolved
Make proper repairs to general alarm bell in E/R so as to be heard over engines while running.
Action required: 705 - Other - as specified
Due 10 May 2005
Resolved 10 May 2005
Communications › Alarms/Indicators › General Alarm
Issued 9 May 2005
Resolved
Provide means to notify the engineer in case of an emergency until the general alarm bell is repaired.
Action required: 705 - Other - as specified
Due 9 May 2005
Resolved 9 May 2005
Engineering › Diesel Engine (propulsion-reduction gear) › Turbocharger
Issued 10 January 2005
Resolved
Tighten up the exhaust lagging around the turbochargers on both MDE's .
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 February 2005
Resolved 23 February 2005
Resolution: Corrected.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 10 January 2005
Resolved
Identify what the circuit breaker on the main deck port side fwd of the snack bar is used for and label the same.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 25 January 2005
Resolved 9 February 2005
Engineering › Diesel Engine (propulsion-direct drive) › Governor
Issued 20 July 2004
Resolved
Remove bailing wire and make permanent repair to the port MDE throttle linkage.
Action required: 705 - Other - as specified
Due 27 July 2004
Resolved 24 August 2004
Resolution: -PTT
Engineering › Freshwater System (jacketwater cooling) › Hose
Issued 20 July 2004
Resolved
Replace the bulging rubber expansion joint J/W line to the L/O cooler.
Action required: 705 - Other - as specified
Due 27 July 2004
Resolved 24 August 2004
Resolution: -PTT
Construction/Loadline › Penetrations › Flange Pad
Issued 20 July 2004
Resolved
Make repairs to the leaking flange blank in the pump room.
Action required: 705 - Other - as specified
Due 27 July 2004
Resolved 24 August 2004
Resolution: Flange is above the waterline. Vessel replaced the flange cover.
Electrical › Electrical Distribution System (service) › Wiring
Issued 15 April 2004
Resolved
Properly wire A/C unit in pilot house.
Condition: Improper Installation
Due 23 April 2004
Resolved 20 July 2004
Resolution: Verified by [name withheld].
Lifesaving › Rescue Boat › Construction
Issued 15 April 2004
Resolved
Replace block to rescue boat.
Condition: Improper/Lack of Maintenance
Due 23 April 2004
Resolved 20 July 2004
Resolution: Verified by [name withheld].
Fire Fighting › Combustible Materials › Furniture/Furnishings
Issued 15 April 2004
Resolved
Remove all open trash recepticals from all enclosed passenger areas.
Condition: Improper Installation
Due 23 April 2004
Resolved 15 April 2004
Electrical › Electric Supply System (service)
Issued 13 January 2004
Resolved
Replace missing cover on battery box in PA system room. LEGACY COMPONENT DESC: Battery Installation
Due 20 January 2004
Resolved 29 January 2004
Electrical › Electrical Distribution System (service)
Issued 13 January 2004
Resolved
Replace missing outlet cover between water fountains, stbd side main deck. LEGACY COMPONENT DESC: Outlet Box
Due 20 January 2004
Resolved 29 January 2004
Electrical › Electrical Distribution System (service)
Issued 13 January 2004
Resolved
Replace missing outlet cover in concession area behind coca cola reefer. LEGACY COMPONENT DESC: Outlet Box
Due 20 January 2004
Resolved 29 January 2004
Construction/Loadline › Hull
Issued 13 January 2004
Resolved
C/R deck under ladder where it attatches to deck crew lounge.
Due 20 January 2004
Resolved 29 January 2004
Engineering › Bilge Water Management System
Issued 13 January 2004
Resolved
Secure electric bilge pump float and repair or replace inop electric bilge pump for shafts in crew lounge bilge. LEGACY COMPONENT DESC: Pump
Due 20 January 2004
Resolved 29 January 2004
Engineering › Pressure Vessel
Issued 13 January 2004
Resolved
Bench test pressure relief valve to air tank in pump room. LEGACY COMPONENT DESC: Relief Valve
Due 20 January 2004
Resolved 20 February 2004
Resolution: Replaced valve with 90 psi valve.
Engineering › Pressure Vessel
Issued 13 January 2004
Resolved
Replace faulty gauge to air compressor in E/R. LEGACY COMPONENT DESC: Pressure Gauge
Due 29 January 2004
Resolved 29 January 2004
Electrical › Lighting (emergency)
Issued 10 September 2003
Resolved
All emergency lights are to be properly marked.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 24 September 2003
Resolved 10 September 2003
Resolution: Lights were remarked prior to the completion of the inspection.
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 10 September 2003
Resolved
The leak on the raw water cooling intake pump housing is to be repaired to the satisfaction of the attending marine inspector.
Action required: 705 - Other - as specified
Due 24 September 2003
Resolved 10 September 2003
Resolution: The pump housing was changed and proper operation was witnessed prior to the completion of the inspection.
Engineering › Bilge Water Management System
Issued 10 September 2003
Resolved
The secondary bilge pump is to be repaired and proper operation proven to the satisfaction of the attending CG marine inspector. A portable pump is to be kept onboard and operational until such time. LEGACY COMPONENT DESC: Pump
Action required: 705 - Other - as specified
Due 24 September 2003
Resolved 26 September 2003
Resolution: New bilge pump installed and tested satisfactorily.
Engineering › Fuel Oil Service System
Issued 10 September 2003
Resolved
The emergency fuel cut-off valve is to be reworked (painted over) and proper operation is to be demonstrated to the satisfaction of the attending CG marine inspector. LEGACY COMPONENT DESC: Valve, Control
Action required: 705 - Other - as specified
Due 24 September 2003
Resolved 26 September 2003
Resolution: Fuel cut-off valve was tested and found to be operational.
Engineering › Compressed Air System (control)
Issued 10 September 2003
Resolved
The air receiver located in the sewage compartment is to be hydrostatically pressure tested in the presence of a CG marine inspector. LEGACY COMPONENT DESC: Receiver/Bottle
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 24 September 2003
Resolved 26 September 2003
Resolution: Witnessed satisfactory hydro test of air receiver to 1.25 times the MAWP.
Engineering › Bilge Water Management System
Issued 10 September 2003
Resolved
Excessive oil is to be removed from the bilges NLT 12SEP03.
Action required: 705 - Other - as specified
Due 12 September 2003
Resolved 12 September 2003
Resolution: Confirmation was received that all oil was removed.
Engineering › Diesel Engine (propulsion-electric)
Issued 6 June 2003
Resolved
Replace raw water overboard return line for genset cooling (stbd) LEGACY COMPONENT DESC: Piping (exhaust)
Due 16 June 2003
Resolved 24 June 2003
Resolution: corrected
Deck/Cargo › Mooring/Anchoring
Issued 28 February 2003
Resolved
Make available for insp anchor, chain, line. LEGACY COMPONENT DESC: Anchor
Due 11 June 2003
Resolved 6 June 2003
Resolution: Inspected anchor, chain, line - all sat
Engineering › Compressed Air System (control)
Issued 28 February 2003
Resolved
Hydro pres vessel in sewage compartment LEGACY COMPONENT DESC: Receiver/Bottle
Due 11 June 2003
Resolved 24 June 2003
Resolution: Corrected
Construction/Loadline › Structures
Issued 28 February 2003
Resolved
Make repairs to holed Gunwale behind stbd fwd bit.
Due 11 June 2003
Resolved 6 June 2003
Resolution: Holes repaired in gunwale - all sat.
Electrical › Electric Generation Source (service)
Issued 13 January 2003
Resolved
Remove/Secure dead end wiring on AC Generator LEGACY COMPONENT DESC: Conductor
Action required: 705 - Other - as specified
Due 13 February 2003
Resolved 15 January 2003
Resolution: Cable secured in junction box
Engineering › Sea-water System (primary cooling)
Issued 13 January 2003
Resolved
Repair saltwater leak to AC Generator pump LEGACY COMPONENT DESC: Piping
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 February 2003
Resolved 15 January 2003
Resolution: Piping replace, all sat
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 13 January 2003
Resolved
Repair/provide additional retro for lifejackets as marked by [name withheld] are excess
Action required: 705 - Other - as specified
Due 13 February 2003
Resolved 15 January 2003
Resolution: Retro added to all marked lifejackets.
Engineering › Diesel Engine (propulsion-direct drive) › Piping (exhaust)
Issued 13 January 2003
Resolved
Replace lagging as needed on both M/E turbo/exhaust manifolds
Action required: 705 - Other - as specified
Due 13 February 2003
Resolved 15 January 2003
Resolution: New laggin installed where needed.
Electrical › Electrical Distribution System (service)
Issued 31 July 2002
Resolved
Install outlet box in accom. space for refrigerators LEGACY COMPONENT DESC: Outlet Box
Condition: Improper Installation
Due 14 August 2002
Resolved 22 October 2002
Fire Fighting › Means of Escape
Issued 31 July 2002
Resolved
Mark emergency escape hatch on both sides iwo engine room LEGACY COMPONENT DESC: Escape Route Signs
Condition: Unknown
Due 14 August 2002
Resolved 31 July 2002
Lifesaving › Launching Appliances
Issued 31 July 2002
Resolved
Provide appropriate davit sling for launching of rescue boat LEGACY COMPONENT DESC: Davit
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 14 August 2002
Resolved 22 October 2002
Engineering › Diesel Engine (propulsion-direct drive) › Governor
Issued 31 July 2002
Resolved
Repair idle speed of MDE
Condition: Improper/Lack of Maintenance
Due 14 August 2002
Resolved 31 July 2002
Fire Fighting › Fire Pumps
Issued 18 July 2002
Resolved
Repair inoperative secondary fire pump.
Due 29 July 2002
Resolved 22 October 2002
Lifesaving › Rescue Boat
Issued 31 January 2002
Resolved
Repair cracks in stern of fiberglass rescue boat. LEGACY COMPONENT DESC: Construction
Condition: Improper/Lack of Maintenance
Due 20 February 2002
Resolved 20 February 2002
Resolution: Repaired/ SAT-RR
Electrical › Electrical Distribution System (service)
Issued 31 January 2002
Resolved
Prove proper operation of the DC Generator switchboard prior to commercial operations. LEGACY COMPONENT DESC: Switchboard
Due 20 February 2002
Resolved 20 February 2002
Resolution: Tested Sat/RR
Operations/Management › Drills/Instruction
Issued 31 January 2002
Resolved
Conduct fire and manoverboard drills at 1st Quarterly. Winter crew onboard vessel, drills to be conducted with regular crew after vessel is brought back in service. LEGACY COMPONENT DESC: Man Overboard Recovery
Due 29 April 2002
Resolved 23 April 2002
Fire Fighting › Structural - A Class Divisions
Issued 31 January 2002
Resolved
Prove proper operation of local controls for fire screen door prior to commercial service. LEGACY COMPONENT DESC: Openings - Fire Doors
Due 20 February 2002
Resolved 20 February 2002
Resolution: Tested Sat/RR
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 31 January 2002
Resolved
Replace starboard MDE sight glass guards.
Condition: Damaged By Earlier Event
Due 28 February 2002
Resolved 20 February 2002
Resolution: Installed SAT/RR
Accommodation/Occupational Safety › Occupational Safety
Issued 31 January 2002
Resolved
Sweep overhead of after steering.
Due 28 February 2002
Resolved 20 February 2002
Resolution: Swept/SAT
Engineering › Bilge Water Management System
Issued 31 January 2002
Resolved
Replace bilge foot strainer in steering space. LEGACY COMPONENT DESC: Strainer
Due 28 February 2002
Resolved 20 February 2002
Resolution: Installed/SAT-RR
Electrical › Electric Generation Source (service)
Issued 31 January 2002
Resolved
Repair starboard DC generator expansion tank bottom supply pipe. LEGACY COMPONENT DESC: Generator
Due 28 February 2002
Resolved 20 February 2002
Resolution: Repaired/Sat-RR
Accommodation/Occupational Safety › Medical/First Aid
Issued 31 January 2002
Resolved
Replenish first aid kit.
Condition: Improper/Lack of Maintenance
Due 28 February 2002
Resolved 31 January 2002
Electrical
Issued 14 August 2001
Resolved
REPAIR/REPLACE REVERSE CURRENT RELAYS ON DC GENERATOR SYSTEM. OPERATE IN SINGLE GEN MODE UNTIL REPAIRED TO SATISFACTION OF USCG MARINE INSPECTOR.
Condition: Unknown
Due 14 August 2001
Resolved 14 August 2001
Fire Fighting
Issued 14 August 2001
Resolved
REPLACE CO2 HOSE FOR FIXED SYSTEM IN ENGINE ROOM.
Condition: Unknown
Due 14 August 2001
Resolved 14 August 2001
Accommodation/Occupational Safety
Issued 14 August 2001
Resolved
REPAIR STARBOARD BRIDGE WINDOW TO OPERATE PROPERLY/CLOSE.
Condition: Unknown
Due 14 August 2001
Resolved 14 August 2001
Construction/Loadline
Issued 22 May 2001
Resolved
Complete dive survey of entire underwater body, provide results to NY Marine Inspection Office, and receive approval from Coast Guard Marine Inspector prior to conducting commercial operations.
Condition: Unknown
Due 22 June 2001
Resolved 23 May 2001
Lifesaving
Issued 15 August 2000
Resolved
UPDATE CREW EMERGENCY INSTRUCTIONS IAW 46 CFR 199.80.
Condition: Unknown
Due 15 August 2000
Resolved 15 August 2000
Engineering
Issued 15 August 2000
Resolved
INSTALL APPROPRIATE ENGINE ALARM AT ENGINE ROOM ANNUNCIATOR PANEL ABLE TO BE HEARD ABOVE AMBEINT ENGINE ROOM NOISE.
Condition: Unknown
Due 15 August 2000
Resolved 15 August 2000
Lifesaving
Issued 15 August 2000
Resolved
PROVIDE EMERGENCY INSTRUCTIONS TRAINING MANUAL FOR CREW IAW 46 CFR 199.180(A).
Condition: Unknown
Due 15 August 2000
Resolved 15 August 2000
Fire Fighting
Issued 3 February 2000
Resolved
Provide proof of valid servicing of all portable fire extinguishers prior to operation.
Condition: Unknown
Due 15 February 2000
Resolved 16 February 2000
Construction/Loadline
Issued 22 April 1999
Resolved
REPAIR AFT WATERTIGHT BULKHEAD IWO SINK IN COMPARTMENT 6.
Condition: Unknown
Due 5 May 1999
Resolved 5 May 1999
Engineering
Issued 22 April 1999
Resolved
REPAIR PORT MAIN ENGINE TACHOMETER.
Condition: Unknown
Due 5 May 1999
Resolved 5 May 1999
Lifesaving
Issued 26 January 1999
Resolved
RESCUE BOAT OARS TOO SHORT FOR ROWING. REPLACE WITH OARS OF MINIMUM 8 FOOTIN LENGTH.
Condition: Unknown
Due 26 January 1999
Resolved 26 January 1999
Lifesaving
Issued 26 January 1999
Resolved
RENEW AS NEEDED, RETRO TAPE ON PFD'S.
Condition: Unknown
Due 26 January 1999
Resolved 26 January 1999
Fire Fighting
Issued 26 January 1999
Resolved
PROVIDE PROOF OF SERVICING VESSEL'S PORTABLE FIRE EXTINGUISHERS.
Condition: Unknown
Due 26 January 1999
Resolved 28 January 1999
Deck/Cargo
Issued 26 January 1999
Resolved
PROVIDE PORTABLE OR FIXED CONTAINMENT FOR FUELING STATION TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 26 January 1999
Resolved 26 January 1999
Navigation
Issued 26 January 1999
Resolved
PROVIDE EFFICIENT MEANS OF 2-WAY COMMS BETWEEN RESCUE BOAT STATION AND BRIDGE.
Condition: Unknown
Due 26 January 1999
Resolved 26 January 1999
Electrical
Issued 26 January 1999
Resolved
IDENTIFY SOURCE AND REPAIR GROUND AT MAIN DISTRIBUTION PANEL (GROUND DETECTOR SYSTEM LAMPS).
Condition: Unknown
Due 26 January 1999
Resolved 26 January 1999
Electrical
Issued 26 January 1999
Resolved
DEMONSTRATE PROPER OPERATION OF GENERATOR ALARM SYSTEM.
Condition: Unknown
Due 26 January 1999
Resolved 26 January 1999
Engineering
Issued 9 November 1998
Resolved
Vessel to provide documentation from manufacturer that the main engines overspeed trip should not be tested.
Condition: Unknown
Due 9 November 1998
Resolved 9 November 1998
Accommodation/Occupational Safety
Issued 3 August 1998
Resolved
PROVE PROPER OPERATION OF EMERGENCY ESCAPE HATCH IN E/R & REPLACE HATCH GASKET.
Condition: Unknown
Due 3 August 1998
Resolved 3 August 1998
Electrical
Issued 3 August 1998
Resolved
MAKE OPERABLE THE STBD E-LIGHT IN E/R IWO LADDERWELL. PROVIDE CAGE FOR LIGHT FIXTURE ON PORT SIDE IN E/R IWO LADDERWELL.
Condition: Unknown
Due 3 August 1998
Resolved 3 August 1998
Fire Fighting
Issued 3 August 1998
Resolved
PROVE HYDRO-TEST WITHIN LAST 5 YEARS FOR SEMIPORTABLE CO2 EXTINGUISHER LOCATED IN THE E/R.
Condition: Unknown
Due 3 August 1998
Resolved 3 August 1998
Engineering
Issued 3 August 1998
Resolved
PROVE PROPER OPERATION OF ALL AUDIO/VISUAL ALARMS (LOW LUBE OIL, HI JACKET WATER TEMP, ETC) FOR ALL GENERATORS AND BOTH MDE's.
Condition: Unknown
Due 3 August 1998
Resolved 3 August 1998
Navigation
Issued 11 May 1998
Resolved
PROVIDE DEVATION CARD
Condition: Unknown
Due 11 May 1998
Resolved 11 May 1998
Electrical
Issued 11 May 1998
Resolved
MAKE REPAIRS TO #2 SSGEN REVERSE CURRENT RELAY, PROVE PROPER OPERATION TO SATISFACTION OF ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 11 May 1998
Resolved 11 May 1998
Electrical
Issued 11 May 1998
Resolved
INVESTIGATE WHEATHER 30A WATER HEARTER BREAKER IS NEEDED IN 20A CIRCUIT. IF SO REPLACE WITH 20A BREAKER, IF NOT RE-LABLE CURCIT.
Condition: Unknown
Due 11 May 1998
Resolved 11 May 1998
Lifesaving
Issued 11 May 1998
Resolved
INSTALL FLOATABLE GRAB LINES ON LIFE FLOATS.
Condition: Unknown
Due 11 May 1998
Resolved 11 May 1998
Fire Fighting
Issued 11 May 1998
Resolved
INSTALL FIRE EXTINGUISHER IN SNACK BAR.
Condition: Unknown
Due 11 May 1998
Resolved 11 May 1998
Electrical
Issued 3 February 1998
Resolved
Replace existing 30A hot water heater circuit breaker with one of proper amperage (20A or less)
Condition: Unknown
Due 18 February 1998
Resolved 24 February 1998
Engineering
Issued 3 February 1998
Resolved
Renew leaking seal for #1 SSGEN raw water pump
Condition: Unknown
Due 18 February 1998
Resolved 24 February 1998
Electrical
Issued 3 February 1998
Resolved
Replace existing 100A generator circuit breaker with one of proper amperage(70A or less)
Condition: Unknown
Due 18 February 1998
Resolved 24 February 1998
Unknown
Issued 18 September 1997
Resolved
PERMANENTLY MOUNT HOT DOG, COFFEE & POPCORN MAKERS IN CONCESSION AREAS
Condition: Unknown
Due 18 September 1997
Resolved 18 September 1997
Fire Fighting
Issued 18 September 1997
Resolved
REPACK #2 FIRE PUMP.
Condition: Unknown
Due 18 September 1997
Resolved 18 September 1997
Electrical
Issued 18 September 1997
Resolved
MAKE INSTALLATION OF DRINK COOLERS & REFRIGERATION UNITS WITH FIXED ELECTRICAL WIRING/CONNECTIONS IN CONCESSION AREA.
Condition: Unknown
Due 18 September 1997
Resolved 18 September 1997
Navigation
Issued 23 June 1997
Resolved
Update all charts.
Condition: Unknown
Due 23 June 1997
Resolved 23 June 1997
Fire Fighting
Issued 23 June 1997
Resolved
Service CO2 extinguisher, starboard side on bulkhead leading to heads.
Condition: Unknown
Due 23 June 1997
Resolved 23 June 1997
Unknown
Issued 23 June 1997
Resolved
Whistle air receiver needs to be brought into compliance. Hydro in presenceof marine inspector. Provide [name withheld] with plan by compliance date.
Condition: Unknown
Due 23 June 1997
Resolved 23 June 1997
Electrical
Issued 23 June 1997
Resolved
Replace emergency lights in men and womens heads.
Condition: Unknown
Due 23 June 1997
Resolved 23 June 1997
Lifesaving
Issued 23 June 1997
Resolved
Place donning instructions on all decks where lifejackets are stored.
Condition: Unknown
Due 23 June 1997
Resolved 23 June 1997
Documentation
Issued 18 June 1996
Resolved
PROVIDE UPDATED CHARTS FOR INTENDED VOYAGE
Condition: Unknown
Due 19 June 1996
Resolved 20 June 1996
Construction/Loadline
Issued 18 June 1996
Resolved
PUMP OUT ENGINE RM BILGES TO A SHORESIDE FACILITY AND PROVIDE RECEIPTS.
Condition: Unknown
Due 19 June 1996
Resolved 20 June 1996
Fire Fighting
Issued 18 June 1996
Resolved
PERMANENTLY MOUNT FIREFIGHTING APPLICATOR AT OR NEAR ENGINE ROOM HATCH.
Condition: Unknown
Due 19 June 1996
Resolved 20 June 1996
Unknown
Issued 18 June 1996
Resolved
REPAIR VENT MOTOR FOR SHAFT ALLEY SPACE LABELED "BILGE VENT" AND OPERATIONALLY TEST SHUTDOWN.
Condition: Unknown
Due 18 June 1996
Resolved 18 June 1996
Lifesaving
Issued 14 March 1996
Resolved
CONDUCT FIRE AND BOAT DRILLS, INCLUDING LOWERING THE RESCUE BOAT TO THE WATER, IN THE PRESENCE OF A MARINE INSPECTOR PRIOR TO CARRYING PASSENGERS.
Condition: Unknown
Due 1 April 1996
Resolved 5 April 1996
Lifesaving
Issued 21 July 1995
Resolved
STENCIL DESIGNATION FOR "ADULT LIFE PRESERVERS" AND "CHILD LIFE PRESERVERS"ON AFT MAIN DECK.
Condition: Unknown
Due 21 July 1995
Resolved 21 July 1995
Lifesaving
Issued 21 July 1995
Resolved
LASH PADDELS IN ALL LIFE FLOATS.
Condition: Unknown
Due 26 July 1995
Resolved 26 July 1995
Lifesaving
Issued 23 June 1995
Resolved
REPLACE RING BUOY ON STBD AFT SIDE.
Condition: Unknown
Due 26 July 1995
Resolved 26 July 1995
Construction/Loadline
Issued 23 June 1995
Resolved
PROVE PROPER OPERATION OF FOREPEAK SPACE BILGE SUCTION.
Condition: Unknown
Due 26 July 1995
Resolved 26 July 1995
Construction/Loadline
Issued 23 June 1995
Resolved
PUMP OUT E/R BILGES AND REMOVE OILY WASTES WITHIN.
Condition: Unknown
Due 26 July 1995
Resolved 26 July 1995
Engineering
Issued 23 June 1995
Resolved
PERPERLY INSTALL 30X30 FLAME SCREENS ON MAIN ENGINE DIESEL OIL FLOAT TANKS.
Condition: Unknown
Due 26 July 1995
Resolved 26 July 1995
Lifesaving
Issued 23 June 1995
Resolved
PROVE PROPER OPERATION OF AUDIBLE ALERT ON MAIN ENGINE FAULT BOARD.
Condition: Unknown
Due 26 July 1995
Resolved 26 July 1995
Engineering
Issued 23 June 1995
Resolved
REPAIR A/C GENERATOR HI-TEMP ALARM.
Condition: Unknown
Due 26 July 1995
Resolved 26 July 1995
Lifesaving
Issued 23 June 1995
Resolved
PROVIDE FCC RADIOTELEPHONE CERTIFICATE AND RADIO STATION LICENSE.
Condition: Unknown
Due 26 July 1995
Resolved 26 July 1995
Accommodation/Occupational Safety
Issued 23 June 1995
Resolved
REPAIR CREW QUARTER VENTILATION FAN TEST REMOVE SWITCH FROM BRIDGE.
Condition: Unknown
Due 26 July 1995
Resolved 26 July 1995
Lifesaving
Issued 23 June 1995
Resolved
RENEW FLOOR TO LIFE FLOAT. VESSEL MAY CARRY ONLY 450 PAX UNTIL LIFEFLOAT IS REPAIRED.
Condition: Unknown
Due 26 July 1995
Resolved 26 July 1995
Lifesaving
Issued 23 June 1995
Resolved
SECURED LIFE FLOAT PAINTERS TO THE VESSEL (CALLED "JACK RYAN" TO INFORM HIMOF THIS REQ 1400 23JUN95).
Condition: Unknown
Due 26 July 1995
Resolved 26 July 1995
Engineering
Issued 24 March 1995
Resolved
REPLACE NEWLY INSTALLED HOSES ON BOTH MDE (L/O SWITCHES), A/C DIESEL GENERATOR (FUEL LINES OFF FILTER) AND STBD DIESEL D/C GEN (FUEL FILTER) WITH APPROVED SAE 51942 HOSE.
Condition: Unknown
Due 11 April 1995
Resolved 11 April 1995
Fire Fighting
Issued 24 March 1995
Resolved
PRIOR TO CARRYING PASSENGERS CONDUCT A FIRE & RESCUE BOAT DRILL WITH VESSELCREW TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 11 April 1995
Resolved 11 April 1995
Electrical
Issued 24 March 1995
Resolved
PROVE PROPER OPERATION OF #1 SSDC-(D.C.) REVERSE CURRENT RELAY.
Condition: Unknown
Due 11 April 1995
Resolved 11 April 1995
Construction/Loadline
Issued 13 January 1995
Resolved
REMOVE 6 VOLT BATTERY PORT ENGINE ROOM BILGE.
Condition: Unknown
Due 13 January 1995
Resolved 13 January 1995
Construction/Loadline
Issued 13 January 1995
Resolved
REWIRE BILGE PUMP FOR HAND SINK SUMP.
Condition: Unknown
Due 13 January 1995
Resolved 13 January 1995
Construction/Loadline
Issued 13 January 1995
Resolved
REWELD SIDE SUPPORT TO DECK, PORT SIDE MIDSHIPS.
Condition: Unknown
Due 13 January 1995
Resolved 13 January 1995
Construction/Loadline
Issued 13 January 1995
Resolved
REWELD CRACKED ANGLE SUPPORT FOR DECK PLATES INBOARD PORT MDE.
Condition: Unknown
Due 13 January 1995
Resolved 13 January 1995
Construction/Loadline
Issued 13 January 1995
Resolved
REWELD STBD HANDRAIL LEADING TO O1 DECK.
Condition: Unknown
Due 13 January 1995
Resolved 13 January 1995
Unknown
Issued 10 March 1994
Resolved
POST OIL DISCHARGE PROHIBITED PLACARDS IN E/R.
Condition: Unknown
Due 25 March 1994
Resolved 25 March 1994
Construction/Loadline
Issued 10 March 1994
Resolved
REMOVE OILY DEBRIS FROM E/R BILGES.
Condition: Unknown
Due 25 March 1994
Resolved 25 March 1994
Engineering
Issued 10 March 1994
Resolved
STENCIL FUEL OIL REMOTE SHUT-OFF VALVE AND TEE WRENCH
Condition: Unknown
Due 25 March 1994
Resolved 25 March 1994
Accommodation/Occupational Safety
Issued 2 March 1994
Resolved
POST OIL DISCHARGE PROHIBITED PLACARDS IN E/R.
Condition: Unknown
Due 2 March 1994
Resolved 2 March 1994
Construction/Loadline
Issued 2 March 1994
Resolved
REMOVE OILY DEBRIS FROM E/R BILGES.
Condition: Unknown
Due 2 March 1994
Resolved 2 March 1994
Engineering
Issued 2 March 1994
Resolved
STENCIL FUEL OIL REMOTE SHUT-OFF VALVE AND TEE WRENCH.
Condition: Unknown
Due 2 March 1994
Resolved 2 March 1994
Engineering
Issued 30 June 1993
Resolved
PROVIDE LAGGING FOR EXHAUST MANIFOLD COOLING WATER PIPING FOR ALL THREE SHIP SERVICE GENERATORS.
Condition: Unknown
Due 9 August 1993
Resolved 9 August 1993
Electrical
Issued 30 June 1993
Resolved
PROVE PROPER OPERATION OF PORT DC GENERATOR LOW WATER PRESSURE ALARM.
Condition: Unknown
Due 9 August 1993
Resolved 9 August 1993
Navigation
Issued 30 June 1993
Resolved
PROVDE RELIEF VALVE WITH SET POINT BELOW MAWP OF AIR RECEIVER, 100 PSI. VALVE MUST MEET ASME UG-125 THROUGH UG-136.
Condition: Unknown
Due 9 August 1993
Resolved 9 August 1993
Accommodation/Occupational Safety
Issued 30 June 1993
Resolved
PROVIDE COVER FOR VENTILATION FAN IN CREWS QUARTERS.
Condition: Unknown
Due 9 August 1993
Resolved 9 August 1993
Electrical
Issued 30 June 1993
Resolved
PROVIDE COVER FOR JUNCTION BOX FOR VENT FAN WIRING IN CREWS QUARTERS.
Condition: Unknown
Due 9 August 1993
Resolved 9 August 1993
Engineering
Issued 29 June 1992
Resolved
PROVE PROPER OPERATION OF HIGH TEMP ALARMS FOR BOTH MAIN DIESEL ENGINES.
Condition: Unknown
Due 29 June 1992
Resolved 29 June 1992
Engineering
Issued 29 June 1992
Resolved
PROVE PROPER OPERATION OF LOW LUBE OIL PRESSURE AND HIGH TEMP ALARM FOR BOTH MAIN DIESEL ENGINES.
Condition: Unknown
Due 14 August 1992
Resolved 14 August 1992
Construction/Loadline
Issued 6 November 1987
Resolved
MAKE PERMANENT REPAIRS TO LEAKING RIVETS ON ENGINEROOOM STARBOARD SIDE FORWARD BULKHEAD AT ENGINEROOM TO F/O TANK BOUNDARY.
Condition: Unknown
Due 6 November 1987
Resolved 6 November 1987
Construction/Loadline
Issued 6 November 1987
Resolved
PROVIDE SUITABLE CLOSURES FOR WATER TIGHT HATCH PORT SIDE OF MSD SPACE.
Condition: Unknown
Due 6 November 1987
Resolved 6 November 1987
Navigation
Issued 10 April 1987
Resolved
PROVIDE DEVIATION TABLE FOR THE MAGNETIC COMPASS.
Condition: Unknown
Due 10 April 1987
Resolved 10 April 1987