ST HERMAN

ST HERMAN is a 1997 passenger vessel (inspected). The Coast Guard has recorded 83 inspections since 1997, most recently in January 2026, along with 115 deficiencies and 4 casualty investigations between 2006 and 2016.

Records from 1997 to 2026. Most recent: inspection, 7 January 2026.

Built
1997
Last inspected
7 January 2026
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDD7093
452017
Flag
UNITED STATES
367181840
Maury page id
psix-452017

Inspections, by type

…with no type recorded7
Years with a record 28 calendar years (1997–2026)
The 83 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)78.5 ft × 28.4 ft × 8.2 ft
Registered tonnagegross 89 / net 71
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderALLEN MARINE INC. · SITKA, AK, UNITED STATES · built 1997
Hull materialAluminum
PropulsionJet Drive
Hull shapeNot recorded
Hull configurationTwin Hull
Hailing portSITKA, AK
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 14 March 2026 · expires 31 March 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it89 - Simplified, Gross Ton
71 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDD7093MMSI 367181840 · active · compulsorily equipped · granted 28 January 2017, expires 21 April 2027
WCX2811MMSI not assigned · expired · compulsorily equipped · granted 21 February 1997, cancelled 28 April 2007
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspected as a tow unit · 2

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

BIG RED Passenger (Inspected) · MISLE 424010 · 31 July 2016 · activity 5960452ST NICHOLAS Passenger (Inspected) · MISLE 491053 · 19 May 2006 · activity 2653658

Inspection history · 83

7 January 2026 Examination of Repairs · Vessel Attendance
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8292407
1 December 2025 Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8276058
10 October 2025 Deficiency Check · Internal Structural Exam · Annual Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8250489
30 September 2024 Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8012555
24 September 2024 Annual Inspection · Internal Structural Exam · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8007888
13 April 2024 Deficiency Check · In-Service Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7894641
15 November 2023 Hull Examination · Examination of Repairs · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7823043
20 October 2023 Liferaft Servicing · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7831420
29 September 2023 Internal Structural Exam · Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7775922
14 June 2023 Deficiency Check · Administrative Inspection · Damage Survey
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7715321
15 March 2023 Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7648431
19 January 2023 Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7623626
5 January 2023 Annual Inspection · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7616875
26 January 2022 Liferaft Servicing
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7393898
2 November 2021 Deficiency Check · COI Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7343702
26 March 2021 Deficiency Check · Examination of Repairs · Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7163528
16 June 2020 Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6978724
11 March 2020 Internal Structural Exam · Annual Inspection · Deficiency Check · Administrative Inspection · DAPI Audit
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6924688
22 October 2019 In-Service Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6842222
17 May 2019 Damage Survey · Deficiency Check · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6689064
26 February 2019 Internal Structural Exam · Deficiency Check · Hull Examination
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6633014
21 December 2018 Liferaft Servicing
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6633478
20 December 2018 Liferaft Servicing
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6633583
6 December 2018 Liferaft Servicing
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6620621
30 November 2018 Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6591232
6 November 2018 In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6576041
2 November 2018 Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6574858
28 September 2018 Internal Structural Exam · DAPI Audit · Administrative Inspection · Annual Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6549271
2 May 2018 Deficiency Check · In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6405116
4 April 2018 Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6385250
12 December 2017 Administrative Inspection
Administrative · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6324756
5 December 2017 COI Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6318138
12 May 2017 Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6144786
27 February 2017 Internal Structural Exam · Hull Examination · DAPI Audit
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6096484
28 September 2016 Deficiency Check · Annual Inspection · Administrative Inspection · Internal Structural Exam
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5998810
31 July 2016 Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5960452
28 March 2016 Damage Survey
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 5843220
26 January 2016 Deficiency Check · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5803841
23 November 2015 Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5769872
19 October 2015 Annual Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5746237
16 October 2014 Administrative Inspection · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5008917
21 June 2014 Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 4936916
9 June 2012 Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 4340930
9 June 2012 Deficiency Check · Damage Survey
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 4340932
15 February 2012 Administrative Inspection
Administrative · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 4245106
13 January 2012 Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 4237865
11 January 2011 Hull Examination
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 3925155
26 March 2010 COI Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 3703587
18 March 2009 Annual Inspection · Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 3435942
29 February 2008 Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 3156134
22 January 2008 Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 3134283
27 April 2007 Annual Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 2916639
10 April 2007 Deficiency Check · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 2905473
2 April 2007 Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 2900415
9 January 2007 Administrative Inspection
Administrative · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 2852993
29 June 2006 Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 2695720
27 June 2006 Damage Survey
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 2694731
19 May 2006 Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 2653658
10 March 2006 Examination of Repairs · Annual Inspection
Physical examination · MSD SITKA · USCG Arctic District (CGD-A) · Activity 2633499
12 May 2005 Deficiency Check
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 2357297
11 April 2005 COI Inspection
Physical examination · MSD SITKA · USCG Arctic District (CGD-A) · Activity 2333458
26 January 2005 Hull Examination · Construction Oversight · Internal Structural Exam
Physical examination · MSD SITKA · USCG Arctic District (CGD-A) · Activity 2281421
27 August 2004 Damage Survey
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 2181607
16 July 2004 Examination of Repairs
Physical examination · MSD SITKA · USCG Arctic District (CGD-A) · Activity 2135701
8 July 2004 Annual Inspection
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 2126653
8 June 2004 Examination of Repairs
Physical examination · MSD SITKA · USCG Arctic District (CGD-A) · Activity 2093779
5 April 2004 Deficiency Check
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 2038361
10 March 2004 Damage Survey
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 2021992
14 May 2003 Re-Inspection · Deficiency Check
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1793699
11 May 2003 Examination of Repairs
Physical examination · MSD SITKA · USCG Arctic District (CGD-A) · Activity 1792950
28 March 2003 Construction Oversight · Internal Structural Exam · Plan Review "T" Boat · Hull Examination
Physical examination · MSD SITKA · USCG Arctic District (CGD-A) · Activity 1766089
7 May 2002 In-Service Inspection
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1617770
20 March 2002 Annual Inspection · MARPOL Annex V Examination · Administrative Inspection
Physical examination · MSD SITKA · USCG Arctic District (CGD-A) · Activity 1493223
20 April 2001 Re-Inspection · Deficiency Check · Hull Examination · MARPOL Annex V Examination
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1382242
22 June 2000 Deficiency Check
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 818806
23 May 2000 Damage Survey · Deficiency Check
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 820642
22 May 2000 Type not recorded
No type recorded · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 155540
11 May 2000 Type not recorded
No type recorded · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 817691
9 May 2000 Deficiency Check
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 818423
20 April 2000 COI Inspection · MARPOL Annex V Examination
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1403118
20 April 1999 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1390992
13 April 1999 Re-Inspection · Hull Examination
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1388782
16 May 1997 Hull Examination · Initial Certification · MARPOL Annex V Examination
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1406150

Deficiency record · 115

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 10 October 2025 Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from fire or machinery failure. Vessel has an exhaust leak on their STBD side fwd main engine. Repair to satisfaction of USCG. 46 CFR 182.100
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 October 2025
Resolution: Rectified
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 October 2025 Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from fire or machinery failure. Vessel has a torn vent hose in the port fuel space. Repair to satisfaction of USCG. 46 CFR 182.100
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 20 October 2025
Resolution: Rectified
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 10 October 2025 Resolved
Each item of survival craft equipment must be of good quality, and efficient for the purpose it is intended to serve. Each 50 person IBA has securing straps that are frayed. Replace to satisfaction of USCG.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 20 October 2025
Resolution: Rectified
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 24 September 2024 Resolved
The material, design, construction, workmanship, and arrangement of main propulsion machinery and of each auxiliary, directly connected to the engine and supplied as such, must be at least equivalent to the standards established by the ABS Steel Vessel Rules (incorporated by reference, see 46 CFR 58.03-1), except as otherwise provided by this subchapter. Fwd Port main engine is unable to shutdown from the wheelhouse. Enact repairs to the satisfaction of USCG 46 CFR 58.05-1
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 October 2024
Resolved 30 September 2024
Resolution: Had operator start engine and perform shut down from operating station; all sat.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 24 September 2024 Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from fire or machinery failure. Replace existing damaged flexible raw water hose on port aft engine and install chaffing gear on new hose. 46 CFR 182.100
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 October 2024
Resolved 30 September 2024
Resolution: Hose replaced and chaffing gear installed.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 24 September 2024 Resolved
Each vessel must have the following: (1) Marine charts of the area to be transited, published by the National Ocean Service, U.S. Army Corps of Engineers, or a river authority that— (i) Are of a large enough scale and have enough detail to make safe navigation of the area possible. Vessel does not have paper charts, therefore, in the event of a loss of power to the bridge, digital charts and publications need to be connected to a backup power source.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 October 2024
Resolved 30 September 2024
Resolution: Vessel rep provided up-to-date charts.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 29 September 2023 Resolved
Complete but simple instructions for the operation of a fixed gas fire extinguishing system must be located in a conspicuous place at or near each pull box and stop valve control and in the space where the extinguishing agent cylinders are stored. Posted CO2 instructions for the port and stbd engine rooms, ivo agent bottle and pull station, contain incorrect operating instructions, to include the time it takes for discharge to occur. Consult with system servicing technician to determine proper instructions at local and remote stations. 46CFR185.612(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 October 2023
Resolution: CO2 discharge instructions (port & stbd; local and remote) changed to reflect appropriate step and accurate time delay (30 seconds); all sat.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 29 September 2023 Resolved
Fixed gas extinguishing systems: System design and installation must be in accordance with the Marine Design, Installation, Operation, and Maintenance Manual approved for the system by the Commandant. Time delay on the port fixed CO2 extinguishing system is less than 30 seconds. Per the fire system servicing report, port side time delay is at 29.5 seconds. Provide servicing report meeting the 30 seconds standard. 46CFR181.410
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 13 April 2024
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 5 January 2023 Resolved
An inflatable liferaft or inflatable buoyant apparatus must be serviced at a facility specifically approved by the Commandant for the particular brand, and in accordance with servicing procedures meeting the requirements of part 160, subpart 160.151, of this chapter. IBA's are past due the annual inspection. 46 CFR 185.730
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 March 2023
Resolution: Verified IBAs were satisfactorily serviced in MAR23.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 5 January 2023 Resolved
At each initial and subsequent inspection for certification, the owner or managing operator must be prepared to conduct tests and have the vessel ready for inspection of its fire protection equipment. Portable fire extinguishers are past due for the annual servicing. 46 CFR 176.810(a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 March 2023
Resolution: Verified portable extinguishers were satisfactorily serviced FEB23.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 5 January 2023 Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. Fuel leaks were identified on both fuel tank sight glasses valves. 46 CFR 182.100
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 March 2023
Resolution: Verified satisfactory fuel sight glasses; no leaks observed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 5 January 2023 Resolved
A voltmeter and an ammeter must be provided for a generator rated at 50 volts or more. Ammeter was found inoperable.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 March 2023
Resolution: Verified satisfacory operation of ammeter. The vessel crew had not made any repairs to the ammeter. The crew believed that not enough load was previously placed onto generator during test to register on the ammeter.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 5 January 2023 Resolved
Each door, hatch, or scuttle, used as a means of escape, must be capable of being opened by one person, from either side, in both light and dark conditions. The method of opening a means of escape must be obvious, rapid, and of adequate strength. Aft emergency escape door latches were not operating properly. 46 CFR 177.500
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 March 2023
Resolution: Verified satisfactory means of escape.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 January 2023 Resolved
Prior to carrying passengers, prove proper operation of the vessels propulsion, steering and bilge systems to the satisfaction of a Coast Guard MI. 46 CFR 176.404
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 March 2023
Resolution: Observed satisfactory operation of vessel's propulsion and steering systems while underway. Observed satisfactory operation of bilge system; conducted operational bilge dewatering tests in the #2 Port/STBD voids and Port/STBD Jet voids.
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 5 January 2023 Resolved
Prior to carrying passengers, mob, fire and abandon ship drills must be conducted to the satisfaction of a coast guard marine inspector. 46 CFR 185.520
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 March 2023
Resolution: Conducted satisfactory MOB, fire, and abandon ship drills.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 2 November 2021 Resolved
Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. Make repairs to the cooling water leak on the #4 cooling water discharge pipe. 46 CFR 177.970
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 November 2021
Resolution: Cooling water leak repaired sat.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 2 November 2021 Resolved
Piping, including valves, pipe fittings and flanges, conveying vapor, gas, or liquid, the temperature of which exceeds 65.5 °C (150 °F), must be suitably insulated where necessary to prevent injuries. Install suitable protection on the all MDE turbos. 46 CFR 182.100
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 November 2021
Resolution: Insulation installed on all MDE turbos.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 2 November 2021 Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards. Replace missing cover in the midships head where the back of the electrical shore tie connection is exposed. 46 CFR 183.200
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 November 2021
Resolution: Missing cover has been replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 2 November 2021 Resolved
A voltmeter and an ammeter, which can be used for measuring voltage and current of a generator that is in operation, must be provided for a generator rated at 50 volts or more. For each alternating current generator, a means for measuring frequency must also be provided. Repair inoperable amp and hertz meter. 46 CFR 183.320 46 CFR 183.320
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 November 2021
Resolution: Amp and hertz meter repaired SAT.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 2 November 2021 Resolved
Conduct MOB, fire and abandon ship drills in the presence of a Coast Guard Marine Inspector prior to operating the vessel with passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 November 2021
Resolution: Drills conducted SAT.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 11 March 2020 Resolved
Provide and properly install all primary lifesaving appliances. IBA removed for service.
Action required: 17 - Rectify deficiencies prior to departure
Due 11 March 2020
Resolved 2 November 2021
Resolution: Primary lifesaving reinstalled on vessel.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 11 March 2020 Resolved
Prove proper operation of fire main. Unable to test due to freezing conditions.
Action required: 17 - Rectify deficiencies prior to departure
Due 11 March 2020
Resolved 2 November 2021
Resolution: Firemain test SAT.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 11 March 2020 Resolved
Conduct Man Overboard and Fire Drills to the satisfaction of an attending USCG Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Due 11 March 2020
Resolved 2 November 2021
Resolution: Closed and re-added to COI activity.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 11 March 2020 Resolved
Prove proper operation of bilge pumping systems. Unable to test due to freezing conditions.
Action required: 17 - Rectify deficiencies prior to departure
Due 11 March 2020
Resolved 16 June 2020
Resolution: Witnessed satisfactory pumping of bilge system, dewatering port fore-peak
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 11 March 2020 Resolved
Make permanent repairs to broken overhead lighting fixture in main cabin port side, aft.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 March 2020
Resolved 16 June 2020
Resolution: Lighting fixture replaced.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 11 March 2020 Resolved
Provide proper metal support for overhead wiring in port forepeak.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 March 2020
Resolved 16 June 2020
Resolution: Wire run properly supported.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 11 March 2020 Resolved
Remove unused fire extinguisher bracket from generator room.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 March 2020
Resolved 16 June 2020
Resolution: Bracket removed.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 11 March 2020 Resolved
Make proper wiring connections on #2 MDE top, aft section in way of circuit breaker.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 March 2020
Resolved 3 November 2021
Resolution: Completed.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 11 March 2020 Resolved
Remove or properly terminate dead end wires in way of #1 MDE outboard side.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 March 2020
Resolved 2 November 2021
Resolution: Completed.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 11 March 2020 Resolved
Replace missing guards in way of aft engine room drive shaft penetrations.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 March 2020
Resolved 16 June 2020
Resolution: Guards installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 March 2020 Resolved
Make permanent repairs to correct coolant leak from head gasket on #4 MDE.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 March 2020
Resolved 2 November 2021
Resolution: Repairs made. Optest SAT.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 11 March 2020 Resolved
Provide Fixed CO2 systen servicing report.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 March 2020
Resolved 2 November 2021
Resolution: CO2 Servicing completed. Optest SAT.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 22 October 2019 Resolved
Replaced both port and starboard time delay bottles. Both trips at around 24 and 25 seconds on a 30 second bottle
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 November 2021
Resolution: Time delays replaced and servicing tech tested SAT.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 22 October 2019 Resolved
Prove port side aft engine secures with CO2 system.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 December 2019
Resolution: vessel repaired shutdown, tested all sat
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 22 October 2019 Resolved
Prove port side fwd ventilation closes
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 December 2019
Resolution: vessel has repaired vent closer.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 22 October 2019 Resolved
Replace port side pull cable
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 December 2019
Resolution: Port side pull cable was replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 May 2019 Resolved
Prove proper operations of all steering pumps
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 May 2019
Resolution: got vessel underway tested all steering pumps, all sat
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 6 November 2018 Resolved
Install Carbon Dioxide gas storage warning signage as per 46 CFR 185.612 (g)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 November 2018
Resolution: Vessel has installed CO2 warning signs
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 6 November 2018 Resolved
Replace alarm in starboard side engine room
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 November 2018
Resolution: Vessel has installed new CO2 Alarm in engine room
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 28 September 2018 Resolved
Repair fuel oil leak on port side fwd main engine first stage fuel oil filter
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 September 2018
Resolution: Vessel has replaced fuel oil fliter bowl
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 28 September 2018 Resolved
Replace port side bilge suction flex hose from pipe to pump due to chaffing.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 November 2018
Resolution: Replaced port side bilge suction flex hose
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 September 2018 Resolved
Provide battery trays for all batteries in both engine rooms
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 November 2018
Resolution: Vessel has installed battery trays on all batteries
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 28 September 2018 Resolved
Repair cooling water exhaust leak on port side fwd main engine
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 November 2018
Resolution: Vessel has repaired cooling water leak on the port side fwd engine
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 28 September 2018 Resolved
Repair exhaust leak on starboard side aft main engine.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 November 2018
Resolution: Vessel has fixed exhaust leak on starboard aft engine
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 28 September 2018 Resolved
Remove dead end wires from port side engine room aft inboard side
Action required: 705 - Other - as specified
Resolved 30 November 2018
Resolution: Vessel has removed all dead end wires
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 28 September 2018 Resolved
Reinstall protective wrap on port side outboard exhaust piping.
Action required: 705 - Other - as specified
Resolved 12 March 2019
Resolution: Discussed requirement with vessel operator as to what piping systems were required to be protected. Identified piping section is a raw water relief for the exhaust system and never exceeded 150 degrees F and did not require thermal protection.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 28 September 2018 Resolved
Repair port side fwd engine guard
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 November 2018
Resolution: Vessel has replaced port fwd engine guard
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 28 September 2018 Resolved
Repair port side aft top safety line
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 November 2018
Resolution: Vessel has repaired port side aft top safety line
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 28 September 2018 Resolved
Install proper electrical box cover for the toilet flush buttons in the center and port heads.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 November 2018
Resolution: Vessel has installed proper electrical box covers on toilet flush buttons
Engineering › Bilge Water Management System › Pump
Issued 4 April 2018 Resolved
Prove prope operation of bilge system by 01JUN2018.
Action required: 705 - Other - as specified
Due 1 June 2018
Resolved 2 May 2018
Resolution: tested bilge pymp all sat
Communications › Radio Communications › EPIRB
Issued 5 December 2017 Resolved
Renew overdue expired battery for the onboard EPIRB.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 December 2017
Resolved 4 April 2018
Resolution: New EPIRB presented.
Fire Fighting › Fixed Fire Detection System › Arrangement
Issued 5 December 2017 Resolved
Demonstrate proper operation of the Main Engines shutdown upon released of the fixed firefighting CO2 system into the machinery space.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 29 December 2017
Resolved 20 March 2018
Resolution: Demonstrated, sat.
Operations/Management › Drills/Instruction › Fire
Issued 5 December 2017 Resolved
Demonstrate emergency drills & safety instructions prior to carrying revenue passengers to the satisfaction of an attending marine inspector.
Condition: Invalid
Action required: 705 - Other - as specified
Due 1 April 2018
Resolved 4 April 2018
Resolution: Witnessed drills and pax brief.
Construction/Loadline › Penetrations › Pipe Flange
Issued 27 February 2017 Resolved
Penetrations of required watertight bulkheads by rigid plastic pipes are prohibited unlessthe requirements of the reference are met. Provide a metallic valve for the potable Water penetration in the port fuel void adjacent to the penetration on both sides of the bulkhead or in some other manner in conformity with regulation.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 May 2017
Resolved 11 May 2017
Resolution: Done, new mettalic vlaves installed, sat.
Construction/Loadline › Hull › Hull Plating
Issued 27 February 2017 Resolved
Repair hull plating tear in the port jet room.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 1 May 2017
Resolved 7 March 2017
Resolution: Verified repair via a 18" x 18" insert. Visual exam and vacuum box test sat.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 27 February 2017 Resolved
Piping which exceeds 150F must be suitably insulated where necessary to prevent injuries. Repair or replace lagging on the starboard aft main diesel engine exhaust.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 May 2017
Resolved 11 May 2017
Resolution: Done, sat.
Engineering › Fuel Oil Service System › Hose
Issued 27 February 2017 Resolved
Flexible nonmetallic hoses fabricated on site must be hydrostatically tested to twice the maximum operating pressure of the system. Conduct required hydrostatic test of newly fabricated fuel system hoses.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 May 2017
Resolved 7 March 2017
Resolution: Verified tech report indicating satisfactory hydro test of hoses.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 28 September 2016 Resolved
Complete annual servicing on all portable fire extinguishers.
Action required: 705 - Other - as specified
Due 28 October 2016
Resolved 1 November 2016
Resolution: [name withheld] attended vessel to witness properly serviced fire extinguishers.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 21 October 2015 Resolved
Service firefighting equipment provide servicing reports.
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 November 2015
Resolved 26 January 2016
Lifesaving › Inflatable Buoyant Apparatus › Servicing
Issued 21 October 2015 Resolved
Provide lifesaving servicing reports/certificates.
Action required: 705 - Other - as specified
Due 4 November 2015
Resolved 26 January 2016
Operations/Management › Navigation Safety › Carriage of Charts and Publications
Issued 21 October 2015 Resolved
Provide 2015 copy of Light List.
Action required: 705 - Other - as specified
Due 4 November 2015
Resolved 23 November 2015
Operations/Management › Navigation Safety › Navigation Underway, General
Issued 21 October 2015 Resolved
Repair engine hours gauge in wheelhouse.
Action required: 705 - Other - as specified
Due 4 November 2015
Resolved 23 November 2015
Navigation › Collision/Grounding Avoidance › Echo-sounding Device
Issued 21 October 2015 Resolved
Repair depth sounder.
Action required: 705 - Other - as specified
Due 4 November 2015
Resolved 23 November 2015
Construction/Loadline › Hull › Bottom Plating
Issued 9 June 2012 Resolved
Provide repair proposeal for damage to port quarter followin allision with dock. Meanwhile while underway with PAX, increase rounds NTE 30 mins. Prior to each trip ensurge bilge pump and high water alram are tested and tests logged. Immediately report any changes to USCG.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 12 June 2012
Resolved 14 June 2012
Resolution: Repairs made and verified SAT. Welder conducted dye pen test to determine extent of small crack, drill stopped, gouged and welded. Repairs verified via soap and blow test. Vessel note added to make permanent repairs at next DDX.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 18 March 2009 Resolved
Provide servicing report. Allen Marine to provide solution due to no third party servicing company in Sitka.
Action required: 705 - Other - as specified
Resolved 26 March 2010
Resolution: FFE system serviced on 11 March.
Lifesaving › Lifejacket/PFD (General) › Lights
Issued 29 February 2008 Resolved
Provide lights for PFD's.
Action required: 705 - Other - as specified
Resolved 26 March 2010
Resolution: Vessel''s route changed to L,B, S. no light required.
Electrical › Electrical Distribution System (service) › Wiring
Issued 27 April 2007 Resolved
Remove improper orange commercial extension cord that was cut and spliced into wiring for 110 volt coffee warmer. Also remove wire nuts. (Wire nuts may only be used if taped and in a junction box.) As the cord requires neither to reach the outlet, replace wiring and wire nuts with proper plug.
Condition: Placed in Improper Service
Due 27 April 2007
Resolved 27 April 2007
Resolution: Repaired on the spot. Photos taken by ALLEN MARINE electrician for internal company training of marine electrical requirements
Electrical › Electrical Distribution System (service) › Wiring
Issued 27 April 2007 Resolved
Repair improper wiring to ground fault outlet in pilot house in aft storage. Wiring consists of a two-wire conductor and a single wire conductor. Single wire 110 Volt service conductors can only be used in conduit. Replace with proper three-wire UL Boat cable conductor.
Condition: Placed in Improper Service
Due 27 May 2007
Resolved 27 April 2007
Resolution: Corrected on the spot.
Fire Fighting › Fixed Fire Detection System › Power Supply
Issued 10 April 2007 Resolved
Ensure that fire detection system is electronically supervised.
Due 1 July 2007
Resolved 16 July 2007
Engineering › Sea-water System (primary cooling) › Piping
Issued 27 June 2006 Resolved
Repair crack in weld seam of the doubler plate for the starboard aft main engine raw water intake spool piece.
Action required: 705 - Other - as specified
Due 11 July 2006
Resolved 29 June 2006
Resolution: No crack found. Leak was the result of ill fitting gasket and bolts not tightened correctly.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 27 June 2006 Resolved
Repair crack extending half-way around the 3-inch port forward exhaust relief pipe
Action required: 705 - Other - as specified
Due 11 July 2006
Resolved 29 June 2006
Resolution: Drill stopped v & welded
Fire Fighting › Fire Pumps › Arrangement
Issued 13 April 2005 Resolved
Due to recent servicing of fire pump, the pump engaged, a hose loosened and disconnected in the engine room, while conducting operational tests, and partially flooded engine room to approximately one to two feet while underway.
Action required: 705 - Other - as specified
Resolved 13 May 2005
Fire Fighting › Fire Pumps › Pressure
Issued 11 April 2005 Resolved
Replace inoperative pressure gauge.
Due 11 May 2005
Resolved 12 May 2005
Resolution: Witnessed sat operation.
Fire Fighting › Fire Pumps › Power Source
Issued 11 April 2005 Resolved
Make repairs to fire main power-take-off. Belts not fully engaging.
Action required: 705 - Other - as specified
Resolved 13 May 2005
Construction/Loadline › Hull › Sheerstrake
Issued 5 April 2004 Resolved
C & R damage IWO STBD side rub rail sideshell above the waterline mid body section as marked during damaged assessement.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 5 April 2004
Resolved 5 April 2004
Resolution: Done, sat
Construction/Loadline › Hull
Issued 10 March 2004 Resolved
C&R damage IWO STBD side rub rail sideshell above the waterline mid body section as marked during damage assessment. LEGACY COMPONENT DESC: Sheerstrake
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 5 April 2004
Resolved 5 April 2004
Resolution: C&R damaged area. Sat.
Navigation › Piloting/Steering
Issued 10 March 2004 Resolved
Provide transit plan to OCMI prior to relocating vsl for repairs. No passengers permitted during transit. LEGACY COMPONENT DESC: Transit Plan
Condition: Unknown
Action required: 705 - Other - as specified
Due 5 April 2004
Resolved 5 April 2004
Resolution: Transit plan provided as required.
Engineering › Bilge Water Management System
Issued 14 May 2003 Resolved
Repair bilge pump & test to the satisfaction of an attending marine inspector. LEGACY COMPONENT DESC: Pump
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 May 2003
Resolved 15 May 2003
Resolution: Port Engineer, Mikko Polly, called attesting to the bilge pump repaired, tested pumping two fwd compartments, & all satisfactory. Vessel to be placed back in service this morning.
Accommodation/Occupational Safety › Messroom
Issued 14 May 2003 Resolved
Secure for sea the microwave oven located in the kitchen. LEGACY COMPONENT DESC: Microwave Oven
Condition: Improper Installation
Due 28 May 2003
Resolved 14 May 2003
Resolution: Secured
Engineering › Steering Gear System › Linkage
Issued 14 May 2003 Resolved
Secure attachments linkage to steering connections either double nut or self locking, or locktite to prevent from getting loose.
Condition: Improper Installation
Due 28 May 2003
Resolved 14 May 2003
Resolution: Use locktite
Lifesaving › Lifebuoys
Issued 14 May 2003 Resolved
Repair/replace burned-out light for the lifebouy on the bridge. LEGACY COMPONENT DESC: Self-igniting Lights
Condition: Unknown
Due 28 May 2003
Resolved 14 May 2003
Resolution: Replaced light bulb.
Construction/Loadline › Hull
Issued 15 April 2003 Resolved
In Stbd #1 void at top seam of Second Knuckle pick welding pass where missing in the aft bay and next bay fwd. LEGACY COMPONENT DESC: Hull Plating
Due 15 May 2003
Resolved 30 April 2003
Resolution: Weld picked up
Construction/Loadline › Hull
Issued 15 April 2003 Resolved
In stbd void #1 where WTB, side shell, and deck meet in the aft part of void, V & weld the fractured weld. LEGACY COMPONENT DESC: Hull Plating
Due 15 May 2003
Resolved 30 April 2003
Resolution: V & weld completed.
Construction/Loadline › Structures
Issued 15 April 2003 Resolved
In stbd void #1 provide welded insert in hole drilled just off of center line in Collision Bulkhead. LEGACY COMPONENT DESC: Transverse Bulkhead
Due 15 May 2003
Resolved 30 April 2003
Resolution: Inserted.
Construction/Loadline › Hull › Hull Plating
Issued 15 April 2003 Resolved
In port void # 1 Pick up missing weld a top seam of second knuckle.
Due 15 May 2003
Resolved 30 April 2003
Construction/Loadline › Hull › Bottom Plating
Issued 15 April 2003 Resolved
In port void #1 pick up weld on inboard chine near bulkhead.
Due 15 May 2003
Resolved 30 April 2003
Resolution: Corrected.
Construction/Loadline › Penetrations
Issued 15 April 2003 Resolved
In port void #1 pick up weld under bilge pipe penetration of collision bulkhead where missing. LEGACY COMPONENT DESC: Collision Bulkhead bilge line penetration
Due 15 May 2003
Resolved 30 April 2003
Resolution: Corrected.
Engineering › Bilge Water Management System › Valve
Issued 15 April 2003 Resolved
Provide a reach rod for the bilge system valve on the collision bulkhead.
Due 15 May 2003
Resolved 30 April 2003
Resolution: Reach rod provided.
Construction/Loadline › Hull › Transverse Frame
Issued 15 April 2003 Resolved
In stbd void #2 drill stop and V & weld fractured weld on first frame.
Due 15 May 2003
Resolved 30 April 2003
Resolution: Corrected.
Construction/Loadline › Hull › Hull Plating
Issued 15 April 2003 Resolved
In stbd void #2 pick up approx. four feet of missing weld at outboard seam, deck plate and side shell. Construction plans show 100% double continuous.
Due 15 May 2003
Resolved 30 April 2003
Resolution: Welded.
Construction/Loadline › Structures › Deck Plating
Issued 15 April 2003 Resolved
In stbd void #2 pick up approx. one foot of missing weld in overhead ( main deck seam).
Due 15 May 2003
Resolved 30 April 2003
Resolution: Picked up.
Engineering › Bilge Water Management System
Issued 15 April 2003 Resolved
In port void #2 provide a reach rod for the bilge system valve at the collision bulkhead. LEGACY COMPONENT DESC: Reach rod for Valve
Due 15 May 2003
Resolved 30 April 2003
Resolution: Reach rod provided.
Construction/Loadline › Hull › Bottom Plating
Issued 15 April 2003 Resolved
In port void #2 pick up missing weld top of second knuckle in second bay.
Due 15 May 2003
Resolved 30 April 2003
Resolution: Picked up.
Construction/Loadline › Structures
Issued 15 April 2003 Resolved
In port void # 2 provide a welded insert in hole drilled just off of center line in water tight bulkhead. LEGACY COMPONENT DESC: Transverse Bulkhead
Due 15 May 2003
Resolved 30 April 2003
Resolution: Inserted.
Construction/Loadline › Hull › Bottom Plating
Issued 15 April 2003 Resolved
In port void #2 pick up missing weld in aft bay where hull plate at chine is missing approx. threee feet of weld.
Due 15 May 2003
Resolved 30 April 2003
Resolution: Weld picked up.
Electrical › Lighting (service)
Issued 15 April 2003 Resolved
Replace damage 4' florescent fixture in stbd fuel void. LEGACY COMPONENT DESC: Lighting Fixture
Due 15 May 2003
Resolved 30 April 2003
Resolution: Fixture replaced.
Engineering › Bilge Water Management System
Issued 15 April 2003 Resolved
In stbd fuel void replace or repair the cracked bilge spool piece. LEGACY COMPONENT DESC: Piping
Due 15 May 2003
Resolved 30 April 2003
Resolution: Replaced.
Construction/Loadline › Structures
Issued 15 April 2003 Resolved
In stbd fuel void # 2 reweld bases of "candy cane" vents. LEGACY COMPONENT DESC: Ventilators
Due 15 May 2003
Resolved 30 April 2003
Resolution: Welded.
Construction/Loadline › Hull › Bottom Plating
Issued 15 April 2003 Resolved
In port fuel void, V & Reweld six inches of bad weld on frame #1
Due 15 May 2003
Resolved 30 April 2003
Resolution: Rewelded.
Construction/Loadline › Structures › Ventilators
Issued 15 April 2003 Resolved
In port void #2 reweld bases of "candy cane" vents.
Due 15 May 2003
Resolved 30 April 2003
Construction/Loadline › Structures
Issued 15 April 2003 Resolved
In port void #2 reweld bases of "candy cane" vents. LEGACY COMPONENT DESC: Ventilators
Due 15 May 2003
Resolved 30 April 2003
Resolution: Rewelded.
Construction/Loadline › Hull
Issued 15 April 2003 Resolved
In stbd engine room, pick up undercut weld on forward engine stand pipe. LEGACY COMPONENT DESC: Hull Plating
Due 15 May 2003
Resolved 30 April 2003
Resolution: Welded.
Construction/Loadline › Structures › Ventilators
Issued 15 April 2003 Resolved
In stbd engine room replace the missing actuation spring for the air inlet flapper connected to the fire suppression solenoid.
Due 15 May 2003
Resolved 30 April 2003
Resolution: Replaced.
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 15 April 2003 Resolved
In the port & stbd engine rooms, replaced deteriorated hoses to the exhaust cooling system LEGACY COMPONENT DESC: Exhaust System Cooling Hoses
Due 15 May 2003
Resolved 30 April 2003
Resolution: Hoses renewed.
Engineering › Bilge Water Management System › Piping
Issued 15 April 2003 Resolved
In stbd jet room renew cracked bilge piping where cracked.
Due 15 May 2003
Resolved 30 April 2003
Resolution: Replaced.
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 15 April 2003 Resolved
In the port jet room replace the missing cover on the 110V Outlet
Due 15 May 2003
Resolved 30 April 2003
Resolution: Cover replaced.
Construction/Loadline
Issued 23 May 2000 Resolved
EFFECT REPAIRS TO FORWARD BULWARK, BULWARK STIFFENERS, AND DECK FRACTURES IN WAY OF WAVE-DAMAGED BOW AREA.
Condition: Unknown
Due 19 July 2000
Resolved 19 July 2000
Construction/Loadline
Issued 11 May 2000 Resolved
Demonstrate that jet drive shaft penetrations in the aft port and starboardengine room bulkheads are watertight. Plans shall be submitted to the CoastGuard prior to making any modifications to the existing jet drive bulkhead penetrations.
Condition: Unknown
Due 11 May 2000
Resolved 11 May 2000
Accommodation/Occupational Safety
Issued 20 April 2000 Resolved
Tighten cable courses on upper deck rails in accordance with 46 CFR 177.900.
Condition: Unknown
Due 20 April 2000
Resolved 20 April 2000
Lifesaving
Issued 20 April 2000 Resolved
Prior to operations with passengers, provide primary lifesaving equipment in accordance with 46 CFR 180.200.
Condition: Unknown
Due 9 May 2000
Resolved 9 May 2000
Accommodation/Occupational Safety
Issued 20 April 2000 Resolved
Ensure forward exit doors are properly marked in accordance with 46 CFR 177.500.
Condition: Unknown
Due 20 April 2000
Resolved 20 April 2000
Construction/Loadline
Issued 20 April 2000 Resolved
Re-mark vessel with proper permanent hull loading marks in accordance with 46 CFR 185.602.
Condition: Unknown
Due 20 April 2000
Resolved 20 April 2000
Fire Fighting
Issued 20 April 2000 Resolved
Replace plastic waste receptacles with waste receptacles constructed of non-combustible materials in accordance with 46 CFR 177.405.
Condition: Unknown
Due 9 May 2000
Resolved 9 May 2000
Navigation
Issued 20 April 2000 Resolved
Provide all required navigation publications in accordance with 46 CFR 184.420.
Condition: Unknown
Due 9 May 2000
Resolved 9 May 2000
Engineering
Issued 20 April 2000 Resolved
Post fuel shutoff placards in accordance with 46 CFR 185.608.
Condition: Unknown
Due 9 May 2000
Resolved 9 May 2000

Casualty record · 4

19 May 2006Routine · role: Transiting Vicinity of Primary Subject · activity 2653658
9 June 2012Routine · role: Involved in a Marine Casualty · activity 4340930
21 June 2014Routine · role: Involved in a Marine Casualty · activity 4936916
31 July 2016Routine · role: Subject to Marine Inspection · activity 5960452
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.