Records from 1998 to 2004. Most recent: inspection, 3 May 2004.
Inspection history · 21
3 May 2004
Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2058245
11 August 2003
Certificate of Compliance
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1872911
21 April 2003
Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1777934
31 December 2002
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1725177
11 June 2002
Certificate of Compliance
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1629836
11 June 2002
Certificate of Compliance
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1636750
23 June 2001
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1068635
8 June 2001
Letter of Compliance (Initial/Renewal)
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1466226
20 May 2001
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1063808
25 January 2001
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1056943
6 January 2001
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 825403
8 June 2000
Letter of Compliance (Initial/Renewal)
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1415374
4 January 2000
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 20189
26 November 1999
Administrative
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 811549
2 November 1999
Type not recorded
No type recorded · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 17777
8 October 1999
Administrative
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 797079
8 October 1999
Administrative
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1197277
15 June 1999
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1045723
10 June 1999
Letter of Compliance (Initial/Renewal)
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1442849
11 September 1998
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 804577
10 June 1998
Letter of Compliance (Initial/Renewal)
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1456606
Engineering › Diesel Engine (auxiliary) › Gear/Clutch Starter (electric)
Issued 11 June 2002
No resolution recorded
Stand-by Generator: Repair Exhaust Leaks- Left manifold to exhaust pipe to satisfaction of attending Marine Inspector and or Flag State Representative.
Due 11 July 2002 — due date passed with no resolution recorded
Fire Fighting
Issued 8 June 2001
Resolved
RENEW FLEX LOOP ON FIXED CO2 SYSTEM FOR PAINT LOCKER. REPAIR / RENEW PRESSURE SWITCH FOR POWERED VENTILATION SHUT-DOWN. PLACE CO2 WARNING SIGN ON PAINT LOCKER DOOR.
Condition: Unknown
Due 8 June 2001
Resolved 8 June 2001
Construction/Loadline
Issued 8 June 2001
Resolved
REPAIR HOLES IN QUARTERS EXTERIOR SHELL NEAR STARBOARD LIFE BOATS 1st LEVEL.
Condition: Unknown
Due 8 June 2001
Resolved 8 June 2001
Unknown
Issued 8 June 2001
Resolved
PROVIDE DATA PLATE FOR AIR RECEIVER THAT SERVICES DRILL FLOOR.
Condition: Unknown
Due 8 June 2001
Resolved 8 June 2001
Fire Fighting
Issued 8 June 2001
Resolved
CONDUCT HYDROSTATIC TEST ON ALL FIRE HOSES TO AT LEAST 100 PSI FOR AT LEAST10 MINUTES.
Condition: Unknown
Due 8 June 2001
Resolved 8 June 2001
Lifesaving
Issued 8 June 2001
Resolved
CROP AND RENEW WASTED HAND RAILS (AROUND #1 AND #3 LIFE BOAT DAVITS, WALKWAY TO #1 AND #3 LIFE BOATS, WALKWAY TO PORT FORWARD CRANE).
Condition: Unknown
Due 8 June 2001
Resolved 8 June 2001
Engineering
Issued 8 June 2000
Resolved
Conduct total rig emergency shutdown, test reverse power relays on main engines, low lube oil shutdown of main engines, test of the standby generator under load, and ventilation shutdown to satisfaction of attendingclass surveyor.
Condition: Unknown
Due 8 June 2000
Resolved 8 June 2000
Electrical
Issued 8 June 2000
Resolved
Perform semi-annual load test of emergency batteries for two hours. Conduct lifesaving and firefighting appliance training to regular crew and industrial hands every two months.
Condition: Unknown
Due 8 June 2000
Resolved 8 June 2000
Deck/Cargo
Issued 8 June 2000
Resolved
Properly hard pipe mud pit drains in pump room to ensure gas tight and Class I Division I integrity to satisfaction of attending class surveyor ormarine inspector.
Condition: Unknown
Due 8 June 2000
Resolved 8 June 2000
Deck/Cargo
Issued 8 June 2000
Resolved
Make permanent repairs to overboard bilge piping in snake pit to satisfaction of attending class surveyor or marine inspector.
Condition: Unknown
Due 8 June 2000
Resolved 8 June 2000
Engineering
Issued 8 June 2000
Resolved
Install API approved non-metallic fuel oil supply hoses to standby generator, and label emergency fuel shutoff valve.
Condition: Unknown
Due 8 June 2000
Resolved 8 June 2000
Deck/Cargo
Issued 8 June 2000
Resolved
Provide safety valve on cold start rig compressor between discharge manifold and isolation valve.
Condition: Unknown
Due 8 June 2000
Resolved 8 June 2000
Electrical
Issued 8 June 2000
Resolved
Repair or replace generator #1 field. Provide flame bowls to Racor type fuel separator filters.
Condition: Unknown
Due 8 June 2000
Resolved 8 June 2000
Fire Fighting
Issued 8 June 2000
Resolved
Make all stair tower doors self closing and latching.
Condition: Unknown
Due 8 June 2000
Resolved 8 June 2000
Electrical
Issued 10 June 1999
Resolved
REPAIR GROUNDING PROBLEM ON EMERGENCY GENERATOR.
Condition: Unknown
Due 10 June 1999
Resolved 10 June 1999
Electrical
Issued 10 June 1999
Resolved
TEST REVERSE POWER RELAYS ON ALL 03 GENERATORS ENSURING PROPER OPERATION OFEACH.
Condition: Unknown
Due 10 June 1999
Resolved 10 June 1999
Construction/Loadline
Issued 10 June 1998
Resolved
REMOVE PAINT FROM ALL NAME PLATES ON AIR RECIEVERS, BULK TANKS AND ELEC EQUIP.
Condition: Unknown
Due 10 June 1998
Resolved 10 June 1998
Lifesaving
Issued 10 June 1998
Resolved
PROVIDE BENCH REPORTS FOR SAFTIES ON AIR RECEIVERS AND BULK TANKS.
Condition: Unknown
Due 10 June 1998
Resolved 10 June 1998
Fire Fighting
Issued 10 June 1998
Resolved
INSTALL A VENTALATION SHUT DOWN FOR THE PAINT LOCKER.
Condition: Unknown
Due 10 June 1998
Resolved 10 June 1998
Lifesaving
Issued 10 June 1998
Resolved
CROP AND RENEW ALL HOLED OR CORRODED HAND RAILS.
Condition: Unknown
Due 10 June 1998
Resolved 10 June 1998
Construction/Loadline
Issued 10 June 1998
Resolved
REPAIR BILGE LINE VALVE SO THAT IT OPERATES PROPERLY.
Condition: Unknown
Due 10 June 1998
Resolved 10 June 1998
Lifesaving
Issued 10 June 1998
Resolved
REPLACE THE WHEEL HANDLE ON A VALVE ON THE FUEL LINE TO THE MAIN GENERATORSFROM THE DIESEL OIL DAY TANK.
Condition: Unknown
Due 10 June 1998
Resolved 10 June 1998
Unknown
Issued 10 June 1998
Resolved
REPLACE GASKETS ON BOTH MUD PIT ROOMS AND ENSURE SELF CLOSING.
Condition: Unknown
Due 10 June 1998
Resolved 10 June 1998
Unknown
Issued 10 June 1998
Resolved
PROVIDE AN INTERNATIONAL SHORE CONNECTION.
Condition: Unknown
Due 10 June 1998
Resolved 10 June 1998
Lifesaving
Issued 10 June 1998
Resolved
INSTALL EXIT HANDLES IN THE GALLEY FREEZERS.
Condition: Unknown
Due 10 June 1998
Resolved 10 June 1998