Inspection history · 20
9 September 2025
Annual Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8230292
4 June 2024
Deficiency Check · COI Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7912091
21 December 2023
Deadweight Survey · Internal Structural Exam · Deficiency Check · Hull Examination · Drydock Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7840351
25 May 2021
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7209184
17 September 2020
Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7057924
14 August 2020
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7033276
18 April 2019
Administrative Inspection · In-Service Inspection · Deficiency Check · Damage Survey
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6665832
17 April 2019
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6673511
6 April 2019
Administrative Inspection · In-Service Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6657216
6 April 2019
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6663784
5 March 2019
Internal Structural Exam · Administrative Inspection · Drydock Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6636297
20 February 2019
Administrative Inspection · DAPI Audit · COI Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6628474
8 March 2018
Internal Structural Exam · Annual Inspection · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6368640
24 October 2017
Examination of Repairs
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6299787
21 July 2017
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6236310
5 June 2017
Examination of Repairs · Damage Survey · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6166243
30 March 2017
MTSA Verification · Annual Inspection · Internal Structural Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6114333
9 February 2017
Administrative Inspection · Deficiency Check · Construction Oversight · Internal Structural Exam · Drydock Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6085203
14 April 2016
Administrative Inspection · Annual Inspection · Internal Structural Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5854499
15 March 2016
Examination of Repairs
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5833997
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 9 September 2025
Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Dead end wires found in the following areas: above pilothouse (2 sets), under pilothouse console (2 sets), forward voids (port and stbd), lazarettes (port and stbd).
46 CFR 183.200(b)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 September 2025
Resolved 22 September 2025
Resolution: Received pictures of removed dead-end wires.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 9 September 2025
Resolved
A penetration in a watertight bulkhead must be as high and as far inboard in the bulkhead as practicable, and made watertight. 02 penetrations in the aft bulkhead of the port forward void are not watertight.
46 CFR 179.320(c)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 September 2025
Resolved 22 September 2025
Resolution: Received picture of plugged holes.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 9 September 2025
Resolved
Nonmetallic hose may be used for wet exhaust systems provided it is...double clamped where practicable. Flexible hose connections to the port main engine exhaust were made with one clamp.
46 CFR 182.430(e)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 September 2025
Resolved 22 September 2025
Resolution: Received picture of additional hose clamps installed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 9 September 2025
Resolved
Each battery must be…secured to protect against shifting with the roll and pitch of the vessel. Battery boxes not secured, both port and stbd.
46 CFR 183.350(b)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 September 2025
Resolved 22 September 2025
Resolution: Received pictures of secured battery boxes.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 9 September 2025
Resolved
Nonconducting mats or grating must be provided on the deck in front of each switchboard. Mat missing in front of switchboard.
46 CFR 183.330(f)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 September 2025
Resolved 22 September 2025
Resolution: Received picture of rubber matting in front of switchboard.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 9 September 2025
Resolved
All electrical equipment and circuits must be clearly marked and identified. Breaker panel near switchboard has multiple labels for same breaker.
46 CFR 183.220(d)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 September 2025
Resolved 22 September 2025
Resolution: Received picture of corrected labeling.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 9 September 2025
Resolved
Exhaust gas must not leak from the piping or any connections. The starboard main engine exhaust was leaking above the aft end of the engine.
46 CFR 182.430(b)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 September 2025
Resolved 22 September 2025
Resolution: Received statement stating a loose oil supply line and turbo clamps were tightened on STBD main engine.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 9 September 2025
Resolved
Each survival craft must be secured to the vessel by a painter with a float-free link permanently attached to the vessel. The IBA painter was found not secured to the vessel.
46 CFR 180.130(a)(1)
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 9 September 2025
Resolution: Corrected on the spot.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 17 September 2020
Resolved
A qualified servicing facility must conduct inspections on portable extinguishers and fixed-gas extinguishing systems. Annual fire protection inspection has lapsed. Owner must provide satisfactory evidence of required servicing. 46CFR176.810(b)(1)(2)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 July 2024
Resolution: Verified proper servicing report.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 17 September 2020
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure and personal injury. Port motor has excessive vibration.
46CFR182.100
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 June 2024
Resolution: Verified correction.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 17 September 2020
Resolved
An inflatable buoyant apparatus must be serviced at a facility approved by the Commandant no later than the month and year on its servicing sticker. IBA servicing has lapsed. Must provide proof of servicing.
46CFR185.730(a)(1)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 April 2024
Resolution: Verified servicing date.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 17 September 2020
Resolved
Penetrations and openings in watertight bulkheads must have means to make them watertight. Non watertight penetrations found in the following spaces: port and starboard battery room to port and starboard fuel tank void, port and starboard fuel tank void to port and starboard engine room.
46CFR171.114(a)(2)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 June 2024
Resolution: Verified repairs to bulkheads.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 September 2020
Resolved
The discharge ends of fuel tank vent pipes must be fitted with removable flame screens or flame arrestors. Fuel tank vent pipe missing flame screen or flame arrestor.
46CFR182.450(e)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 June 2024
Resolution: Verified flame screen.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 17 September 2020
Resolved
Penetrations and openings in watertight bulkheads must have means to make them watertight. Conduit running from bow to engine room does not have any cap or plug and is fractured in battery room rendering all spaces non-watertight.
46CFR171.114(a)(2)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 June 2024
Resolution: Verified repairs/WT integrity.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 17 September 2020
Resolved
A vessel must carry either a first-aid kit approved under approval series 160.041 or a kit with equivalent contents and instructions. Found the following three items expired in the first-aid kit: burn dressing, ammonia inhalants, and iodine wipes.
46CFR184.710
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 April 2024
Resolution: Verified first aid kit up to date.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 17 September 2020
Resolved
Penetrations of required watertight decks and bulkheads by any rigid plastic pipe are prohibited unless the following requirements are met: each penetration must be accomplished using an acceptable metallic through deck or through bulkhead fitting that is welded or otherwise attached to the bulkhead or deck by an accepted method. Vessels submersible electric bilge pumps utilize PVC piping to lead into the common bilge overboard pipe. A metallic shutoff valve must be attached at the overboard pipe in lieu of PVC.
46 CFR 182.720 (d)(1)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 June 2024
Resolution: Submersible pumps and associated piping removed, overboard access secured.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 18 April 2019
Resolved
The cognizant OCMI may require that a vessel and its equipment undergo any additional test or inspection deemed reasonable and necessary to determine that the vessel and its equipment are suitable for the service in which they are to be employed. Received notification from operator that vessel was taken out of service due to a leaking pipe associated with port main engine sea chest. Provide repair proposal and affect permanent repair to the satisfaction of attending marine inspector.
46 CFR 176.840
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 18 April 2019
Resolved 20 April 2019
Resolution: Approved repair proposal and witnessed satisfactory replacement of sea chest piping.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 6 April 2019
Resolved
The requirements for machinery for electrically propelled vessels are contained in applicable regulations in subchapter J (Electrical Engineering) of this chapter. Each electric propulsion installation must meet section 4-8-5/5.11 of ABS Steel Vessel Rules (incorporated by reference; see 46 CFR 110.10-1). Where two or more control stations are provided outside the engine room, or where the propulsion machinery space is intended for centralized control or unattended operation, the provisions of Part 4, Chapter 9 are to be complied with. Electric power for control, monitoring and safety systems is to be fed from two feeders, one from the main switchboard or other suitable distribution board and the other from the emergency switchboard or an emergency distribution board. The supply status of these feeders is to be displayed and the main power supply failure is to be alarmed. The electric power supply to each of the control, monitoring and safety systems is to be individually monitored. The two feeders are to be connected to a transfer switch in the remote control station. Vessel currently only has one power source for control system. 46 CFR 182.220(b), 46 CFR 111.35-1, ABS Steel Vessel Rules 4-8-5/5.11.2, 4-9-2/11.7.1, 4-9-2/11.7.2
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 May 2019
Resolved 4 June 2019
Resolution: See email in documents.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 20 February 2019
Resolved
At each inspection for certification all observed unsafe practices, fire hazards, and other hazardous situations must be corrected and all required guards and protective devices must be in satisfactory condition. Vessel bilge/fire piping possessed multiple leaks. Leak witnessed in bilge pipe within the port engine room at bend located above the manifold. Second leak witnessed in crossover pipe connecting the port and starboard engine room bilge systems. Vessel must submit repair proposal to include permanent repair plan to the affected system.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 20 February 2019
Resolved 16 March 2019
Resolution: Piping was cropped and renewed.
Fire Fighting › Fixed Halon Fire Extinguishing System › Operating Controls
Issued 8 March 2018
Resolved
Prove proper operation of override/means or reset at the operating station. 46CFR181.420
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 7 April 2018
Resolved 5 June 2018
Resolution: Vessel provided description of onboard arrangement that meets requirements.
Stability › Watertight Integrity › General
Issued 8 March 2018
Resolved
Provide repair plan for approval and make permanent watertight repairs for the nickel sized hole in the deck leading into the starboard side lazarette. 46CFR177.100
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 April 2018
Resolved 9 March 2018
Resolution: Provided pictures of repair to hole in deck above starboard side lazarette.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 5 June 2017
Resolved
Repair damage to handrails on port bow. No passengers are allowed on bow until repairs are completed.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 4 July 2017
Resolved 9 June 2017
Resolution: Handrail rewelded and repairs made. all sat.
Fire Fighting › Structural - A Class Divisions › Machinery Spaces
Issued 14 April 2016
Resolved
Provide a repair proposal for identified through bulkhead cable penetrations for engineering spaces bulkheads in laz spaces, eng rms, and fuel tank voids, as per NVIC 9-97.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 20 May 2016
Resolved 19 May 2016