Records from 1984 to 2026. Most recent: inspection, 17 August 2026.
Inspection history · 199
17 August 2026
Administrative Inspection
Administrative · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 8466786
7 August 2026
Administrative Inspection · Canadian Vsl Safety Exam (D9 only) · Deficiency Check · PSC B
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 8457436
29 May 2026
Administrative Inspection
Administrative · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 8383457
6 May 2026
PSC B · Canadian Vsl Safety Exam (D9 only)
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 8367923
1 May 2026
Canadian Vsl Safety Exam (D9 only) · PSC B
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 8358635
22 April 2026
Administrative Inspection
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 8353884
17 April 2026
Administrative Inspection
Administrative · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 8350628
3 November 2025
Administrative Inspection
Administrative · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 8262310
15 October 2025
Administrative Inspection
Administrative · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8253115
15 July 2025
Administrative Inspection
Administrative · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 8186242
14 July 2025
Administrative Inspection
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 8185317
8 May 2025
Administrative Inspection
Administrative · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 8131190
5 May 2025
Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8128771
10 April 2025
Administrative Inspection
Administrative · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 8110209
13 September 2024
PSC B · Canadian Vsl Safety Exam (D9 only)
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7999901
26 July 2022
Canadian Vsl Safety Exam (D9 only) · PSC B
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7516417
11 July 2021
Administrative Inspection
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7252690
20 June 2021
Administrative Inspection
Administrative · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 7230364
17 May 2021
Administrative Inspection
Administrative · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 7198907
2 May 2021
Administrative Inspection
Administrative · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 7187295
29 October 2020
PSC B
Physical examination · Marine Safety Detachment Massena · USCG Great Lakes District (CGD-GL) · Activity 7086259
15 July 2019
Administrative Inspection
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6750606
6 June 2019
Canadian Vsl Safety Exam (D9 only)
Physical examination · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 6703007
2 November 2018
Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6574632
9 July 2018
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 6474096
29 May 2018
Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6427677
25 May 2018
Canadian Vsl Safety Exam (D9 only)
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 6423692
15 September 2016
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6001453
27 November 2015
Administrative Inspection
Administrative · USCG Great Lakes District (dp) · USCG Great Lakes District (CGD-GL) · Activity 5770878
14 October 2014
Deficiency Check · Examination of Repairs · In-Service Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 5004715
12 October 2014
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 5008417
11 October 2014
Damage Survey
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 5003285
10 October 2014
Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 5002748
3 October 2014
Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4999845
16 December 2011
Type not recorded
No type recorded · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 4230783
20 July 2011
Damage Survey
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 4089039
19 July 2011
Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4086902
19 July 2011
Permit to Proceed
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4088331
11 January 2010
Administrative Inspection · Drydock Extension
Administrative · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 3662146
23 December 2009
Administrative Inspection
Administrative · USCG Great Lakes District (dp) · USCG Great Lakes District (CGD-GL) · Activity 3654590
13 July 2009
Deficiency Check
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 3533249
14 April 2009
Construction Oversight · Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 3451756
8 December 2008
Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3376239
20 August 2008
Administrative Inspection
Administrative · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 3304285
26 June 2008
Deficiency Check
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 3248828
25 April 2008
Deficiency Check
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3192295
22 April 2008
Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3191330
22 April 2008
Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3191357
14 March 2008
Annual Inspection · DAPI Audit · In-Service Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 3090093
28 October 2007
Damage Survey
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3088330
10 October 2007
Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3077840
6 October 2007
Administrative Inspection
Administrative · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3074488
5 October 2007
Administrative Inspection
Administrative · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 3073645
4 October 2007
Type not recorded
No type recorded · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 3076901
1 October 2007
Administrative Inspection
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 3070198
25 September 2007
Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3065540
28 June 2007
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 2976372
10 May 2007
Type not recorded
No type recorded · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 2926972
16 April 2007
Deficiency Check
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 2908966
4 April 2007
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 2920470
9 January 2007
MTSA/ISPS Verification · Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 2853034
12 September 2006
Type not recorded
No type recorded · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 3030689
12 May 2006
Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 2647688
10 May 2006
Deficiency Check
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 2645472
23 March 2006
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 2566520
1 February 2006
Type not recorded
No type recorded · USCG Great Lakes District (dpb) · USCG Great Lakes District (CGD-GL) · Activity 2577514
30 January 2006
Type not recorded
No type recorded · USCG Great Lakes District (dpb) · USCG Great Lakes District (CGD-GL) · Activity 2576025
3 January 2006
Damage Survey
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 2559715
2 January 2006
Type not recorded
No type recorded · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 2575512
11 September 2005
Type not recorded
No type recorded · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 2653563
27 June 2005
Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 2407563
19 April 2005
Type not recorded
No type recorded · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 2514318
11 April 2005
Type not recorded
No type recorded · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 2514504
20 January 2005
MTSA Verification · Hull Examination · COI Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 2277933
26 December 2004
Damage Survey · Examination of Repairs
Physical examination · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 2264748
24 June 2004
Deficiency Check
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 2109396
15 June 2004
Administrative Inspection
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 2098867
25 May 2004
Administrative Inspection
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 2077774
3 May 2004
Administrative Inspection
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 2058084
11 February 2004
Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 2004492
20 January 2004
Drydock Extension
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1988242
17 October 2003
Type not recorded
No type recorded · Marine Safety Detachment Grand Haven · USCG Great Lakes District (CGD-GL) · Activity 1934014
17 October 2003
Type not recorded
No type recorded · Marine Safety Detachment Grand Haven · USCG Great Lakes District (CGD-GL) · Activity 2152159
9 August 2003
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1990631
22 May 2003
Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1799740
10 February 2003
Administrative Inspection
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1742556
13 January 2003
Periodic Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1729756
18 July 2002
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1648487
22 April 2002
Deficiency Check
Physical examination · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1607388
19 March 2002
Re-Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1476034
6 April 2001
Re-Inspection
Physical examination · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1060939
23 October 2000
Type not recorded
No type recorded · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 128442
12 July 2000
Deficiency Check
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 819668
6 May 2000
Type not recorded
No type recorded · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 33748
25 April 2000
Deficiency Check
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 816881
28 March 2000
COI Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1410228
1 December 1999
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 40693
7 October 1999
Administrative
Administrative · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1197606
21 April 1999
Hull Examination · Re-Inspection
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1122989
17 June 1998
Type not recorded
No type recorded · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 24977
31 May 1998
Type not recorded
No type recorded · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1128947
8 May 1998
Type not recorded
No type recorded · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 72632
26 March 1998
COI Inspection
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 791320
5 June 1997
Deficiency Check
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1111343
17 March 1997
Re-Inspection · Damage Survey · Deficiency Check · Examination of Repairs
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1106656
25 January 1997
Damage Survey
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1101752
24 January 1997
Type not recorded
No type recorded · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 10506
16 May 1996
Deficiency Check
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1082276
8 April 1996
Damage Survey · Examination of Repairs
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1078233
23 March 1996
Examination of Repairs · Damage Survey
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1081781
22 March 1996
Type not recorded
No type recorded · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 159791
13 March 1996
Examination of Repairs · COI Inspection · Damage Survey
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1078237
23 September 1995
Type not recorded
No type recorded · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 492790
8 June 1995
Damage Survey
Physical examination · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1185855
20 March 1995
Re-Inspection
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1454164
3 October 1994
Type not recorded
No type recorded · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 37754
14 August 1994
Type not recorded
No type recorded · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 62836
10 August 1994
Type not recorded
No type recorded · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 667050
28 July 1994
Damage Survey · Deficiency Check · Examination of Repairs
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1410997
15 July 1994
Permit to Proceed
Administrative · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1178934
14 July 1994
Type not recorded
No type recorded · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 91029
14 July 1994
Type not recorded
No type recorded · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 225544
4 May 1994
COI Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1449689
18 April 1994
Hull Examination
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1380021
7 May 1993
Re-Inspection
Physical examination · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 831760
15 November 1992
Examination of Repairs
Physical examination · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1466828
8 July 1992
Administrative
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 961704
16 April 1992
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 16514
15 April 1992
COI Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 958572
6 August 1991
Hull Examination
Physical examination · MIO STURGEON BAY · USCG Great Lakes District (CGD-GL) · Activity 1250387
17 May 1991
Re-Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 917559
27 March 1991
Deficiency Check
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 905805
20 March 1991
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 908409
20 March 1991
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 997152
6 February 1991
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1212819
4 January 1991
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1219977
20 December 1990
Damage Survey
Physical examination · MIO ST. IGNACE · USCG Great Lakes District (CGD-GL) · Activity 909158
6 November 1990
Damage Survey
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1225796
5 November 1990
Damage Survey
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1240102
12 September 1990
Type not recorded
No type recorded · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 912527
8 September 1990
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 907530
11 May 1990
Damage Survey
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 901122
23 March 1990
COI Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 910707
17 March 1990
Examination of Repairs
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1224415
4 January 1990
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1211675
3 November 1989
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1009392
13 September 1989
Deficiency Check
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1341837
8 September 1989
Re-Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1345850
5 September 1989
Type not recorded
No type recorded · MSO CLEVELAND · USCG Great Lakes District (CGD-GL) · Activity 1196850
5 September 1989
Type not recorded
No type recorded · MSO CLEVELAND · USCG Great Lakes District (CGD-GL) · Activity 1197515
8 July 1989
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1342676
14 June 1989
Administrative
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 896500
24 April 1989
Type not recorded
No type recorded · MIO ST. IGNACE · USCG Great Lakes District (CGD-GL) · Activity 1031416
4 April 1989
Type not recorded
No type recorded · MSO CLEVELAND · USCG Great Lakes District (CGD-GL) · Activity 1204635
20 March 1989
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1035821
7 February 1989
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1031573
23 January 1989
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 891009
18 October 1988
Type not recorded
No type recorded · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1199500
18 September 1988
Deficiency Check
Physical examination · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1043378
31 August 1988
Type not recorded
No type recorded · MSO CLEVELAND · USCG Great Lakes District (CGD-GL) · Activity 1039944
23 August 1988
COI Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1037963
6 April 1988
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 993550
22 March 1988
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1021343
11 February 1988
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1328908
8 February 1988
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1332021
21 January 1988
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1020589
19 December 1987
Examination of Repairs
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1003947
18 December 1987
Damage Survey
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1005707
27 November 1987
Re-Inspection
Physical examination · MIO STURGEON BAY · USCG Great Lakes District (CGD-GL) · Activity 1026473
25 November 1987
Damage Survey
Physical examination · MIO STURGEON BAY · USCG Great Lakes District (CGD-GL) · Activity 1024877
31 October 1987
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1326914
30 October 1987
Re-Inspection
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1019128
16 October 1987
Type not recorded
No type recorded · MIO ST. IGNACE · USCG Great Lakes District (CGD-GL) · Activity 1016105
8 October 1987
Type not recorded
No type recorded · MSO CLEVELAND · USCG Great Lakes District (CGD-GL) · Activity 1326002
21 April 1987
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1316533
22 January 1987
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1310531
6 January 1987
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1310450
8 October 1986
Credit Drydock
Administrative · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1008418
30 September 1986
Type not recorded
No type recorded · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1312805
29 September 1986
Type not recorded
No type recorded · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1004744
4 September 1986
COI Inspection
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1013818
29 May 1986
Deficiency Check
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 997553
8 January 1986
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1297491
28 December 1985
Damage Survey
Physical examination · MSO CLEVELAND · USCG Great Lakes District (CGD-GL) · Activity 1303403
9 December 1985
Deficiency Check
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 988537
30 November 1985
Deficiency Check
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1293446
22 October 1985
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 992756
14 October 1985
Damage Survey
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1296215
4 September 1985
Deficiency Check
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 986865
3 September 1985
Damage Survey
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1295141
9 August 1985
Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 983585
9 August 1985
Deficiency Check
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1297452
25 June 1985
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 983261
18 June 1985
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 984201
23 May 1985
Type not recorded
No type recorded · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 982916
7 May 1985
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1290054
17 April 1985
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1290053
9 April 1985
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 979125
30 August 1984
Type not recorded
No type recorded · MIO STURGEON BAY · USCG Great Lakes District (CGD-GL) · Activity 975334
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 7 August 2026
Resolved
The requirements of this section must be met in addition to those of 46 CFR 62.50-20. Machinery space bilges, bilge wells, shaft alley bilges, and other minimally attended locations where liquids might accumulate must be monitored from ECC.
The only bilge high level alarm in engine room was inoperable.
Cite: 46 CFR 62.50-30
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 7 August 2026
Resolved 7 August 2026
Resolution: Witness satisfactory test of high level bilge alarm in engine room.
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 7 August 2026
Resolved
All self propelled vessels shall have permanently exhibited (a) general arrangement plan for fire control (c) the fire control plan shall be up to date.
International shore connection location does not match fire control plan.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 September 2026
Resolved 14 August 2026
Resolution: Vessel provided Documentation that the international shore connection has been relocated IAW the approved fire control plan
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 1 May 2026
Resolved
Each liferaft must have a painter system providing a connection between the vessel and the liferaft. The painter on 2 liferafts is not providing a connection between the vessle and the liferaft
Condition: Placed in Improper Service
Action required: 30 - Ship detained
Due 1 May 2026
Resolved 1 May 2026
Resolution: Painters were connected properly between the liferafts and the vessel
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 1 May 2026
Resolved
Each liferaft must be arranged for float free launching. The float free launching mechanism on 4 liferafts are expired.
Condition: Placed in Improper Service
Action required: 30 - Ship detained
Due 1 May 2026
Resolved 1 May 2026
Resolution: Vessel replaced 04 hydrostatic releases allowing proper float free arrangements
11 - Life Saving Appliances › N/A - No Subsystem › Embarkation arrangement survival craft
Issued 1 May 2026
Resolved
Each embarkations ladder must extend in a single length from the deck to the waterline with the vessel in its lightest seagoing condition. Embarkation ladder does not reach waterline.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 June 2026
Resolved 11 June 2026
Resolution: Vessel Recieved new Jacobs Ladder
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 1 May 2026
Resolved
All self propelled vessels shall have permantently exhibited (a) general arrangement plan for fire control (c) the fire control plan shall be up to date. The fire control plan boundary of the generator room shows an A boundary. There are unsealed piping penetrations, Vents without closures, and non-fire doors.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 June 2026
Resolved 16 July 2026
Resolution: Vessel provided class approval letter and fire control & safety plan attesting to correction of the deficiency. See attached for amplifying info.
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 1 May 2026
Resolved
Vessels shall permanently exhibited (a) general arrangement for fire control. The fire extinguisher in the engine room is CO2, the fire control plan lists it as foam.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 June 2026
Resolved 16 July 2026
Resolution: Vessel provided class approval letter and Fire Control & Safety Plan attestting to the correction of the defeciency. See attached documents for amplyfing information.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 1 May 2026
Resolved
Vessels shall permanently exhibit (a) arrangement plan for fire control. The spar deck port aft fire door does not fully close. The paint locker fire door does not fully close.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 31 May 2026
Resolved 6 May 2026
Resolution: Crew repaired the doors and inspection team verified that they closed properly
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 1 May 2026
Resolved
The company should establish procedures, plans and checkilsts as appropriate for key shipboard operations concerning safety of personnel. The SMS procedure for checking the lifeboat states to start the engine. The lifeboat does not have an engine. The SMS does not provide process to test operation of open oared lifeboat.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 June 2026
Resolved 11 June 2026
Resolution: Vessel updated MMS procedure for rescue boat inspection
Documentation › Logs/Records › Garbage Recordkeeping
Issued 25 May 2018
Resolved
Vessel is required to have record of Garbage Disposal (Garbage Recod Book). Vessel currently does not have a garbage record book, nor are they properly documenting garbage disposal. 33CFR151.55
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 29 May 2018
Resolution: Vsl provided photographic proof that garbage log book had been started and contained required entries.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 11 October 2014
Resolved
Make temporary repairs to the transverse bulkhead between the port bunker tank and the port No.-8 wing ballast tank to the satisfaction oc class society, prior to departing Rogers City, MI and before 12 OCT 14.
Due 12 October 2014
Resolved 11 October 2014
Resolution: Repaires were made using clad welding of the bulkhead and repairs were examined by class.
Pollution Prevention/Response › Prevention Equipment › Oily Mixture Discharge Fixed Piping System
Issued 11 October 2014
Resolved
Prior to loading or discharging ballast from the No.-8 wing ballast tank remove all oil residues, to be completed before departing Toledo, OH to the satisfaction of the cognizant OCMI.
Action required: 17 - Rectify deficiencies prior to departure
Due 24 October 2014
Resolved 15 October 2014
Construction/Loadline › Structures › Transverse Bulkhead
Issued 11 October 2014
Resolved
Complete permanent repairs to port bunker tank and port No.-8 wing ballast tank IWO wasted areas in transverse bulkhead to the satisfaction of the cognizant [name withheld] the vessel may operate contingent upon the following: a) port fuel bunker tank shall be isolated from the vessel fuel system and be cleaned of all oil residues to the satisfaction of the cognizant OCMI before departing Toledo.
Action required: 705 - Other - as specified
Due 28 February 2015
Resolved 14 October 2014
Fire Fighting › Combustible Materials › Insulation
Issued 11 October 2014
Resolved
Main engine exhaust lagging/insulation was not in place while operating main engines, creating serious fire hazard, corrected prior to further operation.
Condition: Improper/Lack of Maintenance
Due 11 October 2014
Resolved 11 October 2014
Fire Fighting › Miscellaneous Items › Insulation (Penetration of Oil/Oil Vapors)
Issued 19 July 2011
Resolved
Provide insulation for all surfaces likely to exceed 428°F on both main diesel engines. Insulation shall be non-combustible that is impervious to oil as required by ABS Rules 4-2-1/11.9.
Action required: 705 - Other - as specified
Due 9 August 2011
Resolved 15 August 2011
Resolution: Received photographs emailed from master showing new exhaust lagging installed on both engines.
Stability › Unintentional Flooding › General
Issued 14 April 2009
Resolved
The Fwd (frame57) watertight door port and both watertight doors (frame 57 and 137) port and starboard side in way of conveyour tunnel have wasted stiffeners and gasket edges. Operator shall provide repair proposal to effect permanent repairs.
Action required: 705 - Other - as specified
Resolved 15 July 2011
Resolution: Stiffeners cropped and renewed, gaskets renewed.
Stability › Unintentional Flooding › General
Issued 14 April 2009
Resolved
The manhole covers (all) to access the pipe voids both port and starboard sides of the conveyor tunnel have wasted gasket retainer rings . Operator shall provide proposal to make permanent repairs.
Action required: 705 - Other - as specified
Resolved 15 July 2011
Resolution: Gaskets renewed.
Construction/Loadline › Structures › End Bulkhead
Issued 14 April 2009
Resolved
The frames and approximately 6 inch area below soft patch access in way of number 1 cargo hold is badly deteriorated. Operator to provide repair proposal to make permanent repairs.
Action required: 705 - Other - as specified
Resolved 15 July 2011
Fire Fighting › Ventilation Systems › Duct Hatches
Issued 14 April 2009
Resolved
The closure dogs for the ventilation duct for the Incinerator Room are corroded and no longer function . Due to this the vent cannot be closed to prevent spread of fire. Operator shall make repairs so that vent can be properly closed prior to opeeration of the incinerator.
Action required: 705 - Other - as specified
Due 15 April 2009
Resolved 15 April 2009
Lifesaving › Launching Appliances › Release Mechanism
Issued 14 April 2009
Resolved
The life rafts do not have weak links in their sea painter. Vessel shall install proper weak links.
Action required: 705 - Other - as specified
Due 15 April 2009
Resolved 14 April 2009
Lifesaving › Immersion Suits › Serviceable
Issued 14 April 2009
Resolved
2 Immersion suit have ben found to be unserviceable. 1 suit when donned by crew member ripped out the zipper and arm seams. The other suit was found to have bed seams throughout. Operator shall provide 2 replacement suits for these two units
Action required: 17 - Rectify deficiencies prior to departure
Due 15 April 2009
Resolved 14 April 2009
Lifesaving › Immersion Suits › General
Issued 14 April 2009
Resolved
2 crew members suits are too small for them, and vessel has no spare "Jumbo" sized suits on board. Operator shall provide 2 additional "Jumbo" suits.
Action required: 17 - Rectify deficiencies prior to departure
Due 15 April 2009
Resolved 15 April 2009
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 14 April 2009
Resolved
Vessel has no copy of fire contol plan on the bridge, crew unable to properly document fire zones/progression of fire during drill. Vessel shal make available a copy of the Fire Control Plan readily available on the bridge.
Due 15 April 2009
Resolved 15 April 2009
Electrical › Electric Supply System (service) › Cable
Issued 14 April 2009
Resolved
Te cable for several lights in way of the conveyor tunnel, starboard side are loose in their compression fittings and wires are exposed. Vessel personnel shall make proper repairs to these light fixtures.
Due 15 April 2009
Resolved 15 April 2009
Electrical › Electric Supply System (service) › Cable
Issued 14 April 2009
Resolved
The power supply cable to the Nr 2 SSDG hot start is loose at its cable clamp, and the wire is chafing on the conduit. Vessel shall make effective repairs to this cable and cable clamps.
Action required: 705 - Other - as specified
Due 15 April 2009
Resolved 15 April 2009
Fire Fighting › Fire Main › Condition
Issued 14 April 2009
Resolved
During a test of the emergency fire pump, a section of fire main in the conveyor tunnel, stbd side ruptured. Vessel shall renew this section of pipe and make available for inspection to include hydro test.
Action required: 705 - Other - as specified
Due 15 April 2009
Resolved 15 April 2009
Fire Fighting › Fire Main › Condition
Issued 14 April 2009
Resolved
During the hydro test of fire main repairs, a section of fire main ruptured in the CO2 storage room. Vessel shall renew this section of piping and make available for inspection including a hydro test of piping.
Action required: 705 - Other - as specified
Due 15 April 2009
Resolved 15 April 2009
Navigation › Collision/Grounding Avoidance › Radar
Issued 20 August 2008
Resolved
Vessel reported via phone call & written report that the 3 cm radar is inoperative. Vessel is to inact repairs prior to leaving Indiana Harbor. Vessel is to fax a copy of the technicians report to Sector Lake Michingan for approval.
Action required: 17 - Rectify deficiencies prior to departure
Due 25 August 2008
Resolved 1 September 2008
Resolution: resolved via fax, radar is working correctly fixed by Sperry Marine.
Navigation › Collision/Grounding Avoidance › Radar
Issued 22 April 2008
Resolved
Primary 10-cm radar inoperative.
Action required: 705 - Other - as specified
Resolved 26 April 2008
Resolution: Tech report received, radar repaired.
Operations/Management › Drills/Instruction › Abandon Ship
Issued 25 March 2008
Resolved
Provide proper documentation of a proper life boat drill and full davit weight test IAW 46 CFR 199.45 prior to 25 April 2008.
Due 25 April 2008
Resolved 10 April 2008
Resolution: Received an E-Mail from [name withheld] verifying a satisfactory life boat davit full weight and life boat drill were completed.
Lifesaving › Embarkation Appliances/Stations › Accessability
Issued 25 March 2008
Resolved
Provide proper embarkation ladders for both liferefts in accordance with OLD subchapter I, 46 CFR 94.50-7 prior to 25 June 2008.
Condition: Improper Installation
Due 25 June 2008
Resolved 26 June 2008
Resolution: Received notification that the requirement was cleared via installation of ladder.
Navigation › Collision/Grounding Avoidance › Radar
Issued 5 October 2007
Resolved
3cm radar is inoperative. Must make repairs prior to departure from General Mills Dock, Buffalo.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 October 2007
Resolution: Deficency corrected
Operations/Management › Drills/Instruction › Launching/Recovery of Survival Craft
Issued 5 April 2007
Resolved
Conduct Lifeboats drills.
Action required: 705 - Other - as specified
Due 5 May 2007
Resolved 16 April 2007
Resolution: Witnessed launch and recovery of lifeboat.
Operations/Management › Drills/Instruction › Abandon Ship
Issued 9 January 2007
Resolved
Needs to conduct a lifeboat drill. Begining of the season.
Action required: 705 - Other - as specified
Due 5 May 2007
Resolved 16 April 2007
Resolution: Drills witnessed by SEC Buffalo according to Activity #2908966.
Operations/Management › Drills/Instruction › Abandon Ship
Issued 24 March 2006
Resolved
Launch and operate the lifeboat and provide MSD Sturgeon Bay written statement from master upon completion.
Due 24 May 2006
Resolved 10 May 2006
Resolution: Received e-mail from Master of sat operation and rowing of lifeboat in Superior, WI port call.
Electrical › Electric Generation Source (service) › Generator
Issued 26 December 2004
Resolved
#1 Ship service generator destroyed due to fire.
Condition: Unknown
Action required: 705 - Other - as specified
Due 31 March 2005
Resolved 4 April 2005
Resolution: Generator replaced with new at Bay Shipbuilding Corp. Tested at COI inspection for fit-out. All sat.
Operations/Management › Drills/Instruction
Issued 11 February 2004
Resolved
Conduct fire drill to the satisfaction fo the attending Marine Inspector.
Due 7 April 2004
Resolved 8 April 2004
Navigation › Piloting/Steering
Issued 11 February 2004
Resolved
Update vessel charts to the satisfaction of a CG Marine Inspector, prior to getting under way. LEGACY COMPONENT DESC: Marine Charts
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 April 2004
Operations/Management › Drills/Instruction › Launching/Recovery of Survival Craft
Issued 11 February 2004
Resolved
Conduct an abandon ship drill to the satisfaction of a CG marine inspector LEGACY COMPONENT DESC: Launching/Recovery of Survival Craft
Action required: 705 - Other - as specified
Due 1 July 2004
Resolved 24 June 2004
Fire Fighting › Ventilation Systems
Issued 15 April 2003
Resolved
Provide means for stopping all ventilation fans serving machinery and cargo spaces from outside these spaces as per 46 CFR 92.15-10 (b) (bow thruster vet fan and tunnel vent fan)
Due 15 May 2003
Resolved 29 April 2003
Resolution: Received written report signed by chief engineer, new start stop switch installed, also, breaker in E/R on distribution board, " forward group control breaker", labeled "IN CASE OF FIRE SHUT OFF".
Engineering › Compressed Air System (start air)
Issued 15 April 2003
Resolved
Replace psi gauge on #6 start air receiver LEGACY COMPONENT DESC: Receiver/Bottle
Due 15 May 2003
Resolved 12 May 2003
Resolution: Received signed memo from ChEng, gauge replaced
Engineering › Compressed Air System (start air)
Issued 15 April 2003
Resolved
Complete hydrostatic exam on the following pressure vessels (air receivers): Main ship service, Control air, Fwd vert tunnel entr, and nos 1 - 6 start air receivers. LEGACY COMPONENT DESC: Receiver/Bottle
Due 29 March 2004
Resolved 10 February 2004
Engineering › Fuel Oil Service System
Issued 15 April 2003
Resolved
Afetr completing test of the F/O service tank high level alarm, provide a writtenand signed statement from the chief engineer informing Coast Guard MSO Toledo of the results. LEGACY COMPONENT DESC: Tank
Due 15 May 2003
Resolved 29 April 2003
Resolution: Received written report signed by chief engineer stating F/Oservice tank high level alarm was tested and provided results, alarm sounded at @10" from top of tank.
Electrical › Electric Generation Source (service)
Issued 15 April 2003
Resolved
Prove satisfactory operation 0f #1 and #2 SSG high J/W - Loss of L/O psi engine trip, test #30 in approved automation test procedures, and correct procedure, if necessary, in the vessel's approved vital systems automation test procedures. LEGACY COMPONENT DESC: Generator
Due 15 May 2003
Resolved 29 April 2003
Resolution: Received written report signed by chief engineer, new trip devices installed on both generators and both trips tested sat, also recieved copy of vendor report showing tests completed sat. Test procedure change not required.
Lifesaving › Lifeboat
Issued 14 April 2003
Resolved
Conduct an abandon ship drill.
Due 15 May 2003
Resolved 22 May 2003
Lifesaving › Lifeboat
Issued 14 April 2003
Resolved
Conduct a weight test of the vessels lifeboat
Due 13 June 2003
Resolved 5 June 2003
Fire Fighting
Issued 13 January 2003
Resolved
Prove proper operation of all emergency alarms.
Due 14 April 2003
Resolved 14 April 2003
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 13 January 2003
Resolved
Replace Stbd running light.
Due 14 April 2003
Resolved 14 April 2003
Electrical › Electric Generation Source (emergency)
Issued 13 January 2003
Resolved
Repair dead man alarm at pilot house.
Due 14 April 2003
Resolved 14 April 2003
Stability › Watertight Integrity
Issued 13 January 2003
Resolved
Fix sensor on water tight door 137
Due 14 April 2003
Resolved 14 April 2003
Stability › Watertight Integrity
Issued 13 January 2003
Resolved
Prove proper operation of guillotine gate 137, and ensure all alarms work.
Due 14 April 2003
Resolved 15 April 2003
Stability › Weathertight Integrity
Issued 13 January 2003
Resolved
Prove proper operation of Guillotine gate and alarm at frame no 179
Due 14 April 2003
Resolved 14 April 2003
Lifesaving › Lifebuoys
Issued 13 January 2003
Resolved
Replace three life rings
Due 14 April 2003
Resolved 14 April 2003
Lifesaving › Lifejacket/PFD (General) › Condition
Issued 13 January 2003
Resolved
Replace three life jackets
Due 14 April 2003
Resolved 14 April 2003
Electrical › Electrical Distribution System (emergency)
Issued 13 January 2003
Resolved
Prove proper operation of all General Alarms in cargo tunnel.
Action required: 17 - Rectify deficiencies prior to departure
Due 15 April 2003
Resolved 15 April 2003
Resolution: All alarms in tunnel tested sat
Operations/Management › Drills/Instruction
Issued 19 March 2002
Resolved
Conduct abandon ship drill and exercise lifeboat. LEGACY COMPONENT DESC: Abandon Ship
Due 19 April 2002
Resolved 18 April 2002
Resolution: Witnessed satisfactory abandon ship drill.
Fire Fighting › Fire Main
Issued 19 March 2002
Resolved
Make repairs to ten foot section of fire main on deck port side midships. LEGACY COMPONENT DESC: Condition
Condition: Unknown
Due 19 March 2002
Resolved 26 March 2002
Resolution: Cropped and renewed wasted section of fire main hydro test SAT.
Lifesaving
Issued 6 April 2001
Resolved
Prove lifeboat operational test IAW 46 CFR 199.45(b).
Condition: Unknown
Due 6 April 2001
Resolved 9 April 2001
Lifesaving
Issued 28 March 2000
Resolved
Conduct satisfactory abandonship drill & exercise boat.
Condition: Unknown
Due 28 March 2000
Resolved 28 March 2000
Accommodation/Occupational Safety
Issued 28 March 2000
Resolved
Prove Proper operation of emergency escape scuttle, open/close indicator switch, from engineering main control (FR 212).
Condition: Unknown
Due 28 March 2000
Resolved 28 March 2000
Lifesaving
Issued 28 March 2000
Resolved
Conduct weight test of the lifeboat & falls iaw 46CFR199.190 (h).
Condition: Unknown
Due 28 March 2000
Resolved 28 March 2000
Engineering
Issued 28 March 2000
Resolved
Provide MSO Toledo Inspection Dept with revised automation test procedures.All set points & parameters should be as per applicable tech pubs. Correctpage numbering & numerous set point errors on existing procedures.
Condition: Unknown
Due 28 March 2000
Resolved 28 March 2000
Accommodation/Occupational Safety
Issued 28 March 2000
Resolved
Prove proper operation of the WTD in the aft galley blhd & the stbd conveyor tunnel door in blhd 137.
Condition: Unknown
Due 28 March 2000
Resolved 28 March 2000
Accommodation/Occupational Safety
Issued 28 March 2000
Resolved
Prove proper operation of hydraulic door, between eng. room & conveyor tunnel, swing arm & cable indicator (remote).
Condition: Unknown
Due 28 March 2000
Resolved 28 March 2000
Lifesaving
Issued 21 April 1999
Resolved
Conduct abandon ship drill and provide affidavit of lifeboat waterborne exercise.
Condition: Unknown
Due 21 May 1999
Resolved 15 June 1999
Engineering
Issued 21 April 1999
Resolved
No automation test procedures made available, Provide approved vital systemautomation test procedures.
Condition: Unknown
Due 21 April 1999
Resolved 21 April 1999
Construction/Loadline
Issued 21 April 1999
Resolved
Renew wasted plate in way of center line area of #4 cargo hold aft bulkhead(BHD #179) and engine room/fuel oil day tank, provide gauging report of same.
Condition: Unknown
Due 21 April 1999
Resolved 21 April 1999
Lifesaving
Issued 17 March 1997
Resolved
Conduct lifeboat drill and lifeboat weight test prior to 16MAY97.
Condition: Unknown
Due 17 March 1997
Resolved 17 March 1997
Fire Fighting
Issued 17 March 1997
Resolved
Provide end connection on international shore connection flange that is compatible with the ship's fire main or hose connections prior to 20MAR97.
Condition: Unknown
Due 20 March 1997
Resolved 25 March 1997
Construction/Loadline
Issued 17 March 1997
Resolved
Prove proper operation of bilge alarm and oily water separator prior to 16MAY97.
Condition: Unknown
Due 17 March 1997
Resolved 17 March 1997
Construction/Loadline
Issued 25 January 1997
Resolved
Prior to loading cargo make permanent repairs to 18 inch fracture located in the stbd side hull plating at the 28 foot level in way of the first web frame bay aft of the stem.
Condition: Unknown
Due 25 January 1997
Resolved 25 January 1997
Lifesaving
Issued 13 March 1996
Resolved
Conduct boat drill to the satisfaction of the attending Marine Inspector.
Condition: Unknown
Due 13 March 1996
Resolved 13 March 1996
Engineering
Issued 13 March 1996
Resolved
Prove proper operation of lube oil low sump level alarm on port MDE.
Condition: Unknown
Due 15 May 1996
Resolved 8 April 1996
Engineering
Issued 4 May 1994
Resolved
RUN AUTOMATION ON INBOARD BOILER.
Condition: Unknown
Due 4 May 1994
Resolved 4 May 1994
Lifesaving
Issued 7 May 1993
Resolved
PROVIDE REPLACEMENT CLASS C EPIRB PRIOR TO DEPARTING PORT OF DULUTH- SUPERIOR BUT NO LATER THAN 10MAY93.
Condition: Unknown
Due 10 May 1993
Resolved 10 May 1993
Deck/Cargo
Issued 6 August 1991
Resolved
PROVIDE USCG MARINE SAFETY CENTER APPROVED DRAWINGS FOR NEW STERN THRUSTER INSTALLATION. DO NOT OPERATE STERN THRUSTER UNTIL A USCG MARINE INSPECTOR DETERMINES INSTALLATION IS IN ACCORDANCE WITH USCG MARINE SAFETY CENTER APPROVED DRAWINGS.
Condition: Unknown
Due 6 August 1991
Resolved 6 August 1991
Lifesaving
Issued 17 May 1991
Resolved
CONDUCT U/W DRILLS.
Condition: Unknown
Due 17 May 1991
Resolved 17 May 1991
Construction/Loadline
Issued 6 November 1990
Resolved
MAKE PERMANENT REPAIRS TO THE STEM AND SHELL PLATE IN WAY OF THE STEM, ALL IN THE AREA OF THE 17' DRAFT MARK._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 6 November 1990
Resolved 6 November 1990
Construction/Loadline
Issued 5 November 1990
Resolved
MAKE PERMANENT REPAIRS TO THE DAMAGE TO THE STEM IWO THE 17' DRAFT MARK.
Condition: Unknown
Due 5 November 1990
Resolved 5 November 1990
Construction/Loadline
Issued 11 May 1990
Resolved
HAVE THE VESSEL AVAILABLE FOR INSPECTION IN WAY OF NO. 1 PORT BALLAST TANK.
Condition: Unknown
Due 11 May 1990
Resolved 11 May 1990
Construction/Loadline
Issued 3 November 1989
Resolved
EFFECT PERMANENT REPAIRS TO SIDE SHELL IN WAY OF #8 BALLAST TANK; 1ST BELOWSHEER STRAKE ('I' STRAKE) SEAM TO SEAM BETWEEN FRAMES 163-171, AND ASSOCIATED INTERNALS.
Condition: Unknown
Due 3 November 1989
Resolved 3 November 1989
Fire Fighting
Issued 8 September 1989
Resolved
PROVE PROPER OPERATION OF TUNNEL FIRE PUMP TO THE SATISFACTION OF ATTENDINGCG INSPECTOR.
Condition: Unknown
Due 8 September 1989
Resolved 8 September 1989
Construction/Loadline
Issued 8 September 1989
Resolved
MAKE #3 PORT BALLAST TANK AVAILAVLE FOR EXAMINATION IN WAY OF TEMP. REPAIRS COMPLETED 11SEP89 AT END OF 1990 NAVIGATION SEASON.
Condition: Unknown
Due 8 September 1989
Resolved 8 September 1989
Construction/Loadline
Issued 8 September 1989
Resolved
EFFECT PERMENANT REPAIRS IN WAY OF #3 PORT BALLAST TANK; SHELL AND SLOPE WEB FRAME JUNCTION, GUSSETS, AND ASSOCIATED INTERNALS AT FR'S 67,69,71,73 &75.
Condition: Unknown
Due 8 September 1989
Resolved 8 September 1989
Construction/Loadline
Issued 8 September 1989
Resolved
EFFECT PERMENT REPAIRS IN WAY OF #3 PORT BALLAST TANK, BILGE PLATE (SEAM TOSEAM) FRAME 65 1/2 TO FRAME 76 1/2 AND ASSOCIATED INTERNALS.
Condition: Unknown
Due 8 September 1989
Resolved 8 September 1989
Construction/Loadline
Issued 8 September 1989
Resolved
MAKE #3 PORT BALLAST TANK AVAILABLE FOR EXAMINATION IN WAY OF TEMPORARY REPAIRS COMPLETED 11SEP89 AT END OF 1989 NAVIGATION SEASON.
Condition: Unknown
Due 8 September 1989
Resolved 8 September 1989
Construction/Loadline
Issued 8 September 1989
Resolved
MAKE #3 PORT BALLAST TANK AVAILABLE FOR EXAMINATION IN WAY OF TEMP. REPAIRS COMPLETED 11SEP89 DURING MID 1990 NAVIGATION SEASON.
Condition: Unknown
Due 8 September 1989
Resolved 8 September 1989
Construction/Loadline
Issued 8 July 1989
Resolved
MAKE PERMANENT REPAIR TO THE HULL FRACTURE IN WAY OF AFTER BULKHEAD FRAME 38 IN NUMBER ONE STARBOARD BALLAST TANK AT NEXT DRYDOCKING.
Condition: Unknown
Due 8 July 1989
Resolved 8 July 1989
Fire Fighting
Issued 23 August 1988
Resolved
REPAIR FIRE DAMPER IN WAY OF PORT LADDER MAIN DECK IN HOUSE.
Condition: Unknown
Due 23 August 1988
Resolved 23 August 1988
Fire Fighting
Issued 23 August 1988
Resolved
CONDUCT FIRE DRILL.
Condition: Unknown
Due 23 August 1988
Resolved 23 August 1988
Lifesaving
Issued 23 August 1988
Resolved
PROPERLY STENCIL LIFEBOAT (NAME OF VESSEL, NUMBER OF PERSONS, ETC...)
Condition: Unknown
Due 23 August 1988
Resolved 23 August 1988
Navigation
Issued 23 August 1988
Resolved
MAKE PERMANENT REPAIRS TO GENERAL ALARM BELL LOCATED AT #1 STBD COMPARTMENTIN WAY OF TUNNEL.
Condition: Unknown
Due 23 August 1988
Resolved 23 August 1988
Electrical
Issued 23 August 1988
Resolved
REPAIR EMERGENCY LIGHT IN BOW THRUSTER ROOM
Condition: Unknown
Due 23 August 1988
Resolved 23 August 1988
Fire Fighting
Issued 23 August 1988
Resolved
STENCIL FIRE STATIONS LOCATED IN STEERING SPACE AND JUST OUTSIDE STEERING SPACE W/T DOOR.
Condition: Unknown
Due 23 August 1988
Resolved 23 August 1988
Fire Fighting
Issued 23 August 1988
Resolved
REPAINT AND STENCIL FIRE AXES.
Condition: Unknown
Due 23 August 1988
Resolved 23 August 1988
Lifesaving
Issued 23 August 1988
Resolved
STENCIL ALL RINGBOUYS WITH DOCUMENTED PORT.
Condition: Unknown
Due 23 August 1988
Resolved 23 August 1988
Electrical
Issued 23 August 1988
Resolved
PROVE PROPER OPERATION OF THE LUBE OIL LOW PRESSURE AND JACKET WATER HIGH TEMPERATURE CUT OUTS ON NO. 1 AND NO. 2 S/S GENSETS.
Condition: Unknown
Due 23 August 1988
Resolved 23 August 1988
Construction/Loadline
Issued 19 December 1987
Resolved
MAKE PERMANENT REPAIRS TO PORT BOW SHELL PLATING, BULKHEAD FRAME 15, FRAME 13 AND TANK TOP #1 PORT BALLAST TANK
Condition: Unknown
Due 19 December 1987
Resolved 19 December 1987
Lifesaving
Issued 27 November 1987
Resolved
RENEW LIFEBOAT FALLS PRIOR TO 1988 SAILING SEASON.
Condition: Unknown
Due 27 November 1987
Resolved 27 November 1987
Construction/Loadline
Issued 8 October 1987
Resolved
HATCH COVER CLAMPS IN NEED OF FREEING UP, RENEWED OR ADJUSTMENT AS NECESSARY FOR THE PROPER OPERATION OF HATCH COVERS.
Condition: Unknown
Due 8 October 1987
Resolved 8 October 1987
Construction/Loadline
Issued 28 December 1985
Resolved
MAKE PERMANENT REPAIRS IN WAY OF TEMPORARY REPAIRS TO SIDESHELL FROM STEM TO FRAME #1 PORTSIDE FROM APPROXIMATELY 3 FEET MAINDECK TO APPROXIMATELY 2 FEET BELOW MAINDECK.
Condition: Unknown
Due 28 December 1985
Resolved 28 December 1985
Construction/Loadline
Issued 28 December 1985
Resolved
MAKE PERMANENT REPAIRS IN WAY OF TEMPORARY REPAIRS TO MAINDECK AT STEM.
Condition: Unknown
Due 28 December 1985
Resolved 28 December 1985
Construction/Loadline
Issued 28 December 1985
Resolved
MAKE PERMANENT REPAIS TO CENTERLINE DECK BEAM UNDER THE MAINDECK AT THE STEM.
Condition: Unknown
Due 28 December 1985
Resolved 28 December 1985
Deck/Cargo
Issued 22 October 1985
Resolved
REPAIR HATCH CLAMPS APPROX. 40 VARIOUS HATCHES WHERE MARKED AND DISCUSSED WITH VESSEL,S BOS'N.
Condition: Unknown
Due 22 October 1985
Resolved 22 October 1985
Lifesaving
Issued 22 October 1985
Resolved
PROVIDE PROOF OF C.G.APPROVAL OF ALL SURVIVAL SUITS.
Condition: Unknown
Due 22 October 1985
Resolved 22 October 1985
Construction/Loadline
Issued 22 October 1985
Resolved
INSTALL AND PROVE OPERATION OF WATER TIGHT DOOR ALARM IN PANEL ON BRIDGE.
Condition: Unknown
Due 22 October 1985
Resolved 22 October 1985
Navigation
Issued 22 October 1985
Resolved
DOUBLE NUT OR WIRE ENDS OF TELEMOTOR ARMS ON STEERING GEAR.
Condition: Unknown
Due 22 October 1985
Resolved 22 October 1985
Construction/Loadline
Issued 22 October 1985
Resolved
CALIBRATE BALLAST TANK LEVEL INDICATORS IN ENGINE ROOM CONTROL BOOTH.
Condition: Unknown
Due 22 October 1985
Resolved 22 October 1985
Deck/Cargo
Issued 22 October 1985
Resolved
HATCHES 17 AND 19 COVERS FITTING IMPROPER IN CENTER 1/2" GAP,ADD ADDITIONALGASKET MATERIAL 8FT AFT END 5FT FWD.
Condition: Unknown
Due 22 October 1985
Resolved 22 October 1985
Construction/Loadline
Issued 14 October 1985
Resolved
MAKE PERMANENT REPAIRS TO SIDE SHELL AND INTERNALS IN WAY OF DAMAGE AT THE I STRAKE AT FRAME 13-17 ON THE FWD STBD SIDE, TO INCLUDE RENEWAL OF SIDE SHELL 8'X20', MAIN DK 40"X 12" FWD OF FR 15, FR 15 30"X30" ABOVE MN DK & 57"X 30" BELOW MN DK, FR 16 40"X9'2", SL SHT 66"X12", FR 14 & 2 SIDE LONGS.
Condition: Unknown
Due 14 October 1985
Resolved 14 October 1985
Construction/Loadline
Issued 3 September 1985
Resolved
FRAMES BUCKLED IN AREA 0F DEEP FRAM 9 THU 10-C AND TWEEN DECK BUCKLED.
Condition: Unknown
Due 3 September 1985
Resolved 3 September 1985
Construction/Loadline
Issued 3 September 1985
Resolved
EFFECT PERMANENT REPAIR PRIOR TO FIT-OUT 1986 ON THE FOLLOWING MEMBERS, PORT SIDE HULL AT ANCHOR BOX: FRAMES 9,10,10-A,10-B & 10-C AND TWEEN DECK BUCKLED.
Condition: Unknown
Due 3 September 1985
Resolved 3 September 1985
Engineering
Issued 18 June 1985
Resolved
OPEN AUX BOILER MOUNTINGS FOR INSPECTION.
Condition: Unknown
Due 18 June 1985
Resolved 18 June 1985