This record may be incomplete: the most recent inspection recorded for this vessel was 19 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
5320 - Convention (Subpart B), Gross Ton
3747 - Convention (Subpart B), Net Ton
Maury page id
psix-46105
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
The Coast Guard recorded this vessel and the following in the same
inspection activity — normally a tug and the barges in its tow. Only barges and towing
vessels are in this archive, so any other vessel type in the same activity does not
appear here: these lists are a floor, not a complete manifest.
RENEW AS ORIGINAL ALL ELECTRICAL RACEWAYS ADJACENT TO CARGO HOLE ULLAGE ON PORT SIDE.
Condition: Unknown
Due 17 November 1994
Resolved 17 November 1994
Construction/Loadline
Issued 17 November 1994Resolved
REPAIR WASTED AREAS IN DECK BETWEEN CARGO HOLES #5 & #6 AND TEST REMAINING AREAS BETWEEN CARGO HOLES TO DETERMINE INTEGRITY OF DECK.
Condition: Unknown
Due 17 November 1994
Resolved 17 November 1994
Navigation
Issued 17 November 1994Resolved
RENEW AS ORIGINAL PORT, STBD, AND STERN LIGHT STANDS TO THE SATISFACTION OFLOCAL OCMI.
Condition: Unknown
Due 17 November 1994
Resolved 17 November 1994
Electrical
Issued 17 November 1994Resolved
RENEW AS ORIGINAL GENERATOR EXHAUST PIPE TO SATISFACTION OF LOCAL OCMI.
Condition: Unknown
Due 17 November 1994
Resolved 17 November 1994
Electrical
Issued 17 November 1994Resolved
DEMONSTRATE SATISFACTORY OPERATION OF BARGE GENERATOR AND APPLICABLE ALARMSAND SHUT DOWNS TO THE SATISFACTION OF THE LOCAL OCMI.
Condition: Unknown
Due 17 November 1994
Resolved 17 November 1994
Lifesaving
Issued 17 November 1994Resolved
RENEW ALL WASTED LIFELINE STANCHIONS TO THE SATISFACTION OF LOCAL OCMI.
Condition: Unknown
Due 17 November 1994
Resolved 17 November 1994
Construction/Loadline
Issued 17 November 1994Resolved
RENEW AS ORIGINAL ALL WASTED BALLAST TANK VENT PIPES TO THE SATISFACTION OFLOCAL OCMI.
Condition: Unknown
Due 17 November 1994
Resolved 17 November 1994
Construction/Loadline
Issued 17 November 1994Resolved
RENEW ALL WASTED METAL ON ENTRANCE, 'DOG HOUSE', TO FORWARD STORAGE AREA TOTHE SATISFACTION OF LOCAL OCMI.
Condition: Unknown
Due 17 November 1994
Resolved 17 November 1994
Construction/Loadline
Issued 17 November 1994Resolved
HAVE LOCAL OCMI CONDUCT INTERNAL STRUCTURAL SURVEY IN CONJUNCTION WITH ABOVE REQUIREMENTS.
Condition: Unknown
Due 17 November 1994
Resolved 17 November 1994
Deck/Cargo
Issued 17 November 1994Resolved
REPAIR/RENEW ALL CARGO HATCH ROLLERS TO THE SATISFACTION OF LOCAL OCMI.
Condition: Unknown
Due 17 November 1994
Resolved 17 November 1994
Construction/Loadline
Issued 22 September 1992Resolved
CROP/RENEW #1 VERTICAL STIFFERS PORT SIDE OF NOTCH AFT, APPROX 15' FROM BILGE TO FIRST HORIZONTAL WELD.
Condition: Unknown
Due 22 September 1992
Resolved 22 September 1992
Construction/Loadline
Issued 22 September 1992Resolved
CROP/RENEW #2, #3, TRIPPING BRACKETS TO #1 VERTICAL STIFFENER PORT SIDE NOTCH.
Condition: Unknown
Due 22 September 1992
Resolved 22 September 1992
Construction/Loadline
Issued 22 September 1992Resolved
CROP/RENEW VERTICAL STIFFENERS #5, #6, #7 PORT SIDE NOTCH, APPOX 4" FROM OVERHEAD.
Condition: Unknown
Due 22 September 1992
Resolved 22 September 1992
Construction/Loadline
Issued 22 September 1992Resolved
RENEW WORN WELDS IN #3 PORT TANK, 4TH BAY CARGO LONGITUDINAL, 4TH FROM C/L BULKHEAD.
Condition: Unknown
Due 22 September 1992
Resolved 22 September 1992
Construction/Loadline
Issued 22 September 1992Resolved
REWELD WORN WELD IN #3 PORT TANK, 12TH LONG ON CARGO LONGS #3, 4, 5 FROM C/L BULKHEAD.
Condition: Unknown
Due 22 September 1992
Resolved 22 September 1992
Construction/Loadline
Issued 22 September 1992Resolved
REPLACE 6TH SIDE SHELL LONG FROM THE BOTTOM IN THE 11TH BAY, #3 PORT TANK.
Condition: Unknown
Due 22 September 1992
Resolved 22 September 1992
Construction/Loadline
Issued 22 September 1992Resolved
CROP/RENEW THE TRANSVERSE BULKHEAD AT THE SIDESHELL BETWEEN LONGS 3&7 AND 10 & 13, FORWARD END BAY 4, IN #3 PORT TANK.
Condition: Unknown
Due 22 September 1992
Resolved 22 September 1992
Construction/Loadline
Issued 22 September 1992Resolved
CROP/RENEW WASTED LONGS #6 & #7 IN WAY OF SIDE SHELL PLATING, IN #1 PORT TANK, BAY 10.
Condition: Unknown
Due 22 September 1992
Resolved 22 September 1992
Construction/Loadline
Issued 22 September 1992Resolved
CROP/RENEW TRANSVERSE BULKHEAD AT SIDE SHELL BETWEEN LONGS #9 & 12, BAY 9, IN WAY OF #2 PORT TANK, AND BETWEEN LONGS 6 & 10, BAY 13, IN WAY OF #1 PORTTANK.
Condition: Unknown
Due 22 September 1992
Resolved 22 September 1992
Construction/Loadline
Issued 27 June 1992Resolved
MAKE TEMPORARY WATERTIGHT REPAIRS TO PORTSIDE BOW. FOREPEAK MUST BE CERTIFIED GAS FREE SAFE FOR HOT WORK BY MARINE CHEMIST. PRIOR TO WELDING ORBURNING. DO NOT LEAVE CG MSO NOLA ZONE PRIOR TO EFFECTING PERMANENT REPAIRS.
Condition: Unknown
Due 24 July 1992
Resolved 16 July 1992
Construction/Loadline
Issued 18 November 1991Resolved
REPLACE OR REPAIR AFT PEAK HATCH COVER THE ABOVE STATED REQUIREMENTS TO BE COMPLETED PRIOR TO 18DEC91 TO THE SATISFACTION OF THE ATTENDING USCG MARINEINSPECTOR.
Condition: Unknown
Due 18 November 1991
Resolved 18 November 1991
Construction/Loadline
Issued 18 November 1991Resolved
REPAINT IN VESSEL DRAFT MARKS AND LOADLINES.
Condition: Unknown
Due 18 November 1991
Resolved 18 November 1991
Construction/Loadline
Issued 14 July 1989Resolved
ALL REPAIRS NOTED IN THE ATTACHED "REPAIR SPECIFICATIONS" DATED 13JUL89 ARETO BE COMMENCED NO LATER THAN 31AUG89 AND COMPLETED TO THE SATISFACTION OF THE COGNIZANT OCMI PRIOR TO ISSUING A NEW CERTIFICATE OF INSPECTION.
Condition: Unknown
Due 14 July 1989
Resolved 14 July 1989