This record may be incomplete: the most recent inspection recorded for this vessel was 27 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
798 - Regulatory (Subpart C or D), Gross Ton
798 - Regulatory (Subpart C or D), Net Ton
Maury page id
psix-48858
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
The Coast Guard recorded this vessel and the following in the same
inspection activity — normally a tug and the barges in its tow. Only barges and towing
vessels are in this archive, so any other vessel type in the same activity does not
appear here: these lists are a floor, not a complete manifest.
Remove furnace cover to allow internal inspection.
Condition: Unknown
Due 24 April 1998
Resolved 24 April 1998
Deck/Cargo
Issued 24 April 1998Resolved
Prove proper operation of thermal fluid heater and conduct all safety shutdowns.
Condition: Unknown
Due 24 April 1998
Resolved 24 April 1998
Construction/Loadline
Issued 7 May 1996Resolved
Repair and/or renew as orginal to the satisfaction of attending marine inspector. Damage to chords, trusses and braces located in #2 starboard wing void.
Condition: Unknown
Due 7 June 1996
Resolved 10 May 1996
Fire Fighting
Issued 25 July 1990Resolved
PRIOR TO OPERATING THERMAL FLUID HEATER, PROVIDE OPERATING INSTRUCTIONS FORFIXED CO2 FIRE EXTINGUISHING SYSTEM.
Condition: Unknown
Due 25 July 1990
Resolved 25 July 1990
Fire Fighting
Issued 25 July 1990Resolved
PRIOR TO OPERATING THERMAL FLUID HEATER, SERVICE FIXED CO2 FIRE EXTINGUISHING SYSTEM.
Condition: Unknown
Due 25 July 1990
Resolved 25 July 1990
Electrical
Issued 25 July 1990Resolved
REPAIR 2 ELECTRICAL JUNCTION BOXES ON BULKHEAD AFT SIDE THERMAL FLUID HEATER HOUSE.
Condition: Unknown
Due 25 July 1990
Resolved 25 July 1990
Construction/Loadline
Issued 25 July 1990Resolved
MAKE PERMANENT REPAIRS IN WAY OF FRACTURES IN THE FOLLOWING LOCATIONS: 1.PORT SIDE HEAD LOG WRAPPER. 2. DECK KNUCKLE AT AFT DOUBLE BIT. 3. WRAPPER PLATE, AFT STARBOARD CORNER, TOP EDGE.
Condition: Unknown
Due 25 July 1990
Resolved 25 July 1990
Deck/Cargo
Issued 11 August 1987Resolved
REPLACE OIL TRANSFER HOSE NO LATER THAN COMPLIANCE DATE.
Condition: Unknown
Due 11 August 1987
Resolved 11 August 1987