Inspection history · 96
12 October 2012
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4489820
7 May 2012
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4365097
11 January 2012
Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4222935
11 January 2012
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4259490
15 November 2011
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4189198
12 August 2011
Annual Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4113534
13 October 2010
Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3868917
6 March 2010
Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3726105
11 March 2009
MTSA Verification · Periodic Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3431764
8 April 2008
Annual Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3179755
7 March 2008
Damage Survey · Examination of Repairs
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3161323
22 May 2007
COI Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 2937449
15 February 2006
Annual Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2621074
18 November 2005
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2585774
22 July 2005
Periodic Inspection · MTSA Verification
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2522356
23 August 2004
MTSA Verification · Administrative Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2174025
3 May 2004
Periodic Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2056160
24 March 2004
Administrative Inspection
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2030215
24 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1988893
29 August 2003
Type not recorded
No type recorded · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 1890823
3 April 2003
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1756240
28 February 2003
Annual Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1764375
26 July 2002
Examination of Repairs · Administrative Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1652528
17 May 2002
Administrative Inspection
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1617849
26 April 2002
COI Inspection · Hull Examination · Cargo Tank Internal · Internal Structural Exam
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1608432
14 August 2001
Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1069720
3 April 2001
Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1066490
3 August 2000
Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 821559
1 May 2000
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1408505
26 January 2000
Examination of Repairs
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 814357
12 May 1999
Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1130031
23 July 1998
Administrative
Administrative · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1127234
23 June 1998
Administrative
Administrative · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 793140
26 May 1998
COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1461050
25 August 1997
Hull Examination · Re-Inspection
Physical examination · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 1428813
31 October 1996
Examination of Repairs
Physical examination · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 1166072
11 June 1996
COI Inspection
Physical examination · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 1085993
10 August 1995
Type not recorded
No type recorded · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 510156
28 June 1995
Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1190807
5 April 1995
Deficiency Check
Physical examination · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 840984
22 February 1995
Type not recorded
No type recorded · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 132703
22 February 1995
Type not recorded
No type recorded · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 200696
22 February 1995
Type not recorded
No type recorded · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 752796
22 February 1995
Examination of Repairs
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 847876
3 August 1994
Type not recorded
No type recorded · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 534526
21 July 1994
Type not recorded
No type recorded · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 448091
20 June 1994
COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1330147
27 July 1993
Type not recorded
No type recorded · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 460790
26 July 1993
Re-Inspection
Physical examination · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 842320
27 July 1992
Hull Examination · COI Inspection
Physical examination · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 944869
3 June 1992
Deficiency Check
Physical examination · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 949254
30 March 1992
Type not recorded
No type recorded · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 955966
13 March 1992
Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 950184
21 February 1992
Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1261559
14 February 1992
Type not recorded
No type recorded · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 535153
22 January 1992
Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1263331
3 January 1992
Type not recorded
No type recorded · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 488183
3 January 1992
Type not recorded
No type recorded · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 644293
3 January 1992
Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 944860
3 April 1991
Type not recorded
No type recorded · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 447921
16 November 1990
Examination of Repairs · Damage Survey
Physical examination · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 1223004
22 August 1990
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 445764
6 July 1990
COI Inspection
Physical examination · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 932449
2 July 1990
Damage Survey · Examination of Repairs
Physical examination · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 923515
23 March 1990
Permit to Proceed
Administrative · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 907748
20 December 1989
Type not recorded
No type recorded · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 463348
20 December 1989
Deficiency Check
Physical examination · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 904358
18 September 1989
Drydock Extension
Administrative · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 1195960
1 September 1989
Deficiency Check
Physical examination · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 1353120
29 August 1989
Re-Inspection
Physical examination · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 1345432
8 March 1989
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 891246
9 September 1988
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 515548
24 July 1988
Type not recorded
No type recorded · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 1241353
6 July 1988
COI Inspection
Physical examination · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 1208923
30 December 1987
Type not recorded
No type recorded · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 1008399
4 December 1987
Type not recorded
No type recorded · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 512338
4 December 1987
Type not recorded
No type recorded · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1309054
20 November 1987
Damage Survey · Examination of Repairs
Physical examination · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 1334671
29 June 1987
Re-Inspection · Hull Examination
Physical examination · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 1009365
27 February 1987
Examination of Repairs
Physical examination · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 1002474
27 January 1987
Type not recorded
No type recorded · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 469614
26 January 1987
Type not recorded
No type recorded · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 1010179
26 January 1987
Administrative
Administrative · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1010180
24 November 1986
Deficiency Check
Physical examination · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 1327976
16 September 1986
Type not recorded
No type recorded · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 504716
8 July 1986
COI Inspection
Physical examination · MSO CINCINNATI · Activity 1306946
28 February 1986
Type not recorded
No type recorded · MSO CINCINNATI · Activity 478214
26 November 1985
Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 995187
21 October 1985
Deficiency Check
Physical examination · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 991914
10 October 1985
Re-Inspection
Physical examination · MSO CINCINNATI · Activity 986657
29 March 1985
Type not recorded
No type recorded · MSO CINCINNATI · Activity 459536
11 December 1984
Type not recorded
No type recorded · MSO CINCINNATI · Activity 1284205
28 November 1984
Type not recorded
No type recorded · MSO CINCINNATI · Activity 976015
1 November 1984
Type not recorded
No type recorded · MSO CINCINNATI · Activity 466281
1 November 1984
Type not recorded
No type recorded · MSO CINCINNATI · Activity 975289
11 August 1984
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 527615
Construction/Loadline › Hull › Double Hull
Issued 7 March 2008
Resolved
Boarded barge on dry dock to examine cutlines on the stbd knuckle #1 wing void. A 14' X 3.5' section was cutout in the damaged area, all surrounding metal appeared to be within thickness perimeters.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 March 2008
Resolution: Permanent repair made to the stbd #1 wing void knuckle using a 14'' X 3.5" insert which was inspected and air tested, all sat.
Deck/Cargo › Holds/Tanks
Issued 12 March 2003
Resolved
Cargo tank raised trunk wasted around perimeter.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 April 2003
Resolution: Perimeter renewed: 6.635 sq ft of 5/16" plate.
Construction/Loadline › Hull › Hull Plating
Issued 26 April 2002
Resolved
Renew deck plate at deck knuckle turn on bow, #1 stbd void crop and renew fwd bulkhead as marked 18x18" insert, #2 port void renew/repair fractured side long.in bay NR 7 below deck knuckle, #2 stbd void/ 02 rewelds, #3 stbd void-crop & renew (18x18" insert) IWO 8" fracture in #3bay.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 3 May 2002
Deck/Cargo › Holds/Tanks
Issued 26 April 2002
Resolved
Secure base of stripping line in #2 Cargo Tank. LEGACY COMPONENT DESC: Stripping Line
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 3 May 2002
Deck/Cargo
Issued 26 May 1998
Resolved
INSTALL PIPE PLUGS ON ALL STEAM LINES AFTER THE STOP VALVES ON DECK FOR ALLSTEAM LINES THAT PASS THROUGH CARGO SPACES.
Condition: Unknown
Due 26 May 1998
Resolved 26 May 1998
Construction/Loadline
Issued 26 May 1998
Resolved
REPAIR FRACTURED RUB BAR WELD, STBD SIDE AFT @ 3 FT. DRAFT, IN WAY OF THE #3 VOID/STERN BOX BULKHEAD.
Condition: Unknown
Due 26 May 1998
Resolved 26 May 1998
Construction/Loadline
Issued 26 May 1998
Resolved
REPAINT DRAFT MARKS.
Condition: Unknown
Due 26 June 1998
Resolved 23 June 1998
Construction/Loadline
Issued 26 May 1998
Resolved
REPAINT DRAFT MARKS.
Condition: Unknown
Due 26 May 1998
Resolved 26 May 1998
Construction/Loadline
Issued 26 May 1998
Resolved
INSTALL PROPER GASKETS ON ALL VOID ACCESS COVERS FOR 1-3 PORT/STBD WING VOIDS, BOW RAKE, AND BOX STERN.
Condition: Unknown
Due 26 May 1998
Resolved 26 May 1998
Deck/Cargo
Issued 25 August 1997
Resolved
CONDUCT YEARLY HYDRO TEST OF CARGO PIPING TO 1.5 TIMES THE MAX. ALLOWABLE WORKING PRESSURE.
Condition: Unknown
Due 22 October 1997
Resolved 24 September 1997
Construction/Loadline
Issued 11 June 1996
Resolved
REPAINT DRAFT MARKS.
Condition: Unknown
Due 11 July 1996
Resolved 21 June 1996
Deck/Cargo
Issued 11 June 1996
Resolved
REPACK LOADING AND DISCHARGE VALVE STEMS.
Condition: Unknown
Due 11 July 1996
Resolved 21 June 1996
Deck/Cargo
Issued 11 June 1996
Resolved
REPAIR CARGO PUMP DRIVE SHAFT SAFETY GUARD.
Condition: Unknown
Due 11 July 1996
Resolved 21 June 1996
Deck/Cargo
Issued 22 February 1995
Resolved
PRIOR TO USING CARGO HEATING SYTEM DEMONSTRATE TO A COAST GUARD MARINE INSPECTOR THAT SATISFACTORY PERMANENT REPAIRS HAVE BEEN COMPLETED TO HEATING COILS. THIS INCLUDES INTEGRITY OF HEATING COILS IN ALL CARGO TANKS.
Condition: Unknown
Due 22 February 1995
Resolved 22 February 1995
Deck/Cargo
Issued 26 July 1993
Resolved
REPACK OR TIGHTEN #1 CARGO TANK DISCHARGE VALVE PACKING GLAND.
Condition: Unknown
Due 26 July 1993
Resolved 26 July 1993
Deck/Cargo
Issued 26 July 1993
Resolved
REPLACE #3 CARGO TANK HATCH GASKET.
Condition: Unknown
Due 26 July 1993
Resolved 26 July 1993
Deck/Cargo
Issued 26 July 1993
Resolved
REPLACE CARGO PUMP ENGINE STARTING SYSTEM HYD. HOSES.
Condition: Unknown
Due 26 July 1993
Resolved 26 July 1993
Deck/Cargo
Issued 26 July 1993
Resolved
CONDUCT ANNUAL HYDRO TEST OF CARGO PUMP AND PIPING.
Condition: Unknown
Due 1 September 1993
Resolved 3 August 1993
Deck/Cargo
Issued 27 July 1992
Resolved
PRIOR TO LOADING CARGO THE DRIP PANS ARE TO BE EMPTIED OF COLLECTED LIQUIDSAND MATERIALS. THIS ITEM IS TO BE CORRECTED BY NO LATER THAN 30JULY 1992._x001C_
Condition: Unknown
Due 30 July 1992
Resolved 1 September 1992
Deck/Cargo
Issued 3 January 1992
Resolved
THE #3 CARGO TANK STEAM HEATING COILS APPEAR TO BE CONTAMINATED WITH CARGO,CONTAIN THE SPENT STEAM OR TEST AND REPAIR AS NECESSARY PRIOR TO THE NEXT USE OF THE #3 CARGO TANK STEAM HEATING SYSTEM, BUT NOT LATER THAN THE COMPLIANCE DATE.
Condition: Unknown
Due 3 January 1992
Resolved 3 January 1992
Deck/Cargo
Issued 3 January 1992
Resolved
CLEAN OFF OR REPAINT DANGER-KEEP OUT MARKINGS FOR ALL CARGO TANK OPENING ASNECESSARY NOT LATER THAN THE COMPLIANCE DATE.
Condition: Unknown
Due 3 January 1992
Resolved 3 January 1992
Deck/Cargo
Issued 3 January 1992
Resolved
CONDUCT ANNUAL HYDROSTATIC TEST OF THE CARGO PIPING AND TEST PRESSURE RELIEF VALVES NOT LATER THAN THE COMPLIANCE DATE.
Condition: Unknown
Due 3 January 1992
Resolved 3 January 1992
Deck/Cargo
Issued 3 January 1992
Resolved
PROVIDE PROPERLY FITTED FLAME SCREENS WITH PROPER SCREEN MESH SIZE FOR EACHCARGO TANK OPENING WHICH REMAINS OPEN DURING TRANSFER PRIOR TO THE NEXT CARGO TRANSFER OPERATION, BUT NOT LATER THAN THE COMPLIANCE DATE.
Condition: Unknown
Due 3 January 1992
Resolved 3 January 1992
Deck/Cargo
Issued 3 January 1992
Resolved
REPLACE THE WORN #1 CARGO TANK HATCH COVER GASKET NOT LATER THAN THE COMPLIANCE DATE.
Condition: Unknown
Due 3 January 1992
Resolved 3 January 1992
Deck/Cargo
Issued 20 December 1989
Resolved
GAS FREE #3 CARGO TANK AND ALL ADJACENT SPACES AND PRESENT FOR COAST GUARD INSPECTION TO DETERMINE DAMAGE FROM #3 TANK IMPLOSION. THIS ITEM IS TO BE COMPLETED PRIOR TO LOADING PRODUCT AND THE VESSEL IS NOT TO LEAVE THE [name withheld] PRIOR TO COMPLETION WITHOUT PERMISSION.
Condition: Unknown
Due 20 December 1989
Resolved 20 December 1989
Deck/Cargo
Issued 29 August 1989
Resolved
PROVIDE PROOF OF HYDROSTATIC TEST OF CARGO PIPING.
Condition: Unknown
Due 29 August 1989
Resolved 29 August 1989
Construction/Loadline
Issued 29 August 1989
Resolved
MAKE LEGIBLE ALL DRAFT MARKS TO LIGHT WATER LINE.
Condition: Unknown
Due 29 August 1989
Resolved 29 August 1989
Construction/Loadline
Issued 29 August 1989
Resolved
GAS FREE AND MAKE AVAILABLE FOR INSPECTION THE #3 WING VOID
Condition: Unknown
Due 29 August 1989
Resolved 29 August 1989
Deck/Cargo
Issued 4 December 1987
Resolved
REPLACE STAND PIPE NIPPLE FOR NO2 CARGO TANK P.V. PRIOR TO NEXT LOADING.
Condition: Unknown
Due 4 December 1987
Resolved 4 December 1987
Deck/Cargo
Issued 24 November 1986
Resolved
REPLACE THE MISSING PV VALVE ON THE #1 CARGO TANK WITH AN APPROVED PV VALVEOR GOOSENECK VENT WITH A FLAME SCREEN PRIOR TO NEXT LOADING OF CARGO.
Condition: Unknown
Due 24 November 1986
Resolved 24 November 1986
Construction/Loadline
Issued 8 July 1986
Resolved
MAKE TEMPORARY REPAIRS TO THE FRACTURE LOCATED ON THE BOW, PORT SIDE AT THECORNER. THIS ITEM IS TO BE COMPLETED PRIOR TO DEPARTING THE PORT OF CIN- CINNATI.
Condition: Unknown
Due 8 July 1986
Resolved 8 July 1986
Deck/Cargo
Issued 8 July 1986
Resolved
PROVE THE PROPER OPERATION OF THE CARGO PUMP RELIEF VALVE.
Condition: Unknown
Due 8 July 1986
Resolved 8 July 1986
Construction/Loadline
Issued 8 July 1986
Resolved
MAINTAIN TEMPORARY REPAIRS ON THE VESSEL'S BOW PORT SIDE UNTIL PERMANENT REPAIRS ARE COMPLETED. PERMANENT REPAIRS ARE TO BE COMPLETED AT THE NEXT VESSEL DRYDOCKING REPAIR PERIOD OR THE DATE OF COMPLIANCE, WHICHEVER OCCURSFIRST.
Condition: Unknown
Due 8 July 1986
Resolved 8 July 1986
Unknown
Issued 10 October 1985
Resolved
REPAIR OR REPLACE THE RELIEF VALVE ON THE STEAM LINE. THIS ITEM IS TO BE COMPLETED PRIOR TO USING THE SYSTEM OR THE DATE OF COMPLIANCE WHICHEVER OCCURS FIRST.
Condition: Unknown
Due 10 October 1985
Resolved 10 October 1985
Construction/Loadline
Issued 10 October 1985
Resolved
REPAINT ALL VESSEL DRAFT MARKINGS.
Condition: Unknown
Due 10 October 1985
Resolved 10 October 1985
Deck/Cargo
Issued 10 October 1985
Resolved
REPAIR OR REPLACE THE TACHOMETER ON THE CARGO PUMP ENGINE, THIS ITEM IS TO BE COMPLETED PRIOR TO OPERATING THE CARGO PUMP ENGINE OR THE DATE OF COMP- LIANCE WHICHEVER OCCURS FIRST.
Condition: Unknown
Due 10 October 1985
Resolved 10 October 1985
Deck/Cargo
Issued 10 October 1985
Resolved
CONDUCT A 1 AND 1/2 TIMES MAWP HYDROSTATIC TEST OF CARGO PIPING AND CARGO HOSE OR PROVIDE SATISFACTORY EVIDENCE THAT TESTING HAS BEEN PERFORMED WITH-IN THE LAST YEAR.
Condition: Unknown
Due 10 October 1985
Resolved 10 October 1985
Deck/Cargo
Issued 10 October 1985
Resolved
REPAIR OR REPLACE THE FLAME SCREEN IN NO. 2 CARGO TANK ACCESS OPENING.
Condition: Unknown
Due 10 October 1985
Resolved 10 October 1985
Deck/Cargo
Issued 10 October 1985
Resolved
REPAINT THE WARNING SIGN.
Condition: Unknown
Due 10 October 1985
Resolved 10 October 1985
Deck/Cargo
Issued 10 October 1985
Resolved
CHANGE THE CARGO HOSE HOOK-UP BRINGING ALL CONNECTING FLANGES WITHIN THE DISCHARGE CONTAINMENT.
Condition: Unknown
Due 10 October 1985
Resolved 10 October 1985
Deck/Cargo
Issued 10 October 1985
Resolved
TIGHTEN THE COVER ON THE HYDRAULIC ACCUMILATOR PRESSURE GAUGE.
Condition: Unknown
Due 10 October 1985
Resolved 10 October 1985
Deck/Cargo
Issued 10 October 1985
Resolved
CLEAN OR REPLACE THE FLAME SCREENS ON ALL P/V VALVES AND CLEAN THE VALVES.
Condition: Unknown
Due 10 October 1985
Resolved 10 October 1985
Deck/Cargo
Issued 1 November 1984
Resolved
REPLACE THE FLAME SCREEN ON NO. 3 CARGO TANK ACCESS OPENING.
Condition: Unknown
Due 1 November 1984
Resolved 1 November 1984