Records from 1984 to 2006. Most recent: inspection, 13 September 2006.
Inspection history · 110
13 September 2006
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2777438
30 May 2006
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 2664620
29 May 2006
Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 2734808
25 August 2005
COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2471411
5 May 2005
MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2349752
12 January 2005
Administrative Inspection
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2273635
20 October 2004
Annual Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2222899
17 February 2004
Cargo Tank Internal · Internal Structural Exam · Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 2011572
20 November 2003
Annual Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1950682
8 September 2003
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1902292
3 January 2003
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1725632
10 October 2002
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1691169
16 September 2002
Annual Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1676167
30 May 2002
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1624548
28 April 2002
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1610268
28 April 2002
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1610282
21 February 2002
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1488810
14 February 2002
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1486701
30 November 2001
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 523223
29 August 2001
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1072017
25 July 2001
Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1070691
8 September 2000
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 822797
7 September 1999
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 787782
18 March 1999
Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 808358
24 February 1999
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 506488
7 January 1999
Hull Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1378715
26 October 1998
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 474416
15 September 1998
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 801118
21 May 1998
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1960
21 October 1997
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 777310
18 July 1997
Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1116137
11 May 1997
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 49413
11 May 1997
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 66051
23 April 1997
Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 447175
27 September 1996
MARPOL Annex V Examination · Hull Examination · COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1145970
23 February 1996
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 491170
23 August 1995
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 879012
10 March 1995
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 473068
2 March 1995
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 855430
25 January 1995
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 826343
16 October 1994
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 169382
29 September 1994
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 159531
29 September 1994
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 219225
29 September 1994
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 226276
23 September 1994
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1172509
19 August 1994
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 667045
12 August 1994
Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1176268
13 July 1994
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 667040
12 July 1994
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 48782
19 May 1994
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 105462
7 April 1994
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 667041
7 April 1994
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1165842
28 March 1994
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1370827
31 January 1994
Drydock Extension
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 853557
28 January 1994
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1162445
5 December 1993
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 214320
8 November 1993
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 526922
23 October 1993
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 485003
26 August 1993
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 848054
20 May 1993
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 451103
13 May 1993
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 439585
5 May 1993
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 7948
5 May 1993
Examination of Repairs
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 842008
27 January 1993
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1137464
25 November 1992
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1138489
13 November 1992
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 962100
14 October 1992
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1254748
5 October 1992
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1356156
22 July 1992
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1264629
17 July 1992
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 41119
2 June 1992
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 531644
11 March 1992
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 945335
12 February 1992
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1268595
12 September 1991
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 934139
6 September 1991
Hull Examination · Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 936106
15 July 1991
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 667042
15 May 1991
Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 903132
8 April 1991
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1235921
18 February 1991
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1225312
28 January 1991
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 916933
18 January 1991
Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1215421
19 December 1990
Damage Survey · COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1221073
14 June 1990
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 520140
4 June 1990
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 930488
30 March 1990
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1238106
17 January 1990
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 509333
6 November 1989
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 463541
23 February 1989
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 448791
30 January 1989
COI Inspection · Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1199011
5 October 1988
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 540413
30 June 1988
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 478262
19 April 1988
Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1036593
8 April 1988
Re-Inspection
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1031083
1 July 1987
Type not recorded
No type recorded · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1010599
1 June 1987
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1031682
13 April 1987
Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1330565
17 March 1987
Type not recorded
No type recorded · COTP PHILADELPHIA · USCG East District (CGD-E) · Activity 475190
13 March 1987
Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1323700
13 February 1987
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1324650
21 October 1986
Type not recorded
No type recorded · COTP PHILADELPHIA · USCG East District (CGD-E) · Activity 458003
8 August 1986
Credit Drydock
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1000118
11 April 1986
Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 999952
10 April 1986
Deficiency Check · Re-Inspection · MARPOL Annex I Examination
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1310853
24 December 1985
Type not recorded
No type recorded · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1303741
6 July 1985
Type not recorded
No type recorded · COTP PHILADELPHIA · USCG East District (CGD-E) · Activity 537526
18 June 1985
Type not recorded
No type recorded · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 979902
3 April 1985
Type not recorded
No type recorded · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 982355
23 February 1985
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 486673
16 February 1985
Type not recorded
No type recorded · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1287769
6 November 1984
Type not recorded
No type recorded · COTP PHILADELPHIA · USCG East District (CGD-E) · Activity 511304
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Communications
Issued 25 August 2005
Resolved
Prove proper operation of the #2S overfill alarm and the #5P high level alarm.
Action required: 705 - Other - as specified
Due 26 August 2005
Resolved 26 August 2005
Deck/Cargo › Cargo Stowage › General
Issued 25 August 2005
Resolved
Prove proper operation of the Deck Master guaging system for the #5P Cargo tank. Vessel is using manual guaging until xalibration is complete.
Action required: 705 - Other - as specified
Due 1 September 2005
Resolved 26 August 2005
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 20 October 2004
Resolved
Annual testing certificate is missing certification information for the testing of hoses and indivates that piping was tested at 100 psi (MAWP is 150). Provide proper testing and marking of all cargo piping and hoses.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 October 2004
Resolution: Received fax copy of Oil Transfer Hose and Pipeline Inspection Test record conducted on 20 October 2004. Also received e-mail from [name withheld] indicating that tests had been conducted and proper markings were on the hoses.
Pollution Prevention/Response › Prevention Equipment › Cargo Monitor/Control System
Issued 20 November 2003
Resolved
Prove proper operation of the high and overfill cargo tank alarms prior to next cargo loading.
Due 21 November 2003
Resolved 21 November 2003
Resolution: [name withheld] provided a fax''d statement attesting to completed repairs of the system and satisfactory testing.
Construction/Loadline › Hull › Hull Plating
Issued 20 November 2003
Resolved
Make permanent weld repairs to 3 wasted areas on the main deck i.w.o. stand pipes on 1 stbd cargo tank, 3 port cargo tank and the fwd flange of the pump room access hatch. Repairs to be completed and inspected by a USCG Marine Inspector no later than the January 2004 drydock period. LEGACY COMPONENT DESC: Hull Plating
Condition: Improper/Lack of Maintenance
Due 31 January 2004
Resolved 17 February 2004
Deck/Cargo › Cargo Stowage
Issued 20 November 2003
Resolved
Prove proper operation of the high and overfill cargo tank alarm system prior to the next loading. LEGACY COMPONENT DESC: Monitoring system
Condition: Improper/Lack of Maintenance
Due 21 November 2003
Resolved 21 November 2003
Resolution: Operator sent a fax statement attesting to the proper operation of the cargo system, accepted by ACID as sat proof of completed repairs.
Deck/Cargo
Issued 8 September 2000
Resolved
REPLACE VRS VACUUM GAUGE ON STARBOARD SIDE.
Condition: Unknown
Due 11 September 2000
Resolved 15 September 2000
Construction/Loadline
Issued 8 September 2000
Resolved
PROVIDE GAUGING REPORT OF DECK IN WAY OF PIPE RAILWAY STBD SIDE OF CENTERLINE IN WAY OF STBD CARGO TANK MANWAYS.
Condition: Unknown
Due 11 September 2000
Resolved 15 September 2000
Lifesaving
Issued 8 September 2000
Resolved
PRIOR TO CONDUCTING CARGO OPERATIONS WITH PRODUCTS IN EXCESS OF 5PPM OF BENZENE, BARGE PERSONNEL MUST HAVE BENZENE TRAINING WITHIN ONE YEAR OF CONDUCTING CARGO OPERATIONS._x001C_ _x001C_
Condition: Unknown
Due 11 September 2000
Resolved 15 September 2000
Lifesaving
Issued 8 September 2000
Resolved
SHOW PROOF OF ANNUAL BENZENE MONITORING OR CONDUCT A MONITORING ON THE NEXTCARGO OPERATION CONTAINING BENZENE.
Condition: Unknown
Due 11 September 2000
Resolved 15 September 2000
Lifesaving
Issued 8 September 2000
Resolved
PROVIDE ON BOARD SIGNS THAT IDENTIFY "REGULATED AREAS"._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 11 September 2000
Resolved 15 September 2000
Construction/Loadline
Issued 8 September 2000
Resolved
PROVIDE REPAIR PROPOSAL FOR PLATE REPLACEMENT AS DETERMINED BY GAUGING REPORT.
Condition: Unknown
Due 11 September 2000
Resolved 15 September 2000
Deck/Cargo
Issued 8 September 2000
Resolved
STENCIL "VAPOR" ON LAST METER OF VRS LINE AT MANIFOLD.
Condition: Unknown
Due 14 September 2000
Resolved 15 September 2000
Lifesaving
Issued 8 September 2000
Resolved
HAVE ON BOARD APPROPRIATE CONTAINERS FOR THE REMOVAL OF ON DECK OIL SPILLS OF AT LEAST (7) BARRELS.
Condition: Unknown
Due 11 September 2000
Resolved 15 September 2000
Deck/Cargo
Issued 8 September 2000
Resolved
REPLACE FLAME SCREEN TO ENSURE TIGHT FIT ON ANCHOR ENGINE FUEL TANK.
Condition: Unknown
Due 11 September 2000
Resolved 15 September 2000
Deck/Cargo
Issued 8 September 2000
Resolved
REPAIR PULL HANDLE AND STENCIL MARKINGS FOR EMERGENCY STOPS FOR CARGO PUMP ENGINE.
Condition: Unknown
Due 11 September 2000
Resolved 15 September 2000
Unknown
Issued 25 January 1995
Resolved
PROVIDE COAST GUARD APPROVED PLANS FOR THE RECENTLY INSTALLED COMPRESSED AIR PIPING.
Condition: Unknown
Due 25 January 1995
Resolved 25 January 1995
Engineering
Issued 23 September 1994
Resolved
PROVIDE APPROVED PLANS FOR NEWLY INSTALLED AIR RECEIVER AND ASSOCIATED PIPING. THE AIR RECEIVER IS NOT TO BE USED UNTIL APPROVED PLANS ARE RECEIVED, AN INSTALLATION TEST IS CONDUCTED AND THE AIR RECEIVER IS CG STAMPED. (SEE 46 CFR 54)
Condition: Unknown
Due 23 September 1994
Resolved 23 September 1994
Deck/Cargo
Issued 28 January 1994
Resolved
PRIOR TO LOADING INCOMPATIBLE CARGOES MAKE REPAIRS AND DEMONSTRATE OPERATION OF BUTTERFLY VALVES AT EACH CARGO TANK TRUNK.
Condition: Unknown
Due 28 January 1994
Resolved 28 January 1994
Documentation
Issued 28 January 1994
Resolved
ON 01FEB94 TANK BARGE IS RESTRICTED TO INLAND WATERS UNTIL BARGE IS REISSUED A PROPER LOADLINE CERTIFICATE, OR EXISTING CERTIFICATE IS EXTENDED.
Condition: Unknown
Due 28 January 1994
Resolved 28 January 1994
Construction/Loadline
Issued 5 May 1993
Resolved
Prior to movement of vessel, provide a marine chemist certificate in way ofthe damaged rake and present for Coast Guard internal examination of the forward rake.
Condition: Unknown
Due 19 July 1993
Resolved 19 July 1993
Deck/Cargo
Issued 5 May 1993
Resolved
Prior to transferring cargo using the forward manifold line (green valve) conduct a hydrostatic test and present documentation of same to the Coast Guard.
Condition: Unknown
Due 19 July 1993
Resolved 19 July 1993
Construction/Loadline
Issued 5 May 1993
Resolved
Upon completion of discharging the present cargo and prior to loading the next cargo, make permanent repairs to the damaged areas in way of the port bow rake and test to the satisfaction of the attending USCG inspector.
Condition: Unknown
Due 19 July 1993
Resolved 19 July 1993
Deck/Cargo
Issued 5 October 1992
Resolved
PRIOR TO LOADING AN INCOMPATIBLE CARGO DEMONSTRATE OPERATION OF SPRING LOADED HANDLE FOR BUTTERFLY VALVE AT EACH CARGO TANK TRUNK.
Condition: Unknown
Due 5 October 1992
Resolved 5 October 1992
Deck/Cargo
Issued 5 October 1992
Resolved
REMARK VAPOR COLLECTION SYSTEM (VCS) MANIFOLD CONNECTION VALVES PORT & STBDSIDES.
Condition: Unknown
Due 5 October 1992
Resolved 5 October 1992
Deck/Cargo
Issued 5 October 1992
Resolved
MARK TWO CARGO HOSES ON THE VESSEL'S STBD SIDE WITH "OIL SERVICE".
Condition: Unknown
Due 5 October 1992
Resolved 5 October 1992
Deck/Cargo
Issued 5 October 1992
Resolved
PRIOR TO UTILIZING VAPOR COLLECTION SYSTEM (VCS) DEMONSTRATE OPERATION OF THE OVERFILL & HIGH LEVEL ALARMS.
Condition: Unknown
Due 5 October 1992
Resolved 5 October 1992
Construction/Loadline
Issued 12 February 1992
Resolved
REMOVE OIL/ANTIFREEZE/DEBRIS FROM MACHINERY SPACE BILGES PRIOR TO 12MAR92 AND CORRECT ANTIFREEZE LEAK FROM EXPANSION TANK CAP FOR GENERATOR DIESEL PRIME MOVER.
Condition: Unknown
Due 11 March 1992
Resolved 11 March 1992
Construction/Loadline
Issued 12 February 1992
Resolved
MAKE PERMANENT REPAIRS TO STBD FWD RAKE BILGE SUCTION PIPE (RENEW MISSING 3' SECTION AT BOTTOM AND PROVIDE PROPER SIZE STRAINER WITH SCREEN) AND REFASTEN TO BLKHD. COMPLETE AT NEXT GAS FREEING OR DRYDOCKING AND NO LATER THAN 31JAN94.
Condition: Unknown
Due 12 February 1992
Resolved 12 February 1992
Electrical
Issued 12 February 1992
Resolved
REMOVE ALL WIRE NUTS ON WIRING AT BOTTOM OF TRANSFORMER MOUNTED ON BULKHEADAFT OF GENERATOR PANEL IN MACHINERY SPACE AND MAKE PERMANENT TYPE ELECTRICAL CONNECTIONS (46 CFR 111.60-17).
Condition: Unknown
Due 21 February 1992
Resolved 21 February 1992
Electrical
Issued 12 February 1992
Resolved
INVESTIGATE AND REPAIR CAUSE OF INOPERATIVE GROUND DETECTION SYSTEM ON GENERATOR PANEL IN MACHINERY SPACE. DEMONSTRATE PROPER OPERATION (46 CFR 111.05-21)
Condition: Unknown
Due 21 February 1992
Resolved 21 February 1992
Deck/Cargo
Issued 12 February 1992
Resolved
RENEW BROKEN CARGO TANK SECONDARY BLOCKING VALVE HAND WHEELS FOR #1 PORT, #2 STBD AND #1 STBD CARGO TANK STRIPPING VALVE HAND WHEEL. _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 21 February 1992
Resolved 21 February 1992
Engineering
Issued 12 February 1992
Resolved
MAKE REPAIRS TO BROKEN FUEL FILTER MOUNTING BRACKET ON STBD (GREEN) CARGO PUMP DIESEL PRIME MOVER LOCATED IN MACHINERY SPACE
Condition: Unknown
Due 21 February 1992
Resolved 21 February 1992
Fire Fighting
Issued 12 February 1992
Resolved
REPAIR OR REMOVE SCBA AND DEMONSTRATE OPERATION OF LOW PRESSURE ALARM.
Condition: Unknown
Due 11 March 1992
Resolved 11 March 1992
Deck/Cargo
Issued 12 February 1992
Resolved
MAKE ALL HEATING COIL CONTROL VALVE STEMS VAPOR TIGHT WHERE STEM PENETRATESMAIN DECK AT EACH CARGO TANK.
Condition: Unknown
Due 11 March 1992
Resolved 11 March 1992
Engineering
Issued 12 February 1992
Resolved
MAKE REPAIRS TO LEAK AT UNION ON SUPPLY PIPE OF DIESEL FUEL DAY TANK LOCATED PORT AFT MACHINERY SPACE
Condition: Unknown
Due 21 February 1992
Resolved 21 February 1992
Deck/Cargo
Issued 12 September 1991
Resolved
THE VAPOR RECOVERY SYSTEM IS NOT TO BE PLACED IN OPERATION TO ANY SHORE FACILITY UNTIL IT HAS BEEN TESTED IN ACCORDANCE WITH APPROVED PLANS.
Condition: Unknown
Due 19 December 1992
Resolved 24 October 1991
Deck/Cargo
Issued 8 April 1991
Resolved
THE VESSEL WAS NOT FITTED WITH AN ADEQUATE MECHANICAL MEANS OF CLOSING EACHSCUPPER WITHIN THE COAMING AS REQUIRED BY 33 CFR 155.310(B)(3).
Condition: Unknown
Due 8 April 1991
Resolved 8 April 1991
Deck/Cargo
Issued 8 April 1991
Resolved
THE GOOSENECK VENTS ON THE STERN OF THE VESSEL FOR THE BELOW DECK FUEL OIL TANKS WERE NOT FITTED WITH ANY MEANS OF CONTAINMENT IN THE EVENT OF AN OVERFLOW AS REQUIRED BY 33 CFR 155.320(B)(2).
Condition: Unknown
Due 8 April 1991
Resolved 8 April 1991
Deck/Cargo
Issued 28 January 1991
Resolved
THE VAPOR RECOVERY SYSTEM IS NOT TO BE PLACED IN OPERATION TO ANY SHORE _x001C_ FACILITY UNTIL IT HAS BEEN TESTED IN ACCORDANCE WITH CG APPROVED PLANS AND_x001C_THE VESSEL'S OIL TRANSFER PROCEDURES UPDATED.
Condition: Unknown
Due 28 January 1991
Resolved 28 January 1991
Deck/Cargo
Issued 19 December 1990
Resolved
THE THERMAL FLUID HEATER IS NOT TO BE ELECTRICALLY RECONNECTED AND/OR PLACED IN OPERATION UNTIL IT IS INSPECTED AND TESTED IN THE PRESENCE OF A CG MARINE INSPECTOR.
Condition: Unknown
Due 19 December 1990
Resolved 19 December 1990
Deck/Cargo
Issued 19 December 1990
Resolved
THE VAPOR RECOVERY SYSTEM IS NOT TO BE PLACED IN OPERATION UNTIL IT HAS BEEN TESTED IN ACCORDANCE WITH COAST GUARD APPROVED PLANS AND THE VESSEL'S OIL TRANSFER PROCEDURES UPDATED._x001C_ _x001C_
Condition: Unknown
Due 19 December 1990
Resolved 19 December 1990
Electrical
Issued 19 December 1990
Resolved
PKROVE PROPER OPERATION OF THE LOW LUBE OIL AND HIGH WATER TEMP SHUTDOWNS FOR THE CARGO PUMP ENGINES KAND SHIP'S SERVICE GENERATOR.
Condition: Unknown
Due 19 December 1990
Resolved 19 December 1990
Electrical
Issued 30 March 1990
Resolved
PROVIDE RUBBER MAT IN FRONT OF SWITCHBOARD.
Condition: Unknown
Due 30 March 1990
Resolved 30 March 1990
Electrical
Issued 30 March 1990
Resolved
PROVIDE BATTERY BOX FOR GENERATOR STARTING BATTERY.
Condition: Unknown
Due 30 March 1990
Resolved 30 March 1990
Construction/Loadline
Issued 8 April 1988
Resolved
MAKE BOW RAKE AVAILABLE FOR A MARINE INSPECTOR. RAKE TO BE GAS FREE AND SAFE TO ENTER.
Condition: Unknown
Due 8 April 1988
Resolved 8 April 1988
Fire Fighting
Issued 8 April 1988
Resolved
PROVIDE A COPY OF FIRE EXTINGUISHERS SERVICING CERTIFICATE.
Condition: Unknown
Due 8 April 1988
Resolved 8 April 1988
Electrical
Issued 13 March 1987
Resolved
PROVIDE LABEL ON SPARE CIRCUIT BREAKER THAT STATES "SPARE."
Condition: Unknown
Due 13 March 1987
Resolved 13 March 1987
Construction/Loadline
Issued 13 March 1987
Resolved
RENEW THE THIRD VENT PIPE INBOARD FROM STARBOARD SIDE, LOCATED FORWARD OF THE ACCESS TO THE RAKE.
Condition: Unknown
Due 13 March 1987
Resolved 13 March 1987
Engineering
Issued 13 March 1987
Resolved
PROVIDE A CALIBRATED GAUGE FOR THE AIR RECEIVER. REQUIREMENT E3 DTD 13FEB87 BY MIO NEW YORK WILL REMAIN OUTSTANDING UNTIL A TEST IS WITNESSED USING A CALIBRATED GAUGE.
Condition: Unknown
Due 13 March 1987
Resolved 13 March 1987
Deck/Cargo
Issued 13 February 1987
Resolved
REPLACE FLAME SCREENS ON #1 AND #2 PORT AND STARBOARD CARGO TANK P.V. VALVES.
Condition: Unknown
Due 13 February 1987
Resolved 13 February 1987
Engineering
Issued 13 February 1987
Resolved
PRIOR TO USE, PROVE PROPER OPERATION OF THERMAL FLUID HEATER AUTOMATION, SAFETY VALVES, AND ALARMS.
Condition: Unknown
Due 13 February 1987
Resolved 13 February 1987
Electrical
Issued 13 February 1987
Resolved
FILL OPENING IN MAIN ELECTRICAL BOARD FRONT PANEL.
Condition: Unknown
Due 13 February 1987
Resolved 13 February 1987
Unknown
Issued 13 February 1987
Resolved
PROVE PROPER OPERATION OF AIR RECEIVER RELIEF VALVE.
Condition: Unknown
Due 13 February 1987
Resolved 13 February 1987
Deck/Cargo
Issued 13 February 1987
Resolved
PRIOR TO USE, PROVE PROPER OPERATION OF REMOTE SHUTDOWN OF AFT PORT CARGO PUMP.
Condition: Unknown
Due 13 February 1987
Resolved 13 February 1987
Deck/Cargo
Issued 10 April 1986
Resolved
HYDRO TEST CARGO HOSE AND PIPING.
Condition: Unknown
Due 10 April 1986
Resolved 10 April 1986
Deck/Cargo
Issued 10 April 1986
Resolved
TEST SAFETY CONTROLS AND DEVICES ON THERMAL FLUID HEATER.
Condition: Unknown
Due 10 April 1986
Resolved 10 April 1986
Engineering
Issued 16 February 1985
Resolved
MAKE AVAILABLE FOR 1 1/4 MAWP HYDRO THE GEN SERVICE AIR RECEIVER.
Condition: Unknown
Due 16 February 1985
Resolved 16 February 1985
Electrical
Issued 16 February 1985
Resolved
PROVIDE LIGHT GLOBES IN E/R AS REQUIRED.
Condition: Unknown
Due 16 February 1985
Resolved 16 February 1985
Navigation
Issued 16 February 1985
Resolved
PROVE PROPER OPERATION OF INSTALLED FLASHING AMBER LIGHT.
Condition: Unknown
Due 16 February 1985
Resolved 16 February 1985
Deck/Cargo
Issued 16 February 1985
Resolved
CORRECT MISALIGNMENT OF CARGO PUMP EMERGENCY TRIPS AT ENGINE.
Condition: Unknown
Due 16 February 1985
Resolved 16 February 1985
Electrical
Issued 16 February 1985
Resolved
PROVE PROPER OPERATION OF MACHINERY SPACE VENTILATION TRIPS.
Condition: Unknown
Due 16 February 1985
Resolved 16 February 1985
Deck/Cargo
Issued 16 February 1985
Resolved
OPEN FOR EXAMINATION BY A CG MARINE INSPECTOR ALL P/V VALVES.
Condition: Unknown
Due 16 February 1985
Resolved 16 February 1985
Deck/Cargo
Issued 16 February 1985
Resolved
HYDRO TEST CARGO HOSES.
Condition: Unknown
Due 16 February 1985
Resolved 16 February 1985
Fire Fighting
Issued 16 February 1985
Resolved
PROVIDE BII FIRE EXTINGUSIHER FOR ANCHOR WINCH ENG. SPACE IN LIEU OF BI.
Condition: Unknown
Due 16 February 1985
Resolved 16 February 1985