Records from 1984 to 2024. Most recent: inspection, 12 June 2024.
Inspection history · 191
12 June 2024
In-Service Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7935060
25 September 2023
ACP Annual Oversight · Annual Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7803066
22 September 2022
Annual Inspection · ACP Annual Oversight
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7600711
19 July 2022
In-Service Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7512969
22 September 2021
ACP Annual Oversight · Deficiency Check · Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7318312
5 August 2021
In-Service Inspection · Administrative Inspection · Security Breach
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7278601
8 June 2021
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7308613
15 September 2020
In-Service Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7058428
24 February 2020
Deficiency Check · Re-Inspection · Administrative Inspection · ACP COI Oversight
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6914862
28 January 2020
Administrative Inspection
Administrative · Commandant (CG-5P-TI) · Activity 6898184
27 June 2019
Re-Inspection · In-Service Inspection · MTSA/ISPS Verification · ACP COI Oversight
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6744985
10 April 2019
Damage Survey
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6659746
5 April 2019
Administrative Inspection
Administrative · Commandant (CG-5P-TI) · Activity 6658288
5 April 2019
Periodic Inspection · ACP Periodic Oversight · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6658504
15 October 2018
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6562707
27 September 2018
Annual Inspection · ACP Annual Oversight
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6550574
29 May 2018
Administrative Inspection · Deficiency Check · ISM Oversight · In-Service Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6435194
27 May 2018
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6430778
29 December 2017
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6330311
22 September 2017
Damage Survey · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6274860
19 September 2017
MTSA Verification · Annual Inspection · Administrative Inspection · ACP COI Oversight
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6270146
8 August 2017
Examination of Repairs
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6235180
17 August 2016
Examination of Repairs · In-Service Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5975714
8 June 2016
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5917954
13 January 2016
Examination of Repairs
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5802730
22 September 2015
ACP Annual Oversight
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5724951
18 June 2014
MTSA/ISPS Verification · ACP COI Oversight · COI Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 4884495
6 June 2012
MTSA/ISPS Verification
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 4336077
2 May 2012
ACP Annual Oversight · Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 4300670
4 November 2010
Annual Inspection · MTSA/ISPS Verification · ACP COI Oversight
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3863411
8 April 2009
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3450297
3 September 2008
Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3315766
29 March 2008
Examination of Repairs · In-Service Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 3173489
8 March 2007
Deficiency Check · ACP Annual Oversight · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2883946
16 March 2006
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2603508
10 February 2006
Deficiency Check
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 2583021
6 January 2006
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2562202
24 August 2005
MTSA/ISPS Verification · ACP COI Oversight
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 2466725
10 May 2005
MTSA Verification · In-Service Inspection
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 2351015
4 March 2005
Administrative Inspection
Administrative · Commandant (CG-5P-TI) · Activity 2303598
18 November 2004
ACP Annual Oversight
Administrative · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 2242876
15 June 2004
MTSA/ISPS Verification
Physical examination · Commandant (CG-CVC) · Activity 2099251
12 April 2004
Administrative Inspection
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 2042678
9 February 2004
Deficiency Check
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 2003041
29 January 2004
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1996977
26 November 2003
Deficiency Check
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1954845
22 October 2003
ACP COI Oversight
Administrative · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1933484
15 May 2003
Liferaft Servicing
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1794744
5 March 2003
Security Inspection · Administrative Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1752957
4 January 2003
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1994281
9 August 2002
Internal Structural Exam · Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1658908
29 December 2001
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1493402
7 November 2001
Annual Inspection · ACP COI Oversight
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1445900
9 October 2001
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1074141
24 July 2001
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 224812
2 July 2001
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1068492
12 March 2001
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1061178
28 August 2000
COI Inspection · Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1408440
1 December 1999
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 643400
9 November 1999
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 806394
22 October 1999
Damage Survey
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1469931
17 October 1999
Damage Survey
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1123109
16 October 1999
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 171911
15 October 1999
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1381695
10 April 1999
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 83175
30 March 1999
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1117586
22 March 1999
Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1045775
12 March 1999
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 810969
9 February 1999
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 25929
7 February 1999
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 90280
6 January 1999
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 810733
19 November 1998
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 807105
3 October 1998
Deficiency Check
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 801850
23 September 1998
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 799027
28 August 1998
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1408163
6 August 1998
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1131359
10 July 1998
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1400803
26 February 1998
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 781018
18 November 1997
Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1419881
20 October 1997
Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1114784
9 October 1997
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 78341
3 October 1997
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 220924
25 August 1997
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1437283
14 July 1997
Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 780036
2 June 1997
Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1109734
10 March 1997
Type not recorded
No type recorded · Activities Europe · Activity 1101649
7 February 1997
Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1407827
7 January 1997
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1096363
3 December 1996
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1184871
22 November 1996
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1180948
8 October 1996
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 838558
22 August 1996
Deficiency Check · COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1360603
23 May 1996
Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1085355
17 May 1996
Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1443702
7 September 1995
Type not recorded
No type recorded · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1425630
1 September 1995
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1355396
12 June 1995
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1190116
31 May 1995
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 874175
20 April 1995
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 97449
13 February 1995
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 187781
12 December 1994
Damage Survey
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1146884
12 October 1994
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1449728
13 September 1994
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 866009
9 August 1994
Hull Examination · COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1394168
4 August 1994
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1179171
21 June 1994
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1394142
1 June 1994
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 6202
31 May 1994
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 228623
25 May 1994
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 199027
25 May 1994
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 751800
24 April 1994
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 95739
28 January 1994
Examination of Repairs
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1401808
14 December 1993
Type not recorded
No type recorded · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 363023
14 December 1993
Administrative
Administrative · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1159357
25 October 1993
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 827946
31 August 1993
Type not recorded
No type recorded · Commandant (CG-CVC) · Activity 826305
13 August 1993
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1405435
25 June 1993
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 223551
17 June 1993
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 844277
2 May 1993
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 163633
3 April 1993
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 43160
22 March 1993
Administrative
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1144760
19 February 1993
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 36527
4 February 1993
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 125216
26 January 1993
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 5486
18 January 1993
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 36250
18 January 1993
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 115004
15 January 1993
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 124092
9 September 1992
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 674465
8 September 1992
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1257186
4 September 1992
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1244404
27 August 1992
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 59270
21 August 1992
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 957056
24 July 1992
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1263899
16 July 1992
COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1262379
17 June 1992
Administrative
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 945916
12 March 1992
Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1266870
28 January 1992
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1262159
20 December 1991
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1269942
18 December 1991
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 26552
4 November 1991
Damage Survey
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 937977
10 October 1991
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 936042
7 October 1991
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1403513
19 September 1991
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1353329
11 September 1991
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 674466
6 September 1991
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1253220
23 August 1991
Deficiency Check · Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1244199
26 July 1991
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 225928
23 May 1991
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 507233
21 May 1991
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 916527
2 March 1991
Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1238854
2 March 1991
Administrative
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1240145
6 October 1990
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 903968
16 August 1990
Type not recorded
No type recorded · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1228050
1 August 1990
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 925022
27 July 1990
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1219399
19 July 1990
COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1212642
3 April 1990
Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 911895
19 March 1990
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 910167
15 March 1990
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1233214
22 February 1990
Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 900095
8 December 1989
Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 916824
16 November 1989
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1228327
4 October 1989
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1320840
2 October 1989
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1030864
11 September 1989
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 893521
11 September 1989
Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1351074
11 August 1989
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1342716
21 July 1989
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 970740
14 October 1988
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1200480
11 October 1988
Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1194374
29 September 1988
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1044180
17 August 1988
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1346342
11 August 1988
COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1345068
11 May 1988
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1199988
18 December 1987
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1001318
22 September 1987
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1013198
22 August 1987
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1338917
18 August 1987
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1030437
14 August 1987
Re-Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1308753
23 March 1987
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1328995
13 December 1986
Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1006993
14 October 1986
Deficiency Check
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1319754
25 September 1986
Deficiency Check
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1010896
17 July 1986
COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1310791
28 December 1985
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 995626
24 September 1985
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 987932
12 September 1985
Deficiency Check
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 990959
17 August 1985
Damage Survey
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 991184
11 June 1985
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1294263
21 August 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 978213
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 25 September 2023
Resolved
The company should identify equipment and technical systems the sudden operational failure of which may result in hazardous situations. The safety management system should provide for specific measures aimed at promoting reliability of such equipment or systems. These measures should include regular testing of stand-by arrangements and equipment or technical systems that are not in continuous use. During ACP annual oversight inspection, Marine Inspector found that oxygen sensors that are installed at EDG and paint locker were not operational and/or been rendered inoperable. The oxygen sensor installed at the CO2 storage room displayed 19.8% oxygen concentration. Additionally, there were no records of calibration for this equipment. After looking into the SMS, it was determined that the SMS does not provide instructions to personnel on how to safely enter (or not enter) a space monitored by oxygen sensing equipment, what to do if the oxygen sensors are inoperable, how to maintain and test the oxygen sensors, and how and when to calibrate the sensors. Develop procedures for maintaining/calibrating and usage of these oxygen sensors and ensure that measures are integrated into ship’s operational maintenance routine as required by ISM 10.4.
74 SOLAS (20) IX/3.1
ISM 10.3
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 October 2023
Resolved 23 October 2023
Resolution: Accepted by ABS.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 25 September 2023
Resolved
The company should establish procedures, plans and instructions, including checklists as appropriate, for key shipboard operations concerning safety of the personnel, ship and protection of the environment. The various tasks should be defined and assigned to qualified personnel. Vessel has an outdated checklist for bringing vessel from ROS to FOS status. Vessel also decommissions lifesaving equipment (such as lifeboats not in davits) and firefighting equipment (such as fixed foam system in cargo spaces) while in ROS. The pre-deployment preparation of these items are not captured in any current SMS product. Develop updated checklist, plan, procedure, or instruction that includes all necessary items for preparing vessel for fully operational status and ensure tasks are assigned to qualified personnel.
74 SOLAS (20) IX/3.1
ISM 7
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 November 2023
Resolved 6 November 2023
Resolution: Accepted by class. All sat.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 25 September 2023
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. During inspection, Marine Inspector found the following deficiencies that need to be resolved to the satisfaction of ABS:
-Battery Powered E-Light inoperable at the EDG Room
-SSDG exhaust fan excessively oil covered creating a fire hazard
-Bulkhead valves (engine room to aft steering) providing watertight boundary were not on test schedule or emergency procedures for flooding
-The following propulsion boiler system gauges found inoperable: Port main steam inlet pressure, stbd HP Bleed pressure, and chemical feed pump discharge pressure.
-Holes found on the operating flat decking forward of the stbd boiler.
-Inoperable light with damaged support structure identified for the port main turbine L/O sightglass
-Leaking Y Gate valves noted on Fire Stations 66 &68.
74 SOLAS (20) I/11(a)
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 November 2023
Resolved 23 October 2023
Resolution: Accepted by ABS.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 22 September 2022
Resolved
Fire-fighting systems and applicances shall be kept in good working order and readily available for immediate use. Jubilee patch was found on the fire main adjacent to the C-deck riser cut out valve and a leak was identified at the cutout valve for stations 169, 162, 153, & 146. 74 SOLAS (20) II-2/2.1.2
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 1 December 2022
Resolution: Accepted by ABS.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 22 September 2022
Resolved
Where ‘A’ Class divisions are pierced for the passage of electric cables, arrangements shall be made to ensure that the fire resistance is not impaired. Horizontal deck cable transits under the bridge console (03), in the bridge electrical station room (01), and in the gyro room (01) were found modified with sealants not part of the transit design or type approval. 60 SOLAS II/38(a)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 1 December 2022
Resolution: Accepted by ABS.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Bulwarks and freeing ports
Issued 22 September 2022
Resolved
Bulkheads at the exposed ends of superstructures shall be of efficient construction and shall be to the satisfaction of the administration. The enclosed forward mooring deck found with two deteriorated chock drains that are now open to the exterior of the vessel. ICLL (88) II/11
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 1 December 2022
Resolution: Accepted by ABS.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo ports and other similar openings
Issued 22 September 2022
Resolved
The means for securing and maintaining weathertightness shall be to the satisfaction of the administration. The arrangement shall ensure that tightness can be maintained in any sea conditions... Vessel found with damaged dogs on the aft rope locker, a missing dog on the rudder void access, deterioration on the cargo hold 1 emergency escape hatch, and a chock cover at frame 160 unable to be secured weathertight. ICLL (88) II/16(4)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 1 December 2022
Resolution: Accepted by ABS.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 22 September 2022
Resolved
If the administration is satisfied that such doors are essential, watertight doors of satisfactory construction may be fitted in watertight bulkheads dividing cargo between deck spaces. The watertight door at bulkhead 198 (cargo hold C) is missing a section of lower channel gasket rendering it non-watertight. If the administration is satisfied that such doors are essential, watertight doors of satisfactory construction may be fitted in watertight bulkheads dividing cargo between deck spaces.
60 SOLAS II/B.13(1)(i)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 1 December 2022
Resolution: Accepted by ABS.
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 22 September 2022
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on-board. Steam line found with damaged lagging on the port side of the tween (C to B decks). 74 SOLAS (20) I/11
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 1 December 2022
Resolution: Accepted by ABS.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 9 December 2021
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. STBD boiler found with holes in the outer casing at the downcomers. PORT boiler found with holes in outer casing at the aft inboard corner adjacent to the mud drum.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 February 2022
Resolution: ABS accepted.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 9 December 2021
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. The port boiler water level gauge glass was found too cloudy to read, the port bilge/ballast suction gauge glass was shattered, and the STBD ADT tank gauge glass was leaking.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 February 2022
Resolution: ABS accepted.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 22 September 2021
Resolved
In and from all crew and passenger spaces in which crew are normally employed, other than machinery spaces, stairways and ladders shall be arranged so as to provide ready means of escape to the lifeboat embarkation deck. Emergency escape hatches in A cargo deck seized closed.
SOLAS 60 II/68
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 October 2021
Resolved 7 October 2021
Resolution: ABS accepted
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 22 September 2021
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations. Noted 3 wasted bunker gooseneck containments wasted at the base between cargo holds 5 thru 7. Vessel has open item in NSE for repairing 10 containments on main deck that was entered in July 2020 with proposed correction of 2022. Referred item to ABS with requirement to significantly shorten repair window.
74 SOLAS I/11
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 October 2021
Resolved 7 October 2021
Resolution: ABS accepted.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 22 September 2021
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations. Three natural ventilation closures on aft main deck (rope locker exhaust vent, rope locker supply vent, exhaust fan box girder port) found deteriorated to the point where they did not adequately seal/close.
74 SOLAS I/11
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 October 2021
Resolved 7 October 2021
Resolution: ABS accepted.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 27 February 2020
Resolved
Bulkheads divining the machinery space from the cargo spaces forward and aft shall be fitted and made watertight up to the bulkhead deck. Eft engine room bulkhead on the 3 deck found with large bolted openings; only 2 bolts per plate were found installed leaving the remaining holes open. This bulkhead should be a A-60 machinery space boundary. 60SOLAS II/9(b)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 25 March 2020
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 24 February 2020
Resolved
Bulkheads dividing the machinery space from the cargo spaces forward and aft shall be fitted and made watertight up to the bulkhead deck. 3 level engine room door to the elevator found missing latch assembly rendering fire/water boundary incomplete. 60SOLAS II/9(b)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 25 March 2020
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 24 February 2020
Resolved
Where pipes, scuppers, electric cables, etc. are carried through watertight subdivision bulkheads, arrangements shall be made to ensure the water tightness of the bulkheads. Port side 3 deck passageway door found with improperly repaired MCT above it. 60SOLAS II/13(b)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 25 March 2020
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 24 February 2020
Resolved
Where pipes, scuppers, electric cables, etc. are carried through watertight subdivision bulkheads, arrangements shall be made to ensure the water tightness of the bulkheads. Two (02) cable transit penetrations in an A-60 boundary in the main deck athwart ships passage were found out of compliance. 60SOLAS II/13(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 25 March 2020
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - operational damage
Issued 24 February 2020
Resolved
Watertight decks shall be of the same strength as watertight bulkheads at corresponding levels. The means for making them watertight, and the arrangements adopting for closing them, shall be to the satisfaction of the administration. The overhead of the steering gear space (watertight deck) found with an improper penetration for control cabling. 60SOLAS II/16(a)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 25 March 2020
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 24 February 2020
Resolved
Watertight decks shall be of the same strength as watertight bulkheads at corresponding levels. The means for making them watertight, and the arrangements adopting for closing them, shall be to the satisfaction of the administration. Aft main deck reefer electrical kick pipes deteriorated. Cargo holds 5-8. 60SOLAS II/16(a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 25 March 2020
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 24 February 2020
Resolved
Where pipes, scuppers, electric cables, etc. are carried through watertight subdivision bulkheads, arrangements shall be made to ensure the water tightness of the bulkheads. A deck frame 290 deck penetration silicones over. 60SOLAS II/13(b)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 25 March 2020
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 24 February 2020
Resolved
The boundary bulkheads separating accommodation from machinery, cargo, and service spaces, shall be constructed as “A” Class divisions, and these decks shall have an insulation value to the satisfaction of the administration. Both port and stbd force draft fan rooms found with missing bulkhead lagging. 60SOLAS II/40
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 25 March 2020
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 24 February 2020
Resolved
After any survey or the ship under Regulations 7,8,9 or 10 has been completed, no change shall be made in the structural arrangements, machinery, equipment, etc. covered by the survey, without the sanction of the Administration. Two (02) CO distribution heads were found to be missing their horns. One was identified just outboard of the port feed tank and the other was in the lower engine room forward bulkhead area just stbd of center in the bilge. SOLAS 60 I/11
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 25 March 2020
09 - Working and Living Conditions › 092 - Working Conditions › Structural features (ship)
Issued 24 February 2020
Resolved
After any survey or the ship under Regulations 7,8,9 or 10 has been completed, no change shall be made in the structural arrangements, machinery, equipment, etc. covered by the survey, without the sanction of the Administration. A missing guard rail identified in the engine room on the 1 deck fwd stbd corner. Unprotected ladderwell opening. SOLAS 60 I/11
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 25 March 2020
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 24 February 2020
Resolved
After any survey or the ship under Regulations 7,8,9 or 10 has been completed, no change shall be made in the structural arrangements, machinery, equipment, etc. covered by the survey, without the sanction of the Administration. A shattered gauge glass was identified adjacent to the control flat in the engine room. Gauge glass was a personnel hazard. SOLAS 60 I/11
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 25 March 2020
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 24 February 2020
Resolved
Every motor lifeboat shall carry portable fire-extinguishing equipment of an approved type capable of discharging froth or other suitable substance for extinguishing oil fires. Both port and stbd lifeboats found with unserviced fire extinguishers. 60SOLASIII/A 11.e
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 24 February 2020
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 24 February 2020
Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and so installed and protected as to reduce to a minimum any danger to persons on board, due regard being paid to moving parts, hot surfaces and other hazards. The bench grinder in the machine shop has no guards. Guards shall be installed over rotating machinery.
SOLAS 74 II/B 1.26.1
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 25 March 2020
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 27 June 2019
Resolved
33CFR104.230 drill and exercise requirements. Reviewed security documentation and physical security for ISPS/MTSA verification and ISSC SOVC issuance, but departed before being able to observe security drill. Prior to sailing, USCG to witness security drill or exercise.(ABS ACP vessel pending other cert renewals)
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 31 July 2019
Resolved 9 December 2021
Resolution: Vessel provided certification of completing security drills.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 10 April 2019
Resolved
Vessel must demonstrate operational test of starboard propulsion system prior to departure from berth at Vigor Shipyard. 46CFR50.05-10
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 10 April 2019
Resolved 16 May 2019
Resolution: Vessel replaced the failed expansion joint on the 35# steam line to their DC Heater.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 April 2019
Resolved
After any survey, survey conditions must be maintained. Deck holed under port auxiliary exhaust pipe on deck directly above OWS. Make temporary repairs and clear OWS containment of water.
SOLAS 60 1/11
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 5 April 2019
Resolved 5 April 2019
Resolution: Crew made temp repairs and removed water from containment.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 April 2019
Resolved
After any survey, survey conditions must be maintained. Deck holed under port auxiliary exhaust must be gauged and provided permanent repairs.
SOLAS 60 I/11
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2019
Resolved 10 April 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 April 2019
Resolved
After any survey, survey conditions must be maintained. Significant leak at feedwater side of chemical isolation valve (port boiler). Repack and eliminate leak.
SOLAS 60 I/11
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2019
Resolved 10 April 2019
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 5 April 2019
Resolved
Each hose shall be provided with a nozzle and the necessary couplings. Hoses specified in these regulations as 'fire hoses' shall together with any necessary fittings and tools be kept ready for use in conspicious positions near the water service hydrants or connections. Fire station 146 missing spanner wrench.
SOLAS 60 II/56
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 5 April 2019
Resolved 5 April 2019
Resolution: Crew put spanner wrench at station 146.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 5 April 2019
Resolved
In and from all crew and passenger spaces in which crew are normally employed, other than machinery spaces, stairways and ladders shall be arranged so as to provide ready means of escape to the lifeboat embarkation deck. Emergency escape hatches in A cargo deck seized closed. Perform maintenance on hatches or provide a tool to assist with opening.
SOLAS 60 II/68
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 5 April 2019
Resolved 5 April 2019
Resolution: Crew installed spanner wrenches at each escape hatch for A cargo deck.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 27 September 2018
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Prove proper operation of stbd EOT audible alarm (74 SOLAS 2014 I/11).
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2018
Resolved 27 September 2018
Resolution: RO had taken item as an OSR, see ABS report SF3549080.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage treatment plant
Issued 27 September 2018
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons onboard. Forward sewage system space was found with 3 inches of clear standing water. Dewater the space, determine the source and provide rectification to prevent recurrence.
74 SOLAS(14) I/11
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2018
Resolved 2 October 2018
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil and oily mixtures from machinery spaces
Issued 27 September 2018
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present Convention to ensure that the ship in all respects will remain fit to proceed to sea without presenting an unreasonable threat of harm to the marine environment. Hydraulic actuated cargo hold door on C deck at frame 198-1 leaking at the hydraulic ram. Determine the cause of the leak and conduct proper repairs.
MARPOL Annex I/6.4.1
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2018
Resolved 2 October 2018
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 27 September 2018
Resolved
Fire extinguishing appliances in new and existing cargo ships shall be kept in good order. Fire station 176 found leaking at a slow rate and causing corrosion damage to surrounding area.
74 SOLAS(60) II/66
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2018
Resolved 2 October 2018
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 27 September 2018
Resolved
Where provision is made for the injection of gas or steam into machinery or cargo spaces for fire extinguishing purposes, suitable provision shall be made to prevent the inadvertent admission of the gas or steam to any compartment. Break glass for CO2 system located outside CO2 room was missing. Install break glass cover.
74 SOLAS(60) II/58
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2018
Resolved 5 April 2019
Resolution: Verified break glass installed.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 27 September 2018
Resolved
The lights prescribed in these Rules shall have an intensity so as to be visible at the following minimum ranges: in a vessel of 50 meters or more in length, a masthead light - 6 miles. Masthead light onboard is inoperable. Repair light to meet minimum visibility requirements above.
33 CFR 83.22
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2018
Resolved 2 October 2018
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 27 September 2018
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present Convention to ensure that the ship in all respects will remain fit to proceed to sea without presenting an unreasonable threat of harm to the marine environment. Several mechanical plugs for main deck containment were missing or not in place. Install mechanical plugs for all containment areas on main deck.
MARPOL Annex I/6.4.1
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2018
Resolved 5 April 2019
Resolution: Verified plugs in place.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 27 September 2018
Resolved
In addition to the requirements contained elsewhere in the present regulations, ships shall be designed, constructed and maintained in compliance with the structural requirements of a classification society which is recognized by the Administration. Bulwark stanchions on aft port side of main deck wasted due to corrosion. Repair stanchions to the satisfaction of attending marine inspector (MI) or recognized organization (RO).
74 SOLAS(14) II-1/3-1
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2018
Resolved 2 October 2018
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 27 September 2018
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons onboard. Ventilation trunk above the electrical room on the bridge found wasted along the coaming, preventing proper closure. Repair trunk to the satisfaction of attending MI or RO.
74 SOLAS(14) I/11
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2018
Resolved 2 October 2018
Documentation › Safety Management System › Conformity Maintenance Procedures
Issued 4 June 2018
Resolved
A marine casualty occurred on 27 May 2018 in which a mooring line parted and severely injured multiple crew. Upon inspection, the vessel's mooring lines were found heavily worn and deteriorated and the vessel had no accurate records of installation, maintenance, or inspections. Vessel shall develop and implement planned maintenance as outlined in the vessel's SMS. 33 CFR 96.240(b) ISM Code Part A 10.2
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 15 June 2018
Resolution: ABS conducted SMS audit of the applicable sections of the SMS. Issued 01 non-conformity to be corrected by the next intermediate audit in 2019.
Deck/Cargo › Mooring/Anchoring › Mooring Line/Hawser
Issued 29 May 2018
Resolved
Vessels in oceans service shall be fitted with hawsers in general agreement with the Standards established by the American Bureau of Shipping. Based on material condition of the hawsers, the ALGOL shall provide objective evidence that they are in keeping with the standards published by ABS. 46 CFR 96.07-5(a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 May 2018
Resolved 24 October 2018
Resolution: Issued 60 day extension due to owners ordering of new mooring lines. Issued additional 30 day extension due to delay in delivery of new mooring lines. Issued extension to 27OCT18. Verified new lines were onboard and in use 24OCT18.
Lifesaving › Inflatable Liferafts › Float Free
Issued 4 November 2010
Resolved
Relocate liferafts to allow for side-to-side transfer IAW 46CFR199.261(b)(2)(ii), or install sufficient liferafts for 100% on each side.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 November 2010
Resolution: Chief Mate contacted operator representative and ACS immediately to ensure issue would be rectified; entered requirement as resolved
Communications › Alarms/Indicators › General Alarm
Issued 4 November 2010
Resolved
Obtain approval for, or deinstall, the two general alarm contact makers labeled 'intrusion alarm', located on the upper deck at the P/S embarkation stations.
Action required: 705 - Other - as specified
Resolved 4 November 2010
Resolution: Chief Mate notified vessel operator & ACS immediately to begin process of approval for this. Two general alarm contact makers were added in weather deck locations without plan approval IAW 46 CFR 113.25-5(d) for use as ''intrusion alarms''.
Operations/Management › Drills/Instruction › Fire
Issued 24 August 2005
Resolved
Upon activation of vessel conduct fire and boat drills in the presence of a Coast Guard Marine Inspector.
Action required: 705 - Other - as specified
Due 25 August 2006
Resolved 21 August 2007
Construction/Loadline › Penetrations › Pipe Flange
Issued 24 August 2005
Resolved
Renew #6 STBD DFM tank pipe and vent at deck connection where fractured in the presence of a Coast Guard Marine inspector or ABS Surveyor.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 25 November 2005
Resolved 10 February 2006
Resolution: Per ACP ABS surveyor examined repairs and cleared CG-835
Operations/Management › Drills/Instruction
Issued 22 October 2003
Resolved
Conduct fire and boat drill upon activation; prior to departure.
Due 22 December 2003
Resolved 10 February 2004
Resolution: Vessel activated, drills held and were satisfactory.
Fire Fighting › Structural Fire Protection - General
Issued 22 October 2003
Resolved
Prove proper operation of fire screen doors in fore and aft stairtowers.
Due 22 November 2003
Resolved 26 November 2003
Lifesaving
Issued 2 July 2001
Resolved
CONDUCT WIEGHT TEST OF STARBOARD LIFE BOAT.
Condition: Unknown
Due 2 August 2001
Resolved 7 November 2001
Documentation
Issued 2 July 2001
Resolved
PROVIDE APPROVED FIRE SAFETY PLAN.
Condition: Unknown
Due 2 July 2001
Resolved 2 July 2001
Accommodation/Occupational Safety
Issued 28 August 2000
Resolved
INSTALL CG APPROVED MSD IN FORWARD HOUSE
Condition: Unknown
Due 28 September 2000
Resolved 23 October 2000
Navigation
Issued 22 October 1999
Resolved
PROVE PROPER OPERATION OF STEERING SYSTEM WHEN SHIFTING PUMPS (33 SECOND DELAY WHEN SHIFTING FROM PORT TO STBD/9 SECOND DELAY WHEN SHIFTING FROM STBD TO PORT)
Condition: Unknown
Due 15 November 1999
Resolved 10 November 1999
Navigation
Issued 17 October 1999
Resolved
PRIOR TO DEPARTING THE MISSISSIPPI RIVER, PROVIDE TECHNICIAN'S REPORT FOR REPAIRS TO BOTH THE PORT AND STARBOARD STEERING PUMPS AND PROVE PROPER OPERATION OF BOTH STEERING PUMPS WITH CG MARINE INSPECTOR IN ATTENDANCE.
Condition: Unknown
Due 17 October 1999
Resolved 17 October 1999
Unknown
Issued 17 October 1999
Resolved
VESSEL MAY TRANSIT WITHIN THE MISSISSIPPI RIVER TO EFFECT NECESSARY REPAIRSAND/OR SURVEYS PROVIDED TUGS OF ADEQUATE HORSEPOWER ARE PROVIDED TO ASSIST.
Condition: Unknown
Due 17 October 1999
Resolved 17 October 1999
Navigation
Issued 15 October 1999
Resolved
PROVE PROPER OPERATION OF PORT EOT AND ALARMS
Condition: Unknown
Due 15 November 1999
Resolved 21 October 1999
Documentation
Issued 15 October 1999
Resolved
PROVIDE ON BOARD VALID LOADLINE CERTIFICATE.
Condition: Unknown
Due 15 November 1999
Resolved 21 October 1999
Engineering
Issued 15 October 1999
Resolved
PROVE PROPER OPERATION OF THE FOLLOWING LUBE OIL TEMP ALARMS-"3 STBD HP TURBINE AFT, #8 PORT HPHS PINION AFT.
Condition: Unknown
Due 15 October 1999
Resolved 15 October 1999
Electrical
Issued 15 October 1999
Resolved
PROVE PROPER OPERATION OF P/S STG'S AND ALARMS AND SHUTDOWNS.
Condition: Unknown
Due 15 November 1999
Resolved 21 October 1999
Navigation
Issued 6 January 1999
Resolved
PROVIDE UPDATED COMPASS DEVIATION CARD. DEVIATION CARD TO BE PROVIDED PRIOR TO VESSEL DEPARTING SEA BOUY ON NEXT VOYAGE.
Condition: Unknown
Due 6 January 1999
Resolved 6 January 1999
Construction/Loadline
Issued 6 January 1999
Resolved
REPLACE WASTED SCUTTLES AT MAIN DECK AFT, ROPE LOCKERS. PROVE PROPER OPERATION FOR EMERGENCY ESCAPE SCUTTLES.
Condition: Unknown
Due 6 January 1999
Resolved 6 January 1999
Lifesaving
Issued 28 August 1998
Resolved
PROVE PROPER OPERATION OF EMBARKATION LIGHTS ON ALL BOAT DECKS PRIOR TO GETTING UNDERWAY.
Condition: Unknown
Due 11 September 1998
Resolved 14 September 1998
Unknown
Issued 28 August 1998
Resolved
PROVIDE MAG PARTICLE REPORT FOR DAMAGE TO F/O FILL PIPING IN #4 CARGO HOLD "B" DECK STBD SIDE AFT.
Condition: Unknown
Due 28 August 1998
Resolved 28 August 1998
Lifesaving
Issued 28 August 1998
Resolved
PROVE OPERATION OF GENERAL ALARMS IN B3 STBD.
Condition: Unknown
Due 28 August 1998
Resolved 28 August 1998
Construction/Loadline
Issued 28 August 1998
Resolved
PROVE PROPER OPERATION OF B DECK DOOR BETWEEN 3 & 4 HOLD PORTSIDE.
Condition: Unknown
Due 11 September 1998
Resolved 14 September 1998
Navigation
Issued 28 August 1998
Resolved
PROVE PROPER OPERATION OF SSB RADIO PRIOR TO GETTING UNDERWAY.
Condition: Unknown
Due 11 September 1998
Resolved 14 September 1998
Lifesaving
Issued 28 August 1998
Resolved
PROVIDE WATER FOR PORT LIFEBOAT PRIOR TO GETTING UNDERWAY.
Condition: Unknown
Due 11 September 1998
Resolved 14 September 1998
Lifesaving
Issued 28 August 1998
Resolved
REPLACE BOTH LIFEBOAT FALLS, CONDUCT FULL LOAD TEST AND OPERATIONALLY TEST BOAT RELEASING GEAR PRIOR TO GETTING UNDERWAY.
Condition: Unknown
Due 28 August 1998
Resolved 28 August 1998
Lifesaving
Issued 28 August 1998
Resolved
RENEW FIRE INTRUSION SCREENS AS NECESSARY.
Condition: Unknown
Due 11 September 1998
Resolved 14 September 1998
Lifesaving
Issued 28 August 1998
Resolved
CONDUCT FIRE & BOAT DRILLS WITH FULL CREW ON BOARD PRIOR TO GETTING UNDERWAY.
Condition: Unknown
Due 28 August 1998
Resolved 28 August 1998
Lifesaving
Issued 28 August 1998
Resolved
PROVIDE THE FOLLOWING FOR BOTH LIFEBOATS PRIOR TO GETTING UNDERWAY: EYE WASH SOLUTION, LADDER, SPONGES, AND TOOL KIT FOR PORT LIFEBOAT.
Condition: Unknown
Due 11 September 1998
Resolved 14 September 1998
Electrical
Issued 10 July 1998
Resolved
CALIBRATE ALL ELECTRICAL METERS ON MAIN SWITCHBOARD.
Condition: Unknown
Due 10 July 1998
Resolved 10 July 1998
Fire Fighting
Issued 10 July 1998
Resolved
PROPERLY ADJUST VENTILATION DAMPERS IN EMERGENCY GENERATOR ROOM TO PROVIDE PROPER CLOSURE.
Condition: Unknown
Due 10 July 1998
Resolved 10 July 1998
Unknown
Issued 10 July 1998
Resolved
REPAIR AND PROVE PROPER OPERATION OF LUBE OIL BACK PRESSURE TRIP ASSEMBLY ON STBD SSTG.
Condition: Unknown
Due 10 July 1998
Resolved 10 July 1998
Documentation
Issued 25 August 1997
Resolved
PROVIDE TRAINING MANUAL OR MATERIALS AS PER 46CFR 199.180.
Condition: Unknown
Due 25 August 1997
Resolved 25 August 1997
Lifesaving
Issued 22 August 1996
Resolved
CONDUCT WEIGHT TEST OF PORT LIFEBOAT PRIOR TO DEPARTING NEW ORLEANS.
Condition: Unknown
Due 22 August 1996
Resolved 22 August 1996
Electrical
Issued 22 August 1996
Resolved
RENEW ALL SUPPORTS FOR VERTICAL WIRE RUN ON AFT SIDE OF AFT HOUSE.
Condition: Unknown
Due 22 August 1996
Resolved 22 August 1996
Electrical
Issued 22 August 1996
Resolved
PROVER PROPER OPERATION OF ALL SWITCHBOARD REVERSE POWER RELAYS AND STANDBYGENERATOR FUNCTIONS.
Condition: Unknown
Due 7 October 1996
Resolved 3 September 1996
Engineering
Issued 22 August 1996
Resolved
PROVE PROPER OPERATION OF ALL PROPULSION BOILER SAFETY VALVES. COMPLETE PRIOR TO 07OCT96 OR ACTIVATION, WHICHEVER COMES FIRST.
Condition: Unknown
Due 7 October 1996
Resolved 3 September 1996
Engineering
Issued 22 August 1996
Resolved
PROVE PROPER OPERATION OF PORT AND STBD DC HEATER RELIEF VALVES. COMPLETE PRIOR TO 07OCT96 OR ACTIVATION, WHICHEVER COMES FIRST.
Condition: Unknown
Due 7 October 1996
Resolved 3 September 1996
Electrical
Issued 22 August 1996
Resolved
PROVE PROPER OPERATION OF ALL STEAM TURBINE GENERATOR SHUTDOWNS AND ALL STEAM GENERATORS.
Condition: Unknown
Due 7 October 1996
Resolved 3 September 1996
Engineering
Issued 22 August 1996
Resolved
PROVE PROPER OPERATION OF MAIN ENGINE SHUTDOWNS. COMPLETE BY 07OCT96 OR UPON ACTIVATION, WHICHEVER COMES FIRST.
Condition: Unknown
Due 7 October 1996
Resolved 3 September 1996
Engineering
Issued 22 August 1996
Resolved
PROVE PROPER OPERATION OF ALL ITEMS LISTED IN THE APPROVED VESSEL AUTOMATION PROCEDURES. COMPLETE BY 07OCT96 OR ACTIVATION, WHICHEVER COMES FIRST.
Condition: Unknown
Due 7 October 1996
Resolved 3 September 1996
Engineering
Issued 22 August 1996
Resolved
PROVE PROPER OPERATION OF PORT AND STBD PROPULSION BOILERS. COMPLETE BY 07OCT96 OR ACTIVATION WHICH EVER COMES FIRST.
Condition: Unknown
Due 7 October 1996
Resolved 3 September 1996
Lifesaving
Issued 1 September 1995
Resolved
Fax copy of ship's official log showing entries for first underway fire & boat drills.
Condition: Unknown
Due 1 October 1995
Resolved 18 September 1995
Lifesaving
Issued 13 September 1994
Resolved
PROVE PROPER OPERATION OF THE LIMIT SWITCHES INSTALLED ON FORWARD DAVITS OFBOTH LIFEBOAT STATIONS TO SATISFACTION OF AN ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 13 September 1994
Resolved 13 September 1994
Lifesaving
Issued 9 August 1994
Resolved
ADD ONE ADDITIONAL LIMIT SWITCH TO EACH FORWARD DAVIT ARM AT P/S LIFEBOAT STATION. PLANS AND DRAWINGS TO BE SUBMITTED TO LOCAL CG OCMI FOR APPROVAL.
Condition: Unknown
Due 30 September 1994
Resolved 13 September 1994
Fire Fighting
Issued 9 August 1994
Resolved
REPAIR OR REPLACE VALVE ON FOAM STATION 179 ON "E" DECK. VALVE DOES NOT COMPLETELY CLOSE. PROVE PROPER OPERATION IN THE PRESENCE OF CG MARINE INSPECTOR.
Condition: Unknown
Due 9 August 1994
Resolved 9 August 1994
Fire Fighting
Issued 9 August 1994
Resolved
PROVE PROPER OPERATION OF FIRE STATION #182 ON "E" DECK #4 HOLD IN THE PRESENCE OF CG MARINE INSPECTOR
Condition: Unknown
Due 9 August 1994
Resolved 9 August 1994
Fire Fighting
Issued 9 August 1994
Resolved
PAINT FIREMAIN VALVE RED AT FIRE STATION #172 ON "D" DECK #3 HOLD
Condition: Unknown
Due 9 August 1994
Resolved 9 August 1994
Engineering
Issued 9 August 1994
Resolved
PROVE PROPER OPERATION OF AFT OILY WATER SEPARATOR
Condition: Unknown
Due 9 August 1994
Resolved 9 August 1994
Engineering
Issued 9 August 1994
Resolved
PROVE PROPER OPERATION OF DFM PUMP REMOTE SHUTDOWN FROM CO2 PRESSURE SWITCHES
Condition: Unknown
Due 9 August 1994
Resolved 9 August 1994
Fire Fighting
Issued 9 August 1994
Resolved
REPAIR LEAKS ON RELIEF VALVE FLANGE AND SEAL ON AFT FIREPUMP
Condition: Unknown
Due 9 August 1994
Resolved 9 August 1994
Accommodation/Occupational Safety
Issued 9 August 1994
Resolved
ENSURE ALL THREE ELECTRIC FIRED HOT WATER HEATERS HAVE PRESSURE/TEMPERATURERELIEF VALVES THAT ARE SET AT 100 PSI/ 210 DEGREES FARENHEIT
Condition: Unknown
Due 9 August 1994
Resolved 9 August 1994
Deck/Cargo
Issued 9 August 1994
Resolved
PROVE PROPER OPERATION OF REMOTE SHUTDOWN FOR VENTILATION IN #3 CARGO HOLD
Condition: Unknown
Due 9 August 1994
Resolved 9 August 1994
Construction/Loadline
Issued 9 August 1994
Resolved
PROVE PROPER OPERATION OF HIGH LEVEL BILGE ALARMS IN DIESEL GENERATOR ROOM,CARGO HOLD #5 STARBOARD SISE AND CARGO HOLD #8 FRAME 30 PORT SIDE
Condition: Unknown
Due 9 August 1994
Resolved 9 August 1994
Lifesaving
Issued 9 August 1994
Resolved
INSTALL GUARDS ON EXPOSED FALLS ON PORT AND STARBOARD CATWALK OF LIFEBOAT STATIONS
Condition: Unknown
Due 9 August 1994
Resolved 9 August 1994
Lifesaving
Issued 9 August 1994
Resolved
CHANGE FUEL IN PORT MOTOR LIFEBOAT
Condition: Unknown
Due 9 August 1994
Resolved 9 August 1994
Lifesaving
Issued 9 August 1994
Resolved
AFFIX REQUIRE RETROREFLECTIVE TAPE ON PORT AND STARBOARD LIFEBOATS
Condition: Unknown
Due 9 August 1994
Resolved 9 August 1994
Engineering
Issued 31 August 1993
Resolved
MAKE ALL 8 OF THE 12 INCH, 900 POUND ROCKWELL STEAM VALVES AVAILABLE FOR MOUNTING SURVEY; TO INCLUDE MAGNETIC PARTICLE TESTING. ALL REPAIRS TO BE MADE TO THE SATISFACTION OF THE COGNIZANT OCMI.
Condition: Unknown
Due 31 August 1993
Resolved 31 August 1993
Engineering
Issued 17 June 1993
Resolved
PROVE PROPER OPERATION OF THE OIL CONTENT METER.
Condition: Unknown
Due 17 June 1993
Resolved 17 June 1993
Engineering
Issued 17 June 1993
Resolved
PROVE PROPER OPERATION OF THE FORWARD OWS.
Condition: Unknown
Due 17 June 1993
Resolved 17 June 1993
Lifesaving
Issued 21 August 1992
Resolved
PRIOR TO GETTING UNDERWAY, CONDUCT WEIGHT TEST OF STARBOARD LIFEBOAT.
Condition: Unknown
Due 21 August 1992
Resolved 21 August 1992
Fire Fighting
Issued 16 July 1992
Resolved
MAKE PERMANENT REPAIRS AND PROVE PROPER OPERATION OF FIRE STATION VALVES #65, #68, AND #77.
Condition: Unknown
Due 16 September 1992
Resolved 10 August 1992
Engineering
Issued 16 July 1992
Resolved
MAKE PERMANENT REPAIRS TO AND SHOW PROPER OPERATION OF STBD BOILER BAILEY BURNER CONTROLS.
Condition: Unknown
Due 31 August 1992
Resolved 10 August 1992
Engineering
Issued 16 July 1992
Resolved
PROVE PROPER OPERATION OF STBY DIESEL GENERATOR HIGH COOLING WATER TEMP ALARM.
Condition: Unknown
Due 16 September 1992
Resolved 10 August 1992
Electrical
Issued 16 July 1992
Resolved
MAKE PEMANENT REPAIRS TO AND PROVE PROPER OPERATION OF THE ENG'S PORT SIDE ALARM PANEL.
Condition: Unknown
Due 16 July 1992
Resolved 16 July 1992
Deck/Cargo
Issued 16 July 1992
Resolved
PROVE PROPER OPERATION OF GAS DETECTION SYSTEM PRIOR TO LOADING VEHICLES INCARGO SPACES.
Condition: Unknown
Due 16 July 1992
Resolved 16 July 1992
Engineering
Issued 16 July 1992
Resolved
SET & PROVE PROPER OPERATION OF BOTH STEAM DRUM SAFETY VALVES ON STBD BOILER.
Condition: Unknown
Due 31 August 1992
Resolved 10 August 1992
Electrical
Issued 16 July 1992
Resolved
PROVE PROPER OPERATION OF BOTH SSTG LOW LUBE OIL ALARMS AND SHUTDOWNS.
Condition: Unknown
Due 31 August 1992
Resolved 10 August 1992
Construction/Loadline
Issued 23 August 1991
Resolved
PROVE PROPER OPERATION OF FORWARD AND AFT OILY WATER SEPERATOR.
Condition: Unknown
Due 23 August 1991
Resolved 23 August 1991
Engineering
Issued 23 August 1991
Resolved
REPAIR LEAK ON MAIN SCOOP IN WAY OF FLAPPER VALVE SHAFT. THIS REQUIREMENT TO BE SATISFIED DURING NEXT DRYDOCKING BUT IN NO CASE LATER THAN 31 JANUARY1992.
Condition: Unknown
Due 1 November 1991
Resolved 1 November 1991
Engineering
Issued 23 August 1991
Resolved
PROVIDE AN AUTOMATION TEST PROCEDURE FOR BOILER BURNER MANAGEMENT APPROVED BY USCG, AND PROVE PROPER OPERATION OF BOTH BOILERS AUTOMATION IAW USCG APPROVED TEST PROCEDURES.
Condition: Unknown
Due 22 September 1991
Resolved 9 November 1991
Electrical
Issued 23 August 1991
Resolved
REPLACE BROKEN CIRCUIT BREAKERS FOR HOLD 4 VENT AND AC PLANT ON MAIN SWITCHBOARD._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 1 November 1991
Resolved 1 November 1991
Engineering
Issued 23 August 1991
Resolved
REPAIR DECK ON MAIN STEAM STOP VALVE DRAIN PORTSIDE.
Condition: Unknown
Due 1 November 1991
Resolved 1 November 1991
Engineering
Issued 23 August 1991
Resolved
MAKE REPAIRS AND PROVE PROPER OPERATION OF REMOTE REACH ROD OPERATED DIESELFUEL VALVES IN PORT SHAFT ALLEY.
Condition: Unknown
Due 22 September 1991
Resolved 9 November 1991
Electrical
Issued 23 August 1991
Resolved
REPAIR/REPLACE TACHOMETER FOR STANDBY DIESEL GENERATOR.
Condition: Unknown
Due 23 August 1991
Resolved 23 August 1991
Accommodation/Occupational Safety
Issued 23 August 1991
Resolved
REPAIR GALLEY VENT HOOD DAMPERS AND VENT MOTOR CONTROLLER.
Condition: Unknown
Due 22 September 1991
Resolved 9 November 1991
Lifesaving
Issued 23 August 1991
Resolved
CONDUCT WEIGHT OF BOTH LIFEBOATS. BOTH DAVIT FALLS HAD BEEN END FOR ENDED AUGUST 1991 BAYONNE, NJ. REQUIREMENT TO BE COMPLETED NO LATER THAN 30 AUGUST 1991 OR UPON ARRIVAL NEXT U.S. PORT.
Condition: Unknown
Due 1 November 1991
Resolved 1 November 1991
Fire Fighting
Issued 23 August 1991
Resolved
PROVE PROPER OPERATION OF FIRE AND GAS DETECTION SYSTEM.
Condition: Unknown
Due 1 November 1991
Resolved 1 November 1991
Lifesaving
Issued 23 August 1991
Resolved
PROVIDE 6 ADDITIONAL (IMMERSION SUIT) EXPOSURE SUIT.
Condition: Unknown
Due 1 November 1991
Resolved 1 November 1991
Lifesaving
Issued 23 August 1991
Resolved
MAKE ALL EMERGENCY EQUIPMENT READY FOR INSPECTION. TEST MUST BE TO THE SATISFACTION OF ATTENDING MARINE INSPECTOR. NO LATER THAN 30 AUGUST 1991.
Condition: Unknown
Due 1 November 1991
Resolved 1 November 1991
Lifesaving
Issued 23 August 1991
Resolved
CONDUCT OPERATIONAL TEST OF BOTH LIFE BOATS.
Condition: Unknown
Due 1 November 1991
Resolved 1 November 1991
Lifesaving
Issued 23 August 1991
Resolved
PROVIDE TYPE "A" SATELLITE EPIRB AS PER SOLAS AMENDMENT OF 1983.
Condition: Unknown
Due 1 November 1991
Resolved 1 November 1991
Lifesaving
Issued 23 August 1991
Resolved
CONDUCT FIRE AND BOAT DRILL IN THE PRESENCE OF ATTENDING MARINE INSPECTOR NO LATER THAN 30 AUGUST 1991.
Condition: Unknown
Due 1 November 1991
Resolved 1 November 1991
Engineering
Issued 19 July 1990
Resolved
PROVE PROPER OPERATION OF HIGH BILGE ALARMS IN CARGO HOLDS #5 P/S, 6 P/S, 7 P/S, 8 P/S FR30.
Condition: Unknown
Due 19 July 1990
Resolved 19 July 1990
Lifesaving
Issued 19 July 1990
Resolved
CONDUCT FIRE AND BOAT DRILLS.
Condition: Unknown
Due 19 July 1990
Resolved 19 July 1990
Lifesaving
Issued 19 July 1990
Resolved
INSTALL LIFERAFTS AND PROVIDE SERVICING CERTIFICATES TO [name withheld].
Condition: Unknown
Due 19 July 1990
Resolved 19 July 1990
Lifesaving
Issued 19 July 1990
Resolved
REPLACE RINGBUOYS PORT AND STBD ON STERN.
Condition: Unknown
Due 19 July 1990
Resolved 19 July 1990
Fire Fighting
Issued 19 July 1990
Resolved
REPLACE FIRE EXTINGUISHERBRACKET IN PORT LIFEBOAT.
Condition: Unknown
Due 19 July 1990
Resolved 19 July 1990
Navigation
Issued 19 July 1990
Resolved
PROVIDE BLOCK DIAGRAM OF STEERING GEAR SYSTEM FOR THE BRIDGE AND STEERING GEAR ROOM.
Condition: Unknown
Due 19 July 1990
Resolved 19 July 1990
Lifesaving
Issued 19 July 1990
Resolved
PERFORM WEIGHT TEST OF PORT LIFEBOAT.
Condition: Unknown
Due 19 July 1990
Resolved 19 July 1990
Engineering
Issued 19 July 1990
Resolved
IN THE PRESENCE OF A COAST GUARD INSPECTOR, TEST BOTH BOILER AUTOMATION PROCEDURES.
Condition: Unknown
Due 19 July 1990
Resolved 19 July 1990
Engineering
Issued 19 July 1990
Resolved
WHILE BOTH BOILERS ARE IN OPERATION, MAKE FUEL AND FEED WATER SYSTEMS AVAILABLE FOR INSPECTION AND TESTING.
Condition: Unknown
Due 19 July 1990
Resolved 19 July 1990
Engineering
Issued 19 July 1990
Resolved
PROVE PROPER OPERATION OF BOTH PRT & STBD BOILERS' SAFETY VALVES.
Condition: Unknown
Due 19 July 1990
Resolved 19 July 1990
Engineering
Issued 19 July 1990
Resolved
PROVE PROPER OPERATION OF ALL PRESSURE VESSEL RELIEF VALVES.
Condition: Unknown
Due 19 July 1990
Resolved 19 July 1990
Engineering
Issued 19 July 1990
Resolved
WHILE IN OPERATION, MAKE BOTH EVAPORATORS AVAILABLE FOR INSPECTION.
Condition: Unknown
Due 19 July 1990
Resolved 19 July 1990
Electrical
Issued 19 July 1990
Resolved
PROVE PROPER OPERATION OF BOTH SSTG'S REVERSE POWER RELAYS, OVERSPEED TRIPSLOW L/O PRESSURE TRIPS AND ALARMS, AND PARALLEL OPERATIONS.
Condition: Unknown
Due 19 July 1990
Resolved 19 July 1990
Construction/Loadline
Issued 19 July 1990
Resolved
REPLACE WATERTIGHT DOOR TO EMERGENCY BATTERY CHARGER LOCKER.
Condition: Unknown
Due 19 July 1990
Resolved 19 July 1990
Construction/Loadline
Issued 19 July 1990
Resolved
PROVE WATERTIGHTNESS OF THE PORT SIDEPORT DOOR.
Condition: Unknown
Due 19 July 1990
Resolved 19 July 1990
Engineering
Issued 19 July 1990
Resolved
MAKE PERMANENT REPAIRS AND PROVE PROPER OPERATION OF ENGINE ROOM FR141 STBDSTAND-BY GENERATOR ROOM AND STBD SHAFT ALLEY HIGH BILGE ALARMS.
Condition: Unknown
Due 19 July 1990
Resolved 19 July 1990
Construction/Loadline
Issued 11 September 1989
Resolved
CLEAN OILY SLUDGE FROM THE FOLLOWING BALLAST DEEP TANKS: 1) #6 P & S, 2) #7P & S, 3) #8 DEEP TANKS, & MAKE AVAILABLE FOR INTERNAL EXAM WITH A GAS FREECERTIFICATE.
Condition: Unknown
Due 11 September 1989
Resolved 11 September 1989
Construction/Loadline
Issued 11 September 1989
Resolved
MAKE AVAILABLE FOR AN INTERNAL EXAM (WITH A GAS FREE CERTIFICATE) FUEL OIL DOUBLE BOTTOM TANKS AS PER 46 CFR 91.34-1(E).
Condition: Unknown
Due 11 September 1989
Resolved 11 September 1989
Construction/Loadline
Issued 11 September 1989
Resolved
MAKE AVAILABLE FOR EXAM & OPERATION THE PORT & STBD SIDE PORTS.
Condition: Unknown
Due 11 September 1989
Resolved 11 September 1989
Fire Fighting
Issued 21 July 1989
Resolved
REPAIR ALL LEAKING FIRE HYDRANT VALVES THROUGHOUT VESSEL. 46 CFR 95.10-10.
Condition: Unknown
Due 21 July 1989
Resolved 21 July 1989
Electrical
Issued 21 July 1989
Resolved
PROVE OPERATION OF CARGO HOLD VENTILATION FAILURE ALARMS. 46 CFR 92.15-10 (B)(4) AND 46 CFR 97.37-50
Condition: Unknown
Due 21 July 1989
Resolved 21 July 1989
Fire Fighting
Issued 21 July 1989
Resolved
PROVIDE COAST GUARD APPROVED HIGH VELOCITY FOG TIPS FOR ALL 1 1/2" FIRE NOZZLES. 46 CFR 95.10-10(I).
Condition: Unknown
Due 21 July 1989
Resolved 21 July 1989
Electrical
Issued 21 July 1989
Resolved
REMOVE OR END IN JUNCTION BOX EIGHT DEAD ENDED CABLES IN THE STARBOARD BOX GIRDER OVERHEAD IN WAY OF FRAME 215. 46 CFR 111.60-17
Condition: Unknown
Due 21 July 1989
Resolved 21 July 1989
Electrical
Issued 21 July 1989
Resolved
REPAIR AND PROVE OPERATION OF CARBON MONOXIDE SENSOR FOR CARGO HOLDS. VEHICLE CARGO IS NOT TO BE CARRIED IN CARGO HOLDS UNTIL THIS ITEM IS COMPLETED. 46 CFR 97.80-10(B)
Condition: Unknown
Due 21 July 1989
Resolved 21 July 1989
Fire Fighting
Issued 21 July 1989
Resolved
INSTALL AND PROVE OPERATION OF FIRE OR SMOKE DETECTING EQUIPMENT IN CARGO HOLDS 5-8. VEHICLES ARE NOT TO BE CARRIED IN THESE HOLDS UNTIL THE REQUIREDDETECTING EQUIPMENT IS INSTALLED AND OPERATING. 46 CFR 95.05-1(C)
Condition: Unknown
Due 21 July 1989
Resolved 21 July 1989
Documentation
Issued 21 July 1989
Resolved
PROVIDE PERMANENT CURRENT LOADLINE CERTIFICATE. 46 CFR 42.03-5
Condition: Unknown
Due 21 July 1989
Resolved 21 July 1989
Fire Fighting
Issued 21 July 1989
Resolved
REPAIR AND PROVE OPERATION OF KIDDE SMOKE DETECTING CABINET AND BRIDGE REPEATER. 46 CFR 95.05-1(C)
Condition: Unknown
Due 21 July 1989
Resolved 21 July 1989
Fire Fighting
Issued 21 July 1989
Resolved
PROVIDE FIRE SERVICE REPORT AND FOAM ANALYSIS. 46 CFR 97.15-60
Condition: Unknown
Due 21 July 1989
Resolved 21 July 1989
Lifesaving
Issued 17 August 1988
Resolved
INSTALL SCREEN GUARDS ON FORWARD AND AFT DAVITS TRACKS FOR #1 LIFE BOAT.
Condition: Unknown
Due 17 August 1988
Resolved 17 August 1988
Fire Fighting
Issued 11 August 1988
Resolved
DEMONSTRATE PROPER OPERATION OF THE EXHAUST FAN BATTERY LOCKER REMOTE SHUTDOWN.
Condition: Unknown
Due 11 August 1988
Resolved 11 August 1988
Fire Fighting
Issued 11 August 1988
Resolved
DEMONSTRATE PROPER OPERATION OF THE VENTILATION FORE SHIP REMOTE SHUTDOWN.
Condition: Unknown
Due 11 August 1988
Resolved 11 August 1988
Fire Fighting
Issued 11 August 1988
Resolved
DEMONSTRATE PROPER OPERATION OF THE GENERAL SERVICE AND BILGE PUMP REMOTE SHUTDOWN.
Condition: Unknown
Due 11 August 1988
Resolved 11 August 1988
Fire Fighting
Issued 11 August 1988
Resolved
DEMONSTRATE PROPER OPERATION OF THE VENTILATION AFT ACC AFT REMOTE SHUTDOWN.
Condition: Unknown
Due 11 August 1988
Resolved 11 August 1988
Lifesaving
Issued 11 August 1988
Resolved
CONDUCT WEIGHT / SUSPENSION / FLOATATION / AND RELEASE TEST OF THE STBD #1 LIFEBOAT IN THE PRESENCE OF THE CG MARINE INSPECTOR.
Condition: Unknown
Due 11 August 1988
Resolved 11 August 1988
Lifesaving
Issued 11 August 1988
Resolved
DEMONSTRATE PROPER OPERATION OF #1 LIFEBOAT.
Condition: Unknown
Due 11 August 1988
Resolved 11 August 1988
Lifesaving
Issued 11 August 1988
Resolved
DEMONSTRATE PROPER OPERATION OF #1 LIFEBOAT DAVIT PNEUMATIC LIMIT SWITCH
Condition: Unknown
Due 11 August 1988
Resolved 11 August 1988
Lifesaving
Issued 11 August 1988
Resolved
DEMONSTRATE PROPER OPERATION OF THE GENERAL ALARM BELLS LOCATED ON "E" DECK AT FRAMES 142, 224, & 242.
Condition: Unknown
Due 11 August 1988
Resolved 11 August 1988
Electrical
Issued 11 August 1988
Resolved
PROVE AND DEMONSTRATE THAT NO. 1 AND NO. 2 SSTG MEET THE CG REQUIREMENT SETFORTH IN 46 CFR 111.12-1(C) REQUIRING AN AUTOMATIC SHUTDOWN UPON LOSS OF LUBE OIL PRESSURE TO GENERATOR BEARINGS.
Condition: Unknown
Due 11 August 1988
Resolved 11 August 1988
Electrical
Issued 11 August 1988
Resolved
DEMONSTRATE PROPER OPERATION OF THE EMERGENCY GENERATOR LOW LUBE OIL ALARM AND LOW LUBE OIL TRIP AS PER 46 CFR 112.50-1(H) & (I).
Condition: Unknown
Due 11 August 1988
Resolved 11 August 1988
Engineering
Issued 11 August 1988
Resolved
PROVIDE GAGS FOR EACH OF THE BOILER SAFETY RELIEF VALVES.
Condition: Unknown
Due 11 August 1988
Resolved 11 August 1988
Engineering
Issued 11 August 1988
Resolved
REPAIR AND DEMONSTRATE PROPER OPERATION OF THE NO. 5 CARGO HOLD PORT BILGE ALARM.
Condition: Unknown
Due 11 August 1988
Resolved 11 August 1988
Electrical
Issued 11 August 1988
Resolved
DEMONSTRATE PROPER OPERATION OF THE EMERGENCY GENERATOR HIGH COOLING WATER TEMP ALARM AS REQUIRED BY 46 CFR 112.50-1(I).
Condition: Unknown
Due 11 August 1988
Resolved 11 August 1988
Deck/Cargo
Issued 11 August 1988
Resolved
REPAIR AND DEMONSTRATE PROPER OPERATION OF THE INBOARD REFRIDGERATION COMPRESSOR.
Condition: Unknown
Due 11 August 1988
Resolved 11 August 1988
Engineering
Issued 11 August 1988
Resolved
DEMONSTRATE PROPER OPERATION AND SETTING OF THE PORT AND STBD BOILER DC HEATER SAFETY VALVES.
Condition: Unknown
Due 11 August 1988
Resolved 11 August 1988
Electrical
Issued 11 August 1988
Resolved
REPAIR AND DEMONSTATE PROPER OPERATION OF THE S/S DIESEL (EMD) GENERATOR LOW LUBE OIL ALARM AND LOW LUBE OIL SHUTDOWN.
Condition: Unknown
Due 11 August 1988
Resolved 11 August 1988
Fire Fighting
Issued 11 August 1988
Resolved
DEMONSTRATE PROPER OPERATION OF THE SUPPLY FAN TO EMERGENCY GENERATOR ROOM REMOTE SHUTDOWN.
Condition: Unknown
Due 11 August 1988
Resolved 11 August 1988
Unknown
Issued 22 August 1987
Resolved
AT THE NEXT U.S. PORT, MAKE THE PORT MAIN PROPULSION BOILER READY FOR A U.S.COAST GUARD INSPECTION OF THE FIREBOX AND CASING DUE TO A FIRE IN THE FLOOR BRICKWORK ON 22 AUGUST 1987.
Condition: Unknown
Due 22 August 1987
Resolved 22 August 1987
Lifesaving
Issued 14 August 1987
Resolved
INSTALL ON THE PORT AND STARBOARD LIFE BOAT DAVITS A LIMIT STOP SWITCH OF SIMILAR ARRANGEMENT AS THE USNS BELLATRIX.
Condition: Unknown
Due 14 August 1987
Resolved 14 August 1987
Navigation
Issued 14 August 1987
Resolved
REPAIR OR REPLACE THE NORTH STAR 600 DIGITAL MICROPROCESSOR ANTOMATIC LORAN-C NO.71180
Condition: Unknown
Due 14 August 1987
Resolved 14 August 1987
Navigation
Issued 14 August 1987
Resolved
REPAIR OR REPLACE THE TURN RATE INDICATOR AS LISTED IN THE ELECTRONICS EQUIPMENT LIST.
Condition: Unknown
Due 14 August 1987
Resolved 14 August 1987
Navigation
Issued 14 August 1987
Resolved
REPAIR OR REPLACE THE RAYTHEON DEPTH ALARM NO. DE-724
Condition: Unknown
Due 14 August 1987
Resolved 14 August 1987
Unknown
Issued 14 August 1987
Resolved
REPLACE IN RIND THE CAT WALK GRADING FOR PORT MOTOR LIFEBOAT WORK PLATFORM.
Condition: Unknown
Due 14 August 1987
Resolved 14 August 1987
Unknown
Issued 14 August 1987
Resolved
REPAIR OR REPLACE ALL SNAP HOOKS ON SAFETY CHAINS THROUGH OUT THE VESSEL.
Condition: Unknown
Due 14 August 1987
Resolved 14 August 1987
Engineering
Issued 13 December 1986
Resolved
SUPERHEATER DIVISION PLATES IN THE SUPERHEATER HEADERS ARE SEPARATING AT THE PERIPHERY WERE WELDS JOIN THEM WITH THE HEADERS.
Condition: Unknown
Due 13 December 1986
Resolved 13 December 1986
Construction/Loadline
Issued 13 December 1986
Resolved
THE HINGE CUTOUTS ON THE SIDEPORT DOORS ON THE PORT AND STARBOARD SIDES HAVE CRACKS RADIATING FROM THEIR CORNERS. TEMP REPAIRS MADE 05 DEC86. PLANS FOR ALTERATIONS/PERM REPAIRS TO BE SUBMITTED TO COMMANDER, USCG MARINE SAFETY CENTER, 2100 SECOND ST. SW WASHINGTON, DC.
Condition: Unknown
Due 13 December 1986
Resolved 13 December 1986
Engineering
Issued 17 July 1986
Resolved
INFORM THE COGNIZANT [name withheld] SUCCESSFUL COMPLETION OF A DUEL FUEL CHANGEOVER ON BOTH #1 AND #2 MAIN PROPULSION BOILERS. COMPLIANCE DATE IS 27SEP86.
Condition: Unknown
Due 17 July 1986
Resolved 17 July 1986
Electrical
Issued 17 July 1986
Resolved
PROCURE AND INSTALL COVER ON 440 VOLT RECEPTICAL ON FORWARD COMBING ON #7 CARGO HOLD. COMPLIANCE DATE IS 27SEP86.
Condition: Unknown
Due 17 July 1986
Resolved 17 July 1986
Accommodation/Occupational Safety
Issued 17 July 1986
Resolved
RENEW DOGS ON VENT COVERS PORT AND STARBOARD SIDE OF CARGO CRANE. COMPLIANCE DATE IS 27SEP86.
Condition: Unknown
Due 17 July 1986
Resolved 17 July 1986
Unknown
Issued 17 July 1986
Resolved
REPAIR/REPLACE CARBON MONOXIDE SENSOR TUBE #B20 IN #2 HOLD "C" DECK PORT SIDE NEAR FRAME 245. COMPLIANCE DATE IS 27SEP86.
Condition: Unknown
Due 17 July 1986
Resolved 17 July 1986
Electrical
Issued 17 July 1986
Resolved
RENEW WATERTIGHT DOOR AUDIBLE ALARM IN FOLLOWING: #2 HOLD "E" DECK, #4 HOLD "E" DECK AND #4 HOLD "C" DECK. COMPLIANCE DATE IS 27SEP86.
Condition: Unknown
Due 17 July 1986
Resolved 17 July 1986
Electrical
Issued 17 July 1986
Resolved
RENEW WATERTIGHT DOOR VISIBLE ALARM IN FOLLOWING: #2 HOLD "B" DECK, #2 HOLD "C" DECK AND #4 HOLD "C" DECK. COMPLIANCE DATE IS 27SEP86.
Condition: Unknown
Due 17 July 1986
Resolved 17 July 1986
Electrical
Issued 17 July 1986
Resolved
PROVIDE CIRCUT DIRECTORY ON 440 VOLT RECEPTICAL ON FORWARD COMBING ON #7 CARGO HOLD. COMPLIANCE DATE IS 27SEP86.
Condition: Unknown
Due 17 July 1986
Resolved 17 July 1986
Construction/Loadline
Issued 17 July 1986
Resolved
DEMONSTRATE OPERATION OF PORT SIDE DOOR. COMPLIANCE DATE IS 27SEP86.
Condition: Unknown
Due 17 July 1986
Resolved 17 July 1986
Fire Fighting
Issued 17 July 1986
Resolved
CONDUCT EMERGENCY DRILLS WITH FULL CREW COMPLIMENT. COMPLIANCE DATE IS 27SEP86.
Condition: Unknown
Due 17 July 1986
Resolved 17 July 1986
Navigation
Issued 17 July 1986
Resolved
REPAIR/REPLACE BROKEN SPREADER BAR ON PORT SIDE PILOT LADDER. COMPLIANCE DATE IS 27SEP86.
Condition: Unknown
Due 17 July 1986
Resolved 17 July 1986
Unknown
Issued 17 July 1986
Resolved
CONDUCT HYDRO TEST TO FUEL HOSES. COMPLIANCE DATE IS 27SEP86.
Condition: Unknown
Due 17 July 1986
Resolved 17 July 1986
Deck/Cargo
Issued 17 July 1986
Resolved
REMOVE EXCESSIVE OIL IN DRIP PAN, LOWER MOORING WINCH. COMPLIANCE DATE IS 27SEP86.
Condition: Unknown
Due 17 July 1986
Resolved 17 July 1986
Unknown
Issued 17 July 1986
Resolved
PROCURE AND INSTALL DATED BATTERIES FOR FLASH LIGHTS IN HELO GEAR LOCKER. COMPLIANCE DATE IS 27SEP86.
Condition: Unknown
Due 17 July 1986
Resolved 17 July 1986
Deck/Cargo
Issued 17 July 1986
Resolved
REPLACE GASKET PORT SIDE OPENING, LOWER MOORING WINCH ROOM SIDE OPENING. COMPLIANCE DATE IS 27SEP86.
Condition: Unknown
Due 17 July 1986
Resolved 17 July 1986
Construction/Loadline
Issued 17 July 1986
Resolved
PROVE PROPER OPERATION OF PORT SHAFT ALLEY WATER TIGHT DOOR AT BOTH LOCAL AND REMOTE CONTROL STATIONS. COMPLIANCE DATE IS 27SEP86.
Condition: Unknown
Due 17 July 1986
Resolved 17 July 1986
Lifesaving
Issued 17 July 1986
Resolved
CONDUCT WEIGHT, RELEASE AND SUSPENSION TEST TO STARBOARD LIFE BOAT WITH RELATED TESTS TO STARBOARD DAVIT. COMPLIANCE DATE IS 27SEP86.
Condition: Unknown
Due 17 July 1986
Resolved 17 July 1986
Fire Fighting
Issued 17 July 1986
Resolved
RENEW/REPLACE CO2 DIFUSSER IN #4 HOLD, E DECK NEAR FRAME 162. COMPLIANCE DATE IS 27SEP86.
Condition: Unknown
Due 17 July 1986
Resolved 17 July 1986
Electrical
Issued 17 July 1986
Resolved
PROCURE AND INSTALL 2 ELECTRICAL BOX COVERS AT AFT COMBING #6 HOLD INBOARD OF STARBOARD ESCAPE. COMPLIANCE DATE IS 27SEP86.
Condition: Unknown
Due 17 July 1986
Resolved 17 July 1986
Unknown
Issued 17 August 1985
Resolved
THE FOLLOWING DEFICIENCIES PERTAIN TO THE FREIGHT VESSEL USNS ALGOL. THE COMPLIANCE DATE FOR THIS VESSEL IS 30 AUGUST 1985.
Condition: Unknown
Due 17 August 1985
Resolved 17 August 1985
Electrical
Issued 17 August 1985
Resolved
MAKE PERMANENT REPAIRS TO STANDBY DIESEL GENERATOR AND PROVE SATISFACTORY OPERATION UNDERLOAD.
Condition: Unknown
Due 17 August 1985
Resolved 17 August 1985
Engineering
Issued 17 August 1985
Resolved
MAKE PERMANENT REPAIRS TO PORT BOILER #1 BURNER FLAME SCANNER.
Condition: Unknown
Due 17 August 1985
Resolved 17 August 1985
Fire Fighting
Issued 11 June 1985
Resolved
MAKE PERMANENT REPAIRS AND PROVE PROPER OPERATION OF CO2 ACTIVATED AUTOMATICALLY SURE DEVICE FOR EMERGENCY GENERATOR
Condition: Unknown
Due 11 June 1985
Resolved 11 June 1985
Unknown
Issued 11 June 1985
Resolved
OBTAIN CERTIFICATION FOR EXISTING MARINE SANITATION DEVICE AS INSTALLED ABOARD VESSEL IAW PROVISIONS OF 33 CFR 159.12(C) AND AS REQUIRED BY 33 CFR 159.7(C) NOT LATER THAN 11AUG85 TO THE SATISFACTION OF THE COGNIZANT OFFICER IN CHARGE, MARINE INSPECTION.
Condition: Unknown
Due 11 June 1985
Resolved 11 June 1985
Fire Fighting
Issued 11 June 1985
Resolved
CONDUCT FIRE AND BOAT DRILL IAW 46 CFR 97.15-35 DRILLS ARE TO BE COMPLETED PRIOR TO SAILING BUT IN NO CASE LATER THAN 11JUL85 AND COMPLETED TO THE SATISFACTION OF THE COGIZANT OFFICER IN CHARGE MARINE INSPECTION.
Condition: Unknown
Due 11 June 1985
Resolved 11 June 1985
Unknown
Issued 21 August 1984
Resolved
THE FOLLOWING DEFICIENCIES PERTAIN TO ALGOL, DN546383.
Condition: Unknown
Due 21 August 1984
Resolved 21 August 1984
Unknown
Issued 21 August 1984
Resolved
INSTALL LIMIT SWITCHES ON DAVITS FOR BOTH LIFEBOATS TO THE SATISFACTION OF THE [name withheld] 16OCT84.
Condition: Unknown
Due 21 August 1984
Resolved 21 August 1984