MAURY USCG vessel records Sign in
← All vessels

ADMIRAL PRIDE

ADMIRAL PRIDE is a 1997 freight ship. The Coast Guard has recorded 71 inspections since 1997, most recently in July 2026, along with 117 deficiencies and 4 operational controls.

Records from 1997 to 2026. Most recent: inspection, 8 July 2026.

Built
1997
Last inspected
8 July 2026
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9184524 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
465693
Flag
TOGO
303614000, 338433000, 368207000 (licence lapsed)
Maury page id
psix-465693

Inspections, by type

…with no type recorded10
Years with a record 26 calendar years (1997–2026)
The 71 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Ro-Ro Cargo Ship class in Maury's sources begin in 1981.

Documentation record

Tonnage as PSIX records it1083 - Convention (Subpart B), Gross Ton
1684 - Dead Weight, Metric Ton
324 - Convention (Subpart B), Net Ton
974 - Displacement, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

WDG7881MMSI 338433000 · cancelled · compulsorily equipped · granted 24 April 2013, cancelled 18 July 2017 · licensed under a name not among this hull’s recorded names (not shown)
WDB6408MMSI 303614000 · expired · compulsorily equipped · granted 7 February 2004, cancelled 12 April 2014 · licensed under a name not among this hull’s recorded names (not shown)
WCX8030MMSI 368207000 · cancelled · compulsorily equipped · granted 4 February 1998, cancelled 19 August 2004 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 71

8 July 2026 PSC A
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8432489
11 May 2026 Appeal
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8371093
30 April 2026 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8358560
15 January 2026 Deficiency Check · PSC B
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8296388
9 July 2025 PSC A
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8177907
11 June 2025 PSC A
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8155536
6 June 2025 Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8152622
8 January 2025 Deficiency Check · PSC A
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8057418
3 July 2024 PSC A
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7944877
13 December 2023 PSC A
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7837323
10 June 2023 PSC A
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7709872
10 April 2023 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7666038
10 April 2023 Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7666595
1 December 2022 PSC B
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7600687
1 June 2022 PSC B
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7457160
21 November 2021 PSC B
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7354749
19 May 2021 PSC B · Ballast Water Examination
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7197990
2 December 2020 Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7105062
18 November 2020 PSC A
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7095178
13 May 2020 PSC A · Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6951502
14 November 2019 Deficiency Check · Ballast Water Examination · PI Safety Exam · ISPS III Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6853551
10 July 2019 Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6743411
12 June 2019 ISPS III Exam · Ballast Water Examination · PI Safety Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6709419
22 April 2019 Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6621452
22 January 2019 Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6612511
15 January 2019 Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6610916
9 January 2019 Ballast Water Examination · ISPS III Exam · PI Safety Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6607657
15 August 2018 PI Safety Exam · ISPS III Exam · Deficiency Check · Ballast Water Examination
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6510797
31 May 2018 Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6428148
17 May 2018 Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6415242
12 April 2018 Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6388876
13 March 2018 ISPS III Exam · PI Safety Exam · Ballast Water Examination
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6370701
1 March 2018 Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6363756
30 October 2017 ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6297395
4 October 2016 Administrative Inspection
Administrative · Activities Europe · Activity 6015399
23 May 2016 Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6142388
3 May 2012 Internal Structural Exam · Construction Oversight · Hull Examination
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4301036
17 February 2012 MARPOL Annex I Examination · Annual Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4246201
17 December 2010 Deficiency Check · MTSA/ISPS Verification · Drydock Exam · Periodic Inspection · Internal Structural Exam
Physical examination · Activities Europe · Activity 3892109
10 December 2010 Type not recorded
No type recorded · Activities Europe · Activity 3917749
8 December 2009 Annual Inspection
Physical examination · Activities Europe · Activity 3661782
1 April 2009 Type not recorded
No type recorded · Activities Europe · Activity 3444047
19 November 2008 Type not recorded
No type recorded · Activities Europe · Activity 3443417
16 November 2008 Annual Inspection
Physical examination · Activities Europe · Activity 3354827
8 November 2008 Administrative Inspection
Administrative · Commandant (CG-CVC) · Activity 3359439
20 November 2007 Internal Structural Exam · COI Inspection · Hull Examination · MTSA/ISPS Verification
Physical examination · Activities Europe · Activity 3101458
18 September 2007 Administrative Inspection
Administrative · Activities Europe · Activity 3060271
18 October 2006 Annual Inspection
Physical examination · Activities Europe · Activity 2796073
6 January 2006 Periodic Inspection · Hull Examination
Physical examination · Activities Europe · Activity 2538864
24 February 2005 Administrative Inspection
Administrative · Activities Europe · Activity 2298289
14 February 2005 Administrative Inspection
Administrative · Activities Europe · Activity 2292057
12 January 2005 Deficiency Check · Annual Inspection
Physical examination · Activities Europe · Activity 2245802
21 May 2004 MTSA/ISPS Verification
Physical examination · Activities Europe · Activity 2057840
8 January 2004 Annual Inspection
Physical examination · Activities Europe · Activity 1896507
29 December 2003 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1970921
11 September 2003 Type not recorded
No type recorded · Activities Europe · Activity 1902251
15 August 2003 Type not recorded
No type recorded · Activities Europe · Activity 1876711
9 March 2003 Deficiency Check
Physical examination · Activities Europe · Activity 1777701
23 January 2003 COI Inspection
Physical examination · Activities Europe · Activity 1735489
11 January 2003 Internal Structural Exam · Hull Examination
Physical examination · Activities Europe · Activity 1680393
27 January 2002 Re-Inspection
Physical examination · Activities Europe · Activity 1475045
17 September 2001 Administrative
Administrative · Activities Europe · Activity 1072104
24 May 2001 Type not recorded
No type recorded · Activities Europe · Activity 1064510
29 January 2001 Type not recorded
No type recorded · Activities Europe · Activity 1059032
29 January 2001 COI Inspection
Physical examination · Activities Europe · Activity 1366174
16 February 2000 Re-Inspection
Physical examination · Activities Europe · Activity 1433616
20 April 1999 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1124344
9 April 1999 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1467606
9 February 1999 COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1473506
4 October 1998 Examination of Repairs · Damage Survey
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1381345
22 December 1997 Initial Certification · Construction Oversight · Inclining Experiment · Hull Examination · Initial Construction-Excluding Oversight
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1402610

Deficiency record · 117

07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 8 July 2026 Resolved
THE FOLLOWING BASIC PRINCIPLES... ARE EMBODDIED IN THE REGULATIONS AS APPROPRIATE, HAVING REGARD TO THE TYPE OF SHIPS AND THE POTENTIAL FIRE HAZARD INVOLVED, READY AVAILABILITY OF FIRE EXTINGUISHING APPLIANCES. PSCO OBSERVED THE EMERGENCY FIRE PUMP NOT READILY AVAILABLE. 74 SOLAS (97) II-2/2.2.7
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 July 2026
10 - Safety of Navigation › N/A - No Subsystem › Electronic charts (ECDIS)
Issued 8 July 2026 Resolved
HE CONDITION OF THE SHIP AND ITS EQUIPMENT SHALL BE MAINTAINED TO CONFORM WITH THE PROVISIONS OF THE PRESENT REGULATIONS TO ENSURE THAT THE SHIP IN ALL RESPECTS WILL REMAIN FIT TO PROCEED TO SEA WITHOUT DANGER TO THE SHIP OR PERSONS ONBOARD. PSCO OBSERVED ECDIS CHARTS THAT HAS NOT BEEN UPDATED SINCE 2022. 74 SOLAS (20) I/11(a) 16BC
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 July 2026
Resolved 30 July 2026
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 8 July 2026 Resolved
A FIREMAN'S OUTFIT SHALL CONSIST OF A SELF CONTAINED BREATHING APPARATUS WHICH SHALL BE CAPABLE OF FUNCTIONING FOR AT LEAST 30 MINS. PSCO OBSERVED ONE OF THE SCBA BOTTLES WITH INSUFFICIENT COMPRESSED BREATHING AIR. 74 SOLAS (97) II-2/17.1.2.2 16BC
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 July 2026
Resolved 30 July 2026
01 - Certificates & Documentation › 013 - Documents › Cargo information
Issued 8 July 2026 Resolved
CARGO SHALL BE LOADED, STOWED, AND SECURED THROUGHOUT THE VOYAGE IN ACCORDANCE WITH THE CARGO SECURING MANUAL APPROVED BY THE ADMINISTRATION. PSCO WAS UNABLE TO VERIFY THE CARGO ONBOARD WAS SECURED IN ACCORDANCE WITH THE CARGO SECURING MANUAL BECAUSE THE VESSEL DID NOT HAVE IT LISTED IN THE MANUAL. 74 SOLAS (20) VII/5 16BC
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 July 2026
Resolved 30 July 2026
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil discharge monitoring and control system
Issued 15 January 2026 Resolved
Oil filtering equipment referred to in paragraph 1 of this regulation shall be of a design approved by the administration. In considering the design of such equipment, the administration shall have regard to the specification recommended by the organization. The vessel's OCM has not been calibrated in the last 5 years. The last calibration certificate expired on 26JUL2021. MARPOL I/14.6
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 29 January 2026
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 15 January 2026 Resolved
Indicators shall be provided for all sliding doors and for hinged doors in watertight bulkheads. The vessel's watertight door indicator panel on the bridge is inoperable. 74 SOLAS (97) II-1/ 23-1.1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 January 2026
Resolved 29 January 2026
01 - Certificates & Documentation › 012 - Crew Certificates › Other (STCW)
Issued 11 June 2025 Resolved
While at Sea, the Radio Operator designated for radio communicationsduring distress incidents should ensure the proper functioning of the digital selective callingdistress by means of a test call at least onc each week. Chief Mate was unable to perform test call when requested by [name withheld] mate also stated he tests DSC via call once every two months. STCW Part B Ch. VIII Reg 17.1
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 June 2025
Resolution: Captain trained Chief Mate how to properly test DSC,informed Chief Mate on Instructions and required testing intervals. Chief Mate performed proper test on DSC.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Other (ISM)
Issued 11 June 2025 Resolved
The Company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements which may be established by Company. Ship was unable to provide a cyber security plan. Upon further review, iy was evident that a cyber security plan had not been incorporated into the SMS. 74 SOLAS (2020) IX/3.1 ISM Code 10.1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 June 2025
Resolved 24 June 2025
Resolution: Received Cyber Security Plan Addendum from the vessel.
09 - Working and Living Conditions › 092 - Working Conditions › Other (mooring)
Issued 11 June 2025 Resolved
Mooring lines shall be of uniformed thickness throughout their length. During the deck walk, PSCO observed severe fraying of the Port Aft mooring line. Starboard mooring line is unbraided, compromising their strength. 33 CFR 401.10(a)(i)
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 24 June 2025
Resolution: PSCO observed new mooring lines.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 11 June 2025 Resolved
The mans of control of any fixed gas fire-extinguishing system shall be readily accessible.PSCO observed storage of multiple containers of SCBA and LSA appliances inside CO2 room. 74 SOLAS (1997) II-2/5.1.7
Action required: 10 - Deficiency Rectified
Resolved 11 June 2025
Resolution: Crew removed storage from CO2 room.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 8 January 2025 Resolved
The means of securing doors weathertight shall consist of gaskets and clamping devices and shall b earranged that they can be operated from both sides of the bulkhead. PSCO observed weathertight door leading to portside escape hatch and 02 bulkhead doors leading to engine room that would not close. ILLC Chapter II Reg 12
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 January 2025
Resolution: Vessel provided photos to address the hatches and doors that were not closed.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 8 January 2025 Resolved
After survey no change shall be made to the structural arrangements and equipment without the sanction of the administration. PSCO observed hose attached to OWS which is used for testing the 15 PPM alarm when the bilge is empty. Hose is not desplayed on the manufacturer's diagram. 74 SOLAS (20) I/11
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 January 2025
Resolved 22 January 2025
Resolution: Vessel provided, photos and statement of fact attesting to the return of the OWS back to it's original design and function.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 3 July 2024 Resolved
Fire protection systems and appliances shall be maintained ready for use. PSCO observed crew member unable to close ventillation to laundry room due to faulty bolt. 74SOLAS(2004)II-2/14.1.1 10c
Condition: Design Flaw
Action required: 10 - Deficiency Rectified
Resolved 3 July 2024
Resolution: Crew member replaced bolt, to the satisfaction of the USCG.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 18 November 2020 Resolved
Transfer hoses must be pressure tested annually. 33CFR156.170(f)(3) Last test was cnducted in June 2019. Prior to conducting bunker operations in US waters, satisfactory test must be completed.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 December 2020
Resolved 2 December 2020
Resolution: Received proper documentation from the vessel attesting that proper bunker line testing was conducted on 19NOV 20.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 13 May 2020 Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. The pelican hook used to strap the port side life raft into place was wasted. SOLAS 1997 CH III/19.2
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 13 May 2020
Resolved 14 May 2020
Resolution: Vessel provided picture of installation of new pelican hook and reciept of purchase. Picture and reciept uploaded to documents.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Freeboard marks
Issued 13 May 2020 Resolved
The ring, lines and letters shall be painted in white or yellow on a dark ground. The deckline on starboard side was faded. ILLC 1966 ANNEX I REG 8
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 13 May 2020
Resolved 13 May 2020
Resolution: Deficiency was rectified on the spot to the Coast Guard Inspector's satisfaction.
01 - Certificates & Documentation › 011 - Ships Certificates › Minimum Safe Manning Document
Issued 14 November 2019 Resolved
For every ship to which chapter I applies, the administration shall issue an appropriate minimum safe manning document. Minimum safe manning document is expired onboard. 74SOLAS(14)V/14.2.2
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 November 2019
Resolved 24 November 2019
Resolution: Received new Minimum Safe Manning Certificate issued by the Administration.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 14 November 2019 Resolved
The condition and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons onboard. Engine room alarm panel did not relay alarms. 74SOLAS(14)/11(a)
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 November 2019
Resolved 24 November 2019
Resolution: Received Tech Report and letter from Administration attesting to alarm panel being fixed.
14 - Pollution Prevention › 141 - MARPOL Annex I › 15 PPM Alarm arrangements
Issued 14 November 2019 Resolved
Oil filtering equipment shall be such as will ensure that any oily mixture discharged into the sea after passing through the system has an oil content not exceeding 15ppm. When testing OWS system content meter began reading and continued reading over 15ppm. PSC could not determine system operability. MARPOL Annex I/14.6
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 November 2019
Resolved 24 November 2019
Resolution: Received Tech Report and letter from Administration attesting to the OCM being fixed.
10 - Safety of Navigation › N/A - No Subsystem › Rudder angle indicator
Issued 14 November 2019 Resolved
The angular position of the rudder shall be recognizable in the steering gear compartment. Starboard rudder angular indicator was not operational. 74SOLAS(04)II-I/29.11.2
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 November 2019
Resolved 24 November 2019
Resolution: Received Tech Report and letter from the Administration attesting to the rudder angle indicator being fixed.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 12 June 2019 Resolved
No person may use any equipment listed in paragraph (c) of this section for transfer operations unless the vessel tests and inspects the equipment annually. No evidence could be provided for the annual hydrostatic testing of the bunker lines. Proof of the hydrostatic testing is required prior to bunkering in The United States. 33CFR156.170(a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 July 2019
Resolved 11 July 2019
Resolution: Received service report from vessel attesting to the hydrostatic testing of the bunker lines
14 - Pollution Prevention › 146 - MARPOL Annex VI › Bunker delivery notes
Issued 9 January 2019 Resolved
For each ship subject to regulations 5 and 6 of this Annex, details of fuel oil for combustion purposes delivered and used on board shall be recorded by means of a bunker delivery note that shall contain at least the information specified in appendix V to this Annex. The ship carries fuel trucks to Tortola, BVI where the fuel trucks fuel the company’s other ships. A bunker receipt is provided for the transfer of fuel from the trucks to the ship, but the bunker receipt is missing the information required in appendix V, including: ship name; IMO number; date of commencement of delivery; port; sulphur content; declaration from fuel supplier; and density at 15 degrees Celsius, kilograms per cubic meter. MARPOL Annex VI 18.5, 17c
Action required: 17 - Rectify deficiencies prior to departure
Due 9 January 2019
Resolved 10 January 2019
Resolution: Received bunker note with required information for ULSD.
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 9 January 2019 Resolved
Each operation described in paragraph 2 of this regulation shall be fully recorded without delay in the Oil Record Book Part 1, so that all entries in the book appropriate to that operation are completed. The Chief Engineer was logging entries incorrectly in accordance with the Oil Record Book instructions: each entry was missing operational Code and Item Numbers for bunkering of fuel oil and for reception of oily waste. MARPOL Annex I/17.4, 16ac
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 January 2019
Resolved 22 January 2019
Resolution: Vessel submitted copies of their Oil Record Book pages and conducted training with the Chief Engineer.
01 - Certificates & Documentation › 012 - Crew Certificates › Medical certificate
Issued 9 January 2019 Resolved
If the period of validity of a medical certificate expires in the course of a voyage, then the medical certificate shall continue in force until the next port of call where a medical practitioner recognized by the party is available. The master’s medical certificate expired on 16 December 2018, and this is the ship’s fifth port, including Tortola where a medical practitioner is available, call since the expiration of the medical certificate. STCW I/9.6 ; 40ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 9 January 2019
Resolved 15 January 2019
Resolution: Received the master's renewed medical certificate.
01 - Certificates & Documentation › 011 - Ships Certificates › International Energy Efficiency Certificate
Issued 9 January 2019 Resolved
An International Energy Efficiency Certificate for the ship shall be issued after a survey in accordance with the provisions of regulation 5.4 of this Annex to any ship of 400 gross tonnage and above before that ship may engage in voyages to ports under the jurisdiction of other Parties. The owner/operator installed replacement engines during the dry-dock in July 2017, and the U.S. Coast Guard previously issued the ship a deficiency on 13 March 2018 due to missing Engine International Air Pollution Prevention Certificates for each engine. The last annual survey of the International Air Pollution Prevention Certificate was 28 February 2018, and the ship does not have an International Energy Efficiency Certificate. MARPOL Annex VI/6.4, 50ac
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 February 2019
Resolved 11 July 2019
Resolution: An Interim International Energy Efficiency Certificate was issued, valid until 08 July 2019. A IEEC was received by the vessel and verified.
01 - Certificates & Documentation › 013 - Documents › Ship Energy Efficiency Management plan
Issued 9 January 2019 Resolved
Each ship shall keep on board a ship specific Ship Energy Efficiency Management Plan (SEEMP). This may form part of the ship’s Safety Management System (SMS). The ship does not have a separate SEEMP, and the Plan is not included in the ship’s SMS. MARPOL Annex VI/22.1, 50ac
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 February 2019
Resolved 22 April 2019
Resolution: Vessel provided SEEMP.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 15 August 2018 Resolved
On cargo ships, every liferaft, other than those required by regulation 26.1.4, shall be stowed with its painter permanently attached to the ship. The painter line was connected to the weak link in way of the yellow section of the hydrostatic release unit when the instructions clearly showed it should be attached to the red section. This arrangement would have delayed or prohibited automatic inflation and the condition was observed on both port and starboard liferafts. 74 SOLAS (1997) III/29
Action required: 10 - Deficiency Rectified
Due 15 August 2018
Resolved 15 August 2018
Resolution: Rectified on the spot.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 15 August 2018 Resolved
A HAZMAT employee must receive the training required by this subpart at least once every three years. The Master and Chief Mate do not have proof of HAZMAT training within the past three years. 49 CFR 172.704(c)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 August 2018
Resolved 23 August 2018
Resolution: Received hazmat training certificates for the master and two deck officers.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 15 August 2018 Resolved
The Dangerous Cargo Manifest must contain all information required in the 49 Code of Federal Regulations. The Dangerous Cargo Manifest was missing numerous examples of information. 49 CFR 176.30(a)
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 20 August 2018
01 - Certificates & Documentation › 011 - Ships Certificates › Document of Compliance (DoC/ ISM)
Issued 15 August 2018 Resolved
The Document of Compliance shall be issued by a Recognized Organization for a period not to exceed five years. The Recognized Organization issued the Document of Compliance without an issue date. 1974 SOLAS (2014) IX/ Reg 3.1 ISM Part B 13.13.2
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 20 August 2018
01 - Certificates & Documentation › 011 - Ships Certificates › Continuous synopsis record
Issued 15 August 2018 Resolved
Every ship for which chapter I applies shall be issued with a Continuous Synopsis Record. Vessel did not have a Continuous Synopsis Record issued. 1974 SOLAS (2014) XI-1/Reg 5.1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 August 2018
Resolved 20 August 2018
Resolution: Vessel received the original on board.
Documentation › Certificates/Documents › Engine IAPP Certificate
Issued 13 March 2018 Resolved
Each marine diesel engine shall be subject to a pre-certification survey which shall be such as to ensure that the engine as designed and equipped, complies with the NOx emission limits contained in regulation 13 of Annex VI. If this survey confirms compliance, the Administration shall issue an Engine International Air Pollution Prevention Certificate (EIAPP). Both of the propulsion engines were manufacturered in May 2012, and the vessel was not issued EIAPPs for each engine.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 April 2018
Resolved 31 May 2018
Resolution: Received documentation attesting that both Main Diesiel Engines have their own EIAPP certificate.
Documentation › Certificates/Documents › Construction and Equipment Certificate (DSC)
Issued 29 June 2012 Resolved
Provide approved drawings from ABS
Due 28 August 2012
Resolved 9 July 2012
Resolution: Received approved drawings
Documentation › Certificates/Documents › Construction and Equipment Certificate (DSC)
Issued 29 June 2012 Resolved
Provide ABS 10-82 completion letter.
Due 28 July 2012
Resolved 25 July 2012
Resolution: Received 10-82 letter from ABS.
Documentation › Logs/Records › Bunker Delivery Notes/Samples
Issued 17 February 2012 Resolved
Obtain Bunker Delivery notes and maintain file. Properly label bunker samples. Provide at COI inspection.
Due 2 December 2012
Resolved 26 June 2012
Resolution: Vessel acquired bunker box and bottles to keep samples.
Documentation › Manuals/Policy Documentation › Emergency Instructions
Issued 17 February 2012 Resolved
Conduct SMPEP training/drill, inventory spill kit.
Due 9 March 2012
Resolved 21 March 2012
Resolution: Received, reviewed, accepted documentation from vsl [name withheld] stating that training has been conducted and a new spill kit has been placed on board.
Fire Fighting › Portable CO2 Fire Extinguisher › Discharge Hose/Tube
Issued 17 February 2012 Resolved
Replace CO2 discharge hose to paint locker.
Due 24 March 2012
Resolved 26 February 2012
Resolution: Received documentation that the hose hase been replaced.
Engineering › Steering Gear System › Rudder Angle Indicator
Issued 17 February 2012 Resolved
Provide technicians report/captains statement that emergency steering rudder angle indicator is working in all modes.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 February 2012
Resolution: Received statement from captain that the RAI is working properly in all modes at all stations.
Lifesaving › Rescue Boat › Propulsion Casing/Protection
Issued 17 February 2012 Resolved
Provide prop guard on FRC
Due 24 March 2012
Resolved 28 February 2012
Resolution: Recieved documentation (photo) of proper prop guard installed on outboard.
Engineering › Diesel Engine (propulsion-direct drive) › Turbocharger
Issued 17 February 2012 Resolved
Install turbo lagging (1 MDE and 1 SSDG)
Due 9 March 2012
Resolved 28 February 2012
Resolution: Received photo documentation of installation of lagging.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Quantity of CO2
Issued 17 February 2012 Resolved
Determine proper instalation (piping) and qty of bottles for CO2 system. Original plans show 15 bottles, currenly only 12 are connected to the system with 3 extra not connected.
Due 24 March 2012
Resolved 30 March 2012
Resolution: Proper installation has been determined based off of initial drawing (CJ004-1.DWG). Company intends to resubmit to MSC for approval and make any required changes at upcoming drydock. Issues new 835 to ensure CO2 system is approved.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Quantity of CO2
Issued 17 February 2012 Resolved
Submit plans to MSC for approval of current CO2 system installation, make modifications as required
Due 18 December 2012
Resolved 31 May 2012
Resolution: Calculated the required amount of CO2 for the space. The vessel has 12 bottles installed when it will only need about 860 pounds.
Fire Fighting › Fixed Fire Detection System › Power Supply
Issued 17 December 2010 Resolved
Repair Fire Detection System, prior to depature, battery charger inoperative, batteries dead. Received email dated 1/9/2011 concerning repair of ground fault and replacement of a capacitor. Deficiency to remain open to be verified at next attendance.
Condition: Improper/Lack of Maintenance
Due 2 March 2012
Resolved 24 February 2012
Resolution: Secured battery charger for fire detection system and ensured batteries maintained a charge. Batteries were said to have been recently replaced.
Fire Fighting › Firemans Outfit › Protective Clothing
Issued 17 December 2010 Resolved
Provide flash gear (NOMEX hoods) for fire fighting ensembles (2).
Condition: Improper/Lack of Maintenance
Due 17 February 2011
Resolved 21 December 2010
Engineering › Fuel Oil Storage/Transfer System › Flange
Issued 17 December 2010 Resolved
Provide flange shielding in fuel transfer/distribution piping side of pumps in accordance with SOLAS 74(amended) Reg II-2/4.2.2.5.3, crew has used tape on flanges, but require shielding where butterfly valves are fitted as well (special collars). Extended def due to shipping issues. Left def open to be verified at next annual inspection.
Condition: Improper Installation
Due 2 March 2012
Resolved 24 February 2012
Resolution: Identified required flanges and verified shielding was in place.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Piping
Issued 17 December 2010 Resolved
Remove connection between bow thruster fixed fire fighting system and engine room fixed fire system. Bow thruster CO2 activation simultaneously will activate time delay bypass on engine room CO2 system. Received email 1/10/2011 concerning removal of connection, left def open to be verified at next attendance.
Condition: Improper Installation
Due 2 March 2012
Resolved 24 February 2012
Resolution: Verified that connection had been removed and pipes were plugged. Identified additional issue, see new defeciency.
Documentation › Logs/Records › Logbook (official)
Issued 17 December 2010 Resolved
Maintain USCG Official Log book, vessel is on a foreign voyage until it returns to US. Submit as necessary (once log is completed, or periodically) to USCG Activities Europe Will be verified at next inspections.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 2 March 2012
Resolved 24 February 2012
Resolution: Official log book onboard and maintained.
Personnel › Manning/Qualifications › Minimum Safe Manning
Issued 17 December 2010 Resolved
Vessel is not manned in accordance with COI, vessel made the voyage from Soyo to Walvis Bay, a voyage over 600 miles with only 1 Mate, vice 2 as stated on COI. Vessel to be properly manned prior to departure from Walvis Bay.
Condition: Improper Installation
Due 9 January 2011
Resolved 9 January 2011
Resolution: ABS verified full manning of vessel, and reported same.
Documentation › Safety Management System › Conformity Maintenance Procedures
Issued 17 December 2010 Resolved
Provide record of annual thorough testing of rescue boat davit, prior to departure from Walvis Bay. Received email report 1/10/2011 concerning correction, and report issue date 1/3/2011. Left def open to be verified at next attendance.
Condition: Improper/Lack of Maintenance
Due 2 March 2012
Resolved 24 February 2012
Resolution: Reviewed vessel log for rescue boat launches and obtained third paper documentation of davit testing.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 17 December 2010 Resolved
Provide light for starboard bridgewing man overboard lifebuoy (or replace with combi-light/smoke unit-vessel has two additional combi smoke/lights mounted on 01 Deck).
Due 17 January 2011
Resolved 21 December 2010
Communications › Alarms/Indicators › Engineers' Assistance-needed Alarm
Issued 17 December 2010 Resolved
Provide fuel leakage alarms for double-jacketted fuel piping from external high-pressure injection pump to bridge and ECC for ship service generators and bow thruster engine in accordance with SOLAS II-2. (extended to next DD due to complexity)
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 18 December 2012
Resolved 24 February 2012
Resolution: Double jacket alarms tested on SSDG.
Fire Fighting › Fire Hoses › Number
Issued 17 December 2010 Resolved
Provide 1 length of approved fire fighting hose to replace section which failed during pressure test prior to departure from Walvis Bay.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 December 2010
Construction/Loadline › Hull › Side Shell
Issued 17 December 2010 Resolved
Insert shell plating in way of fuel tank 1P as discussed with attending inspector. ABS to certify repair prior to departure from Walvis Bay.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 January 2011
Resolution: ABS Surveyor attested to proper repairs and post-repair testing.
Construction/Loadline › Hull › Side Shell
Issued 17 December 2010 Resolved
Insert side-shell plating in way of accomodation, 01 deck, stbd side, no later than next credit drydocking.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 18 December 2012
Resolved 24 February 2012
Resolution: Inset had an approved repair, no other insets were noted.
Operations/Management › Vessel Safety Management › Reports and Analysis
Issued 24 March 2009 Resolved
Vessel failed to demonstrate proper rectification of non-conformity within time period stipulated by Flag State. Shore side support reported item as been rectified while Vessel reported non-conformity outstanding due to incompatible fittings of SCBA bottles to breathing apparatus. External ISM audit to be carried out by R.O. (ABS) focusing on the reporting and tracking of non-conformities.
Action required: 705 - Other - as specified
Due 24 April 2009
Resolved 19 April 2009
Resolution: ABS ISM intermediate audit report received with non-conformities and observations noted.
Communications › Radio Communications › EPIRB
Issued 16 November 2008 Resolved
Vessel's EPIRB found registered with incorrect MMSI number and hailing port. Vessel to make notifications to nearest shore station (Cape Town) and NOAA. Proof of message receipt from nearest shore station required prior to departure from port.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 November 2008
Resolution: Received message confirmation from [name withheld] station and NOAA. Notification have been made should EPRIB be activated before new EPIRB arrives on board.
Operations/Management › Pollution › Retention of Oily Mixture
Issued 16 November 2008 Resolved
Waste oil being stored on deck in 50 GAL drums to be properly disposed of at shore facility. Drums not located on IOPP as approved storage space. No SOLAS DOC, for on deck stowage, on board. Remove within 7 days. 26 November 2008.
Due 26 November 2008
Resolved 20 November 2008
Resolution: Drums removed to shore facility in presence of USCG Marine Inspector.
Fire Fighting › Firemans Outfit › Protective Clothing
Issued 16 November 2008 Resolved
*Item reported cleared via E-mail dated 18MAR09 and shall remain open until verified to be corrected by attending USCG Marine Inspector* Provide on board two approved fireman's outfits within 30 days. 19 December 2008. **Extended to Jan 19, 2009**Extended to Feb 19, 2009**
Action required: 705 - Other - as specified
Due 2 March 2010
Resolved 8 December 2009
Resolution: Sat
Communications › Radio Communications › EPIRB
Issued 16 November 2008 Resolved
*Item reported cleared via E-mail dated 11DEC08 and shall remain open until verified to be corrected by attending USCG Marine Inspector* Vessel to provide on board an EPIRB with accurate registration information within 30 days. 19 December 2008.
Action required: 705 - Other - as specified
Due 2 March 2010
Resolved 8 December 2009
Resolution: Sat
Engineering › Steering Gear System › Rudder Angle Indicator
Issued 16 November 2008 Resolved
*Item reported cleared via E-mail dated 15DEC08 and shall remain open until verified to be corrected by attending USCG Marine Inspector* Provide corrective action plan to ensure proper operation of vessel's steering when operating in tandem. System is currently operating out of sync and rudder angle indicators found not reporting accurately. Provide within 30 days. 19 December 2008.
Action required: 705 - Other - as specified
Due 2 March 2010
Resolved 8 December 2009
Resolution: Sat
Lifesaving › Buoyant Apparatus › Approval
Issued 16 November 2008 Resolved
*Item reported cleared via E-mail dated 23APR09 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Provide on board two USCG approved ring buoys for quick release from bridgewings within 30 days. 19 December 2008. **Extended to Jan 19, 2009**Extended to Feb 19, 2009**Extended to March 19, 2009**Extended to April 19, 2009**Extended to April 24, 2009**
Action required: 705 - Other - as specified
Due 2 March 2010
Resolved 8 December 2009
Resolution: Sat
Documentation › Logs/Records › Oil Record Book
Issued 16 November 2008 Resolved
*Item reported cleared via E-mail dated 14MAR09 and shall remain open until verified to be corrected by attending USCG Marine Inspector* Vessel has been utilizing USCG oil record book, ed. 07-93. Provide on board an up to date version of USCG oil record book within 30 days. 19 December 2008. **Extended to Jan 19, 2009**Extended to Feb 19, 2009**
Action required: 705 - Other - as specified
Due 2 March 2010
Resolved 8 December 2009
Resolution: Sat
Fire Fighting › Miscellaneous Items › Paint/Flammable Liquid Lockers
Issued 16 November 2008 Resolved
*Item reported cleared via E-mail dated 05DEC08 and shall remain open until verified to be corrected by attending USCG Marine Inspector* Thinner/Paint locker (CO2 protected) found holed/wasted. Repair/replace as original within 30 days. 19 December 2008.
Action required: 705 - Other - as specified
Due 2 March 2010
Resolved 8 December 2009
Documentation › Certificates/Documents › Certificate of Inspection
Issued 16 November 2008 Resolved
Update CSR to reflect change in vessel operating company within 60 days. 19 January 2009.**Extended to Feb 19, 2009**Extended to March 19, 2009****Extended to April 19, 2009**Extended to May 18, 2009**Extended to June 19, 2009**
Action required: 705 - Other - as specified
Due 19 June 2009
Resolved 18 June 2009
Resolution: CSR number 2 has arrived on board. Operator provided documentary proof that new VSP is on board.
Operations/Management › Drills/Instruction › Fire
Issued 16 November 2008 Resolved
*Item reported cleared via E-mail dated 18JUN09 and shall remain open until verified to be corrected by attending USCG Marine Inspector* Provide on board an updated/approved fire control plan which indicates class A and B fire boundaries within 90 days. 19 February 2009.**Extended to March 19, 2009****Extended to April 19, 2009**Extended to May 18, 2009**Extended to June 19, 2009**
Action required: 705 - Other - as specified
Due 2 March 2010
Resolved 8 December 2009
Resolution: Sat
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 16 November 2008 Resolved
*Item reported cleared via E-mail dated 18MAR09 and shall remain open until verified to be corrected by attending USCG Marine Inspector* Vessel's side light screens to be painted matt black within 90 days. 19 February 2009.
Action required: 705 - Other - as specified
Due 2 March 2010
Resolved 8 December 2009
Resolution: Sat
Fire Fighting › Nozzles › Condition
Issued 16 November 2008 Resolved
*Item reported cleared via E-mail dated 16DEC08 and shall remain open until verified to be corrected by attending USCG Marine Inspector* Provide on board connecting chains for all high velocity fog adaptors navy all purpose nozzles within 90 days. 19 February 2009
Action required: 705 - Other - as specified
Due 2 March 2010
Resolved 8 December 2009
Resolution: Sat
Fire Fighting › Means of Escape › Blocked
Issued 16 November 2008 Resolved
*Item reported cleared via E-mail dated 27NOV08 and shall remain open until verified to be corrected by attending USCG Marine Inspector* Replace securing pin on emergency escape hatch (on deck) starboard side within 90 days. 19 February 2009.
Action required: 705 - Other - as specified
Due 2 March 2010
Resolved 8 December 2009
Resolution: Sat
Fire Fighting › Ventilation Systems › Duct Hatches
Issued 16 November 2008 Resolved
*Item reported cleared via E-mail dated 27NOV08 and shall remain open until verified to be corrected by attending USCG Marine Inspector* Label air/vent dampers aft of superstructure, so the order in which they are to be placed can easily be understood within 90 days. 19 February 2009.
Action required: 705 - Other - as specified
Due 2 March 2010
Resolved 8 December 2009
Resolution: Sat
Lifesaving › Buoyant Apparatus › Lifeline
Issued 16 November 2008 Resolved
*Item reported cleared via E-mail dated 20MAR09 and shall remain open until verified to be corrected by attending USCG Marine Inspector* Ring buoy hand lines and attachment lines are to be synthetic, resistant to deterioration from ultraviolet light, and dark in color. Place on board within 90 days. 19 February 2009.**Extended to March 19, 2009**
Action required: 705 - Other - as specified
Due 2 March 2010
Resolved 8 December 2009
Resolution: Sat
Construction/Loadline › Markings › Load Line Mark
Issued 16 November 2008 Resolved
Renew load line seasonal marks so as to conform with load line certificate within 90 days. 19 February 2009.
Action required: 705 - Other - as specified
Due 19 February 2009
Resolved 30 November 2008
Resolution: Load line and seasonal marks have been removed. Photographs submitted to satisfaction of USCG inspector.
Lifesaving › Line-Throwing Appliances › Projectiles
Issued 16 November 2008 Resolved
*Item reported cleared via E-mail dated 13APR09 and shall remain open until verified to be corrected by attending USCG Marine Inspector* Provide on board two buoyant floats for the line throwing apparatus, required by 46 CFR 133.170 and 46 CFR 160.040-4(a) within 90 days. 19 February 2009.**Extended to March 19, 2009****Extended to April 19, 2009**
Action required: 705 - Other - as specified
Due 2 March 2010
Resolved 8 December 2009
Resolution: Sat
Fire Fighting › Miscellaneous Items › A Class Division Penetrations
Issued 16 November 2008 Resolved
*Item reported cleared via E-mail dated 24NOV08 and shall remain open until verified to be corrected by attending USCG Marine Inspector* Replace automatic door closure to class A fire door in galley within 90 days. 19 February 2009.
Action required: 705 - Other - as specified
Due 2 March 2010
Resolved 8 December 2009
Resolution: Sat
Operations/Management › Drills/Instruction › Launching/Recovery of Survival Craft
Issued 16 November 2008 Resolved
*Item reported cleared via E-mail dated 05DEC08 and shall remain open until verified to be corrected by attending USCG Marine Inspector* Provide comprehensive operating manual for the rescue boat davit. 30 days.
Action required: 705 - Other - as specified
Due 2 March 2010
Resolved 8 December 2009
Resolution: Sat
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 16 November 2008 Resolved
*Item reported cleared via E-mail dated 31DEC08 and shall remain open until verified to be corrected by attending USCG Marine Inspector* Inventory and fully stock all first aid kits on vessel. 30 days. **Extended to Jan 1, 2009**
Action required: 705 - Other - as specified
Due 2 March 2010
Resolved 8 December 2009
Resolution: Sat
Fire Fighting › Firemans Outfit › Self-Contained Breathing Apparatus
Issued 16 November 2008 Resolved
*Item reported cleared via E-mail dated 24APR09 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Have all SCBA bottles hydro tested at an approved DOT factility, 30 days. **Extended to Jan 19, 2009**Extended to Feb 19, 2009**Extended to Apr. 21, 2009**Extended to April 24, 2009**
Action required: 705 - Other - as specified
Due 2 March 2010
Resolved 8 December 2009
Resolution: Sat
Lifesaving › Launching Appliances › Falls
Issued 16 November 2008 Resolved
*Item reported cleared via E-mail dated 17MAR09 and shall remain open until verified to be corrected by attending USCG Marine Inspector* Provide certification for rescue boat falls. 30 days. **Extended to Jan 19, 2009**Extended to Feb 19, 2009**Extended to March 19, 2009**
Action required: 705 - Other - as specified
Due 2 March 2010
Resolved 8 December 2009
Resolution: Sat
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 19 October 2006 Resolved
33U.S.C.1321(j)(5)(D)(iii)-The NTVRP does not identify a classified oil spill removal organization for the LA/Long Beach Captain of the Port zone
Due 19 November 2006
Resolved 7 January 2009
Resolution: VRP #04084 deactivated per correspondence received 12/19/2008
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 19 October 2006 Resolved
33U.S.C.1321(j)(5)(G)-The vessel owner/operator has not provided certification ensuring that response resources are capable of responding to the maximum extent practicable, to a worst case discharge 33U.S.C.1321(j)(5)(D)(i)-The NTVRP does not identify the volume and type of fuel oil that would be involved in a worst case discharge
Due 19 November 2006
Resolved 7 January 2009
Resolution: VRP #04084 deactivated per correspondence received 12/19/2008
Fire Fighting › Ventilation Systems › Ducts
Issued 18 October 2006 Resolved
Make the fire damper on the 2nd deck accessible in case of fire. 22OCT06: Received Corrective Action Plan via email. An extension was added to make the fire damper accessible. Item will remain open until cleared by an inspector.
Action required: 705 - Other - as specified
Due 23 January 2008
Resolved 19 November 2008
Resolution: Item found rectified by attending CG MI
Fire Fighting › Ventilation Systems › Ducts
Issued 18 October 2006 Resolved
Repair the fire damper in the mess deck - stuck closed. Received Corrective Action Plan via email. Fire damper was repaired. Item will remain open until verified by an inspector.
Action required: 705 - Other - as specified
Due 23 January 2008
Resolved 19 November 2008
Resolution: Item found rectified by attending CG MI
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 18 October 2006 Resolved
Remove all expired medications. 22OCT06: Received Corrective Action Plan via email. Expired medications were removed. Item will remain open until verified by an inspector.
Action required: 705 - Other - as specified
Due 23 January 2008
Resolved 19 November 2008
Resolution: Item found rectified by attending CG MI
Personnel › Certificates/Documents/Licenses › License, Chief Mate
Issued 18 October 2006 Resolved
Remove crewmember with expired license.
Action required: 705 - Other - as specified
Due 18 November 2006
Resolved 18 October 2006
Resolution: Resolved while the inspectors were still onboard. The crewmember (Filipino) will sail as an AB, the vessel has an extra mate. The crewmember applied for a new license but it has not arrived yet.
Engineering › Diesel Engine (propulsion-reduction gear) › Governor
Issued 18 October 2006 Resolved
Prove proper operation of overspeed shutdown on the stbd main diesel engine.
Action required: 705 - Other - as specified
Due 18 November 2006
Resolved 19 November 2008
Resolution: Item found rectified by attending CG MI
Communications › Alarms/Indicators › Fire Alarm
Issued 18 October 2006 Resolved
Install glass on fixed firefighting pull handle in the forward tunnel. 22OCT06: Received Corrective Action Plan via email. New glass was installed. Item will remain open until verified by an inspector.
Action required: 705 - Other - as specified
Due 23 January 2008
Resolved 19 November 2008
Resolution: Item found rectified by attending CG MI
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 6 January 2006 Resolved
Prove proper operation of the oily water separator prior to departing Walvis Bay, Namibia. Report cleared via E-mail 30 Jan 2006, Item remains open until cleared by attending Marine Inspector.
Condition: Unknown
Action required: 705 - Other - as specified
Due 23 January 2007
Resolved 18 October 2006
Engineering › Freshwater System (jacketwater cooling) › Sensor
Issued 6 January 2006 Resolved
Prove proper operation of the high water temperature shut down on the MDE and SSG. Report cleared via E-mail dated 30 Jan, Item remains open until cleared by attending Marine Inspector.
Action required: 705 - Other - as specified
Due 23 January 2007
Resolved 18 October 2006
Engineering › Lubricating Oil Service System › Cooler
Issued 6 January 2006 Resolved
Prove proper operation of the low lube oil pressure shut down on the MDE and SSG. Report cleared via E-mail dated 30 Jan, Item remains open until cleared by attending Marine Inspector.
Action required: 705 - Other - as specified
Due 23 January 2007
Resolved 18 October 2006
Fire Fighting › Means of Escape › Emergency Lighting
Issued 12 January 2005 Resolved
INSTALL EMERGENCY LIGHT TO CO2 CONTROL/STORAGE SPACE
Condition: Unknown
Due 12 February 2005
Resolved 23 January 2005
Resolution: RECEIVED STATEMENT FROM MASTER ATTESTING THAT AN EMERGENCY LIGHT WAS INSTALLED.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Flame Screens
Issued 12 January 2005 Resolved
RENEW FLAME SCREEN #2 PORT LIQUID MUD TANK.
Due 12 February 2005
Resolved 26 January 2005
Resolution: RECEIVED STATEMENT FROM MASTER ATTESTING THAT THE FLAME SCREEN WAS RENEWED.
Deck/Cargo › Ballast › Vents
Issued 13 May 2004 Resolved
Issued 11 deficiencies during ISPS/MTSA verification exam. Deficiency list attached to MISLE documents under the subject case yet not individually included in inspection results since they contain SSI
Due 22 August 2004
Resolved 12 January 2005
Fire Fighting › Structural Fire Protection - General › Deckhouse Construction
Issued 7 March 2004 Resolved
Repair fire screen doors to provide auto closure and auto latching ( areas of concern include: 01 deck to bridge, 01 deck port aft door and main deck stbd aft door, and main deck galley entry) LEGACY COMPONENT DESC: Accommodation Space Protection
Due 6 April 2004
Resolved 11 April 2004
Resolution: All fire screen doors operating properly. T.G. [name withheld], LT
Fire Fighting › Structural Fire Protection - General › Cooking Area
Issued 7 March 2004 Resolved
repair inoperative A class rolling fire door for the galley passthrough window. LEGACY COMPONENT DESC: Cooking Area
Due 6 April 2004
Resolved 7 March 2004
Resolution: Fire door repaired. T.G. [name withheld], LT
Engineering › Compressed Air System (start air) › Compressor
Issued 7 March 2004 Resolved
replace inoperative relief valves for stbd pressure vessel. LEGACY COMPONENT DESC: Receiver/Bottle
Due 6 April 2004
Resolved 24 April 2004
Resolution: Relief valves renewed. T.G. [name withheld], LT
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Transfer Hose
Issued 7 March 2004 Resolved
Hydro test hoses per 33 CFR 156.170 (f)(3), to 1.5 times MAWP and mark hoses as required. LEGACY COMPONENT DESC: Transfer Hose
Due 6 April 2004
Resolved 15 April 2004
Resolution: New hose onboard, hydro test completed. T.G. [name withheld], LT
Communications › Alarms/Indicators › High Water Alarm
Issued 7 March 2004 Resolved
Provide equipment to test high jacket water temp alarms and shutdowns for main and aux engines. Prove system operation. LEGACY COMPONENT DESC: Jacket water high temp alarm
Due 6 April 2004
Resolved 13 March 2004
Resolution: High temp alarm checked and operating properly. T.G. [name withheld], LT
Communications › Alarms/Indicators › Lube Oil Low Pressure Alarm
Issued 7 March 2004 Resolved
Provide means to test low lube oil alarms and shutdowns for aux generators. LEGACY COMPONENT DESC: Lube Oil Low Pressure Alarm
Due 6 April 2004
Resolved 14 March 2004
Resolution: Alarm and shutdown tested and operating properly. T.G. [name withheld], LT
Communications › Alarms/Indicators › Lube Oil Level Alarm
Issued 7 March 2004 Resolved
Provide means to test overspeed shutdown for emergency generator and prove proper operation. LEGACY COMPONENT DESC: Lube Oil Low Pressure Alarm
Due 6 April 2004
Resolved 31 March 2004
Resolution: overspeed tested and operating properly. T.G. Taylor, T.G.
Fire Fighting › Miscellaneous Items › Materials for Overboard Outlets
Issued 23 January 2003 Resolved
Mud tank flame screens damage/missing. Renew flame screens. LEGACY COMPONENT DESC: flame screens
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 February 2003
Resolved 4 October 2016
Resolution: flame screens renewed
Electrical › Lighting (emergency) › Lighting Fixture
Issued 23 January 2003 Resolved
Light fixture in CO 2 room not operating. Repair and prove proper operation of light fixture. LEGACY COMPONENT DESC: Lighting Fixture
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 February 2003
Resolved 9 March 2003
Resolution: Lamps renewed
Navigation › Piloting/Steering
Issued 23 January 2003 Resolved
(1) Provide current compass deviation table as required by SOLAS chapter V regulation 12 LEGACY COMPONENT DESC: Compass Deviation Table
Action required: 705 - Other - as specified
Due 1 March 2003
Resolved 9 March 2003
Resolution: Received attestation from the master, [name withheld], stating that the magnetic compass was swung on 24 Jan 03.
Navigation › Collision/Grounding Avoidance › Radar
Issued 23 January 2003 Resolved
(2) Radar not operating properly. Trouble shoot repair and prove proper operation prior to returning vessel to service in accordance with 46CFR 130.310. LEGACY COMPONENT DESC: Radar
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 1 March 2003
Resolved 9 March 2003
Resolution: Received attestation from the master, [name withheld], stating that proved proper operations of radars completed on 23 Jan 03.
Communications › Radio Communications
Issued 23 January 2003 Resolved
(3) Provide NOAA registration for EPIRB and properly afix sticker to the EPIRB as required by 47CFR 80.1061(f) LEGACY COMPONENT DESC: EPIRB
Condition: Unknown
Action required: 705 - Other - as specified
Due 1 March 2003
Resolved 9 March 2003
Resolution: Received attestation from the master, [name withheld], stating that NOAA registration for EPIRB completed on 09 Mar 03.
Documentation › Safety/Response Plans/Programs › SOPEP
Issued 23 January 2003 Resolved
(5) Shipboard Oil Pollution Emergency Plan missing approval page. Provide valid approval page for the SOPEP Manual. LEGACY COMPONENT DESC: SOPEP
Condition: Unknown
Action required: 705 - Other - as specified
Due 1 March 2003
Resolved 9 March 2003
Resolution: Received attestation from the master, [name withheld], stating that approval page for SOPEP manaual completed on 09 Mar 03.
Communications › Visual Communication › Warning Sign (radio room)
Issued 23 January 2003 Resolved
(6) Properly mark bow thruster CO2 discharge alarm "WHEN ALARM SOUNDS, LEAVE AT ONCE: CARBON DIOXIDE BEING RELEASED. In accordance with 46CFR 131.815. LEGACY COMPONENT DESC: Warning Sign
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 March 2003
Resolved 9 March 2003
Resolution: Received attestation from the master, [name withheld], stating that CO2 discharge alarm in bowthuster room completed on 30 Jan 03.
Fire Fighting › Combustible Materials › Furniture/Furnishings
Issued 23 January 2003 Resolved
(7) Combustible materials stored behind main switch board. Remove items stowed behind the switch board.
Action required: 705 - Other - as specified
Due 1 March 2003
Resolved 9 March 2003
Resolution: Received attestation from the master, [name withheld], stating boxed removed from behind main switch board completed on 02 Feb 03.
Navigation › Piloting/Steering
Issued 25 January 2002 Resolved
PROVIDE CURRENT UPDATED USCG LIGHT LIST, SAILING DIRECTIONS, COAST PILOT, TIDES & CURRENT TABLES. LEGACY COMPONENT DESC: CURRENT NAVIGATION PUBS 2001/2002
Condition: Improper/Lack of Maintenance
Due 25 February 2002
Resolved 22 February 2002
Resolution: Cleared by faxed statement from master.
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 25 January 2002 Resolved
PROVE PROPER OPERATION OF MAIN ENGINE OVERSPEED PROTECTION IAW APPROVED AUTOMATION TEST PROCEDURES. LEGACY COMPONENT DESC: OVERSPEED
Condition: Unknown
Due 25 February 2002
Resolved 22 February 2002
Resolution: Cleared by faxed statement from master.
Engineering › Compressed Air System (control)
Issued 25 January 2002 Resolved
REMOVE VALVE BETWEEN PORT DECK LOCKER AIR RECIEVER AND RELIEF VALVE ON AIR RECIEVER. LEGACY COMPONENT DESC: Valve
Condition: Improper Installation
Due 25 February 2002
Resolved 22 February 2002
Resolution: Cleared by faxed statement from master.
Accommodation/Occupational Safety › Occupational Safety
Issued 25 January 2002 Resolved
REPAIR/REPLACE EMERGENCY ESCAPE HATCH ASSIST SPRING FOR STARBOARD ESCAPE HATCH FROM ENGINE ROOM.
Condition: Improper/Lack of Maintenance
Due 25 February 2002
Resolved 22 February 2002
Resolution: Cleared by faxed statement from master.
Lifesaving
Issued 24 May 2001 Resolved
Provide two (2) additional sixteen (16) person life rafts iaw SOLAS 74, as amended, Chapter III, Regulation 31. Rafts to be located port and starboard side of vessel.
Condition: Unknown
Due 24 May 2001
Resolved 24 May 2001
Documentation
Issued 29 January 2001 Resolved
Provide Employee Assistance Program (EAP) Supervisory training for personnel in supervisory positions.
Condition: Unknown
Due 31 March 2001
Resolved 25 January 2002
Resolution: Inspectors narrative entry states all items satisfactory w/ exception of the 4 items issued during this inspection.
Engineering
Issued 29 January 2001 Resolved
HYDROSTATICALLY TEST ALL FUEL AND CARGO TRANSFER HOSES.
Condition: Unknown
Due 31 March 2001
Resolved 25 January 2002
Resolution: Inpsector signed off as completed record of testing oil transfer hose during annual inspection.
System not recorded
Issued 16 February 2000 Resolved
COMPLETE WORKLIST ITEMS ISSUED DURING REINSPECTION.
Condition: Unknown
Due 30 July 2000
Resolved 5 April 2002
Resolution: Admin. cleared as items not deemed stringent enough for inspector to detail as independent CG-835''s with intent of full tracking & verification of compliance.
Lifesaving
Issued 9 February 1999 Resolved
INSTALL RESCUE BOAT, OR EQUIVILANT, AND DEMONSTRATE ABILITY TO RECOVER AN UNCONSCIOUS PERSON FROM THE WATER IAW 8TH DISTRICT POLICY LTR DTD 12NOV98.
Condition: Unknown
Due 9 February 1999
Resolved 9 February 1999
Lifesaving
Issued 22 December 1997 Resolved
MAKE THE FOLLOWING MODIFICATIONS TO THE RESCUE SYSTEM: (1)REMOVE THE EXISTING GATE IN VSL BULWARK AND REPLACE WITH A REMOVALBE BOARD TYPE GATE. (2) ADD A STEP AFT OF THE BULWARK GATE. (3) PROVIDE MOUNTING BRACKETS FOR JACOB LADDER FWD OF GATE.
Condition: Unknown
Due 24 December 1997
Resolved 24 December 1997
Lifesaving
Issued 22 December 1997 Resolved
PROVIDE ON BOARD VSL RESPONSE PLAN APPROVAL LETTER.
Condition: Unknown
Due 22 January 1998
Resolved 4 March 1998

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.