Records from 1981 to 2023. Most recent: inspection, 15 September 2023.
Inspection history · 74
15 September 2023
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7792446
7 July 2023
Administrative Inspection
Administrative · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 7735832
31 July 2019
Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6768912
26 October 2018
Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6568944
8 August 2018
Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6533834
31 July 2018
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6496529
24 May 2018
Administrative Inspection
Administrative · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 6431146
24 April 2018
COI Inspection
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 6403026
3 November 2017
Administrative Inspection
Administrative · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 6296953
14 June 2017
Administrative Inspection · Periodic Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6175836
5 June 2012
Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 4334571
4 June 2012
MARPOL Annex I Examination · COI Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 4333984
10 February 2011
Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3942988
23 February 2009
Deficiency Check · Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3422617
9 October 2008
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3341448
30 June 2008
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3252884
24 July 2007
MARPOL Annex I Examination
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3005960
9 July 2007
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 2990799
9 February 2006
Hull Examination · Re-Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2581111
20 January 2006
Drydock Extension
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2570274
20 July 2005
MTSA Verification · COI Inspection
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 2433511
22 October 2004
COI Inspection · Construction Oversight · Administrative Inspection · MTSA/ISPS Verification · Plan Review (Other than "T")
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 2229246
9 February 2004
COI Inspection · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1999903
22 December 2003
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1972303
14 March 2003
Deficiency Check
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 1757404
10 March 2003
Annual Inspection
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 1755309
13 March 2002
Annual Inspection
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 1493085
30 March 2001
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1061507
25 January 2001
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1386960
17 January 2001
Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1441776
27 April 2000
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1444332
7 May 1999
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1375756
9 April 1999
Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1390968
7 August 1998
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1131314
28 July 1998
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1445368
22 July 1997
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1421382
28 August 1996
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1377890
4 April 1996
Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1363566
5 August 1995
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1357291
20 December 1994
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 844201
14 November 1994
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1179590
14 October 1994
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1435550
10 August 1994
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1359913
23 May 1994
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1170692
22 April 1994
Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1362931
1 September 1993
MARPOL Annex II Examination · COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1436790
2 August 1993
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 847924
22 February 1993
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 120345
30 September 1992
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1255718
9 September 1992
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1403554
11 September 1991
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1250057
14 March 1991
Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 912906
19 September 1990
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1225551
26 September 1989
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1210171
14 September 1989
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1045252
14 September 1989
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1204256
4 April 1989
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1349143
15 March 1989
Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1036346
11 January 1989
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1204823
4 October 1988
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1194526
30 August 1988
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1040143
18 September 1987
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1321372
14 September 1987
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1316475
10 September 1986
Re-Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1314390
4 April 1986
Credit Drydock
Administrative · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1001056
31 January 1986
Credit Drydock
Administrative · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 997265
11 October 1985
COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 996248
16 November 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1283129
23 February 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 974433
23 February 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1278760
30 November 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 974833
30 November 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1278676
16 March 1982
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 968990
28 December 1981
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1272036
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 31 July 2018
Resolved
COI Hull Exam dates overdue. Contact MSU Port Arthur to schedule drydock and internal examination. No industrial operations prior to completion.
46 CFR 91.40-3
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 August 2018
Resolved 15 September 2023
Resolution: Vessel has been placed in an Inactive/laid up status and does not posses a valid COI.
Fire Fighting › Fire Pumps › Arrangement
Issued 3 November 2017
Resolved
Vessels shall be equipped with independently driven fire pumps in accordance with table 95.10-5(a), (2 pumps are required for vessels over 1500 GT). The main fire pump is inoperable.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 10 November 2017
Resolved 29 May 2018
Resolution: Fire pumps were tested and found fully operational,
Engineering › Diesel Engine (auxiliary) › Crankcase
Issued 3 November 2017
Resolved
The installation of all systems of a marine engineering nature, with design, construction, and installation shall be as subchapter F. EMD generatio is exhausting oil onto maindeck.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 10 November 2017
Resolved 29 May 2018
Resolution: Generator oil leak was repaired and generator is operational
Lifesaving › Lifebuoys › Serviceable
Issued 14 June 2017
Resolved
04 LIFE RINGS REMOVED FROM SERVICE DUE TO DETERIORATION.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 14 July 2017
Resolved 19 June 2017
Electrical › Electric Generation Source (service) › Switch
Issued 14 June 2017
Resolved
EMERGENCY STOVE AND GRILL SHUTOFF REQUIRES MAINTANANCE AND TESTING.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 14 July 2017
Resolved 19 June 2017
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 14 June 2017
Resolved
MEDICINE IN HOSPITAL SPACE IS EXPIRED.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 July 2017
Resolved 19 June 2017
Electrical › Lighting (service) › Lighting Fixture
Issued 14 June 2017
Resolved
MAJORITY OF BERTH LIGHTS NOT OPERABLE AND NEED REPLACEMENT.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 14 July 2017
Resolved 19 June 2017
Electrical › Lighting (service) › Lighting Fixture
Issued 14 June 2017
Resolved
LIGHT IN ROOM 17 NEEDS TO BE HARD WIRED TO LIGHTING CIRCUIT.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 14 July 2017
Resolved 19 June 2017
Electrical › Lighting (emergency) › Lighting Fixture
Issued 14 June 2017
Resolved
EMERGENCY LIGHTING AT STBD EMBARKATION STATION INOP.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 14 July 2017
Resolved 19 June 2017
Fire Fighting › Firemans Outfit › Boots
Issued 14 June 2017
Resolved
Fireman suit in machinery space is missing boots.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 14 July 2017
Resolved 19 June 2017
Fire Fighting › Fixed CO2 Fire Extinguishing System › Location
Issued 14 June 2017
Resolved
Missing CO2 bottle for paint locker.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 14 July 2017
Resolved 19 June 2017
Fire Fighting › Fixed CO2 Fire Extinguishing System › Nozzle
Issued 14 June 2017
Resolved
Install hoses for CO2 distribution in the bow thruster room.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 14 July 2017
Resolved 19 June 2017
Fire Fighting › Fixed Fire Detection System › Smoke Detectors
Issued 14 June 2017
Resolved
Smoke detector above paint locker nto installed correctly.
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Due 14 July 2017
Resolved 19 June 2017
Operations/Management › Pollution › Control of Discharge of Sewage
Issued 14 June 2017
Resolved
MSD must work.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 14 July 2017
Resolved 19 June 2017
Documentation › Certificates/Documents › Certificate of Inspection
Issued 4 June 2012
Resolved
Vessel did not have a valid COI while operating in a commercial capacity. 2011 annual examination was not conducted.
Action required: 705 - Other - as specified
Resolved 13 June 2012
Resolution: Completed COI inspection and issued new COI.
Engineering › Compressed Air System (control) › Valve
Issued 9 February 2006
Resolved
Test or repair pop-offs valves NLT 17 March 2006
Action required: 705 - Other - as specified
Due 17 March 2006
Resolved 16 March 2006
Resolution: New pop off valves installed.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 20 January 2006
Resolved
Vessel has exceeded required dry dock intervals IAW COI. Vessel is granted a 30 day dry dock extension. Vessel must make vessel available for hull/ISE inspection before 17 February 2006.
Action required: 705 - Other - as specified
Due 17 February 2006
Resolved 9 February 2006
Resolution: Completed Drydock exam on 2/13/2006
Documentation › Certificates/Documents › Certificate of Inspection
Issued 22 October 2004
Resolved
Vessel must provide approved plans from MSC regarding installation of accomodation portable quarters for Suchapter "I" vessels, and other modifications that have been made to the vessel.
Condition: Improper Installation
Due 27 October 2004
Resolved 19 December 2004
Fire Fighting › Fixed Fire Detection System › Smoke Detectors
Issued 22 October 2004
Resolved
Install approved smoke detection system in all quarters buildings and integrated witht he barge's own system IAW 46 CFR 95.05-1.
Due 18 November 2004
Resolved 17 December 2004
Resolution: Inspected and tested.
Fire Fighting › Fixed Fire Detection System › Arrangement
Issued 22 October 2004
Resolved
Each building housing a generator must be provided with an automatic fixed fire extinguishing system IAW 46 CFR 95-05-10 (e) (1).
Due 18 November 2004
Resolved 18 November 2004
Resolution: Not required. Generator rated below 1000hp.
Electrical › Electric Generation Source (service) › Generator
Issued 22 October 2004
Resolved
Each generator must be installed IAW 46 CFR Subchapter J.
Due 18 November 2004
Resolved 13 December 2004
Resolution: Inspected.
Engineering › Fuel Oil Service System › Portable Fuel System
Issued 22 October 2004
Resolved
The fuel system must be installed IAW 46 CFR Subchapter F.
Due 18 November 2004
Resolved 13 December 2004
Resolution: Inspected.
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 22 October 2004
Resolved
Revised Fire Control Plan and Lifesaving Plan must be prepared and submitted for approval by local cognizant [name withheld] 46 CFR 91.55-5 (d) & (g).
Due 18 November 2004
Resolved 17 December 2004
Resolution: Approved by local OCMI.
Lifesaving › Embarkation Appliances/Stations › Designated Location
Issued 22 October 2004
Resolved
A qualified person must be in charge of each liferaft IAW 46 CFR 199.100 (c) (1).
Due 18 November 2004
Resolved 13 December 2004
Resolution: Provided documentation.
Lifesaving › Embarkation Appliances/Stations › Designated Location
Issued 22 October 2004
Resolved
All muster stations must be provided with adequate emergency lighting IAW 46 CFR 199.110 & 111.75-16.
Due 18 November 2004
Resolved 13 December 2004
Resolution: inspected
Lifesaving › Lifebuoys › Not on Board
Issued 22 October 2004
Resolved
Vessel must have onboard required number of life rings IAW 46 CFR Table 199.211.
Due 18 November 2004
Resolved 13 December 2004
Lifesaving › Lifejacket/PFD (General) › Quantity
Issued 22 October 2004
Resolved
Vessel must carry required amount of lifejackets IAW 46 CFR 199.70 & 199.212.
Due 18 November 2004
Resolved 13 December 2004
Lifesaving › Embarkation Appliances/Stations › Accessability
Issued 22 October 2004
Resolved
Vessel must provide launching instructions in the vicinity of each survival craft IAW 46 CFR 199.90.
Due 18 November 2004
Resolved 13 December 2004
Communications › Audible Communications › SPD (Other)
Issued 22 October 2004
Resolved
A general alarm system meeting the requirements of 46 CFR 113.25 (not just requirements of 113.25-25) must be installed witht he portable quarters buildings fully integrated.
Due 18 November 2004
Resolved 13 December 2004
Resolution: tested
Lifesaving › Inflatable Liferafts › Capacity
Issued 22 October 2004
Resolved
Vessel must carry on each side liferafts with an aggregate capacity sufficient to accommodate the ntotal number of person on board and are stowed in a position providing for easy side-to-side transfer IAW 46 CFR 199.261.
Due 18 November 2004
Resolved 13 December 2004
Lifesaving › Inflatable Liferafts › Float Free
Issued 22 October 2004
Resolved
Liferafts must be launched IAW 46 CFR 199.130 (5).
Due 18 November 2004
Resolved 13 December 2004
Lifesaving › Inflatable Liferafts › Boarding Ramp/Ladder
Issued 22 October 2004
Resolved
An embarkation ladder must be located near each raft IAW 46 CFR 199.110 (f) (1-4).
Due 18 November 2004
Resolved 13 December 2004
Lifesaving › Rescue Boat › Carriage Requirement
Issued 22 October 2004
Resolved
Each cargo vessel must carry at least one rescue boat IAW 46 CFR 199.262 with a required launch time IAW 46 CFR 199.290 (d).
Due 18 November 2004
Resolved 22 November 2004
Resolution: using standby tugboat as rescue platform, waiver requested and granted.
Stability › Intact Stability (when using lifting gear) › General
Issued 22 October 2004
Resolved
Vessel must apply all of 46 CFR 171 Subpart C for stability requirements. (Intact, subdivision & damage).
Due 18 November 2004
Resolved 19 December 2004
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 22 October 2004
Resolved
Storm rails must be installed IAW 46 CFR 92.25 in addition to guard rails.
Due 18 November 2004
Resolved 13 December 2004
Resolution: Inspected.
Construction/Loadline › Penetrations › Weld
Issued 22 October 2004
Resolved
Non-Destructive Testing must be performed on all extension welds for each center accommodation unit IAW 46 CFR 56.95-10 (a) (3).
Due 18 November 2004
Resolved 22 November 2004
Resolution: Rcvd certificate of thrid party testing.
Accommodation/Occupational Safety › Occupational Safety › Welding/Hot Work
Issued 22 October 2004
Resolved
A limit switch must be installed so that the crane while in operation has sufficient clearance from hitting the top accommodation units IAW 46 CFR 91. 25-50.
Due 18 November 2004
Resolved 13 December 2004
Resolution: Installed guard for portable quarters.
Accommodation/Occupational Safety › Sleeping Accommodations › Berth
Issued 22 October 2004
Resolved
Required ventilation must be installed in each living quarters, especially where the exhaust from the crane may enter living spaces IAW 46 CFR 92.15-15 (a).
Due 18 November 2004
Resolved 13 December 2004
Resolution: Inspected.
Operations/Management › Drills/Instruction › Abandon Ship
Issued 22 October 2004
Resolved
An Emergency Evacuation Plan must be provided IAW 46 CFR 116.520.
Due 18 November 2004
Resolved 13 December 2004
Resolution: Incorporated into vessel''s station bill. Standby tug present at all times.
Operations/Management › Drills/Instruction › Not Conducted
Issued 22 October 2004
Resolved
Training & Drills must be conducted IAW 46 CFR 199.180.
Due 18 November 2004
Resolved 6 December 2004
Resolution: Inspector witnessed drills with 35 crew members broken down into zones.
Fire Fighting › Means of Escape › Number
Issued 22 October 2004
Resolved
Egress from all accommodation units must be verified to be in compliance with 46 CFR 92.10.
Due 18 November 2004
Resolved 13 December 2004
Resolution: Verified
Operations/Management › Drills/Instruction › Abandon Ship
Issued 22 October 2004
Resolved
Conduct abandon ship drill with full complement of vessel personnel. Video tape drill from start to finish and provide copy to CG.
Action required: 705 - Other - as specified
Due 20 January 2005
Resolved 17 January 2005
Resolution: Rcvd video and signed training forms from vessel personnel performing required abandonship drill. Drill completed satisfactory.
Lifesaving › Inflatable Liferafts › Boarding Ramp/Ladder
Issued 9 February 2004
Resolved
Aft liferaft not deployable in all situations (see Activity1999903) Re-locate raft to stbd side near existing raft and provide illumination.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 May 2004
Resolved 13 December 2004
Stability › Watertight Integrity
Issued 10 March 2003
Resolved
Several Bulkhead penetrations were not properly packed, therefore, not retaining watertight integrity. LEGACY COMPONENT DESC: Bulkhead penetration
Condition: Improper Installation
Due 10 April 2003
Resolved 14 March 2003
Resolution: Crew repacked loose bulkhead penetrations
Accommodation/Occupational Safety › Other Accommodation Spaces
Issued 10 March 2003
Resolved
Dryer located within EMG space needs to have lent trap installed within venting system. LEGACY COMPONENT DESC: Laundry
Condition: Improper/Lack of Maintenance
Due 10 April 2003
Resolved 14 March 2003
Resolution: Crew installed a lent box and attached it to the dryer duct.
Electrical › Lighting (service)
Issued 10 March 2003
Resolved
Secure wire within proper enclosure in the port wichroom or permanently remove fixture from vessel. LEGACY COMPONENT DESC: Lighting Fixture
Condition: Unknown
Due 10 April 2003
Resolved 14 March 2003
Resolution: Wire was secured within enclosure.
Fire Fighting › Portable Dry Chemical Fire Extinguisher
Issued 10 March 2003
Resolved
Vessel did not have current service report for portables and CO2 system. LEGACY COMPONENT DESC: Service
Condition: Unknown
Due 10 April 2003
Resolved 14 March 2003
Resolution: Reviewed third party report, all satisfactory.
Lifesaving › Lifebuoys
Issued 10 March 2003
Resolved
FWD and port Aft lifebuoys were punctured in several places. Crew directed to replace. LEGACY COMPONENT DESC: Stowage
Condition: Unknown
Due 10 April 2003
Resolved 14 March 2003
Resolution: Vessel representative provided two new ring buoys for vessel
Engineering › Fuel Oil Storage/Transfer System
Issued 10 March 2003
Resolved
Flame screen on port fuel tank vent was punctured and needed to be replaced. LEGACY COMPONENT DESC: Vent Pipe
Condition: Damaged By Earlier Event
Due 10 April 2003
Resolved 14 March 2003
Resolution: Crew replaced flame screen.
Construction/Loadline
Issued 25 January 2001
Resolved
Provide repair proposal for review to repair #2 stbd ballast tank inboard bulkhead now found holed and leaking. (Priority 1 deficiency)
Condition: Unknown
Due 25 January 2001
Resolved 9 February 2001
Accommodation/Occupational Safety
Issued 25 January 2001
Resolved
Repair #2 toilet in port fwd crew lavatory.
Condition: Unknown
Due 25 January 2001
Resolved 25 January 2001
Accommodation/Occupational Safety
Issued 25 January 2001
Resolved
Repair crew lockers: S-13, S-14
Condition: Unknown
Due 25 January 2001
Resolved 25 January 2001
Accommodation/Occupational Safety
Issued 25 January 2001
Resolved
Clean hospital, inventory and stow gear/medicines. (Priority 1 deficiency)
Condition: Unknown
Due 25 January 2001
Resolved 9 February 2001
Accommodation/Occupational Safety
Issued 25 January 2001
Resolved
Repair #2 sink, port outboard crew lavatory for P8/P9 staterooms.
Condition: Unknown
Due 25 January 2001
Resolved 25 January 2001
Accommodation/Occupational Safety
Issued 25 January 2001
Resolved
Conduct industrial cleaning of galley grill/fryer vent.
Condition: Unknown
Due 25 January 2001
Resolved 25 January 2001
Accommodation/Occupational Safety
Issued 25 January 2001
Resolved
Repair lt switch in stateroom P-6.
Condition: Unknown
Due 25 February 2001
Resolved 9 February 2001
Electrical
Issued 25 January 2001
Resolved
Provide weather tight enclosures for all welding lead junctions (4).
Condition: Unknown
Due 25 January 2001
Resolved 25 January 2001
Electrical
Issued 25 January 2001
Resolved
Provide weather tight cap to 440V junction box now found missing.
Condition: Unknown
Due 25 January 2001
Resolved 25 January 2001
Electrical
Issued 25 January 2001
Resolved
Provide protective matting for area within emergency generator distributionpanel.
Condition: Unknown
Due 25 January 2001
Resolved 25 January 2001
Lifesaving
Issued 25 January 2001
Resolved
Replace bottle of eyewash solution, now found missing, to station located in roundhouse workshop.
Condition: Unknown
Due 25 January 2001
Resolved 25 January 2001
Lifesaving
Issued 25 January 2001
Resolved
Make appropriate changes to fire safety plan as listed.
Condition: Unknown
Due 25 January 2001
Resolved 25 January 2001
Lifesaving
Issued 25 January 2001
Resolved
Stencil the following items: CO2 pull station (fwd machinery space), "E" lt(FS #3), "E" lt (portside engrm access), supply vent stops to thruster machinery space, emerg engrm vent shutdowns (main deck), day tank to stern generator.
Condition: Unknown
Due 25 January 2001
Resolved 25 January 2001
Fire Fighting
Issued 28 July 1998
Resolved
Re-install fusable link in galley serving line fire damper.
Condition: Unknown
Due 7 August 1998
Resolved 11 August 1998
Accommodation/Occupational Safety
Issued 28 July 1998
Resolved
Clean under, around and behind all equipment in galley.
Condition: Unknown
Due 7 August 1998
Resolved 11 August 1998
Construction/Loadline
Issued 28 July 1998
Resolved
Replace WTD gasket, port entrance to quarters from main deck.
Condition: Unknown
Due 7 August 1998
Resolved 11 August 1998
Lifesaving
Issued 28 July 1998
Resolved
Tighten nylon hold down straps on all liferafts.
Condition: Unknown
Due 7 August 1998
Resolved 11 August 1998
Electrical
Issued 28 July 1998
Resolved
Repair light switch at entrance, inside, refer/refrigerator room, cover held on with tape.
Condition: Unknown
Due 7 August 1998
Resolved 11 August 1998
Lifesaving
Issued 28 July 1998
Resolved
Provide life jacket donning placards for both styles onboard.
Condition: Unknown
Due 7 August 1998
Resolved 11 August 1998
Lifesaving
Issued 28 July 1998
Resolved
Replace following ring buoys:_x001C_ 1) bow-upper cat walk_x001C_ 2) starboard side admidships_x001C_ 3) center dog house facing pipe reel
Condition: Unknown
Due 7 August 1998
Resolved 11 August 1998
Engineering
Issued 28 August 1996
Resolved
RENEW MISSING LAGGING OF EMERGENCY GENERATOR EXHAUST.
Condition: Unknown
Due 28 September 1996
Resolved 12 December 1996
Documentation
Issued 28 August 1996
Resolved
PROVIDE TRASH LOG.
Condition: Unknown
Due 28 September 1996
Resolved 12 December 1996
Electrical
Issued 28 August 1996
Resolved
PROPERLY INSTALL EXPLOSION-PROOF STUFFING TUBE IN LIGHT FIXTURE OF PAINT LOCKER & RENEW GUARD.
Condition: Unknown
Due 28 September 1996
Resolved 12 December 1996
Lifesaving
Issued 28 August 1996
Resolved
HYDRO TEST & REFILL SPARE BREATHING AIR CYLINDER FOR SCBA.
Condition: Unknown
Due 28 September 1996
Resolved 12 December 1996
Electrical
Issued 28 August 1996
Resolved
STENCIL BATTERY BOXES AS TO SYSTEM SERVED.
Condition: Unknown
Due 28 September 1996
Resolved 12 December 1996
Lifesaving
Issued 28 August 1996
Resolved
STENCIL "BEWARE OF TAIL ROTOR" IN WAY OF STEPS LEADING TO HELO DECK.
Condition: Unknown
Due 28 September 1996
Resolved 12 December 1996
Unknown
Issued 5 August 1995
Resolved
PROVIDE U-I-A FORMS FOR TWO NEW AIR RECEIVERS IN STARBOARD WINCH ROOM.
Condition: Unknown
Due 31 August 1995
Resolved 31 August 1995
Accommodation/Occupational Safety
Issued 5 August 1995
Resolved
RENEW LIGHT FIXTURE COVERS IN THE FOLLOWING, GENERATOR ROOM AFT, DIVE QUARTERS HEAD OVER SINK, DIVE QUARTERS FORWARD, PORT WINCH ROOM AND GLOBE AT PORT COMPAINWAY.
Condition: Unknown
Due 31 August 1995
Resolved 31 August 1995
Accommodation/Occupational Safety
Issued 5 August 1995
Resolved
RENEW OVERGEAD CEILING PANELS IN CABIN S-11, REMOVE CARDBOARD.
Condition: Unknown
Due 31 August 1995
Resolved 31 August 1995
Electrical
Issued 5 August 1995
Resolved
REMOVE ALL DEAD ENDED CABLES BACK TO JUNCTION BOX FROM REMOVED SEWAGE PUMP IN GENERATOR ROOM FORWARD.
Condition: Unknown
Due 31 August 1995
Resolved 31 August 1995
Accommodation/Occupational Safety
Issued 14 October 1994
Resolved
REMOVE LOCKING DEVICES FROM ALL WATER TIGHT DOORS IN THE PATHS OF EGRESS.
Condition: Unknown
Due 14 November 1994
Resolved 18 November 1994
Construction/Loadline
Issued 14 October 1994
Resolved
INSTALL BILGE ALARMS IN THE FORWARD MACHINERY SPACES.
Condition: Unknown
Due 14 November 1994
Resolved 18 November 1994
Engineering
Issued 14 October 1994
Resolved
UPDATE FUEL OIL TRANSFER PROCEDURES IAW 33 CFR 155.750.
Condition: Unknown
Due 14 November 1994
Resolved 18 November 1994
Navigation
Issued 14 October 1994
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 14 October 1994
Resolved 14 October 1994
Accommodation/Occupational Safety
Issued 14 October 1994
Resolved
UPDATE THE VESSEL FIRE AND SAFETY PLAN TO REFLECT THE ALTERATIONS PREFORMEDON DURING THE LAST D/D.
Condition: Unknown
Due 14 November 1994
Resolved 18 November 1994
Engineering
Issued 14 October 1994
Resolved
REPLACE PLASTIC SIGHT GLASSES ON LUBE OIL TANKS WITH FIRE RESISTANT GLASS.
Condition: Unknown
Due 14 November 1994
Resolved 18 November 1994
Fire Fighting
Issued 10 August 1994
Resolved
THE BOW THRUSTER ROOM FIXED CO2 SYSTEM SHALL REMAIN DISCONNECTED FORM THE CO2 CYLINDERS UNTIL APPROVAL FORM CG MARINE SAFETY CENTER IS RECEIVED. A MARINE INSPECTOR MUST WITNESS TESTING OF THE APPROVED SYSTEM.
Condition: Unknown
Due 10 August 1994
Resolved 10 August 1994
Engineering
Issued 10 August 1994
Resolved
BARGE IS NOT TO OPERATE WITHOUT A TOW VESSEL OF APPROPRIATE SIZE TO CONTORLMOVEMENT DURING ALL BARGE OPERATIONS.
Condition: Unknown
Due 10 August 1994
Resolved 10 August 1994
Documentation
Issued 22 April 1994
Resolved
CONDUCT DEAD WEIGHT SURVEY IN PRESENCE OF COAST GUARD INSPECTOR.
Condition: Unknown
Due 22 April 1994
Resolved 22 April 1994
Documentation
Issued 22 April 1994
Resolved
PROVIDE COPY OF A.B.S. VERIFICATION OF SATISFACTORY REVIEW AND INSPECTION OF MODIFICATION IAW NVIC 10-82 CH2.
Condition: Unknown
Due 22 April 1994
Resolved 22 April 1994
Documentation
Issued 22 April 1994
Resolved
PROVIDE APPROVED LIGHT SHIP DATA TO COGNIZANT OCMI.
Condition: Unknown
Due 22 April 1994
Resolved 22 April 1994
Electrical
Issued 1 September 1993
Resolved
REPAIR / REPLACED MACHINERY SPACE BENT SUPPLY BLOWER INTAKE VENT DOOR.
Condition: Unknown
Due 1 September 1993
Resolved 1 September 1993
Electrical
Issued 9 September 1992
Resolved
REPAIR PORT GENERATOR AND TEST REVERSE POWER RELAY PRIOR TO OPERATION OF VESSEL.
Condition: Unknown
Due 9 September 1992
Resolved 9 September 1992
Engineering
Issued 11 September 1991
Resolved
AIR RECIEVER LOCATED IN CRANE CAB SHALL NOT BE USED UNTIL SUCH TIME AS IT'SAPPROVAL CAN BE DETERMINED.
Condition: Unknown
Due 11 September 1991
Resolved 11 September 1991
Documentation
Issued 14 September 1989
Resolved
AS PER 46CFR97.15-35(A) & (C) CONDUCT REQUIRED FIRE AND ABANDON SHIP DRILLSENSURE ALL DRILLS IN VESSELS OFFICIAL LOGBOOK. SUBMIT COPY OF OFFICIAL LOGSTO [name withheld] PRIOR TO 14 OCT 89.
Condition: Unknown
Due 14 September 1989
Resolved 14 September 1989
Construction/Loadline
Issued 30 August 1988
Resolved
CROP AND RENEW APPOX. 3'X 4' SECTION OF DECK IN CONTROL TOWER 01 DECK IN WAY OF ROTTED OUT AREA.
Condition: Unknown
Due 30 August 1988
Resolved 30 August 1988
Fire Fighting
Issued 28 December 1981
Resolved
MAKE NECESSARY REPAIRS TO HELO DECK TO COMPLY WITH THE MODU REGULATIONS 46 CFR 107, 108, 109.
Condition: Unknown
Due 28 December 1981
Resolved 28 December 1981