07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 28 November 2023
Resolved
Fire-fighting systems and appliances shall be kept in good working order and readily available for immediate use.
The remote reach rods for “emer. fire pump cut out valve” located on the starboard side of the aft deck are seized, and one valve handle is broken. Repair and prove proper operation of all reach rods for emergency fire pump / fire main to the attending ABS surveyor.
Update 12/27/23: at request of the vessel PIC, the due date has been extended for 30 days; now due 1/28/24.
Update 1/26/24: at request of the vessel PIC, the due date has been extended for an additional 30 days; now due 2/28/24.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 December 2023
Resolved 27 February 2024
Resolution: Received ABS report no. 6274617, which reports that the noted reach rods were serviced/repaired and proven fully operational to the satisfaction of the attending ABS surveyor.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 28 November 2023
Resolved
Emergency lighting shall be provided at every boat station on deck and oversides and in all alleywells, stairways, and exits. All emergency lights shall be marked with a letter “E” at least ½ inch high.
Various e-lighting for emergency escape scuttles/trunks from the starboard tunnel space and some aft cargo holds were found not illuminated. Additionally, various e-lighting around the lifeboats and in the aforementioned escape scuttles were not properly marked. Ensure all e-lights throughout the vessel are illuminated and properly marked to the satisfaction of the attending ABS surveyor.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 December 2023
Resolved 27 December 2023
Resolution: Per ABS report no. 6191017, the noted areas of emergency lighting were found illuminated and new markings found applied in the missing areas to the satisfaction of the attending ABS surveyor.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 28 November 2023
Resolved
Fire-fighting systems and appliances shall be kept in good working order and readily available for immediate use.
The “vent fans fwd” button on the "vent-fan emerg stop station" on the bridge did not stop either the forward accommodation or forward cargo hold vent fans when tested. Determine which vent fan(s) this remote stop controls and demonstrate its proper functionality to the satisfaction of the attending ABS surveyor. Additionally, provide a hammer or other arrangement to expediently access the ‘break-glass’ enclosure in case of an emergency.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 December 2023
Resolved 27 December 2023
Resolution: Per ABS report no. 6191017, the noted stop button on the bridge was operated and relevant fans proven to shut down. A break-glass hammer was attached to the station to the satisfaction of the attending ABS surveyor.
99 - Other › N/A - No Subsystem › Other (MARPOL operational)
Issued 28 November 2023
Resolved
A ship of >300 gross tons must have a fixed container or enclosed deck area under or around each fuel oil or bulk lubricating oil tank vent, overflow, and fill pipe that has a capacity of one barrel.
Fuel oil containment for vent for a double bottom tank on starboard side, approximately halfway on the aft deck (specific label not legible) is wasted and holed. Nearby containments also appear suspect; all to be close-up inspected and repaired as necessary to the satisfaction of the attending ABS surveyor.
Update 12/27/23: at request of the vessel PIC, the due date has been extended for 30 days; now due 1/28/24.
Update 1/26/24: at request of the vessel PIC, the due date has been extended for an additional 30 days; now due 2/28/24.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 December 2023
Resolved 27 February 2024
Resolution: Received ABS report no. 6274617, which reports that the holed containment including the adjacent containment were cropped and renewed to the satisfaction of the attending ABS surveyor.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 28 November 2023
Resolved
Maintenance, testing, and inspection shall be carried out based on the guidelines developed by the Organization and in a manner having due regard to ensuring the reliability of fire-fighting systems and appliances. A sampling of detectors and manual call points shall be tested monthly so that all devices have been tested within 5 years.
At time of attendance there was not objective evidence available onboard that a percentage of manual call points were being tested monthly, and locations tracked to ensure all are tested within a 5 year period.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 December 2023
Resolved 27 December 2023
Resolution: Per ABS report no. 6191017, A-deck stations were sampled/tested and proven satisfactory at this time. A monthly PM has been added to the vessle maintenance/monitoring schedule at this time.
11 - Life Saving Appliances › N/A - No Subsystem › Thermal Protective Aids
Issued 28 November 2023
Resolved
Lifesaving appliances and arrangements required by this part shall be approved by the Administration. The approval series for thermal protective aids is 160.174. NVIC 02-19 discusses approval under a MRA. All items covered under the MRA must be marked with the appropriate USCG approval number.
The thermal protective aids found in the starboard lifeboat are Datrex model TPS, part number DX1529M and do not have any markings indicating CG type approval. Provide proof that these thermal protective aids have CG type approval, or replace any non-CG type approved
thermal protective aids with the proper type.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 December 2023
Resolved 27 December 2023
Resolution: Per ABS report no. 6191017, the thermal protective aids were replaced with Hansen - Ascotherm MK IV type with USCG approval No. 160.174/3/0.
10 - Safety of Navigation › N/A - No Subsystem › Rudder angle indicator
Issued 28 November 2023
Resolved
The navigational equipment and systems referred to in this regulation shall be so installed, tested, and maintained as to minimize malfunction.
The rudder angle indicator located on the port side of the wheelhouse near the GMDSS suite reads approximately 5 degrees to port when the rudder is amidship. Also, the rudder angle indicator on the port bridge wing reads approximately 2 degrees off.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 December 2023
Resolved 27 December 2023
Resolution: Per ABS report no. 6191017, the suspect indicator was replaced on the aft port side of the bridge and steering system tested. Both indicators read the samme rudder angle to the satisfaction of the attending ABS surveyor.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 16 August 2023
Resolved
The following fire protection systems shall be kept in good order so as to ensure their required performance if a fire occurs: structural fire protection, including fire-resisting divisions, and protection of openings and penetrations in these divisions.
The following fire doors were found with issues as noted below:
-Cargo hold E deck centerline stairwell door does not close and latch.
-Door 232 from officer’s mess into galley; door catches on the frame.
-Aft house 01 deck port side stairwell door does not close and latch.
-Aft house 02 deck port side stairwell door doorknob pulled off when tested.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 September 2023
Resolved 11 September 2023
Resolution: During ABS and CG attendance on 9/5/23, all doors were satisfactory fixed with exception of aft house 02 deck door. This was subsequently confirmed as satisfactory by ABS on 9/11/23 as documented in report no. 5963481.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 16 August 2023
Resolved
The following fire protection systems shall be kept in good order so as to ensure their required performance if a fire occurs: fire detection and fire alarm systems.
FOS fire detection panel unit in the aft house showed a
trouble alarm at time of attendance.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 September 2023
Resolved 5 September 2023
Resolution: Fault was for A deck hold 3 area. Some detector heads were cleaned and some others replaced. Fault not longer present at time of CG MI attendance on 9/5/23.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 16 August 2023
Resolved
Maintenance, testing, and inspection shall be carried out based on the guidelines developed by the Organization and in a manner having due regard to ensuring the reliability of fire-fighting systems and appliances. Portable containers or portable tanks containing foam concentrate, excluding protein based concentrates, less than 10 years old, that remain factory sealed can normally be accepted without the periodical foam control tests required in MSC.1/Circ.1312 being carried out.
Portable foam containers in the emergency gear locker in the aft house have a date label of 11/04/04, and there is no record of periodical foam testing being carried out since.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 September 2023
Resolved 11 September 2023
Resolution: As per ABS report no. 5963481, new foam canisters with foam dated from 2023 were provided onboard. Same was confirmed by attending CG MI.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 16 August 2023
Resolved
Fire-fighting systems and appliances shall be kept in good working order and readily available for immediate use.
The following fire station valves found leaking by when fire main was pressurized:
-Station 40.
-Station 26.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 September 2023
Resolved 5 September 2023
Resolution: CG MI confirmed that two leaking valves were replaced with new valves. No leakages were observed when fire main was pressurized.
09 - Working and Living Conditions › 092 - Working Conditions › Gas instruments
Issued 16 August 2023
Resolved
Every ship to which chapter I applies shall carry an appropriate portable atmosphere testing instrument or instruments. Suitable means shall be provided for the calibration of all such equipment.
Vessel currently has MSA multigas meters, for which the manufacturer’s instructions call for bump testing prior to use. The calibration gas currently provided onboard expired as of 7/13/23, and the SR 3212310 raised for new calibration gas has not been filled/new calibration gas supplied onboard as of date of CG inspection (8/16/23).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 September 2023
Resolved 5 September 2023
Resolution: New span gas was provided onboard and sighted by the attending CG MI.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 16 August 2023
Resolved
The following fire protection systems shall be kept in good order so as to ensure their required performance if a fire occurs: structural fire protection, including fire-resisting divisions, and protection of openings and penetrations in these divisions.
The following electrical penetrations in fire boundaries found not properly sealed:
-Starboard tunnel rock-block style penetration near cargo hold 6-7.
-Cargo hold E deck port side near cargo hold 1.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 September 2023
Resolved 5 September 2023
Resolution: The starboard tunnel rock-block style penetration was redone to be properly arranged. The cargo hold E deck penetration was properly sealed with firestop sealant.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 16 August 2023
Resolved
The Company should identify equipment and technical systems the sudden operational failure of which may result in hazardous situations. The safety management system should provide for sufficient measures aimed at promoting the reliability of such equipment or systems.
The inventory for various critical spare parts are below the minimum ROB inventory established by the ISM Company. This issue was noted during the external ISM-DOC audit on 11/28/22 (finding no. 435) and also during the internal ISM-SMC audit on 6/8/23 (finding no. 3). The provided corrective action plan for internal audit finding no. 3 indicates that some spares were ordered, but the budget for ordering critical spares in FY23 has been exhausted prior to orders being placed for all critical spare parts needed to obtain the minimum ROB quantity, with SR3212271 for replenishing critical spares for FY24.
Provide a corrective action plan to the satisfaction of
both CG and ABS for how the critical spare parts
requirements will be achieved in a timely fashion.
Update 9/29/23: The due date for this deficiency has been extended to 11/1/23 based on the operator's report that MARAD intends to allocate funding for continued procurement of spare parts, and work to revise the critical spare parts list is in progress.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 September 2023
Resolved 30 November 2023
Resolution: The critical spare parts lists has been revised and standardized across the FSS class. Requisitions have been raised and approved for critical spares below the min ROB quantity. Approximately 20 items remain to be filled at this time.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 16 August 2023
Resolved
After any survey of the ship under regulations 7,8, 9, or 10 has been completed, no change shall be made in the structural arrangements, machinery, equipment, or other items covered by the survey, without the sanction of the Administration.
-Drain pipe leading out to port side forecastle deck in vicinity of frame 300 is holed.
-Electrical kickup penetration on port side forecastle deck is wasted and holed.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 September 2023
Resolved 5 September 2023
Resolution: The holed section of drain pipe was cropped and renewed. The electrical kickpipe penetration was removed and the deck found satisfactory sealed.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 7 December 2022
Resolved
The following fire protection systems shall be kept in good order so as to ensure their required performance if a fire occurs: [.1] structural fire protection, including fire-resisting divisions, and protection of openings and penetrations in these divisions.
-Fire screen doors for entry to cargo hold 2 from main deck of forward house, port and starboard side, are not properly sealing to prevent the passage of flame and smoke as required for class A divisions.
-Electrical penetration above the door for entry to cargo hold 2 from the forward house, main deck, port side, is not properly sealed.
-Electrical penetration in aft house, main deck, amidships, on aft bulkhead, is of mismatched type (e.g. mixing rock-block type and fire resistant putty).
-Ventilation dampers for the heaters in the port and starboard fan rooms (main deck, forward house) are severely wasted and seized.
-Manual ventilation cover for supply for CO2 room (located on aft bulkhead of aft house) has a wasted lip.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 January 2023
Resolved 3 February 2023
Resolution: ABS report no. 5599596, dated 2/3/23, reports that the noted fire protection items were repaired and properly reinstalled to the satisfaction of the attending Surveyor.
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 7 December 2022
Resolved
The master of every new ship shall be supplied with sufficient information, in an approved form, to enable him to arrange for the loading and ballasting of his ship.
Current ILLC, certificate no. 72707401-4259263-043 states “The vessel shall be operated in accordance with the Trim and Stability Booklet, Drawing Number 4843856, Rev D, bearing the ABS Americas approval stamp dated 22 November 2006.” The most current version of the Trim and Stability Booklet onboard is Rev F, with associated ABS Houston Letter Ref T1300718 dated 24-Dec-14. The version of CargoMax currently in use is build 2.1.0243 dated 9/22/2014. Also, Ref F of the Trim and Stability Booklet makes multiple references to Military Sealift Command (ex: “These differences should be reported immediately to the MSC Headquarters’ Naval Architecture Branch (MSC Code N721)”). Resolve to the satisfaction of ABS.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 January 2023
Resolved 22 March 2023
Resolution: Per ABS report no. 5671931, the certificate module was re-generated and loadline certificate re-issued at this time to reflect the latest trim/stability booklet and review.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 7 December 2022
Resolved
Fire-fighting systems and appliances shall be kept in good working order and readily available for immediate use.
Emergency fire pump discharge valve found leaking near the bonnet.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 January 2023
Resolved 3 February 2023
Resolution: ABS report no. 5599596, dated 2/3/23 reports that the leaking emergency fire pump valve was repaired and proven free of leakage to the satisfaction of the attending Surveyor.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 7 December 2022
Resolved
Manholes and flush scuttles in position 1 or 2 shall be closed by substantial covers capable of being made watertight.
The following scuttles were found with wasted or holed lids/covers:
-cargo hold 7 aft port side.
-cargo hold 7 aft starboard side.
-cargo hold 8 forward starboard side.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 January 2023
Resolved 3 February 2023
Resolution: ABS report no. 5599596, dated 2/3/23 reports that the noted scuttles were cleaned and repaired to the satisfaction of the attending Surveyor and found properly installed in their designated locations.
09 - Working and Living Conditions › 092 - Working Conditions › Ventilation (Working spaces)
Issued 7 December 2022
Resolved
After any survey of the ship under regulations 7,8, 9, or 10 has been completed, no change shall be made in the structural arrangements, machinery, equipment, or other items covered by the survey, without the sanction of the Administration.
Exhaust fan for the forward rope locker is inop. Lock-out/tag-out tag No. ANT 009 from 3/21/16 states “need new motor”.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 January 2023
Resolved 3 February 2023
Resolution: ABS report no. 5599596, dated 2/3/23 reports that the fan motor was replaced and fan proven fully operational to the satisfaction of the attending Surveyor.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 7 December 2022
Resolved
Hot surfaces likely to come into contact with the crew during operations are to be suitably guarded or insulated.
Lagging is missing on flanges for steam piping inboard
of the port condenser.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 January 2023
Resolved 3 February 2023
Resolution: ABS report no. 5599596, dated 2/3/23 reports that the missing lagging was installed and examined to the satisfaction of the attending Surveyor.
08 - Alarms › N/A - No Subsystem › Steering gear alarm
Issued 7 December 2022
Resolved
Ships shall be provided with a main steering gear to the satisfaction of the Administration.
When operating on emergency steering from the steering flat, there is an intermittent “steering failure” alarm that activates at the bridge console. This seems to routinely activate when going to from amidships to starboard, when passing around 10 degrees to starboard.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 January 2023
Resolved 22 March 2023
Resolution: Per ABS report no. 5671931, the emergency steering was operated in the presence of the attending Surveyor and found free of alarms. Reportedly the steering console on bridge must be set to NFU to avoid steering failure alarms when operated locally.
99 - Other › N/A - No Subsystem › Other (MARPOL operational)
Issued 7 December 2022
Resolved
A ship of >300 gross tons must have a fixed container or enclosed deck area under or around each fuel oil or bulk lubricating oil tank vent, overflow, and fill pipe that has a capacity of one barrel.
Fuel oil containment for vent for double bottom 08-P DFM (located port side, on aft bulkhead of aft house) is wasted and holed. 12/28/22: Double Bottom 09-P-DFM found wasted and holed.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 January 2023
Resolved 26 January 2023
Resolution: Steel repairs were made to a total of three fuel oil containments and found satisfactory by the attending MI.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 December 2022
Resolved
All electrical apparatus shall be so constructed and so installed that danger of injury in ordinary handling shall not exist.
Dead end wiring noted near purifiers and in starboard side shaft alley.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 January 2023
Resolved 3 February 2023
Resolution: ABS report no. 5599596, dated 2/3/23 reports that the noted electrical wiring was properly terminated and secured to the satisfaction of the attending Surveyor.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 7 December 2022
Resolved
After any survey of the ship under regulations 7,8, 9, or 10 has been completed, no change shall be made in the structural arrangements, machinery, equipment, or other items covered by the survey, without the sanction of the Administration.
RPM gauge for emergency generator is reading erratically.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 January 2023
Resolved 3 February 2023
Resolution: ABS report no. 5599596, dated 2/3/23 reports that the emergency generator tachometer was repaired/replaced and proven fuly operational and accurate to the satisfaction of the attending Surveyor.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 7 December 2022
Resolved
After any survey of the ship under regulations 7,8, 9, or 10 has been completed, no change shall be made in the structural arrangements, machinery, equipment, or other items covered by the survey, without the sanction of the Administration.
-Drain pipe on forecastle deck, starboard side, near fire station #10 is holed near the overhead.
-A section of steel drain pipe at overhead in cargo hold B deck, hold 1, has been replaced with PVC piping.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 January 2023
Resolved 3 February 2023
Resolution: ABS report no. 5599596, dated 2/3/23 reports that the noted sections of drain piping were permanently repaired/replaced with approved plan material to the satisfaction of the attending Surveyor.
09 - Working and Living Conditions › 092 - Working Conditions › Ventilation (Working spaces)
Issued 7 December 2022
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons onboard.
Multiple debris screens for cargo hold ventilation trunks are wasted or holed. Repair or replace to the satisfaction of ABS.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 January 2023
Resolved 3 February 2023
Resolution: ABS report no. 5599596, dated 2/3/23 reports that the noted holed/wasted cargo hold ventilation debris screens were repaired/replaced with new screens to the satisfaction of the attending Surveyor.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Sulphur oxides
Issued 13 December 2021
Resolved
While ships are operating within an Emission Control Area (ECA), the sulphur content of fuel oil used on board ships shall not exceed the following limits: 0.10% m/m [14.4]. The sulphur content of fuel oil used or carried for use on board a ship shall not exceed 0.50% m/m [14.1].
Supplement to IAPP (SOVC), no. 7207401-4259263-391, indicates that when the ship operates inside an ECA, the ship uses fuel oil with a sulphur content that does not exceed 0.10% m/m.
Vessel used HFO with a sulphur content >0.5 % during recent turbo-activation in August-September 2021 (voyage entirely within North American ECA). Additionally, approximately 4000 mt of HFO with a sulphur content of >0.5 % remains board at this time.
Develop and implement corrective action plan to the satisfaction of CG and ABS.
Note: any exemption from the requirements of MARPOL VI/14 would require approval from CG HQ.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 March 2022
Resolution: MARAD has elected to surrender the IAPP SOVC iaw the allowance in CVC-4 letter 16711, serial no. 132, of 5/29/2019. ABS has issued a Statement of Fact, no. 7207401-5198402-502, documenting that vessel does not comply with MARPOL VI/14 (SOx).
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 13 December 2021
Resolved
Fire-fighting systems and appliances shall be kept in good working order and readily available for immediate use.
There are six items relating to the CO2 system called out on Harris Fire Protection report no. 1226353 of 9/29/21, including ER hose reel hose needing replacement due to dry rotting, and multiple flex hoses.
In addition to the listed items in report no. 1226353, during ACP annual it was noted that CO2 flex hoses for two bottles in forward battery room are located directly against each other and thus liable to chafing.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 January 2022
Resolution: Accepted by ABS as condition of ACS on 1/3/21 in ABS report no. 5068212; finding no. 1112. Actual rectification of deficient conditions reported to be completed on 1/14/22.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 13 December 2021
Resolved
Every fuel oil suction pipe from a storage, settling, or daily service tank situated above the double bottom shall be fitted with a cock or valve capable of being closed from outside the space concerned in the vent of a fire arising in the space in which such tanks are situated.
Remote pull/actuation cable for EDG fuel shutdown at governor parted when tested during inspection.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 January 2022
Resolution: Accepted by ABS as condition of ACS on 1/3/21 in ABS report no. 5068212; finding no. 1113. Remote pull cable arrangement repaired and tested in presence of ABS and CG on 1/14/22.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 13 December 2021
Resolved
Maintenance, testing, and inspections shall be carried out based on the guidelines developed by the Organization [IMO MSC Circ 1432] and in a manner having due regard to ensuring the reliability of fire-fighting systems and appliances.
IMO MSC Circ 1432/5.9 requires that portable fire extinguishers are checked monthly to verify that they are in place, properly arranged, and in proper condition.
There is no objective evidence of checks of the portable fire extinguishers being carried out at the required monthly intervals.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 January 2022
Resolution: Accepted by ABS as condition of ACS on 1/3/21 in ABS report no. 5068212; finding no. 1114. Fire extinguisher tags endorsed for monthly check by ship's staff on 1/22 and monthly PM job has been added in NSE.
10 - Safety of Navigation › N/A - No Subsystem › Pilot ladders and hoist/pilot transfer arrangements
Issued 13 December 2021
Resolved
All arrangements for pilot transfer shall efficiently fulfill their purpose of enabling pilots to embark and disembark safely. The appliances shall be kept clean, properly maintained and stowed and shall be regularly inspected to ensure that they are safe to use [23.2.1]. Arrangements shall be provided to enable the pilot to embark and disembark safely on either side of the ship [23.3.1].
One of pilot ladders found with three damaged steps.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 January 2022
Resolution: Accepted by ABS as condition of ACS on 1/3/21 in ABS report no. 5068212; finding no. 1115. New pilot ladder delivered onboard and sighted by ABS and CG on 1/14/22.
11 - Life Saving Appliances › N/A - No Subsystem › Line-throwing appliance
Issued 13 December 2021
Resolved
Ships shall carry a line-throwing appliance of an approved type.
Line throwing appliances have expiry date of 10/2021.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 January 2022
Resolution: Accepted by ABS as condition of ACS on 1/3/21 in ABS report no. 5068212; finding no. 1116. New rockets replaced and verified by the attending surveyor on 1/19/22.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 13 December 2021
Resolved
The following fire-protection systems shall be kept in good working order so as to ensure their required performance if a fire occurs: [.2] fire detection and fire alarm systems.
ROS fire detection system showing fault in zone 5.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 December 2021
Resolution: Per ABS report no. 5068212, it is reported that the fault has been cleared and verified to the satisfaction of the attending ABS surveyor.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 13 December 2021
Resolved
The means for securing and maintaining weathertightness shall be to the satisfaction of the Administration.
Multiple locations of pooled water found on “A” deck. It is reported that water is leaking into the cargo hold from the hatch coaming of the cargo accordion-style hatch above.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 January 2022
Resolution: Accepted by ABS as condition of ACS on 1/3/21 in ABS report no. 5068212; finding no. 1118. Cargo hatch coaming cleaned of debris and hose tested in presence of ABS and CG on 11/14/22 with no water ingress observed.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 13 December 2021
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board.
“A” deck to “B” deck cargo ramp has transverse support member that is completely wasted through in several locations. Additionally, one dog has hydraulic leak that is dripping onto the flexible water drain hose and the ramp below.
*No cargo authorized for carriage on B deck and below until transverse support member is repaired.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 January 2022
Resolved 3 January 2022
Resolution: Accepted by ABS as condition of ACS on 1/3/21 in ABS report no. 5068212; finding no. 1119. Actual rectification occurred on 4/26/22 via crop-and-renew of wasted area, as documented in ABS report no. 5215456.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 13 December 2021
Resolved
The Company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations [10.1]. In meeting these requirements, the Company should ensure that appropriate corrective action is taken for any non-conformity reported [10.2.3].
Subject vessel has PMP class notation. Most recent Condition Monitoring Service Report, no. 2021051, dated 11-2021, includes six red (“major discrepancy, repair immediately”) findings from thermal imaging and eight red (“major discrepancy, repair immediately”) findings from vibration analysis. Three of the red items from the vibration analysis (standby fire pump, stbd A/C fan fwd, and supply Fan TAS-3) have been noted as red in the last 3 annual reports.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 January 2022
Resolved 26 April 2022
Resolution: Per ABS report no.5215456, the 6 major thermal imaging discreps were corrected by the ship's electrician + documented in NSE. The 8 major vibration analysis discreps were corrected, w/ exception of fans TAS-3, SE-33, SE-32 - new ABS finding 1141 raised.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 13 December 2021
Resolved
The following fire-protection systems shall be kept in good working order so as to ensure their required performance if a fire occurs: [.1] structural fire protection.
Structural fire protection on lower ~3 feet of aft and outboard bulkheads of port and starboard fan room in forward house was removed during renewal of steel bulkheads and not replaced.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 January 2022
Resolved 3 January 2022
Resolution: Accepted by ABS as condition of ACS on 1/3/21 in ABS report no. 5068212; finding no. 1121. Structural fire protection reported renewed to satisfaction of attending ABS surveyor on 2/15/22, as per ABS report no. 5142688.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 13 December 2021
Resolved
The following fire-protection systems shall be kept in good working order so as to ensure their required performance if a fire occurs: [.1] structural fire protection, including protection of openings and penetrations in these divisions.
Electrical penetrations from forward house main deck passageway into electrical distribution room not properly sealed.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 January 2022
Resolved 3 January 2022
Resolution: Accepted by ABS as condition of ACS on 1/3/21 in ABS report no. 5068212; finding no. 1122. Electrical penetrations re-packed with IMO/CG-type approved fire stop sealant and sighted by CG and ABS on 1/14/22.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 13 December 2021
Resolved
The following fire-protection systems shall be kept in good working order so as to ensure their required performance if a fire occurs: [.2] fire detection and fire alarm systems.
Heat detector in “A” deck, hold 3, port side found disattached from mounting bracket and hanging by power wires.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 January 2022
Resolved 28 December 2021
Resolution: Per ABS report 5068212, the noted detector is reported to be re-installed and verified to the satisfaction of the attending ABS surveyor.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 13 December 2021
Resolved
Fire-fighting systems and appliances shall kept in good working order and readily available for immediate use.
Fire stations 57, 63, and 74 found to be leaking by at the hydrant valve.
Fire station 62 found with gatorade bottle on pipe termination.
Note: it is understood that fire main has been winterized for the season. Repairs to be confirmed upon the system being put back in service.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 January 2022
Resolved 3 January 2022
Resolution: Accepted by ABS as condition of ACS on 1/3/21 in ABS report no. 5068212; finding no. 1124. Fire hydrant valves have been replaced, fire main energized, and no leakages observed by ABS and CG on 1/14/22.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 13 December 2021
Resolved
The following fire-protection systems shall be kept in good working order so as to ensure their required performance if a fire occurs: [.1] structural fire protection, including fire-resisting divisions, and protection of openings of these divisions.
The following fire screen doors in the aft house found to not be fully closing and latching: crew laundry, door 266 main deck to engine room, SCBA compressor room, and steward room.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 January 2022
Resolved 3 January 2022
Resolution: Accepted by ABS as condition of ACS on 1/3/21 in ABS report no. 5068212; finding no. 1125. Actual rectification of deficient condition has not yet occurred.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 13 December 2021
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board.
Hydraulic hoses for sliding water-tight doors E-242, E-298-1, E-298-2, and D-198-1 found with cracks and leaks.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 January 2022
Resolved 28 December 2021
Resolution: Per ABS report no. 5068212, the noted hoses are reported to be replaced and tested to the satisfaction of the attending ABS surveyor.
99 - Other › N/A - No Subsystem › Other (MARPOL operational)
Issued 13 December 2021
Resolved
A ship of >300 gross tons must have a fixed container or enclosed deck area under or around each fuel oil or bulk lubricating oil tank vent, overflow, and fill pipe that has a capacity of one barrel.
Port and starboard bunkering manifold containment are missing drain plug fittings, thereby not providing an oil-tight enclosure.
*Must be corrected prior to bunkering operations.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 January 2022
Resolved 14 January 2022
Resolution: Plugs verified in place on 1/14/22 by attending CG [name withheld] had also previously reported as corrected as part of report no. 5068212 on 1/4/22.
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 13 December 2021
Resolved
Satisfactory means shall be provided for the protection of the crew in getting to and from their quarters, the machinery space and all other parts used in the necessary work on the ship.
Broken handrails noted in aft house port side stair tower on main deck and O2 deck and near main cargo hold ramp between B and C deck.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 January 2022
Resolved 3 January 2022
Resolution: Accepted by ABS as condition of ACS on 1/3/21 in ABS report no. 5068212; finding no. 1129. Handrails reported as repaired to the satisfaction of the attending ABS survyeor on 3/23/22, as documented in ABS report no. 5198402.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 13 December 2021
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and readily available for immediate use.
Life ring buoy at starboard girder box needs new retro-reflective tape and plug.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 January 2022
Resolved 28 December 2021
Resolution: As per ABS report no. 5068212, the noted ring life buoy was replaced with an onboard spare and verified in position to the satisfaction of the attending ABS surveyor.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 13 December 2021
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board.
Electrical panel in SOPEP locker is not readily accessible by the crew due to storage of items around the panel.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 January 2022
Resolved 5 January 2022
Resolution: Per ABS report no. 5068212, the space was cleaned and panel access made clear to the satisfaction of the attending ABS surveyor.
01 - Certificates & Documentation › 013 - Documents › Ship Energy Efficiency Management plan
Issued 13 December 2021
Resolved
Each ship shall keep on board a ship specific Energy Efficient Management Plan (SEEMP).
Supplement to IEEC (SOVC), no. 7207401-2406546-003, indicates that the ship has a SEEMP.
No SEEMP has been provided for the vessel / available onboard at time of inspection.
Develop and implement corrective action plan to the satisfaction of CG and ABS.
Note: any exemption from the requirements of MARPOL VI/22 would require approval from CG HQ.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 January 2022
Resolved 23 March 2022
Resolution: MARAD has elected to surrender the IEEC SOVC iaw the allowance in CVC-4 letter 16711, serial no. 132, of 5/29/2019. ABS has issued a Statement of Fact, no. 7207401-5198402-502, documenting that vessel does not comply with MARPOL VI/22 (SEEMP).
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 19 December 2019
Resolved
Demonstrate emergency drills, prove proper operation of the port lifeboat, and verify status of watertight doors in accordance with submitted voyage plan to the satisfaction of the attending marine inspector prior to departing [name withheld] Anchorage.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 December 2019
Resolution: Attended vessel.
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 10 December 2018
Resolved
Upon activation and Prior to getting underway, provide cew liceses and documents IAW COI
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 27 August 2021
Resolution: Crew staffed up to FOS; carried out satisfactory checks of FOS crew documents.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 10 December 2018
Resolved
Upon activation and Prior to getting underway, Conduct satisfactory fire and boat drills.
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 27 August 2021
Resolution: Crew staffed up to FOS; observed satisfactory fire and abandon ship drills.
Engineering › Steam Boiler (propulsion) › Downcomer
Issued 24 January 2018
Resolved
Stbd boiler shut down due to pipe leak.
Action required: 705 - Other - as specified
Due 24 January 2018
Resolved 16 February 2018
Resolution: Atended vessel conducted final hydro of Stbd Propulsion boiler after repairs.
Operations/Management › Vessel Activity › Other
Issued 24 January 2018
Resolved
The following is required for the vessel to transit Sector Hampton Roads AOR: One tug of at least 5000 Hp, or 2 tugs with one of 3000Hp and one of 2000Hp. Tug escort requirement will be considered met when vessel is no longer in Sector HR AOR.
74 Solas 14
II-1/Reg 26.3
Action required: 17 - Rectify deficiencies prior to departure
Due 25 January 2018
Resolved 25 January 2018
Resolution: Vessel had left AOR in transit to Baltimore.
Personnel › Certificates/Documents/Licenses › License, Master
Issued 10 May 2017
Resolved
Upon activation & prior to getting underway, Provide crew licenses/documents IAW COI.
Action required: 705 - Other - as specified
Due 10 May 2018
Resolved 19 January 2018
Resolution: Completed satisfactory review of crew licenses and documents prior to activation.
Operations/Management › Drills/Instruction › Abandon Ship
Issued 10 May 2017
Resolved
Upon activation, & prior to getting underway, Conduct satisfactory Fire/Boat drills.
Action required: 705 - Other - as specified
Due 10 May 2018
Resolved 19 January 2018
Resolution: Conducted satisfactory fire and boat drills during activation.