Records from 1998 to 2016. Most recent: inspection, 21 March 2016.
Inspection history · 23
21 March 2016
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 5837301
1 July 2012
Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4362645
14 February 2012
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4243907
12 February 2012
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4242833
8 December 2011
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4202919
2 August 2011
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4099205
20 January 2011
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3929513
19 January 2011
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3927317
8 December 2009
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3646417
7 December 2009
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3645756
5 December 2009
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3645098
16 October 2002
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1690014
28 July 2002
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1652991
4 February 2002
In-Service Inspection · Annual Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1484049
17 June 2001
Type not recorded
No type recorded · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 291059
9 June 2000
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 5596
24 April 2000
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 277193
22 April 2000
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 277149
13 January 2000
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 273613
24 November 1999
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 434991
6 October 1999
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 433541
14 January 1999
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 424443
30 November 1998
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 423112
Fire Fighting › Fixed Fire Detection System › Smoke Detectors
Issued 21 March 2016
Resolved
0715 - Detection - Any required fixed fire detection and fire alarm system shall be capable of immediate operation at all times. A smoke detector located over the #3 generator was found inoperable due to faulty wiring. 74 SOLAS (97 Cons Ed) Ch II-2 Reg 13.1.1 Code 10b/c
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 21 March 2016
Resolved 21 March 2016
Resolution: Corrected on the spot. Faulty Smoke detector was replaced. Satisfactory operation of the new detector witnessed by PSCO and attending Flag State Surveyor.
Navigation › Collision/Grounding Avoidance › Radar
Issued 14 February 2012
Resolved
1530 - Each vessel of 10,000 GT or more must have a second marine radar system. Vessel has inoperable X-Band Radar. 33CFR164.37
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 7 March 2012
Resolution: Tech report regarding proper operation of the X-Band (3cm) radar has been received by Sector San Juan Port State Control. Deficiency is cleared to the satisfaction of USCG Port State Control Officer.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 14 February 2012
Resolved
1730 - Condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations. Re-Circulation valve on the Oily Water Separator found with hole and temporary patch. 74SOLAS (CONS09)I/11A Prior to next US port after sailing foreign.
Action required: 705 - Other - as specified
Resolved 23 April 2012
Resolution: Class report received. Repair corrected to the satisfaction of Class (Germanischer Lloyd).
Operations/Management › Casualty Reporting/Post-Casualty Actions › Report of Potential Vessel Casualty
Issued 14 February 2012
Resolved
33CFR164.53(b) Vessel secondary radar was not operable, vessel failed to request deviation letter to the COTP.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 February 2012
Resolved 29 February 2012
Resolution: Vessel requested LOD after it was discovered that the radar was inoperable and LOD letter was drafted.
Fire Fighting › Fire Main › Condition
Issued 20 January 2011
Resolved
PSCO found temporary repair on the fire main next to the #4 cargo hold on the port side of the vessel. Chief mate informed the PSCO that the new section of the fire main has been ordered and provided a copy of the requisition. Action taken: 70(a)(c)
Condition: Damaged By Earlier Event
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 28 March 2011
Resolution: Received class report stating that the section of the fire main has been replaced, has been tested and is working properly.
Engineering › Diesel Engine (auxiliary) › Gear/Clutch Starter (hydraulic)
Issued 8 December 2009
Resolved
Emergency generator did not start using the hydraulic starter at least 30 minutes after the battery starter was used IAW 74 SOLAS(04 CONSOLIDATED) PART D CH II-1/44.2. Vessel shall rectify deficiency prior to departure to the satisfaction of the Coast Guard.
Due 9 December 2009
Resolved 8 December 2009
Resolution: The crew fixed the hydraulic starter prior to the US Coast Guard leaving the vessel.
Unknown
Issued 24 November 1999
Resolved
ALARM PANAL FOR #2 STEERING PUMP IS OOC.(PART IS ON ORDER)TESTED SYSTEM.PUMPS WILL STILL SWITCH OVER IN STAND BY MODE,LIGHT & ALARM "CONTROLBOARD"NOT OPERATIONAL FOR #2 PUMP ONLY.PUMP & STEERING SYSTEM SAT.WITH FULLCONTROL FROM NFU & F/U.@ BRIDGE.
Condition: Unknown
Due 13 January 2000
Resolved 13 January 2000
Electrical
Issued 30 November 1998
Resolved
REPAIR NO. 2 STEERING TANK LOW LEVEL ALARM TO INDICATE PROPERLY ON THE BRIDGE. CORRECT TO THE SATISFACTION OF CLASS SOCIETY.
Condition: Unknown
Due 14 January 1999
Resolved 14 January 1999
Engineering
Issued 30 November 1998
Resolved
REPLACE INSULATOR BLANKET LUBE OIL FOR STEAM HEATER IN ENGINE ROOM BY CENTRIFUGAL PURIFIER. CORRECT TO THE SATISFACTION OF CLASS SOCIETY.
Condition: Unknown
Due 14 January 1999
Resolved 14 January 1999