Records from 2005 to 2026. Most recent: inspection, 2 February 2026.
Inspection history · 50
2 February 2026
Vessel Attendance · Deficiency Check · Internal Structural Exam · COI Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8297239
19 September 2025
Administrative Inspection · Annual Inspection · Internal Structural Exam · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8237465
6 September 2025
In-Service Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8243795
13 May 2025
Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8137122
12 May 2025
In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8133634
26 September 2024
Internal Structural Exam · Deficiency Check · Annual Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8009458
18 March 2024
Administrative Inspection · Deadweight Survey · Plan Review "T" Boat
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7888438
20 December 2023
Plan Review "T" Boat · Examination of Repairs · Internal Structural Exam · In-Service Inspection · Hull Examination
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7841266
8 September 2023
Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7775827
27 May 2023
Examination of Repairs · Damage Survey · Administrative Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7698716
10 January 2023
Examination of Repairs · Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7618961
22 October 2022
Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7581857
20 September 2022
Administrative Inspection · Annual Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7562811
22 August 2022
Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7541096
3 March 2022
Liferaft Servicing
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7409705
15 September 2021
In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7312421
2 September 2021
Deficiency Check · Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7305824
1 September 2021
Damage Survey
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7302771
19 August 2021
Administrative Inspection
Administrative · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7291460
28 July 2021
Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7270786
26 July 2021
Deficiency Check · COI Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7265522
13 July 2021
Deficiency Check · Examination of Repairs · Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7257386
6 March 2021
In-Service Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7151225
4 January 2021
In-Service Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7124005
14 April 2020
Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6939209
5 November 2019
Annual Inspection · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6849137
2 October 2019
Deficiency Check · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6826873
15 September 2019
Damage Survey · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6813512
12 September 2019
Administrative Inspection · Damage Survey · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6811109
17 August 2019
Administrative Inspection · Damage Survey
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6788805
17 August 2019
Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6867576
28 February 2019
Internal Structural Exam · Hull Examination · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6634193
6 November 2018
Deficiency Check · In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6576036
1 November 2018
Annual Inspection · Administrative Inspection · Deficiency Check · DAPI Audit · Internal Structural Exam
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6571390
6 May 2018
Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6413701
2 May 2018
In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6405169
16 April 2018
In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6393319
12 December 2017
Administrative Inspection
Administrative · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6325018
3 November 2017
Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6302570
23 October 2017
Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6294083
20 October 2017
Plan Review "T" Boat
Administrative · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6291768
16 October 2017
DAPI Audit · Annual Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6289051
10 October 2017
In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6289554
28 April 2017
Damage Survey · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6134844
28 April 2017
Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6136536
31 January 2017
Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6080001
26 January 2017
In-Service Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6077952
22 September 2016
Internal Structural Exam · COI Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5998785
29 April 2016
Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5867619
13 January 2016
Deficiency Check · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5797101
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 2 February 2026
Resolved
Piping, valves, and fittings in a fire main system must comply with subpart G, part 182, of this chapter. A pin hole leak was identified in the fire main system aft of the inboard MDE at the first vertical section of piping. Marked with blue sharpie.
46 CFR 181.310(b)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 February 2026
Resolution: Fire main piping repaired. Tested sat.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 2 February 2026
Resolved
All escape hatches and other emergency exits used as means of escape must be marked on both sides in clearly legible letters at least 50 millimeters (2 inches) high: “EMERGENCY EXIT, KEEP CLEAR”. Forward engine room escape hatches were not properly marked on both sides of the emergency exit.
46 CFR 185.606
Action required: 701 - Prior to carriage of passengers/cargo
Due 16 February 2026
Resolved 20 February 2026
Resolution: Emergency exits were properly labeled.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 2 February 2026
Resolved
A vessel must carry one floating waterlight, unless it is limited to daytime operation, in which case no floating waterlight is required. Floating waterlight was found inoperable. Vessel is restricted to daylight hours only until floating waterlight is fixed or replaced.
46 CFR 180.70(d)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 February 2026
Resolved 20 February 2026
Resolution: New floating waterlight was installed.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 2 February 2026
Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date:(1) Charts of large enough scale to make safe navigation possible;(2) U.S. Coast Pilot or similar publication;(3) Coast Guard Light List; (4) Tide tables; and(5) Current tables. Vessel did not have updated electronic navigational charts or publications.
46 CFR 184.420
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 February 2026
Resolved 20 February 2026
Resolution: Charts and pubs were updated.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 19 September 2025
Resolved
When installed in a machinery space, paint locker, a space containing flammable liquid stores, or a space with a fuel tank, a fixed carbon dioxide system must meet the following requirements.(i) The quantity of carbon dioxide in kilograms (pounds) that the system must be capable of providing to a space must not be less than the gross volume of the space divided by the appropriate factor given in Table 181.410(f)(4)(i). If fuel can drain from a space being protected to an adjacent space or if the spaces are not entirely separate, the volume of both spaces must be used to determine the quantity of carbon dioxide to be provided. The carbon dioxide must be arranged to discharge into both such spaces simultaneously. Engine room port side forward bulkhead has multiple holes from missing hardware rendering the space not vapor tight exceeding the CO2 volume available Make the port engine room vapor tight.
46 CFR 181.410 (f)(4)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 September 2025
Resolution: Holes sealed with fire resistent sealant and bolts with washers.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 19 September 2025
Resolved
An adult life jacket must be provided for each person carried on board a vessel. Vessel only equipped with 142 serviceable Life jackets. Vessel is restricted to 142 total persons on board. Vessel requires additional 14 life jackets to meet total allow persons on board.
46 CFR 180.71
46 CFR 180.71
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 October 2025
Resolved 22 September 2025
Resolution: Life jackets provided
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 19 September 2025
Resolved
Except on a vessel limited to daytime operations, the compass must be illuminated. Magnetic compass does not have illumination. Repair or replace magnetic compass light. Vessel is restricted to daylight operation until repair or replacement to the satisfaction of the attending marine inspector.
46 CFR 184.402 (c)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 October 2025
Resolved 22 September 2025
Resolution: New illuminated compass installed.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 26 September 2024
Resolved
On a vessel of not more than 19.8 meters (65 feet) in length carrying more than 49 passengers, and on a vessel of more than 19.8 meters (65 feet) in length, the minimum capacity of the fire pump must be 189 liters (50 gallons) per minute at a pressure of not less than 414 kPa (60 psi) at the pump outlet. Fire pump pressure gauge is indicating less than 65 psi at the discharge side. Ensure fire pump reaches 65 psi no latter than 30SEP2024.
Action required: 705 - Other - as specified
Resolved 30 September 2024
Resolution: Tested fire pump. Successfully was able to reach more than 60psi; all sat.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 26 September 2024
Resolved
Each connection to a conductor or terminal part of a conductor must be made within an enclosure. 24 volt connections in port and stbd engine rooms is not within an enclosure. 46CFR183.340
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 1 October 2024
Resolution: 24 volt lugs protected
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 8 September 2023
Resolved
On a vessel of more than 65' in length, the minimum capacity of the fire pump must be 50 gallons per minute at a pressure of not less than 60 psi at the pump outlet. The engine-driven fire pump only achieved 30 psi while testing the upper fire-hose station. Prove proper operation to the attending CG Marine Inspector (MI).
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 September 2023
Resolution: Fire pump replaced and retested.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 8 September 2023
Resolved
On a vessel of at least 26' in length, a visual and audible alarm must be provided at the operating station to indicate a high water level. The starboard jet room high level alarm only intermittently produced a visual and audible alarm. Restore functionality of specified high level alarm and prove proper operation to the attending CG MI.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 September 2023
Resolution: Alarm restored and retested.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 8 September 2023
Resolved
All machinery and equipment must be installed and
maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure and personnel injury. Sea suction hose for the port, aft engine was chafed in multiple locations. Replace hose.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 September 2023
Resolution: Sea suction hose replaced.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 8 September 2023
Resolved
A hatch exposed to the weather must be watertight. The glue for the gasket on the port jet room watertight hatch failed causing a lack of watertight integrity. Restore gasket.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 September 2023
Resolution: Glue and gasket restored.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 8 September 2023
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 September 2023
Resolution: Repaired 24 adult lifejackets and 1 child. Vessel has two spare adult PFDs.
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 8 September 2023
Resolved
Electrical equipment on a vessel must be installed and maintained to provide services necessary for safety under normal and emergency conditions. Inverter for the public address emergency source of power was producing an unknown alarm and squeal. Identify alarm and restore inverter to normal operating condition.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 September 2023
Resolution: Inverter replaced. PA system retested using inverter.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 8 September 2023
Resolved
The master of the vessel shall ensure that each EPIRB is tested monthly. The EPIRB test shall be logged or otherwise documented. Vessel's logbook for the 2023 operating season was missing EPIRB tests for the months of April, June and July. Provide training to masters to ensure proper log keeping.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 September 2023
Resolved 11 September 2023
Resolution: Training provided.
09 - Working and Living Conditions › 091 - Living Conditions › Sanitary Facilities
Issued 8 September 2023
Resolved
A vessel with installed toilet facilities must have a marine sanitation device that complies with 33 CFR part 159. Aft MSD holding tank on board had pinholes and corrosion compromising the integrity of the tank. In addition, the discharge connection on the port side of the holding tank was compromised. Several drops were observed accumulating around the connection. Restore tank and connections to original condition prior to 2024 operating season.
Action required: 705 - Other - as specified
Resolved 29 December 2023
Resolution: Sewage tank and fittings were replaced with new in kind.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 20 September 2022
Resolved
Watertight integrity.
(a) A hatch exposed to the weather must be watertight...
The flush deck hatch for the starboard side forward peak void does not dog down watertight. Properly repair quick closing hatch cover so it will dog down watertight. 46 CFR 179.360
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 October 2022
Resolved 21 October 2022
Resolution: New watertight hatch installed and dogs properly.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 20 September 2022
Resolved
Lighting fixtures.
(a) Each lighting fixture globe, lens, or diffuser must have a guard or be made of high strength material, except in an accommodation space, radio room, galley, or similar space where it is not subject to damage. Light fixture in the starboard side generator void the 110v light fixture is missing the globe. Properly repair light fixture. 46 CFR 183.410
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 October 2022
Resolved 21 October 2022
Resolution: Light globe was replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 September 2022
Resolved
Flexible hose designed for use with hose clamps may be installed with two clamps, at both ends of the of the hose. Marine Inspector observed the port side bilge pump suction hose had one hose clamp at the end of hose near pump. Install second hose clamp on bilge suction hose.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 October 2022
Resolved 21 October 2022
Resolution: Second hose clamp installed on bilge suction hose.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 20 September 2022
Resolved
Each deck where survival craft or rescue boats are stowed must be kept clear of obstructions that would interfere with the boarding and launching of the survival craft or rescue boat. Marine inspector observed a gangway stored on the bow blocking access to the life rafts. Restow gangway and securely stow gangway so that it does not impede the launching of primary lifesaving equipment.
Action required: 10 - Deficiency Rectified
Due 20 September 2022
Resolved 20 September 2022
Resolution: Gangway was restowed in a position to give access to life rafts.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 26 July 2021
Resolved
The use of wire nuts is permitted under the following conditions: Connections must be made within an enclosure and the insulated cap must be secured to prevent loosening due to vibration. #3 port side void water pump has wire nuts installed. Place spliced wires in an enclosure.
46 CFR 183.340(i)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 August 2021
Resolved 28 July 2021
Resolution: Wires were placed in enclosure.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 26 July 2021
Resolved
The discharge ends of fuel tank vent pipes must be fitted with removable flame screens or flame arresters. The flame screens must consist of a single screen of corrosion resistant wire of at least 30 × 30 mesh. The flame screens or flame arresters must be of such size and design as to prevent reduction in the net cross sectional area of the vent pipe and permit cleaning or renewal of the flame screens or arrester elements. Port side fuel tank vent was missing the required flame screen.
46 CFR 182.450(e)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 August 2021
Resolved 28 July 2021
Resolution: Flame screen has been installed.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 26 July 2021
Resolved
Each connection to a conductor or terminal part of a conductor must be made within an enclosure. Bilge high level alarm connections are not made in an enclosure.
46 CFR 183.340(g)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 August 2021
Resolved 28 July 2021
Resolution: Connections were placed in a enclosure.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 4 January 2021
Resolved
While testing both port and starboard engine room CO2 system time delays, delays failed to last the design time of delay. Repair or replace time delays and provide service report.
Action required: 17 - Rectify deficiencies prior to departure
Due 4 January 2021
Resolved 22 July 2021
Resolution: Received servicing report attesting to the repairs and satisfactory test of CO2 time delays.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 5 November 2019
Resolved
Bilge pumping system inoperable. Prove proper operation of bilge pumping system.
Action required: 17 - Rectify deficiencies prior to departure
Due 6 November 2019
Resolved 14 April 2020
Resolution: Witnessed proper operation of bilge pumping.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 5 November 2019
Resolved
No fire service report on board vessel. Provide service report for annual CO2 system servicing.
Action required: 17 - Rectify deficiencies prior to departure
Due 6 November 2019
Resolved 14 April 2020
Resolution: Received Fire service certificate.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 5 November 2019
Resolved
Provide fixed fire extinguishing system for oil fire furnace on upper deck. Vessel restricted from using furnace until cleared by attending marine inspector.
Action required: 705 - Other - as specified
Resolved 25 August 2022
Resolution: Owner installed a pre engineered fixed fire system with remote pull, alarms, and automatic shut down. Owner also installed a remote fuel shut off and manual vent closure device tested - all sat.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 5 November 2019
Resolved
Number 2 & 4 MDE missing exhaust lagging. Properly install exhaust piping lagging on all hot sections of exhaust piping.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 November 2019
Resolved 14 April 2020
Resolution: Exhaust lagging replaced.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 5 November 2019
Resolved
Number 2 MDE has excessive oi8l leak from manifold behind oil filters. Make permanent repairs to stop leaking.
Action required: 17 - Rectify deficiencies prior to departure
Due 6 November 2019
Resolved 14 April 2020
Resolution: Oil leak corrected.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 5 November 2019
Resolved
Conduct fire and man overboard drills as well as sea trials with attending CG Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Due 6 November 2019
Resolved 14 April 2020
Resolution: Witnessed satisfactroy drills.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 15 September 2019
Resolved
Repair engine guard on front of Starboard aft main engine
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 October 2019
Resolution: RCVD picture of installed engine guard all sat
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 15 September 2019
Resolved
Cover exposited exhaust piping on starboard aft main engine to prevent contact of hot piping
Action required: 10 - Deficiency Rectified
Resolved 15 September 2019
Resolution: Vessel's Crew adjusted lagging to cover all hot pipping.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 12 September 2019
Resolved
Port aft main engine overheated and siezed. Repair and prove proper operation prior to conducting passenger operations.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 September 2019
Resolution: Vessel has repaired engine, tested all sat.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 6 November 2018
Resolved
Install Carbon Dioxide gas storage warning signage as per 46 CFR 185.612 (g)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 November 2018
Resolution: Vessel has installed warning signs
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 1 November 2018
Resolved
Prove that fire pump produces 60 psi at pump outlet
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 November 2018
Resolution: Fire pump now produces 60 PSI.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 1 November 2018
Resolved
Provide Alcohol testing equipment onboard for each crew member onboard
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 November 2018
Resolution: Vessel has provided Alcohol testing equipment onboard for each crew member onboard
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 1 November 2018
Resolved
Provide a horn that produces the required dB and audibility range listed in 33 CFR 86
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 November 2018
Resolution: Vessel has repaired shipps horn
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 1 November 2018
Resolved
Repair electrical outlet on starboard side aft by bar.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 November 2018
Resolution: Vessel has repaired electrical outlet
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 1 November 2018
Resolved
Replaced chaffed battery wire coming off of the #2 engine in the port engine room
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 December 2018
Resolution: Vessel has repalced battery cable
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 November 2018
Resolved
Install batteries in a battery tray or box that are resistant to the damage from electrolyte
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 November 2018
Resolution: Vessel has installed batteries boxes.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 1 November 2018
Resolved
Provide updates for paper charts onboard
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 November 2018
Resolution: Vessel has updates charts onbaord
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 1 November 2018
Resolved
Replace all expired items in all first aid kits onboard
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 November 2018
Resolution: Vessel has replaced all expired items in the first aid kits
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 1 November 2018
Resolved
Prove proper operation of smoke detector in the center head
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 November 2018
Resolution: vessel has repiared smoke detector.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 1 November 2018
Resolved
Replace reflective tape on port aft main deck life bouy
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 November 2018
Resolution: Vessel has replaced reflective tape on port aft main deck life bouy
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 1 November 2018
Resolved
Properly mark the number and size of life jackets being storage in lockers
Action required: 705 - Other - as specified
Due 1 May 2019
Resolved 4 March 2019
Resolution: Verfied PFD stowage locations were properly marked with quantitiy and size.
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 1 November 2018
Resolved
Provide donning and using instructions for all life jackets onboard
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 November 2018
Resolution: Vessel has removed all different style lifejackets and replaced with all of the same type.
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 1 November 2018
Resolved
Vessel must conduct and log drills every month if reasonable , but at least once within a 3 month period before getting underway with passengers
Action required: 705 - Other - as specified
Due 1 April 2019
Resolved 14 March 2019
Resolution: Verified vessel conducted and logged appropriate drills. Discussed regulatory requirement to conduct and log drills.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 1 November 2018
Resolved
Fix oil leak on #2 engine inboard side
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 November 2018
Resolution: Vessel has fixed oil leak
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 1 November 2018
Resolved
Fix weather tight gasket on both engine room hatches
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 November 2018
Resolution: Vessel has repaired weather tight gaskets.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 1 November 2018
Resolved
Fix exhaust leak on #2 and #3 main engines
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 November 2018
Resolution: Vessel has fixed exhaust leak.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 1 November 2018
Resolved
Fix exhaust cooling water leak on the #2 Main engine
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 November 2018
Resolution: Vessel has fixed exhaust cooling water leak
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 1 November 2018
Resolved
Fix exhaust lagging on #1 and #3 main engine to protect all personal from hot surfaces
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 November 2018
Resolution: Vessel has fixed exhaust lagging
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 1 November 2018
Resolved
Fix or reinstall guard over all rotating equipment fuel oil pump guard is missing on all but one main engine and both port engines are miss or have damaged fly wheel guards
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 November 2018
Resolution: Vessel has fixed and repiared all guards.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 1 November 2018
Resolved
Durning next dry dock repair the 10 cracked welds in the Starboard #1 Void 3 are in the area of the aft trans. Frame at the deck on the aft side and 3 on the fwd side of the same frame and 4 cracked welds at deck fwd must frame
Action required: 705 - Other - as specified
Due 28 February 2019
Resolved 4 March 2019
Resolution: Verified all identified fractured welds were picked up.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 1 November 2018
Resolved
Prove proper operation of the port side bilge pump while being used cross connected to pump the starboard void
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 November 2018
Resolution: Vessel has repaired port bilge pump.
Construction/Loadline › Hull › Stiffener
Issued 16 April 2018
Resolved
ID'd ~10 cracked welds attaching stiffeners to plating.
Action required: 705 - Other - as specified
Due 7 May 2018
Resolved 7 May 2018
Resolution: Verified all fractured welds were picked up.
Communications › Radio Communications › EPIRB
Issued 16 October 2017
Resolved
Replace EPIRB due to expired battery
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 October 2017
Resolution: RCVD EPRIB registration cleared CG-835.
Operations/Management › Drills/Instruction › Not Conducted
Issued 16 October 2017
Resolved
Didn’t get underway or conducted drills at this time issued CG-835 to conduct drills with CG inspector prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 October 2017
Resolution: Got vessel underway to conducted drills and underway passenger safety brief, All sat. Cleared CG-835 for drills.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 10 October 2017
Resolved
Engines and power ventilation were not operating at the time of the test. Demonstrate operation of the engine and power ventilation shutdowns to the attending CG Marine Inspector. 46 CFR 181.410(b)(10) Correct at next Annual inspection.
Action required: 705 - Other - as specified
Due 1 May 2018
Resolved 20 March 2018
Resolution: Verified system as per above requirement, sat.
Fire Fighting › Fire Main › Condition
Issued 28 April 2017
Resolved
Effect repairs to the #4 engine and demonstrate full functionality of the fire main to the satisfaction of the [name withheld] 46CFR181.300 prior to carrying passengers.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 April 2017
Resolved 29 April 2017
Resolution: Witnessed proper operation of the #4 engine and fire pump. All sat.
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 31 January 2017
Resolved
Penetrations of required watertight bulkheads by rigid plastic pipes are prohibited unless the requirements of the reference are met. Provide a metallic valve adjacent to the penetration on both sides of the bulkhead or in some other manner in conformity with regulations.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 May 2017
Resolved 3 November 2017
Resolution: Vessel has installed required valves on bulkhead