15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 25 September 2023
Resolved
The company should identify equipment and technical systems the sudden operational failure of which may result in hazardous situations. The safety management system should provide for specific measures aimed at promoting reliability of such equipment or systems. These measures should include regular testing of stand-by arrangements and equipment or technical systems that are not in continuous use. During ACP annual oversight inspection, Marine Inspector found that oxygen sensors that are installed at EDG and paint locker were not operational and/or been rendered inoperable. The oxygen sensor installed at the CO2 storage room displayed 19.8% oxygen concentration. Additionally, there were no records of calibration for this equipment. After looking into the SMS, it was determined that the SMS does not provide instructions to personnel on how to safely enter (or not enter) a space monitored by oxygen sensing equipment, what to do if the oxygen sensors are inoperable, how to maintain and test the oxygen sensors, and how and when to calibrate the sensors. Develop procedures for maintaining/calibrating and usage of these oxygen sensors and ensure that measures are integrated into ship’s operational maintenance routine as required by ISM 10.4.
74 SOLAS (20) IX/3.1
ISM 10.3
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 October 2023
Resolved 23 October 2023
Resolution: Accepted by ABS.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 25 September 2023
Resolved
The company should establish procedures, plans and instructions, including checklists as appropriate, for key shipboard operations concerning safety of the personnel, ship and protection of the environment. The various tasks should be defined and assigned to qualified personnel. Vessel has an outdated checklist for bringing vessel from ROS to FOS status. Vessel also decommissions lifesaving equipment (such as lifeboats not in davits) and firefighting equipment (such as fixed foam system in cargo spaces) while in ROS. The pre-deployment preparation of these items are not captured in any current SMS product. Develop updated checklist, plan, procedure, or instruction that includes all necessary items for preparing vessel for fully operational status and ensure tasks are assigned to qualified personnel.
74 SOLAS (20) IX/3.1
ISM 7
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 November 2023
Resolved 6 November 2023
Resolution: Accepted by class. All sat.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 25 September 2023
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. During inspection, Marine Inspector found the following deficiencies that need to be resolved to the satisfaction of ABS:
-Battery Powered E-Light inoperable at the EDG Room
-SSDG exhaust fan excessively oil covered creating a fire hazard
-Bulkhead valves (engine room to aft steering) providing watertight boundary were not on test schedule or emergency procedures for flooding
-The following propulsion boiler system gauges found inoperable: Port main steam inlet pressure, stbd HP Bleed pressure, and chemical feed pump discharge pressure.
-Holes found on the operating flat decking forward of the stbd boiler.
-Inoperable light with damaged support structure identified for the port main turbine L/O sightglass
-Leaking Y Gate valves noted on Fire Stations 66 &68.
74 SOLAS (20) I/11(a)
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 November 2023
Resolved 23 October 2023
Resolution: Accepted by ABS.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 22 September 2022
Resolved
Fire-fighting systems and applicances shall be kept in good working order and readily available for immediate use. Jubilee patch was found on the fire main adjacent to the C-deck riser cut out valve and a leak was identified at the cutout valve for stations 169, 162, 153, & 146. 74 SOLAS (20) II-2/2.1.2
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 1 December 2022
Resolution: Accepted by ABS.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 22 September 2022
Resolved
Where ‘A’ Class divisions are pierced for the passage of electric cables, arrangements shall be made to ensure that the fire resistance is not impaired. Horizontal deck cable transits under the bridge console (03), in the bridge electrical station room (01), and in the gyro room (01) were found modified with sealants not part of the transit design or type approval. 60 SOLAS II/38(a)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 1 December 2022
Resolution: Accepted by ABS.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Bulwarks and freeing ports
Issued 22 September 2022
Resolved
Bulkheads at the exposed ends of superstructures shall be of efficient construction and shall be to the satisfaction of the administration. The enclosed forward mooring deck found with two deteriorated chock drains that are now open to the exterior of the vessel. ICLL (88) II/11
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 1 December 2022
Resolution: Accepted by ABS.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo ports and other similar openings
Issued 22 September 2022
Resolved
The means for securing and maintaining weathertightness shall be to the satisfaction of the administration. The arrangement shall ensure that tightness can be maintained in any sea conditions... Vessel found with damaged dogs on the aft rope locker, a missing dog on the rudder void access, deterioration on the cargo hold 1 emergency escape hatch, and a chock cover at frame 160 unable to be secured weathertight. ICLL (88) II/16(4)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 1 December 2022
Resolution: Accepted by ABS.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 22 September 2022
Resolved
If the administration is satisfied that such doors are essential, watertight doors of satisfactory construction may be fitted in watertight bulkheads dividing cargo between deck spaces. The watertight door at bulkhead 198 (cargo hold C) is missing a section of lower channel gasket rendering it non-watertight. If the administration is satisfied that such doors are essential, watertight doors of satisfactory construction may be fitted in watertight bulkheads dividing cargo between deck spaces.
60 SOLAS II/B.13(1)(i)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 1 December 2022
Resolution: Accepted by ABS.
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 22 September 2022
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on-board. Steam line found with damaged lagging on the port side of the tween (C to B decks). 74 SOLAS (20) I/11
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 1 December 2022
Resolution: Accepted by ABS.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 9 December 2021
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. STBD boiler found with holes in the outer casing at the downcomers. PORT boiler found with holes in outer casing at the aft inboard corner adjacent to the mud drum.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 February 2022
Resolution: ABS accepted.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 9 December 2021
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. The port boiler water level gauge glass was found too cloudy to read, the port bilge/ballast suction gauge glass was shattered, and the STBD ADT tank gauge glass was leaking.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 February 2022
Resolution: ABS accepted.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 22 September 2021
Resolved
In and from all crew and passenger spaces in which crew are normally employed, other than machinery spaces, stairways and ladders shall be arranged so as to provide ready means of escape to the lifeboat embarkation deck. Emergency escape hatches in A cargo deck seized closed.
SOLAS 60 II/68
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 October 2021
Resolved 7 October 2021
Resolution: ABS accepted
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 22 September 2021
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations. Noted 3 wasted bunker gooseneck containments wasted at the base between cargo holds 5 thru 7. Vessel has open item in NSE for repairing 10 containments on main deck that was entered in July 2020 with proposed correction of 2022. Referred item to ABS with requirement to significantly shorten repair window.
74 SOLAS I/11
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 October 2021
Resolved 7 October 2021
Resolution: ABS accepted.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 22 September 2021
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations. Three natural ventilation closures on aft main deck (rope locker exhaust vent, rope locker supply vent, exhaust fan box girder port) found deteriorated to the point where they did not adequately seal/close.
74 SOLAS I/11
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 October 2021
Resolved 7 October 2021
Resolution: ABS accepted.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 27 February 2020
Resolved
Bulkheads divining the machinery space from the cargo spaces forward and aft shall be fitted and made watertight up to the bulkhead deck. Eft engine room bulkhead on the 3 deck found with large bolted openings; only 2 bolts per plate were found installed leaving the remaining holes open. This bulkhead should be a A-60 machinery space boundary. 60SOLAS II/9(b)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 25 March 2020
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 24 February 2020
Resolved
Bulkheads dividing the machinery space from the cargo spaces forward and aft shall be fitted and made watertight up to the bulkhead deck. 3 level engine room door to the elevator found missing latch assembly rendering fire/water boundary incomplete. 60SOLAS II/9(b)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 25 March 2020
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 24 February 2020
Resolved
Where pipes, scuppers, electric cables, etc. are carried through watertight subdivision bulkheads, arrangements shall be made to ensure the water tightness of the bulkheads. Port side 3 deck passageway door found with improperly repaired MCT above it. 60SOLAS II/13(b)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 25 March 2020
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 24 February 2020
Resolved
Where pipes, scuppers, electric cables, etc. are carried through watertight subdivision bulkheads, arrangements shall be made to ensure the water tightness of the bulkheads. Two (02) cable transit penetrations in an A-60 boundary in the main deck athwart ships passage were found out of compliance. 60SOLAS II/13(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 25 March 2020
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - operational damage
Issued 24 February 2020
Resolved
Watertight decks shall be of the same strength as watertight bulkheads at corresponding levels. The means for making them watertight, and the arrangements adopting for closing them, shall be to the satisfaction of the administration. The overhead of the steering gear space (watertight deck) found with an improper penetration for control cabling. 60SOLAS II/16(a)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 25 March 2020
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 24 February 2020
Resolved
Watertight decks shall be of the same strength as watertight bulkheads at corresponding levels. The means for making them watertight, and the arrangements adopting for closing them, shall be to the satisfaction of the administration. Aft main deck reefer electrical kick pipes deteriorated. Cargo holds 5-8. 60SOLAS II/16(a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 25 March 2020
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 24 February 2020
Resolved
Where pipes, scuppers, electric cables, etc. are carried through watertight subdivision bulkheads, arrangements shall be made to ensure the water tightness of the bulkheads. A deck frame 290 deck penetration silicones over. 60SOLAS II/13(b)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 25 March 2020
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 24 February 2020
Resolved
The boundary bulkheads separating accommodation from machinery, cargo, and service spaces, shall be constructed as “A” Class divisions, and these decks shall have an insulation value to the satisfaction of the administration. Both port and stbd force draft fan rooms found with missing bulkhead lagging. 60SOLAS II/40
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 25 March 2020
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 24 February 2020
Resolved
After any survey or the ship under Regulations 7,8,9 or 10 has been completed, no change shall be made in the structural arrangements, machinery, equipment, etc. covered by the survey, without the sanction of the Administration. Two (02) CO distribution heads were found to be missing their horns. One was identified just outboard of the port feed tank and the other was in the lower engine room forward bulkhead area just stbd of center in the bilge. SOLAS 60 I/11
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 25 March 2020
09 - Working and Living Conditions › 092 - Working Conditions › Structural features (ship)
Issued 24 February 2020
Resolved
After any survey or the ship under Regulations 7,8,9 or 10 has been completed, no change shall be made in the structural arrangements, machinery, equipment, etc. covered by the survey, without the sanction of the Administration. A missing guard rail identified in the engine room on the 1 deck fwd stbd corner. Unprotected ladderwell opening. SOLAS 60 I/11
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 25 March 2020
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 24 February 2020
Resolved
After any survey or the ship under Regulations 7,8,9 or 10 has been completed, no change shall be made in the structural arrangements, machinery, equipment, etc. covered by the survey, without the sanction of the Administration. A shattered gauge glass was identified adjacent to the control flat in the engine room. Gauge glass was a personnel hazard. SOLAS 60 I/11
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 25 March 2020
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 24 February 2020
Resolved
Every motor lifeboat shall carry portable fire-extinguishing equipment of an approved type capable of discharging froth or other suitable substance for extinguishing oil fires. Both port and stbd lifeboats found with unserviced fire extinguishers. 60SOLASIII/A 11.e
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 24 February 2020
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 24 February 2020
Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and so installed and protected as to reduce to a minimum any danger to persons on board, due regard being paid to moving parts, hot surfaces and other hazards. The bench grinder in the machine shop has no guards. Guards shall be installed over rotating machinery.
SOLAS 74 II/B 1.26.1
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 25 March 2020
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 27 June 2019
Resolved
33CFR104.230 drill and exercise requirements. Reviewed security documentation and physical security for ISPS/MTSA verification and ISSC SOVC issuance, but departed before being able to observe security drill. Prior to sailing, USCG to witness security drill or exercise.(ABS ACP vessel pending other cert renewals)
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 31 July 2019
Resolved 9 December 2021
Resolution: Vessel provided certification of completing security drills.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 10 April 2019
Resolved
Vessel must demonstrate operational test of starboard propulsion system prior to departure from berth at Vigor Shipyard. 46CFR50.05-10
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 10 April 2019
Resolved 16 May 2019
Resolution: Vessel replaced the failed expansion joint on the 35# steam line to their DC Heater.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 April 2019
Resolved
After any survey, survey conditions must be maintained. Deck holed under port auxiliary exhaust pipe on deck directly above OWS. Make temporary repairs and clear OWS containment of water.
SOLAS 60 1/11
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 5 April 2019
Resolved 5 April 2019
Resolution: Crew made temp repairs and removed water from containment.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 April 2019
Resolved
After any survey, survey conditions must be maintained. Deck holed under port auxiliary exhaust must be gauged and provided permanent repairs.
SOLAS 60 I/11
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2019
Resolved 10 April 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 April 2019
Resolved
After any survey, survey conditions must be maintained. Significant leak at feedwater side of chemical isolation valve (port boiler). Repack and eliminate leak.
SOLAS 60 I/11
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2019
Resolved 10 April 2019
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 5 April 2019
Resolved
Each hose shall be provided with a nozzle and the necessary couplings. Hoses specified in these regulations as 'fire hoses' shall together with any necessary fittings and tools be kept ready for use in conspicious positions near the water service hydrants or connections. Fire station 146 missing spanner wrench.
SOLAS 60 II/56
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 5 April 2019
Resolved 5 April 2019
Resolution: Crew put spanner wrench at station 146.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 5 April 2019
Resolved
In and from all crew and passenger spaces in which crew are normally employed, other than machinery spaces, stairways and ladders shall be arranged so as to provide ready means of escape to the lifeboat embarkation deck. Emergency escape hatches in A cargo deck seized closed. Perform maintenance on hatches or provide a tool to assist with opening.
SOLAS 60 II/68
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 5 April 2019
Resolved 5 April 2019
Resolution: Crew installed spanner wrenches at each escape hatch for A cargo deck.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 27 September 2018
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Prove proper operation of stbd EOT audible alarm (74 SOLAS 2014 I/11).
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2018
Resolved 27 September 2018
Resolution: RO had taken item as an OSR, see ABS report SF3549080.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage treatment plant
Issued 27 September 2018
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons onboard. Forward sewage system space was found with 3 inches of clear standing water. Dewater the space, determine the source and provide rectification to prevent recurrence.
74 SOLAS(14) I/11
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2018
Resolved 2 October 2018
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil and oily mixtures from machinery spaces
Issued 27 September 2018
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present Convention to ensure that the ship in all respects will remain fit to proceed to sea without presenting an unreasonable threat of harm to the marine environment. Hydraulic actuated cargo hold door on C deck at frame 198-1 leaking at the hydraulic ram. Determine the cause of the leak and conduct proper repairs.
MARPOL Annex I/6.4.1
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2018
Resolved 2 October 2018
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 27 September 2018
Resolved
Fire extinguishing appliances in new and existing cargo ships shall be kept in good order. Fire station 176 found leaking at a slow rate and causing corrosion damage to surrounding area.
74 SOLAS(60) II/66
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2018
Resolved 2 October 2018
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 27 September 2018
Resolved
Where provision is made for the injection of gas or steam into machinery or cargo spaces for fire extinguishing purposes, suitable provision shall be made to prevent the inadvertent admission of the gas or steam to any compartment. Break glass for CO2 system located outside CO2 room was missing. Install break glass cover.
74 SOLAS(60) II/58
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2018
Resolved 5 April 2019
Resolution: Verified break glass installed.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 27 September 2018
Resolved
The lights prescribed in these Rules shall have an intensity so as to be visible at the following minimum ranges: in a vessel of 50 meters or more in length, a masthead light - 6 miles. Masthead light onboard is inoperable. Repair light to meet minimum visibility requirements above.
33 CFR 83.22
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2018
Resolved 2 October 2018
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 27 September 2018
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present Convention to ensure that the ship in all respects will remain fit to proceed to sea without presenting an unreasonable threat of harm to the marine environment. Several mechanical plugs for main deck containment were missing or not in place. Install mechanical plugs for all containment areas on main deck.
MARPOL Annex I/6.4.1
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2018
Resolved 5 April 2019
Resolution: Verified plugs in place.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 27 September 2018
Resolved
In addition to the requirements contained elsewhere in the present regulations, ships shall be designed, constructed and maintained in compliance with the structural requirements of a classification society which is recognized by the Administration. Bulwark stanchions on aft port side of main deck wasted due to corrosion. Repair stanchions to the satisfaction of attending marine inspector (MI) or recognized organization (RO).
74 SOLAS(14) II-1/3-1
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2018
Resolved 2 October 2018
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 27 September 2018
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons onboard. Ventilation trunk above the electrical room on the bridge found wasted along the coaming, preventing proper closure. Repair trunk to the satisfaction of attending MI or RO.
74 SOLAS(14) I/11
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2018
Resolved 2 October 2018
Documentation › Safety Management System › Conformity Maintenance Procedures
Issued 4 June 2018
Resolved
A marine casualty occurred on 27 May 2018 in which a mooring line parted and severely injured multiple crew. Upon inspection, the vessel's mooring lines were found heavily worn and deteriorated and the vessel had no accurate records of installation, maintenance, or inspections. Vessel shall develop and implement planned maintenance as outlined in the vessel's SMS. 33 CFR 96.240(b) ISM Code Part A 10.2
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 15 June 2018
Resolution: ABS conducted SMS audit of the applicable sections of the SMS. Issued 01 non-conformity to be corrected by the next intermediate audit in 2019.
Deck/Cargo › Mooring/Anchoring › Mooring Line/Hawser
Issued 29 May 2018
Resolved
Vessels in oceans service shall be fitted with hawsers in general agreement with the Standards established by the American Bureau of Shipping. Based on material condition of the hawsers, the ALGOL shall provide objective evidence that they are in keeping with the standards published by ABS. 46 CFR 96.07-5(a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 May 2018
Resolved 24 October 2018
Resolution: Issued 60 day extension due to owners ordering of new mooring lines. Issued additional 30 day extension due to delay in delivery of new mooring lines. Issued extension to 27OCT18. Verified new lines were onboard and in use 24OCT18.