MAURY USCG vessel records
← All vessels

EL MORRO

Built
1966
Last inspected
11 January 2026
Documentation
Expired · NVDC file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Towing Vessel class in Maury's sources begin in 1980.

Inspection record

Last inspected 11 January 2026
…with no type recorded33
Operational controls None recorded without a removal date
Years with a record 18 calendar years (1991–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

6707064
WDE6763
Flag
UNITED STATES
Maury page id
psix-89513

Documentation record

Registered dimensions (L × B × D)89.4 ft × 28.1 ft × 9.5 ft
Registered tonnagegross 191 / net 101
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderEQUITABLE EQUIPMENT COMP · MADISONVILLE, LA, UNITED STATES · built 1966
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portSAN JUAN, PR
Endorsements, as the file codes themcw_un, reg
DocumentationExpired · issued 30 June 2004
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it101 - Regulatory (Subpart C or D), Net Ton
191 - Regulatory (Subpart C or D), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel

Behind this panel: 57 inspections, each with its date, unit and type; 22 deficiencies with the resolution recorded against each, 1 without one; operational controls, none recorded without a removal date; 4 other vessels inspected with it; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 4

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

PROASSIST III Towing Vessel · MISLE 65963 · 19 August 2008 · activity 3403860MARILIN R Towing Vessel · MISLE 192140 · 19 August 2008 · activity 3403860PEDRITO Towing Vessel · MISLE 250527 · 19 August 2008 · activity 3403860OFFSHORE 2402 Tank Barge · MISLE 45173 · 14 July 1992 · activity 130485

Inspection history · 57

11 January 2026 PSC B
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8290804
7 March 2025 PSC A
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 8089334
27 February 2025 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8085640
22 May 2023 Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7694032
30 March 2023 Deficiency Check · Administrative Inspection
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 7659774
2 November 2021 Deficiency Check
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 7343859
9 March 2021 Initial Certification · Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7144637
10 February 2021 Deficiency Check
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 7138671
21 January 2021 In-Service Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7128327
9 September 2013 Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4710152
10 September 2012 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4438318
25 May 2012 MTSA Verification · Industry Initiated Exam
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 4321396
29 March 2012 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4274619
2 September 2010 Type not recorded
No type recorded · USCGC THETIS (WMEC 910) · Activity 3843366
6 July 2009 Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3525663
30 April 2009 Administration
Administrative · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 3464459
19 August 2008 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3403860
22 July 2008 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3275959
11 June 2008 Annual Inspection · MTSA/ISPS Verification
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3234992
27 August 2007 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3040127
10 August 2007 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3023182
10 August 2007 Type not recorded
No type recorded · Commandant (CG-CVC) · Activity 3023265
2 October 2006 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2792414
7 September 2006 Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2771918
10 July 2006 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2708314
8 July 2006 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2709663
27 June 2006 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2693022
30 January 2006 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2576066
24 January 2006 MTSA Verification · Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2572659
24 January 2006 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2575095
21 January 2006 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2570452
15 January 2006 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2567151
15 January 2006 Type not recorded
No type recorded · USCGC SAPELO (WPB 1314) · USCG Southeast District (CGD-SE) · Activity 2568785
19 December 2005 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2553702
13 April 2005 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2333129
9 September 2004 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2192414
25 August 2004 Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 2178044
22 August 2004 Annual Inspection
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 2172644
22 August 2004 Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 2172822
18 August 2004 Annual Inspection
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 2172011
17 August 2004 Annual Inspection
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 2168483
17 August 2004 MTSA Verification
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 2168576
11 August 2004 Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 2165011
29 July 2004 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2149103
20 March 2004 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 2027854
19 February 2004 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 2008945
19 November 2002 Administrative Inspection
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1717937
11 September 2002 Liferaft Servicing
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1674242
4 June 2002 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1626221
8 December 1999 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 502115
3 November 1999 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 21411
8 April 1999 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 209508
8 April 1999 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 757331
27 September 1993 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 10276
22 June 1993 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 122745
14 July 1992 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 130485
23 October 1991 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 668659

Deficiency record · 22

07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 11 January 2026 No resolution recorded
FIRE EXTINGUISHING APPLIANCES IN NEW AND EXISTING PASSENGER SHIPS AND CARGO SHIPS SHALL BE KEPT IN GOOD ORDER AND AVAILABLE FOR IMMEDIATE USE AT ALL TIMES DURING THE VOYAGE. PSCO OBSERVED A LEAK IN THE FIRE MAIN, LOCATED WITHIN THE ENGINE ROOM. SOLAS (60) CH. 2 // 66 17AC
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 30 March 2023 Resolved
A towing vessel subject to this subchapter and choosing the Coast Guard inspection option, or required to have the Coast Guard inspection option, must undergo an annual inspection within 3 months before or after the COI anniversary date. VSL must undergo an Annual inspection before it can operate. 46CFR137.200
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 July 2023
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 8 April 2021 Resolved
Electrical system and equipment must function properly and minimize system failures and fire and shock hazards. The starboard generator cable sheathing must go through connector.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 May 2021
Resolved 2 November 2021
Resolution: starboard generator cable sheathing is installed correctly through connector.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 9 March 2021 Resolved
All towing vessels must be operated in a manner that minimizes the risk of down-flooding and progressive flooding. In addition, the master must ensure that all hatches, doors, and other openings designed to be watertight or weathertight function properly. All four doors on the main deck, both port and starboard side, did not close or seal properly. When closed, daylight is seen throughout the door. The vessel shall conduct a hose test of at least 30 psi on door in the presence of a marine inspector. 46 CFR 140.610(a)&(b
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 8 April 2021
Resolution: Attended vessel and witnessed satisfactory water hose test on doors with no water intrusion.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 9 March 2021 Resolved
A remote shut-off valve must be fitted on any fuel line that supplies fuel directly to a propulsion engine or generator so that it stops the flow of fuel in the event of a fire or break in the line. Both shut-off valves on the vessel's fuel day tank that services both generators and main engines do not close completely. 46 CFR 143.260(b)
Condition: Improper Installation
Action required: 30 - Ship detained
Resolved 8 April 2021
Resolution: Witnessed satisfactory test of remote fuel shut off valve.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 9 March 2021 Resolved
Machinery systems must be designed and maintained to provide for the safe operation of the towing vessel and safety of persons on board. The vessel's steering gear showed signs of significant lack of maintenance and wastage. Specifically, the system's rudder stock quadrant wire-rope cables (port and starboard) were severely wasted, had multiple fishhooks and broken strands. This condition compromises the steering gear and the vessel's ability to safely maneuver. 46 CFR 143.205(b)
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 8 April 2021
Resolution: Wire-rope cable and accessories replaced with new. Witnessed succesful steering test.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 9 March 2021 Resolved
Electrical systems and equipment must function properly and minimize system failures and fire and shock hazards. (a) Individual circuit breakers on switchboards and distribution panels must be labeled with a description of the loads they serve. Labels required for power distribution system, switchboards and generators. (b) The port side generator connection box is unbolted and unsecured. (c) The starboard generator cable sheathing must go through connecter. Currently, three individual wires go through the connector. (d) A receptacle box was found broken and improperly installed below the bridge operating station on the port side. The electrical box was found without a cover, broken, and with a multi-plug with various equipment installed. This creates a fire hazard and risk of electrical shock for the crew. (e) A battery was found to be installed in-way-of the engine room workbench without a cover and was not secured. (f) Ground detector meter on switchboard is not working. (g) Multiple hot and neutral wires were found to be reversed on all receptacles. h) Port air compressor motor electrical connection box connector was loose and disconnected.
Action required: 30 - Ship detained
Resolved 8 April 2021
Resolution: All issues resolved with exception STBD generator cable sheathing. Wrote new def with 30 days to resolve.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 9 March 2021 Resolved
The hailing port of the vessel must be marked on some clearly visible exterior part of the stern of the vessel. Vessel must display the correct hailing port of San Juan, PR as per Certificate of Documentation.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 March 2021
Resolved 8 April 2021
Resolution: Hailing port changed.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 9 March 2021 Resolved
The owner or managing operator must implement a health and safety plan that complies with this part and includes record keeping procedures. The owner, managing operator, or master must ensure that all persons on board a towing vessel comply with the health and safety plan. Current plan contents are copied directly from the CFR. Health and safety plan must be specific for the vessel and fleet.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 March 2021
Resolved 2 November 2021
Resolution: health and safety plan is stored electronically and specific to the vessel/fleet.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 9 March 2021 Resolved
A towing vessel must be equipped with an Automatic Identification System capable of providing the vessel information. Vessel current AIS is not displaying the current draft and correct length.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 March 2021
Resolved 8 April 2021
Resolution: AIS displaying correct info.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 9 March 2021 Resolved
All towing vessels must meet the communications requirements of 33CFR part 26. Vessel's current FCC Vessel Bridge to Bridge Safety Radiotelephony Certificate must display the correct gross tonnage.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 March 2021
Resolved 12 March 2021
Resolution: Company provided cert. with correct Gross Tonnage.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 9 March 2021 Resolved
Each towing vessel must have a fire-detection system installed to detect engine room fires. Fire detection system on vessel is not approved under 46 CFR Subchapter M. Owner must provide letter stating compliance with subchapter M from professional engineer.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 March 2021
Resolved 12 March 2021
Resolution: Company provided PE letter for fire detection system Subchapter M compliance.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 9 March 2021 Resolved
Portable fire extinguishers must be inspected, maintained, and tested in accordance with Chapters 7 and 8 of NFPA 10. The fire extinguisher in pilothouse is under charged.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 March 2021
Resolved 8 April 2021
Resolution: Fire extinguisher properly charged.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 March 2021 Resolved
Piping and machinery components that exceed 220 °C (428 °F), including fittings, flanges, valves, exhaust manifolds, and turbochargers, must be insulated. Measures must be in place to prevent flammable or combustible liquid piping leaks from coming into contact with these components. Stbd main turbo charger lagging not installed.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 March 2021
Resolved 8 April 2021
Resolution: Lagging installed properly.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 9 March 2021 Resolved
The following systems must be equipped with gauges at the machinery location: auxiliary generator engine lubricating oil pressure, auxiliary generator engine RPM, and generator engine cooling water temperature. The vessel is missing the required gauges on its generators and switchboards.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 9 March 2021
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 9 March 2021 Resolved
The master must ensure that all lifesaving equipment is properly maintained and ready for use at all times. Stbd life raft painter was not connected correctly.
Action required: 10 - Deficiency Rectified
Resolved 9 March 2021
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 21 January 2021 Resolved
The owner and managing operator must ensure that the towing vessel is in compliance with this subchapter and other applicable laws and regulations at all times. The vessel EL MORRO is a non-TSMS towing vessel, therefore not required a Safety Management System (SMS) per regulation. Sector San Juan has found the below deficiencies to be objective evidence that serious substandard conditions have not been pro-actively managed by the vessel's owner/operator, leading to a lack of safety culture on board the vessel.
Action required: 30 - Ship detained
Resolved 10 February 2021
Resolution: Company conducted repairs and training regarding all deficiencies issued on 21 JAN 2020. CG MI attended and witness repairs and training.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 21 January 2021 Resolved
All towing vessels must be operated in a manner that minimizes the risk of down-flooding and progressive flooding. In addition, the master must ensure that all hatches, doors, and other openings designed to be watertight or weathertight function properly. All four doors on the main deck, both port and starboard side, did not close or seal properly. When closed, some dogs did not touch the strike plate, while others maintained a half inch gap from the strike plate. Daylight is seen from the door when closed, and the gasket does not create an adequate seal.
Action required: 30 - Ship detained
Resolved 10 February 2021
Resolution: Repairs and replacements to all watertight doors and openings were conducted.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 21 January 2021 Resolved
Each space where the crew may be quartered or normally employed must have at least two means of escape. The engine room emergency escape hatch was seized in the closed position and cannot be opened in case of emergency without a tool. This situation presents an unsafe condition to the crew. Furthermore, items in the galley space are blocking both exits, creating an unsafe egress hazard in an emergency situation.
Action required: 30 - Ship detained
Resolved 10 February 2021
Resolution: All emergency escape routes were cleared and freed. Training was conducted regarding the importance and function of emergency espace routes.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 21 January 2021 Resolved
The master must ensure that all hatches, doors, and other openings designed to be watertight or weathertight function properly. All portholes showed signs of water intrusion. The starboard side door on the bridge showed severe wastage at the bottom of the door frame. The wastage appeared to be repaired with an unknown epoxy type product which was easily broken while tapping with an inspection hammer.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 February 2021
Resolved 10 February 2021
Resolution: Epoxy was removed and wasted metal cout out. Inserts were fit and welded in place.
Electrical › Electric Generation Source (service) › Generator
Issued 19 November 2002 Resolved
Repair/replace slow speed coupling for the #1 steam turbine generator.
Condition: Unknown
Due 30 November 2002
Resolved 30 November 2002
Resolution: Repairs completed to the slow speed coupling on the #1 steam turbine generator. Repairs witness and approved by ABS Jacksonville.
Engineering › Steering Gear System
Issued 4 June 2002 Resolved
Vessel lost steering while transiting the port of Aguirre, Puerto Rico
Condition: Unknown
Due 25 June 2002
Resolved 25 June 2002
Resolution: Cleared by Inspector.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.