Records from 1984 to 2008. Most recent: inspection, 8 April 2008.
Inspection history · 49
8 April 2008
Load Line/Change of Employment
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3180131
19 April 2001
Drydock Extension
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1382224
12 April 2001
Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1457918
21 May 2000
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 818637
3 April 2000
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1413687
15 February 2000
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1408448
21 April 1999
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1430668
16 March 1999
Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1369102
3 December 1998
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1365037
27 February 1998
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1421464
17 January 1998
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1372138
14 February 1997
Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1422809
27 August 1996
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1469807
23 July 1996
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1084275
23 July 1996
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1087407
24 June 1996
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1084212
1 February 1996
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1411228
17 February 1995
Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1394275
17 February 1994
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1163275
2 February 1994
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1391955
27 September 1993
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 10276
21 September 1993
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1443409
15 April 1993
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1149675
23 February 1993
Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1379738
28 April 1992
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 957015
11 February 1992
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 954237
6 February 1992
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 948150
23 October 1991
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1249094
23 September 1991
Hull Examination · Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 937968
10 June 1991
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1231240
10 June 1991
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1243659
7 April 1991
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1232328
21 March 1991
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 929238
20 February 1991
Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1240499
29 May 1990
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 923153
16 March 1990
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 924691
16 February 1990
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 928757
15 February 1990
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 923342
14 March 1989
Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1207340
14 October 1988
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1198357
14 October 1988
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1198361
5 March 1988
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1337188
5 June 1987
Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1000175
14 May 1986
Credit Drydock
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1304593
18 March 1986
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 993098
28 February 1986
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1293106
12 March 1985
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 980976
14 March 1984
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 973043
13 March 1984
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1278596
Electrical
Issued 15 February 2000
Resolved
SUBMIT PLANS FOR PLANNED NEW ELECTRICAL INSTALLATION IAW 46 CFR SUBPART 110.25. (GENERATOR AND ELECTRIC CARGO PUMP). SUBMIT PLANS AND RECEIVE APPROVAL PRIOR TO INSTALLATION. SUBMIT PLANS NO LATER THAN 15MAR00 IF REPAIRS ARE TO COMMENCE BY 01APR00._x001C_
Condition: Unknown
Due 18 February 2000
Resolved 18 February 2000
Electrical
Issued 15 February 2000
Resolved
Remove all dead end wiring in the cargo pump room and generator room. Correct prior to 30Apr2000._x001C_
Condition: Unknown
Due 15 February 2000
Resolved 15 February 2000
Construction/Loadline
Issued 15 February 2000
Resolved
RENEW REMOVED VERTICAL FRAME REMOVED TO INSTALL TEMP CARGO PUMP AND PIPING.V ESSEL IS RESTRICTED FOR CARRYING DECK CARGO UNTIL RENEWAL. CORRECT PRIORTO 30APR00._x001C_ _x001C_
Condition: Unknown
Due 15 February 2000
Resolved 15 February 2000
Electrical
Issued 15 February 2000
Resolved
Renew electrical box/sw for the ballast pump. Corroded and holed. Correctprior to 30Apr2000._x001C_
Condition: Unknown
Due 15 February 2000
Resolved 15 February 2000
Deck/Cargo
Issued 15 February 2000
Resolved
COMPLETE THE INSTALLATION OF NEW CARGO PUMP SYSTEM PRIOR TO 30APR00._x001C_
Condition: Unknown
Due 15 February 2000
Resolved 15 February 2000
Navigation
Issued 16 March 1999
Resolved
PAINT SHIELDS FOR NAVIGATION LIGHTS FLAT BLACK.
Condition: Unknown
Due 22 April 1999
Resolved 22 April 1999
Electrical
Issued 16 March 1999
Resolved
INSTALL SOLDIER TYPE BATTERY TERMINALS ON GENERATOR AND CARGO PUMP BATTERIES.
Condition: Unknown
Due 22 April 1999
Resolved 22 April 1999
Engineering
Issued 16 March 1999
Resolved
INSTALL HOSE CLAMPS ON CARGO PUMP INJECTOR PRE-PUMP (FUEL) HOSES.
Condition: Unknown
Due 22 April 1999
Resolved 22 April 1999
Electrical
Issued 16 March 1999
Resolved
INSTALL ELECTRICAL CABLE SECURING DEVICES ON MORE THAN 14 INCHES APART ON ALL ELECTRICAL CABLES IN THE CARGO PUMP COMPARTMENT.
Condition: Unknown
Due 22 April 1999
Resolved 22 April 1999
Electrical
Issued 16 March 1999
Resolved
REMOVE ALL DEAD END ELECTRICAL CABLES IN THE CARGO PUMP ROOM.
Condition: Unknown
Due 22 April 1999
Resolved 22 April 1999
Lifesaving
Issued 16 March 1999
Resolved
REMOVE ALL TRASH FROM AROUND GENERATOR AND BILGES OF THE CARGO PUMP ROOM.
Condition: Unknown
Due 22 April 1999
Resolved 22 April 1999
Documentation
Issued 16 March 1999
Resolved
PROVIDE A LETTER FROM BACARDI CORPORATON STATING THAT ANTLLES AGGREGATES ISTHE OPERATOR OF THE VESSEL AS PER 46 CFR 138.100.
Condition: Unknown
Due 6 April 1999
Resolved 6 April 1999
Engineering
Issued 16 March 1999
Resolved
REPLACE FUEL HOSES ON GENERATOR WITH FUEL HOSE THAT MEETS SAE J-1942 STANDARDS.
Condition: Unknown
Due 22 April 1999
Resolved 22 April 1999
Documentation
Issued 16 March 1999
Resolved
PROVIDE DRUG TESTING PROGRAM THAT MEETS 46 CFR PART 16._x001C_
Condition: Unknown
Due 22 April 1999
Resolved 22 April 1999
Electrical
Issued 16 March 1999
Resolved
INSTALL WIRE HOLDING DEVICES NO MORE THAN 24 INCHES APART FOR NAVIGATION LIGHTS ELECTRICAL WIRING.
Condition: Unknown
Due 22 April 1999
Resolved 22 April 1999
Electrical
Issued 16 March 1999
Resolved
RENEW WIRING FROM START PUSH BUTTON SWITCH TO THE STARTER, CARGO PUMP ENGINE.
Condition: Unknown
Due 22 April 1999
Resolved 22 April 1999
Lifesaving
Issued 16 March 1999
Resolved
CLEAN OIL FROM CARGO PUMP ENGINE AND BILGE UNDER THE ENGINE.
Condition: Unknown
Due 22 April 1999
Resolved 22 April 1999
Engineering
Issued 3 December 1998
Resolved
INSTALL NEW SERVICE GENERATOR TO THE SATISFACTION OF THE ATTENDING COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 12 January 1999
Resolved 6 February 1999
Navigation
Issued 17 January 1998
Resolved
DEMONSTARTE PROPER OPERATION OF STARBOARD & STERN NAVIGATIONAL LIGHT PHOTO SENSOR CELL.
Condition: Unknown
Due 17 January 1998
Resolved 19 February 1998
Electrical
Issued 17 January 1998
Resolved
PLACE NON-CONDUCTIVE MATTING IN FRONT OF ELECTRICAL SWITCHBOARD & PANELS INGENERATOR COMPARTMENT.
Condition: Unknown
Due 1 March 1998
Resolved 1 March 1998
Electrical
Issued 17 January 1998
Resolved
COMPLETE ELECTRICAL DIRECTORY FOR ELECTRICAL SYSTEM.
Condition: Unknown
Due 27 February 1998
Resolved 17 March 1998
Construction/Loadline
Issued 17 January 1998
Resolved
REPLACE MISSING BOLT & NUT ON STARBOARD BALLAST TANK FORWARD VENT.
Condition: Unknown
Due 1 March 1998
Resolved 1 March 1998
Electrical
Issued 17 January 1998
Resolved
REPLACE AUTOMOTIVE BATTERIES WITH DEEP CYCLE MARINE TYPE BATTERIES.
Condition: Unknown
Due 17 January 1998
Resolved 19 February 1998
Lifesaving
Issued 17 January 1998
Resolved
REMOVE PAINT FROM GENERATOR COMPARTMENT.
Condition: Unknown
Due 17 January 1998
Resolved 19 February 1998
Lifesaving
Issued 17 January 1998
Resolved
REMOVE SUPPLIES, PARTS AND LOOSE GEAR ADRIFT FROM AROUND GENERATOR ELECTRICAL SWITCHBOARD AND PANELS.
Condition: Unknown
Due 19 February 1998
Resolved 19 February 1998
Construction/Loadline
Issued 17 January 1998
Resolved
REPAIR OR REPLACE WASTED HATCH COVER FOR CARGO PUMP COMPARTMENT IN WAY OF GENERATOR ROOM DECK.
Condition: Unknown
Due 27 February 1998
Resolved 17 March 1998
Construction/Loadline
Issued 17 January 1998
Resolved
ELIMINATE EXCESSIVE LEAKING FROM BALLAST PUMP SHAFT PACKING GLAND TO SATISFACTION OF ATTENDING COAST GUARD INSPECTOR.
Condition: Unknown
Due 27 February 1998
Resolved 17 March 1998
Navigation
Issued 17 January 1998
Resolved
RENEW PORT SIDE & STERN NAVIGATIONAL RUNNING LIGHT SCREENS, PAINT FLAT BLACK.
Condition: Unknown
Due 17 January 1998
Resolved 1 March 1998
Deck/Cargo
Issued 17 January 1998
Resolved
OPEN & FREE UP SEIZED VENT BALL IN #4 CARGO TANK GOOSENECK VENT.
Condition: Unknown
Due 1 March 1998
Resolved 1 March 1998
Electrical
Issued 17 January 1998
Resolved
SHORE UP & BRACE BATTERIES FOR NAVIGATIONAL RUNNING LIGHTS.
Condition: Unknown
Due 1 March 1998
Resolved 1 March 1998
Construction/Loadline
Issued 17 January 1998
Resolved
FREE UP SEIZED DOGS ON CARGO ENGINE COMPARTMENT WEATHER TIGHT DOOR.
Condition: Unknown
Due 1 March 1998
Resolved 1 March 1998
Electrical
Issued 17 January 1998
Resolved
DEMONSTRATE PROPER OPERATION OF GENERATOR LOSS OF LUBE OIL & HIGH WATER TEMPERATURE SHUTDOWNS TO SATISFACTION OF ATTENDING COAST GUARD INSPECTOR.
Condition: Unknown
Due 27 February 1998
Resolved 17 March 1998
Construction/Loadline
Issued 17 January 1998
Resolved
RENEW GASKET ON STARBOARD BALLAST TANK HATCH COVER.
Condition: Unknown
Due 27 February 1998
Resolved 17 March 1998
Construction/Loadline
Issued 17 January 1998
Resolved
REPLACE MISSING DOG ON #3S CARGO TANK HATCH COVER.
Condition: Unknown
Due 27 February 1998
Resolved 17 March 1998
Deck/Cargo
Issued 17 January 1998
Resolved
INSTALL DRIP SHIELD COLLECTOR UNDER IN-LINE FILTER BETWEEN DIESEL FUEL TANKAND CARGO PUMP.
Condition: Unknown
Due 27 February 1998
Resolved 17 March 1998
Construction/Loadline
Issued 14 February 1997
Resolved
INSTALL GASKETT ON HATCH IN GENERATOR ROOM LEADING TO PUMP ROOM.
Condition: Unknown
Due 14 March 1997
Resolved 13 March 1997
Engineering
Issued 14 February 1997
Resolved
INSTALL PIPE HANGER ON RETURN FUEL LINE FROM LOWER PUMP ENGINE AT VERTICLE RUN NEXT TO EMERGENCY CUT-OFF VALVE.
Condition: Unknown
Due 14 March 1997
Resolved 13 March 1997
Engineering
Issued 14 February 1997
Resolved
MAKE EMERGENCY CUT OFF VALVE TO FUEL TANK OPERABLE.
Condition: Unknown
Due 14 March 1997
Resolved 13 March 1997
Engineering
Issued 14 February 1997
Resolved
INSTALL FUEL OIL CONTAINMENT AT BUNKER STATION.
Condition: Unknown
Due 14 March 1997
Resolved 13 March 1997
Construction/Loadline
Issued 24 June 1996
Resolved
Renew deck plate where wasted in way of #3 stbd, approx. 4' aft of outboardmanhole, outboard of life line.
Condition: Unknown
Due 24 June 1996
Resolved 24 June 1996
Construction/Loadline
Issued 24 June 1996
Resolved
Renew wasted side longs (5each) forward 3 bays portside of #4 void.
Condition: Unknown
Due 24 June 1996
Resolved 24 June 1996
Deck/Cargo
Issued 24 June 1996
Resolved
Renew #2 port and #4 void gooseneck vents in way of wastage.
Condition: Unknown
Due 24 June 1996
Resolved 24 June 1996
Accommodation/Occupational Safety
Issued 24 June 1996
Resolved
Repair/renew ladder bracketts in #4 stdb, #3 port, and in the Engine room.
Condition: Unknown
Due 24 June 1996
Resolved 24 June 1996
Construction/Loadline
Issued 24 June 1996
Resolved
Renew 4ea diagonal stiffeners, 1st 2 bays outboard in #1 port.
Condition: Unknown
Due 24 June 1996
Resolved 24 June 1996
Construction/Loadline
Issued 24 June 1996
Resolved
Renew brackett at frame #2, stbd side of aft rake where wasted.
Condition: Unknown
Due 24 June 1996
Resolved 24 June 1996
Construction/Loadline
Issued 24 June 1996
Resolved
Repair/renew deep web longitudinal stiffener, #1 stbd at frame #4 in aft rake.
Condition: Unknown
Due 24 June 1996
Resolved 24 June 1996
Construction/Loadline
Issued 24 June 1996
Resolved
Reweld deck insert, aft rake, approx. 8' forward of centerline manhole.
Condition: Unknown
Due 24 June 1996
Resolved 24 June 1996
Construction/Loadline
Issued 1 February 1996
Resolved
Paint loadline plimsel in a contrasting color to the hull.
Condition: Unknown
Due 1 March 1996
Resolved 27 February 1996
Documentation
Issued 1 February 1996
Resolved
Provide original COFR certificate (copy onboard).
Condition: Unknown
Due 1 March 1996
Resolved 27 February 1996
Deck/Cargo
Issued 2 February 1994
Resolved
PROVIDE DOCUMENTATION OF TEST FOR CARGO PUMP RELIEF VALVE.
Condition: Unknown
Due 16 February 1994
Resolved 17 February 1994
Construction/Loadline
Issued 21 September 1993
Resolved
MAKE SATISFACTORY REPAIRS TO FRACTURE IN BOTTOM PLATING AND ASSOCIATED FRAME IN #3 PORT CARGO TANK.
Condition: Unknown
Due 25 September 1994
Resolved 3 February 1994
Construction/Loadline
Issued 21 September 1993
Resolved
MAKE PERMANANT REPAIRS TO BOTTOM PLATING AND ASSOCIATED INTERNALS IN #4 STBD CARGO TANK.
Condition: Unknown
Due 25 September 1993
Resolved 3 February 1994
Electrical
Issued 23 February 1993
Resolved
PROPERLY SECURE STARTING BATTERY TO CARGO PUMP ENGINE.
Condition: Unknown
Due 23 February 1993
Resolved 23 February 1993
Electrical
Issued 23 February 1993
Resolved
Provide proper electrical outlet cover for 110 volt outlet in lower machinery space.
Condition: Unknown
Due 23 February 1993
Resolved 23 February 1993
Electrical
Issued 23 February 1993
Resolved
Properly secure front panel or generator switchboard._x001C_
Condition: Unknown
Due 23 February 1993
Resolved 23 February 1993
Electrical
Issued 11 February 1992
Resolved
PROVIDE FRONT COVER FOR ELECTRICAL PANEL ON FORWARD BULKHEAD IN GENERATOR ROOM.
Condition: Unknown
Due 13 May 1992
Resolved 13 May 1992
Electrical
Issued 11 February 1992
Resolved
PROVIDE DIRECTORY FOR ALL ELECTRICAL PANELS IN GENERATOR ROOM.
Condition: Unknown
Due 13 May 1992
Resolved 13 May 1992
Unknown
Issued 11 February 1992
Resolved
PAINT HULL MARKINGS ON STERN OF BARGE.
Condition: Unknown
Due 13 May 1992
Resolved 13 May 1992
Electrical
Issued 11 February 1992
Resolved
REMOVE ALL DEADEND WIRES THROUGHOUT VESSEL.
Condition: Unknown
Due 13 May 1992
Resolved 13 May 1992
Electrical
Issued 11 February 1992
Resolved
PROVIDE PERMANENT INSTALLATION FOR LIGHT FIXTURE OVER CARGO PUMP PRIME MOVER.
Condition: Unknown
Due 13 May 1992
Resolved 13 May 1992
Engineering
Issued 11 February 1992
Resolved
RENEW FLAME SCREEN ON DIESEL FUEL TANK VENT. THIS SCREEN MUST BE A MINIMUM OF 30X30 MESH.
Condition: Unknown
Due 13 May 1992
Resolved 13 May 1992
Engineering
Issued 11 February 1992
Resolved
RENEW LOUVERS ON INTAKE VENT FOR ENGINEROOM AND PROVIDE GASKETED COVER FOR SAME.
Condition: Unknown
Due 13 May 1992
Resolved 13 May 1992
Construction/Loadline
Issued 11 February 1992
Resolved
conduct hose test (water pressure a minimum of 30psi) in presence of Coast Guard inspector of deck insert in way of 45 tank vent.
Condition: Unknown
Due 13 May 1992
Resolved 13 May 1992
Construction/Loadline
Issued 10 June 1991
Resolved
IN THE #4 STBD TANK, CROP AND INSERT APPROX 4FT X 3FT STBD SIDE SHELL PLATEBETWEEN AFT BULKHEAD & 1ST FRAME FWD & ASSOCIATED #2 SIDE SHELL LONG DOWN._x001C__x001C_ _x001C_
Condition: Unknown
Due 25 October 1991
Resolved 25 October 1991
Construction/Loadline
Issued 10 June 1991
Resolved
IN THE #2 STBD TANK REPLACE 2ND & 3RD & 4TH BRACKETS DOWN IN WAY OF THE FWDBULKHEAD & THE STBD SIDE SHELL._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 25 October 1991
Resolved 25 October 1991
Construction/Loadline
Issued 10 June 1991
Resolved
IN THE AFT RAKE, CROP AND RENEW #6 AND #10 STERN LOG BRACKETS PORTSIDE OF CENTERLINE VERTICAL KEEL_x001C_ _x001C_ _x001C_
Condition: Unknown
Due 25 October 1991
Resolved 25 October 1991
Construction/Loadline
Issued 10 June 1991
Resolved
IN THE #4 PORT VOID CROP AND RENEW AS NECESSARY ALL LONGITUDINAL BULKHEAD STIFFENERS ON STBD BULKHEAD._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 25 October 1991
Resolved 25 October 1991
Construction/Loadline
Issued 10 June 1991
Resolved
IN THE #2 PORT VOID, CROP AND RENEW THE TOP BRACKETS FOR THE LADDER._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 25 October 1991
Resolved 25 October 1991
Construction/Loadline
Issued 10 June 1991
Resolved
IN THE FORWARD RAKE END, CROP AND INSERT #2 TRANSVERSE DEEP WEB FROM HEADLOG IN WAY OF THE DIESEL FUEL TANKS._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 25 October 1991
Resolved 25 October 1991
Construction/Loadline
Issued 10 June 1991
Resolved
IN THE FWD RAKE, GOUGE AND WELD THE #3 PORT DEEP WEB AS MARKED._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 25 October 1991
Resolved 25 October 1991
Construction/Loadline
Issued 10 June 1991
Resolved
IN THE FWD RAKE, GOUGE AND WELD #1 SIDE LONG IN WAY OF THE SIDE SHELL FRAME._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 25 October 1991
Resolved 25 October 1991
Construction/Loadline
Issued 10 June 1991
Resolved
IN FWD RAKE, CROP AND RENEW #5 STBD SIDE SHELL FRAME AND ASSOCIATED SIDE LONG AS MARKED._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 25 October 1991
Resolved 25 October 1991
Construction/Loadline
Issued 10 June 1991
Resolved
IN THE FWD RAKE, CROP AND INSERT #1 SIDE LONG BETWEEN #1 AND #2 SIDE SHELL FRAMES AND ASSOCIATED SIDE SHELL PLATING AS MARKED._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 25 October 1991
Resolved 25 October 1991
Construction/Loadline
Issued 10 June 1991
Resolved
IN THE #5 BALLAST TANK (AFT RAKE) CROP AND RENEW 2ND SIDE LONG DOWN STBD SIDE BETWEEN FWD BULKHEAD & 1ST FRAME AFT._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 25 October 1991
Resolved 25 October 1991
Construction/Loadline
Issued 10 June 1991
Resolved
CROP AND RENEW ALL LONGITUDINAL SWASH BULKHEADS IN WAY OF THE BULKHEAD IN #5 BALLAST TANK (AFT RAKE)._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 25 October 1991
Resolved 25 October 1991
Construction/Loadline
Issued 10 June 1991
Resolved
CROP AND RENEW 1ST FRAME AFT OF FWD BULKHEAD BETWEEN 3RD & 4TH SWASH BULKHEADS FROM STBD IN THE #5 BALLAST TANK (AFT RAKE)._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 25 October 1991
Resolved 25 October 1991
Construction/Loadline
Issued 10 June 1991
Resolved
CROP & RENEW 2ND, 3RD & 4TH SIDE LONGS DOWN AT STBD SIDE SHELL BETWEEN FWD BULKHEAD & 1ST FRAME AFT IN THE #2 STBD TANK._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 25 October 1991
Resolved 25 October 1991
Construction/Loadline
Issued 10 June 1991
Resolved
IN THE #2 STBD TANK, REPLACE LOWER DIAGONALS STBD SIDE IN WAY OF THE 1ST FRAME SIDE IN WAY OF THE 1ST FRAME AFT OF THE FWD BULKHEAD._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 25 October 1991
Resolved 25 October 1991
Construction/Loadline
Issued 10 June 1991
Resolved
IN THE #2 STBD TANK, CROP AND INSERT 2ND FRAME AFT OF FWD BULKHEAD AT STBD SIDE SHELL FROM 1ST SIDE LONG DOWN TO MIDPOINT BETWEEN 5TH & 6TH SIDE LONGSDOWN._x001C_ _x001C_
Condition: Unknown
Due 25 October 1991
Resolved 25 October 1991
Construction/Loadline
Issued 10 June 1991
Resolved
IN THE #2 STBD TANK, CROP & INSERT UPPER & LOWER DIAGONALS AT 2ND FRAME AFTFWD BULKHEAD AT STBD SIDE SHELL._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 25 October 1991
Resolved 25 October 1991
Construction/Loadline
Issued 10 June 1991
Resolved
CROP AND INSERT AS NECESSARY ALL WASTED OVERHEAD DECK FRAMES IN THE AFT RAKE._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 25 October 1991
Resolved 25 October 1991
Construction/Loadline
Issued 10 June 1991
Resolved
IN THE #3 STBD TANK CROP & INSERT 3RD & 4TH LOWER DIAGONALS AFT OF FWWD BULKHEAD ON OUTBOARD SIDE._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 25 October 1991
Resolved 25 October 1991
Construction/Loadline
Issued 10 June 1991
Resolved
GOUGE AND WELD #1 AND #2 LONGITUDINAL DEEP WEB FRAMES PORTSIDE IN WAY OF THE FWD BULKKHEAD IN THE AFT RAKE._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 25 October 1991
Resolved 25 October 1991
Electrical
Issued 20 February 1991
Resolved
INSTALL HEAT SHIELD AND PLUG COCK ON RACOR FUEL FILTER FOR S/S GENERATOR.
Condition: Unknown
Due 20 February 1991
Resolved 20 February 1991
Construction/Loadline
Issued 20 February 1991
Resolved
CROP AND RENEW AS REQUIRED TRANSVERSE FRAMES AND DEEP LONGS AT INTERSECTIONJOINTS IN WAY OF TRANSVERSE FRAMES #2, #3 AND #4 FROM PORT TO STARBOARD IN THE STERN RAKE. THIS ITEM TO BE COMPLETED AT NEXT DRYDOCKING BUT NO LATER THAN 31MAY91.
Condition: Unknown
Due 20 February 1991
Resolved 20 February 1991
Construction/Loadline
Issued 15 February 1990
Resolved
REPAIR OR REPLACE WASTED DIAGNALS AND ANGLES SUPPORT IN AFTER RAKE END.
Condition: Unknown
Due 15 February 1990
Resolved 15 February 1990
Unknown
Issued 13 March 1984
Resolved
PLUG THE HOLE IN THE GENERATOR SPACE ON THE MAIN DECK NEXT TO THE FIRE EXTINGUISHER.
Condition: Unknown
Due 13 March 1984
Resolved 13 March 1984
Unknown
Issued 13 March 1984
Resolved
LABEL THE CARGO PUMP ENGINE EMERGENCY SHUTDOWN ON THE MAIN DECK. ALSO RUN THE ENGINE AND TEST THE SHUTDOWN.
Condition: Unknown
Due 13 March 1984
Resolved 13 March 1984
Unknown
Issued 13 March 1984
Resolved
INSTALL A DIRECTORY ON THE MAIN DECK CIRCUIT BREAKER PANEL.
Condition: Unknown
Due 13 March 1984
Resolved 13 March 1984
Unknown
Issued 13 March 1984
Resolved
MOUNT 3 B-II FIRE EXTINGUISHERS IN BRACKETS AND PROVIDE PROOF THAT THE FIREEXTINGUISHERS HAVE BEEN PROPERLY SERVICED WITHIN THE LAST 12 MONTHS.
Condition: Unknown
Due 13 March 1984
Resolved 13 March 1984
Unknown
Issued 13 March 1984
Resolved
THE FOLLOWING DEFICIENCIES ARE FOR THE ST KITTS, DN569102.
Condition: Unknown
Due 13 March 1984
Resolved 13 March 1984
Unknown
Issued 13 March 1984
Resolved
RENEW THE LIFELINE ON THE PORT SIDE AFT IN THE VICINITY OF THE STERN COMPARTMENT.
Condition: Unknown
Due 13 March 1984
Resolved 13 March 1984
Unknown
Issued 13 March 1984
Resolved
INSTALL A POLLUTION PLACARD AT THE FUEL TANK VENT.
Condition: Unknown
Due 13 March 1984
Resolved 13 March 1984