Records from 2003 to 2026. Most recent: inspection, 13 March 2026.
Inspection history · 22
13 March 2026
In-Service Inspection · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8326728
15 August 2024
ACP Periodic Oversight · MTSA/ISPS Verification · Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7948342
12 April 2024
Damage Survey · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7894488
12 April 2024
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7896465
12 July 2023
ACP Annual Oversight · MTSA/ISPS Verification · Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7701002
7 July 2023
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7803382
2 August 2022
Annual Inspection · ACP Annual Oversight
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7490963
25 May 2021
ACP COI Oversight · Re-Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7206905
31 March 2021
Drydock Exam · Deficiency Check · ACP Drydock Oversight
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7166400
2 March 2021
Type not recorded
No type recorded · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7158151
26 February 2021
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7147129
11 August 2020
Annual Inspection · ACP Annual Oversight
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7031453
15 August 2019
Deficiency Check · In-Service Inspection · Periodic Inspection · ACP Periodic Oversight
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6784408
9 May 2018
Deficiency Check · Annual Inspection · In-Service Inspection · ACP Annual Oversight
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6405168
7 May 2018
Administrative Inspection
Administrative · Commandant (CG-5P-TI) · Activity 6408169
3 November 2017
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6300262
7 August 2017
Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6233118
24 May 2017
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6131873
1 July 2016
Drydock Exam · ACP Periodic Oversight
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 5941112
23 June 2016
Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5906742
23 May 2016
Deficiency Check · COI Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5869199
8 February 2016
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5821257
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 15 August 2024
Resolved
Periodic safety test must be conducted annually to demonstrate the proper operation of the primary and alternate controls alarms, power sources, transfer override arrangements, interlocks and safety controls. In lieu of testing over speed trips on Coffin Feed Water pumps annually, the overspeed device needs to be tested by the manufacturer on a 5 year cycle.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 August 2024
Resolved 29 August 2024
Resolution: Received updated certifications for overspeed units.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 12 April 2024
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Ships hull was breached by an unattended sand blasting machine in the starboard healing tank resulting in a hole approximately 1/2" by 4" 15'-20' below the ship's waterline. 74SOLAS2014 I/11 60ac
Action required: 60 - Rectify deficiencies prior to movement
Due 15 April 2024
Resolved 22 April 2024
Resolution: Received ABS Class Survey Report attesting to satisfactory permanent repair to damage.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 13 July 2023
Resolved
The liferaft painter system shall provide a connection between the ship and the liferaft and shall be so arranged as to ensure that the liferaft when released and, in the case of an inflatable liferaft, inflated is not dragged under by the sinking ship. MI observed STBD side liferafts incorrectly arranged for a float-free deployment.
SOLAS 74 (Cons 14)
III Reg 31.1
LSA Code 2.1.6.1
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 19 July 2023
Resolution: Received email
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 13 July 2023
Resolved
An illuminated magnetic steering compass, mounted in a binnacle, that can be read at the vessel's main steering stand. Magnetic compass was not illuminated and the heading could not be read from the main conning position.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 19 July 2023
Resolution: Received email
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 11 August 2020
Resolved
Before the ship leaves port and at all times during the voyage, all life saving appliance shall be in working order & ready for immediate use. Provide and put in proper place, all lifesaving equipment.
Condition: Invalid
Action required: 705 - Other - as specified
Due 30 September 2020
Resolved 11 September 2020
Resolution: Def cleared
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 11 August 2020
Resolved
Before the ship leaves port and at all times during the voyage, the medical chest shall be stocked with required medicines. Provide proper medicine chest prior to activation.
Condition: Invalid
Action required: 705 - Other - as specified
Due 30 September 2020
Resolved 11 September 2020
Resolution: Def Cleared
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 11 August 2020
Resolved
The drills of the crew shall take place w/in 24 hrs of the ship leaving a port if more than 25% of the crew have not participated in abandon ship & fire drill on board that particular ship in the previous month. Vessel must perform fire, security & abandon ship drills in the presence of a CG marine inspector prior to activation
Condition: Invalid
Action required: 705 - Other - as specified
Due 30 September 2020
Resolved 11 September 2020
Resolution: Def Cleared
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 15 August 2019
Resolved
The drills of the crew shall take place with in 24HR of the ship leaving a port if more than 25% of the crew have not participated in abandon ship and fire drills on board that particular ship in the previous month. Vessel must perform fire, security, and abandon ship drills in the presence of a CG MI. Prior to activation.
Action required: 705 - Other - as specified
Resolved 20 September 2019
Resolution: MI witnessed satisfactory Fire, Security, and abandon ship drills. ALL SAT.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 15 August 2019
Resolved
Before the ship leaves port and at all times during the voyage, all lifesaving appliance shall be in working order and ready for immediate use. Provide and put in place all lifesaving appliances. Prior to activation.
Action required: 705 - Other - as specified
Resolved 20 September 2019
Resolution: MI inspected all lifesaving appliances IAW vessel plan. ALl appliances installed and in in good working order.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 15 August 2019
Resolved
All ship's irrespective of size, shall have nautical charts and publications to plan and display the ship's route for intended voyage and to plot and monitor positions throughout the voyage. Vessel shall provide charts and publication for intended voyages. Prior to activation.
Action required: 705 - Other - as specified
Resolved 20 September 2019
Resolution: MI examined and verfified all updated charts and publications. ALL SAT.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 15 August 2019
Resolved
Contracting governments undertake for each of its ships shall be sufficiently and effectively manned. Provide full compliment of licensed officers and crew as per the COI. Prior to activation.
Action required: 705 - Other - as specified
Resolved 20 September 2019
Resolution: MI verfied officers and crew licences and endorsements. Vessel is manned IAW COI. ALL SAT.
Construction/Loadline › Structures › Deck Plating
Issued 10 May 2018
Resolved
Crop and renew wasted area weather deck port side of bridge also include pyro locker mounts.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 June 2018
Resolved 7 June 2018
Resolution: 24 x 24" insert installed, all sat.
Construction/Loadline › Structures › Superstructure
Issued 10 May 2018
Resolved
Repair fractures on upper ramp shive housing
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 June 2018
Resolved 7 June 2018
Resolution: Small fractures ground out and rewelded, all sat
Electrical › Electric Supply System (service) › Cable
Issued 10 May 2018
Resolved
repair ramp electrical cover on lamp and brackets P&S Side
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 June 2018
Resolved 7 June 2018
Resolution: Recepticales repalced in kind, all sat.
Fire Fighting › Miscellaneous Items › A Class Division Penetrations
Issued 10 May 2018
Resolved
Install self closing mechanism on galley door.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 June 2018
Resolved 7 June 2018
Resolution: Self colosing mechanism installed, all sat.
Construction/Loadline › Structures › Superstructure
Issued 10 May 2018
Resolved
Repair vent on top of crane house #1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 June 2018
Resolved 7 June 2018
Resolution: Swing bolt and gasktet replaced in kind, all sat.
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 10 May 2018
Resolved
Repair/Replace gasket and missing bolts on #8 deep F/O tank cover
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 June 2018
Resolved 7 June 2018
Resolution: Broken studs and gaskets replaced, all sat.
Navigation › Piloting/Steering › Marine Charts
Issued 10 May 2018
Resolved
Provide Navigational chatrs/pubs.
Action required: 17 - Rectify deficiencies prior to departure
Due 11 May 2018
Resolved 22 August 2019
Operations/Management › Drills/Instruction › Abandon Ship
Issued 10 May 2018
Resolved
Demonstrate satisfactory drills.
Action required: 17 - Rectify deficiencies prior to departure
Due 11 May 2018
Resolved 22 August 2019
Engineering › Steam Boiler (propulsion) › Valve, Relief
Issued 10 May 2018
Resolved
Both boiler steam drum pilot safety valves missing easing gear.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 10 May 2018
Resolved 7 June 2018
Resolution: Deficiency turned over to ABS as OSR.
Navigation › Piloting/Steering › Marine Charts
Issued 24 May 2017
Resolved
Provide updated charts and publications prior to sailing
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 August 2017
Resolution: Charts and publications were provided.
Communications › Alarms/Indicators › Rudder Angle Indicator
Issued 24 May 2017
Resolved
Prove proper operation of RPM indicator and rudder angle indicator.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 August 2017
Resolution: Proper operation was observed.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 24 May 2017
Resolved
Provide vaild hospital medications and supplies.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 7 August 2017
Resolution: Hospital supplies were provided.
Accommodation/Occupational Safety › Occupational Safety › Hand Grab
Issued 24 May 2017
Resolved
Repair pilot handrail on starboard side.
Action required: 705 - Other - as specified
Due 24 June 2017
Resolved 22 June 2017
Resolution: Handrail was repaired.
Lifesaving › Inflatable Liferafts › Markings
Issued 24 May 2017
Resolved
Provide launching instructions for port side liferaft #16DK + k200102
Action required: 705 - Other - as specified
Due 24 June 2017
Resolved 22 June 2017
Resolution: Launching instructions were provided.
Deck/Cargo › Holds/Tanks › Scuttle
Issued 24 May 2017
Resolved
Excape Hatch on port side "B" deck at frame 59 needs to be made watertight.
Due 24 June 2017
Resolved 22 June 2017
Resolution: Hatch was made watertight.
Deck/Cargo › Holds/Tanks › Scuttle
Issued 24 May 2017
Resolved
Excape hatch at frame 127 centerline needs a new seal.
Action required: 705 - Other - as specified
Due 24 June 2017
Resolved 22 June 2017
Resolution: Newe seal was provided.
Deck/Cargo › Holds/Tanks › Scuttle
Issued 24 May 2017
Resolved
Emergency escape hatch in #2 hold near fire station #23 needs a new handle.
Action required: 705 - Other - as specified
Due 24 June 2017
Resolved 22 June 2017
Resolution: New handle was provided.
Engineering › Pressure Vessel › Relief Valve
Issued 24 May 2017
Resolved
Provide satisfactory evedence of relif valve testing for relief valves throughout the engineroom.
Action required: 705 - Other - as specified
Due 24 June 2017
Resolved 22 June 2017
Construction/Loadline › Hull › Hull Plating
Issued 24 May 2017
Resolved
Provide gauging report for hull in the vicinity of overboard piping on the portside of the engineroom as identified.
Condition: Improper/Lack of Maintenance
Due 24 June 2017
Resolved 8 June 2017
Operations/Management › Drills/Instruction › Abandon Ship
Issued 23 May 2016
Resolved
Demonstrate satisfactory fire and abandon ship drills prior to getting underway.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 25 June 2016
Resolved 23 June 2016
Resolution: MIs witnessed satisfactory abandon ship drill.