Records from 2003 to 2026. Most recent: inspection, 13 April 2026.
Inspection history · 118
13 April 2026
Administrative Inspection · Re-Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8349755
22 March 2026
Damage Survey · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8330507
7 October 2025
Examination of Repairs · Administrative Inspection · Vessel Attendance · Internal Structural Exam · Deficiency Check · Drydock Exam · COI Inspection
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 8249238
28 September 2025
Load Line/Change of Employment
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 8242703
9 September 2025
Administrative Inspection · Re-Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8205616
31 August 2025
Administrative Inspection
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 8221600
3 June 2025
Re-Inspection · DAPI Audit
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8129226
17 March 2025
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8101548
10 March 2025
Re-Inspection · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8087418
28 December 2024
In-Service Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 8056877
16 October 2024
In-Service Inspection · Deficiency Check · Internal Structural Exam · Examination of Repairs · Drydock Exam · COI Inspection
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 8020206
15 October 2024
Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 8019237
10 October 2024
Damage Survey
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 8017519
8 October 2024
Load Line/Change of Employment
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 8016404
10 September 2024
Re-Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8000349
28 June 2024
Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7944668
28 June 2024
Damage Survey
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7946771
20 June 2024
Deficiency Check · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7939112
7 June 2024
Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7930101
4 June 2024
Administrative Inspection · Re-Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7929571
23 May 2024
Damage Survey
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7922012
28 March 2024
Administrative Inspection
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7887132
4 March 2024
Re-Inspection · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7873949
11 February 2024
Damage Survey · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7864035
8 January 2024
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7845389
7 November 2023
Drydock Exam · Administrative Inspection · COI Inspection · Internal Structural Exam · Examination of Repairs · Deficiency Check
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7821786
1 September 2023
Load Line/Change of Employment
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7785615
1 September 2023
Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7786501
29 August 2023
Administrative Inspection · Re-Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7776181
5 June 2023
Re-Inspection · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7704770
20 May 2023
Administrative Inspection · Damage Survey
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7692611
14 April 2023
Administrative Inspection
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7670582
6 March 2023
Administrative Inspection · Re-Inspection · Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7641002
16 November 2022
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7595787
24 October 2022
Administrative Inspection · Special · Internal Structural Exam · Examination of Repairs · Drydock Exam · Hull Examination · DAPI Audit · MTSA Verification · COI Inspection
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7582804
13 September 2022
Periodic Inspection · Administrative Inspection · DAPI Audit
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7554464
31 August 2022
Administrative Inspection
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7548850
9 June 2022
Periodic Inspection · Administrative Inspection
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7473261
7 March 2022
Administrative Inspection · Periodic Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7407293
7 January 2022
Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7379187
4 January 2022
Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7378036
3 January 2022
Damage Survey
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7375248
2 January 2022
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7374662
18 December 2021
Damage Survey · Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7370232
18 December 2021
Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7371349
5 October 2021
Examination of Repairs · In-Service Inspection · Administrative Inspection · Deficiency Check · COI Inspection
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7341005
4 October 2021
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7341024
10 August 2021
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7282400
6 August 2021
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7280031
23 July 2021
Annual Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7265640
13 July 2021
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7254444
6 July 2021
In-Service Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7240985
3 July 2021
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7246803
25 June 2021
Damage Survey · Administrative Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7236089
12 May 2021
Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7195424
10 May 2021
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7195978
19 April 2021
Administrative Inspection
Administrative · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7178681
13 April 2021
Damage Survey
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7174471
13 April 2021
Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7175424
13 May 2020
Administrative Inspection · MTSA Verification · Deficiency Check · Examination of Repairs · Internal Structural Exam · COI Inspection · Drydock Exam
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 6956237
5 February 2020
Administrative Inspection
Administrative · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6903746
14 January 2020
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6889455
12 November 2019
Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6853997
6 November 2019
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6885682
15 September 2019
Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6820284
14 September 2019
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6816857
6 September 2019
Administrative Inspection
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6820247
27 August 2019
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6885380
19 August 2019
Periodic Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6755256
19 August 2019
Administrative Inspection
Administrative · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 6788093
16 August 2019
Administrative Inspection
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6785558
16 August 2019
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6785679
11 July 2019
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6885340
21 May 2019
Periodic Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6689846
7 May 2019
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6679104
3 April 2019
Administrative Inspection
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6655462
20 March 2019
Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6646330
14 March 2019
Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6642961
28 February 2019
Administrative Inspection · Periodic Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6632592
8 February 2019
Administrative Inspection · Welding Related Inspections Qualification Testing · Deficiency Check · Examination of Repairs
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6620562
25 January 2019
Examination of Repairs
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6616957
21 January 2019
Examination of Repairs · Administrative Inspection · Damage Survey
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6616194
8 January 2019
Administrative Inspection · Deficiency Check · Examination of Repairs
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6607309
20 November 2018
Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6583862
12 November 2018
Type not recorded
No type recorded · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6589408
26 October 2018
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 6569000
9 October 2018
COI Inspection · Deficiency Check · Administrative Inspection · Examination of Repairs · MTSA Verification
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 6560365
2 October 2018
In-Service Inspection
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 6560354
5 September 2018
ISM Oversight
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6564006
4 September 2018
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6532139
30 July 2018
Periodic Inspection · MTSA Verification
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6499375
18 May 2018
Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6421899
27 March 2018
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6379989
8 February 2018
Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6355244
4 February 2018
Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6349995
2 February 2018
Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6348799
22 January 2018
MTSA Verification · Periodic Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6351576
19 September 2017
COI Inspection
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 6270529
16 August 2017
Administrative Inspection
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6243012
15 June 2017
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6257069
31 May 2017
MTSA Verification · Annual Inspection · Re-Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6182315
7 April 2017
Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6121761
27 March 2017
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6113193
27 March 2017
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6113262
27 February 2017
MTSA Verification · Re-Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6096356
28 January 2017
Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6081090
5 January 2017
Deficiency Check
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 6066411
20 December 2016
Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6060590
16 December 2016
Damage Survey
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6059172
30 November 2016
Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6050740
22 September 2016
COI Inspection · Deficiency Check · Internal Structural Exam · Examination of Repairs · In-Service Inspection
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 6021323
15 August 2016
Re-Inspection · Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5969670
31 May 2016
Periodic Inspection · MTSA Verification
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5917864
12 April 2016
Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 5858535
2 April 2016
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 5846052
18 March 2016
Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 5837649
10 March 2016
Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 5831504
17 February 2016
COI Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 5817147
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 23 December 2024
Resolved
No repairs or alterations affecting the safety of the vessel with regard to the hull, machinery, or equipment, shall be made without the knowledge of the Officer in Charge, Marine Inspection. An inspection, either general or partial depending upon the circumstances, shall be made whenever any important repairs or alterations are undertaken. Schedule 40 piping is installed in fireman not in accordance with drawing. Renew to schedule 80 and perform hydrostatic test in accordance with 46CFR56.97-30 to satisfaction of attending marine inspector. 46CFR78.17-80(a)
Action required: 705 - Other - as specified
Due 17 December 2025
Resolved 7 January 2026
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 15 October 2024
Resolved
The fire main has had two failures in the past year. In light of this, a hydrostatic pressure test of 1.5 times MAWP shall be conducted at the next scheduled dry-dock of the entire fire main. The hydrostatic test pressure must be maintained for a minimum total time of 10 minutes and for such additional time as may be necessary to conduct the examination for leakage. All tests and repairs are to be made to the satisfaction of the attending CG Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 November 2024
Resolved 23 December 2024
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 10 September 2024
Resolved
It shall be the duty of the owner, master, or person in charge to see that the vessel's firefighting equipment is at all times ready for use and that all such equipment required by the regulations in this subchapter is provided, maintained, and replaced as indicated. A section of the deluge sprinkler system branch line piping, starboard side zone 4 (frame 89), was damaged. Provide repair plan to replace damaged piping during next scheduled dry docking.
46 CFR 78.17-80
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 17 December 2024
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 28 June 2024
Resolved
All piping, valves, and fittings shall meet the applicable requirements of 46 CFR Subchapter F. Subchapter F requires the adoption of American Society of Mechanical Engineers (ASME). In order to meet the ASME standard, a certified weld procedure is first required and then implemented by a qualified welder.
Currently there is a soft patch on the firemain overboard discharge spool piece, inway of butterfly
valve. Approved temp repair authorized Peterson
Welding to fabricate new spool piece, however they do not have CG or ABS certified welders. Therefore repair is only temporary. Vessel to renew spool piece at next dockside availability, using an ABS or CG approved procedure and welder that is qualified to that procedure.
Action required: 705 - Other - as specified
Due 1 November 2024
Resolved 23 December 2024
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 28 June 2024
Resolved
system must be subjected to a hydrostatic test pressure that at every point in the system is not less than 1.5 times the maximum allowable working pressure. Upon completion of repairs, a pressure test shall be conducted in accordance with 46 CFR Subchapter F. The fire pump is documented to operate at 118 psi; in order to meet Subchapter F, the system should be tested at 177 psi.
Action required: 705 - Other - as specified
Due 1 November 2024
Resolved 23 December 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 4 June 2024
Resolved
Periodic tests and inspection shall be made of the main and auxiliary machinery, boilers, and other equipment as prescribed in this part. The "hot box" the vessel was utilizing for the periodic tests does not fit the new jacket water temp probe and could not be set to a specific temperature but rather the power must be held in to raise the temperature. Provide method of testing jacket water temperature probes that meets Periodic SSafety Test procedure requirements for Coast Guard periodic inspections and maintenance needs.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 July 2024
Resolved 20 June 2024
Resolution: Received email from vessel master with photograph of new hotbox onboard.
10 - Safety of Navigation › N/A - No Subsystem › Gyro compass
Issued 28 March 2024
Resolved
Each vessel must have a gyrocompass. Vessel report that the gyro was not operating as intended. Vessel shall submit tech report attesting to proper repairs prior to returning to service. 33 CFR 164.35(d)
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 29 March 2024
Resolved 31 March 2024
Resolution: Received tech report
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 11 February 2024
Resolved
01 - 07106 - A fire detection and alarm system must automatically reset to a normal operating condition after alarm and fault situations are cleared. Power disruption caused fire panel to fault on Zone 4, only cleared by removing and reinstalling control card. Replace card at earliest opportunity and monitor for similar behavior in same/other Zones. - 46 CFR 76.27-10(c) - 10.C
Action required: 10 - Deficiency Rectified
Due 11 February 2024
Resolved 11 February 2024
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 8 January 2024
Resolved
In each crew berthing areas and washing areas information on the procedures and resources to report crimes, including sexual assault and sexual harassment, must be adequately posted. These procedures and resources must include at a minimum the following information:
1. Company policies regarding sexual assault, sexual harassment, and drug and alcohol usage.
2. Telephone numbers, websites and email addresses for reporting allegations of sexual assault and sexual harassment to the Coast Guard.
3. Company procedures to report violations of company policy and how to access resources.
4. Resources provided by outside organizations such as sexual assault hotlines and counseling.
Provide a copy of informational bulletins addressing policies and procedures per safety management system satisfaction of attending Marine Inspector.
46 U.S.C. § 11101
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 February 2024
Resolved 22 February 2024
Resolution: Reviewed SASH bulletin content and posting onboard.
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 8 January 2024
Resolved
The owner of a vessel subject to inspection under
section 3301 shall ensure such vessel is equipped with a vessel master key control system, manual or electronic, which provides controlled access to all copies of the vessel's master key of which access shall only be available to an established list of crew, by position, allowed to access and use the master key. This list must be maintained onboard the vessel and included within vessel’s safety management system. Additionally, a log book must be maintained with records of access and use of the mater key and shall include the following information at a minimum; date and time of access, room or location accessed, and name and rank of crewmember using the master key.
This log book is required to be included in the safety management system. It may be in electronic format and shall be located in a centralized location that is readily accessible to law enforcement personnel.
Provide a plan to incorporate a master key control system and recordkeeping procedures onboard the vessel to the satisfaction of the attending Marine Inspector.
46 USC 3106
01MAR2024: Extended deficiency until 31MAR2024 pending final review of the proposed SMS amendment by ABS.
05APR2024: Extended deficiency until 30APR2024 to address SMS procedure discrepancies.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 February 2024
Resolved 9 May 2024
Resolution: Received updated SMS procedures addressing SASH master key control system.
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 8 January 2024
Resolved
With respect to sexual harassment and sexual assault, procedures for and annual training requirements for all responsible persons and vessels to which this chapter
applies on: Prevention; bystander intervention; reporting; response; and investigation.
Provide a plan to incorporate the sexual assault and sexual harassment requirements into the Safety Management System to the satisfaction of the attending Marine Inspector.
46 USC 3203 & 46 USC 3205
02FEB2024: Due date extended to 01MAR2024 as third party is under contract to complete SMS update by 01MAR2024.
01MAR2024: Extended deficiency until 31MAR2024 pending final review of the proposed SMS amendment by ABS.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 February 2024
Resolved 5 April 2024
Resolution: Received approved SMS procedures for sexual assault and sexual harassment responses and training.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 12 December 2023
Resolved
Each vessel must meet the applicable requirements in subchapter S of this chapter. Each opening in an exposed weather deck must have a means for closing weathertight. The MSD space escape hatch failed a hose test due to a crack on the sealing edge. Temporary repair as approved by attending MI is authorized through October 2024. Provide permanent repair proposal.
46 CFR 72.30-1
46 CFR 171.122(f)
Action required: 705 - Other - as specified
Due 31 October 2024
Resolved 4 December 2024
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 12 December 2023
Resolved
Each vessel must meet the applicable requirements in subchapter S of this chapter. Except as provided in paragraph (d) of this section, the bulkhead deck or a deck above it must be weathertight. The line locker bulkhead to the weather deck is no longer weathertight due to wastage, multiple holes from wastage was discovered. Temporary repair as approved by attending MI is authorized through October 2024. Provide permanent repair proposal.
46 CFR 72.30-1
46 CFR 171.122(b)
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 October 2024
Resolved 4 December 2024
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage treatment plant
Issued 12 December 2023
Resolved
Each device must be free of design defects such as rough or sharp edges that may cause bodily injuries or that would allow toxic substances to escape to the interior
of the vessel. Excessive corrosion was discovered under
the angled side plating on the bottom plate of the MSD holding tank. Provide repair proposal to be completed to satisfaction of attending Marine Inspector no later than October 2024.
33 CFR 159.95 (a)(1)
Action required: 705 - Other - as specified
Due 31 October 2024
Resolved 6 November 2024
Resolution: Received satisfactory gauging report of MSD tank.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 12 December 2023
Resolved
The damper and the portion of duct containing the damper shall be constructed of at least 1/8 inch steel plate suitably stiffened. The bottom blade on the number 5 (1S2) vehicle deck supply automatic damper was found wasted through. Temporary repair as approved by attending MI is authorized through October 2024. Provide permanent repair proposal.
46 CFR 72.05-50 (b)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 October 2024
Resolved 11 December 2024
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 21 May 2023
Resolved
01 - 07113 - All piping, valves, and fittings shall meet the applicable requirements of 46 CFR Subchapter F. Subchapter F requires the adoption of American Society of Mechanical Engineers (ASME). In order to meet the ASME standard, a certified weld procedure is first required and then implemented by a qualified welder. The repair was conducted without meeting these requirements. Although the repairs passed an operation pressure test, it is still found to only warrant as a temporary repair. Vessel to crop out and renew at next drydock, using both an approved qualification procedure and welder that is qualified to that procedure. - 46 CFR 76.10-15(a); 46 CFR 57.03, 57.05 - 705C
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 October 2023
Resolved 19 November 2023
Resolution: Repair completed by qualified welder and system hydrotest passed
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 21 May 2023
Resolved
02 - 07113 - Minimum required hydrostatic test pressure for piping system must be subjected to a hydrostatic test pressure that at every point in the system is not less than 1.5 times the maximum allowable working pressure. Upon completion of repairs, a pressure test shall be conducted in accordance with 46 CFR Subchapter F. The fire pump is documented to operate at 118 psi; in order to meet Subchapter F, the system should be tested at 177 psi. - 46 CFR 56.97-30(e) - 705C
Action required: 705 - Other - as specified
Due 31 October 2023
Resolved 19 November 2023
Resolution: Repair completed by qualified welder and system hydrotest passed
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 14 April 2023
Resolved
All piping, valves, and fittings shall meet the applicable requirements of sub chapter F. Vessel reported a pin-hole leak in the fire main. 46CFR76.10-15(a)
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 April 2023
Resolved 16 April 2023
Resolution: Tested system at 100 psi. no leaks witnessed.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 14 April 2023
Resolved
All piping, valves and fittings shall meet the applicable requirements of sub-chapter F. Sub-Chapter F requires the adoption of American Society of Mechanical Engineers (ASME). In order to meet the ASME standard, a Certified weld procedure is first required and then implemented by a qualified welder. The repair was conducted without meeting these requirements. Although the repairs passed a 100 psi test, it is still found to only warrant as a temporary repair. Vessel to crop out and renew at next Dry-Dock, using both an approved qualification procedure and welder that is qualified to that procedure. 46 CFR 76.10-15(a)
46 CFR 57.03 & 57.05
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 October 2023
Resolved 19 November 2023
Resolution: Repair completed by qualified welder and system hydrotest passed
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 14 April 2023
Resolved
Minimum required hydrostatic test pressure for piping system must be subjected to a hydrostatic test pressure that at every point in the system is not less than 1.5 times the maximum allowable working pressure. Upon completion of repairs, a pressure test shall be conducted in accordance with Sub-Chapter F. The fire pump is documented to operate at 118 psi. In order to meet Sub-chapter F the system should be tested at 177 psi. 46 CFR 56.97-30(e)
Action required: 705 - Other - as specified
Due 31 October 2023
Resolved 19 November 2023
Resolution: Repair completed by qualified welder and system hydrotest passed
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 6 March 2023
Resolved
Provide and post schematic diagram of the system and instructions detailing alternate methods of discharging the system should the manual release or stop valve controls fail to operate for the Emergancy
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 April 2023
Resolved 9 March 2023
Resolution: all sat.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 6 March 2023
Resolved
Remark Emergency escape Hatches from sewage space and bow thruster space. EMERGENCY ESCAPE-DO NOT BLOCK.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 April 2023
Resolved 9 March 2023
Resolution: all sat
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Other (ISM)
Issued 9 June 2022
Resolved
Vessel must conduct inspection of all active tags and audit Lock Out Tag Log as per the Company’s Lock out Tag Out Procedures. Vessel shall complete 2 inspections/Audit and forward results to USCG.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 July 2022
Resolved 27 June 2022
Resolution: Rcvd Log of LOTO being logged.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 5 October 2021
Resolved
Provide adequate protection for all exposed portions of the main engine exhaust systems as required by 46 CFR 58.10-5(d)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 3 January 2022
Resolved 4 December 2021
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 5 October 2021
Resolved
Main engine exhaust lagging is deteriorated and failing, renew all failed exhaust lagging and ensure all exhaust components are adequately protected.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 January 2022
Resolved 2 January 2022
Resolution: NEW EXHAUST BLANKETS INSTALLED ON BOTH ENGINES
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 5 October 2021
Resolved
Prove proper operation of all automatic sprinkler system alarms as per approved PSTP's
Action required: 17 - Rectify deficiencies prior to departure
Due 3 January 2022
Resolved 6 December 2021
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 6 July 2021
Resolved
Properly adjust the following fire screen doors on car deck: Steward storage, Engineers head, electric work shop and paint locker.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 July 2021
Resolved 13 July 2021
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 6 July 2021
Resolved
Reinstall wire grommet holding the wire for fire alarm in electrical work shop.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 July 2021
Resolved 13 July 2021
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 6 July 2021
Resolved
Properly secure cover for fuse box on car deck in electrical work shop.
Action required: 10 - Deficiency Rectified
Due 6 July 2021
Resolved 6 July 2021
Resolution: Cover was reinstalled
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 6 July 2021
Resolved
Install missing bilge suction screens IVO Port and Starboard Bilge Well in the Engine Room.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 August 2021
Resolved 9 August 2021
Resolution: BILGE COVERS INSTALLED
10 - Safety of Navigation › N/A - No Subsystem › Gyro compass
Issued 12 May 2021
Resolved
Conduct repairs to the Gyrocompass prior to 5/26/2021, vessel can continue operate under the following Restrictions; Daylight operation only, More than three nautical miles of visibility and all Deck Watch standers are aware of the inaccurate Gyrocompass prior to accepting the watch.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 May 2021
Resolved 16 May 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 13 April 2021
Resolved
Vessel's #1 SSDG tripped off-line while vessel was underway. Repair/renew #1 SSDG to original condition prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 April 2021
Resolved 13 April 2021
Resolution: Mechanic replaced both batteries for 24v control system on SSDG. Generator was tested under load and tested satisfactory.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 13 May 2020
Resolved
Make permanent repairs to the fire detection system it currently showing a trouble condition in the supervision of the input trigger circuit. The error indicates an open loop in the PAD-2, however, the detective devices function. Make permanent repairs to the fire detection system and demonstrate to the satisfaction of attending CG Marine Inspector. 46 CFR 76.05
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 May 2021
Resolved 16 May 2021
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of Lifeboats
Issued 14 September 2019
Resolved
Strap which secures lifeboat onboard vessel during transit failed. Vessel fashioned temporary strap which may be cut in an emergency until replacement strap is installed. Vessel shall provide photo of newly installed strap and receipt/report of work done following replacement.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 September 2019
Resolved 20 September 2019
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 28 February 2019
Resolved
Crop and renew affected area as indicated on the most recent pit survey by completion of next scheduled dry dock.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 31 October 2019
Resolved 5 February 2020
Resolution: Vessel surrendered COI.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 28 February 2019
Resolved
Make Fire Screen doors leading into the observation deck area capable of fully closing regardless of closing sequence.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 March 2019
Resolved 14 March 2019
Resolution: Witnessed sat closure of fire doors; metal strip replaced with Assa Abloy gasket.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 8 February 2019
Resolved
An ABS certified pit surveyor/NDT specialist shall conduct an extensive pit survey for hull plating and frames from 68-78 from inboard most longitudinal to level with the space's deck plate.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 20 February 2019
Resolution: Pit Survey complete and submitted to Sector Anchorage
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 8 February 2019
Resolved
Conduct daily rounds of affected area, log and email report weekly to USCG Sector Anchorage. Immediately notify USCG of any conditions change.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 31 October 2019
Resolved 12 November 2019
Resolution: Vessel is in dry dock and no longer requires weekly reporting.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 8 February 2019
Resolved
Provide USCG Sector Anchorage ABS's Condition of Class for the temporary concrete repair within 30 days of this CG-835.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 March 2019
Resolved 22 April 2019
Resolution: Recieved ABS class report for temp concrete patch
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 January 2019
Resolved
Provide permanant repair plan to USCG for review.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 January 2019
Resolved 13 January 2019
Resolution: Submitted temp repair plan
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 January 2019
Resolved
Update USCG on any changes of condition onboard the vessel related to the keel cooler leak prior to effecting permanant repairs.
Action required: 705 - Other - as specified
Due 22 January 2019
Resolved 6 February 2019
Resolution: Vessel in Drydock to make permanant repairs
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 January 2019
Resolved
Complete permanant repairs to the effected areas IVO stbd keel cooler near frame 70 and 71. If temp repairs degrades and begins leaking during the interim, it will need to be reported to the USCG immediately. Temp repairs will acceptable until 08FEB2019.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 February 2019
Resolved 28 February 2019
Resolution: Permanant repairs completed
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 9 October 2018
Resolved
Re-write sections of the Periodic Safety Test Procedure (PSTP) due the written procedure not matching field procedure or demonstrated procedure.
a) Accommodation Space Sprinkler System Tests Installed Fire Sprinkler system, Section D. Zone Flow Switch Alarm. Demonstrated test showed actual water tripping the flow switch versus manually tripping the switch, which is in accordance with 46 CFR 61.40-10(b). Re-write procedure as demonstrated during inspection.
b) Diesel Generator Set Tests, Section J. Switchboard Voltage Cut Out Switch and Manual Voltage Control. The procedure needs re-sequencing (d) Reset Voltage switch back to Auto position. Ensure that Voltage and Hz are reading normal in Auto mode.
and (e) Generator will need to be shut down and restarted to reset switchboard logic. By reversing these two steps will reduce questions and time in the field.
c) Oil Fired Boiler Test. actual set points are missing from the test procedure, incorporate all test points. Example, normal operating pressure, high limit control pressure, oil pressure switch, relief valve set point. All points are missing from the document.
Re-write the above requirements for the PSTP and submit to the MSC within 60 days, in accordance with 46 CFR 61.40 Design Verification and Periodic Testing of Vital system Automation.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 December 2018
Resolved 19 November 2018
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 9 October 2018
Resolved
Repair or replace the manual control system for the class three watertight door in way of engine room and shaft alley, due to exceeding the 90 second required time in accordance with ASTM -F-1197, Incorporated by referenced in 46 CFR 170.270.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 December 2018
Resolved 19 November 2018
Resolution: Manual control system replaced and tested to closure time of 57 seconds in the presence of CGMI.
Engineering › Diesel Engine (propulsion-direct drive) › Piston Pin
Issued 27 March 2018
Resolved
Pin missing that provided linkage to engine and bridge for air control
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 27 March 2018
Resolved 27 March 2018
Resolution: replaced pin and provided statement from Chief Engineer and CAPT attesting to repairs.
Lifesaving › Launching Appliances › Davit
Issued 2 February 2018
Resolved
Repair/replace Port davit winch motor.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 9 February 2018
Resolved 4 February 2018
Resolution: Chief Engineer found a defective contactor and a forward limit switch that had shorted out. Once both were changed out the Davit winch was tested and is fully operational.
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 19 September 2017
Resolved
Install access panels/plates for all automatic fire dampers to allow for inspection and verify operation.
Action required: 705 - Other - as specified
Due 30 November 2018
Resolved 31 October 2018
Construction/Loadline › Structures › Superstructure
Issued 19 September 2017
Resolved
Remove doubler and make permanent repairs to bulkhead IWO galley reefer/freezer. Conduct gauging of deck IWO leaking reefer/freezer.
Due 30 November 2018
Resolved 31 October 2018
Lifesaving › Lifeboat › Canopy
Issued 31 May 2017
Resolved
Renew port and starboard lifeboat canopies to original specifications.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 September 2017
Resolved 27 October 2017
Lifesaving › Lifeboat › Windows/Translucent Panels
Issued 31 May 2017
Resolved
Replace damaged lifeboat windows on port and starboard lifeboats. Renew with original equipment.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 September 2017
Resolved 27 October 2017
Navigation › Collision/Grounding Avoidance › Radar
Issued 27 March 2017
Resolved
Provide proof of operable marine radar via tech report.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 29 March 2017
Resolved 28 March 2017
Resolution: Tech Rep repaired.
Engineering › Freshwater System (jacketwater cooling) › Piping
Issued 30 January 2017
Resolved
Replace temporary piping installed on starboard main engine jacket water cooling discharge line with manufacturer produced or approved part.
Condition: Invalid
Action required: 705 - Other - as specified
Due 1 March 2017
Resolved 21 February 2017
Engineering › Freshwater System (jacketwater cooling) › Piping
Issued 28 January 2017
Resolved
Affect permanent repairs to starboard main engine jacket water cooling discharge piping.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 February 2017
Resolved 30 January 2017
Resolution: Vsl made temp repairs
Engineering › Diesel Engine (propulsion-reduction gear) › Governor
Issued 16 December 2016
Resolved
Renew faulty governor on the port main diesel engine.
Action required: 705 - Other - as specified
Due 30 December 2016
Resolved 19 December 2016
Resolution: The old governor was re-installed & run sat. PME requires the governor for servicing. Spare new governor runs erratically with a binded drive shaft until MDE shutdown. That was the symtom engineers had & upon inspection found the shaft gears stripped.
Communications › Alarms/Indicators › Sprinkler Alarm System
Issued 28 November 2016
Resolved
Correct two test procedures in the Machinery PSTP; (1)Sprinkler system test uses magnets this is in conflict with the manufacturer instructions, (2)The ESP 1000 is in need of simplification as discussed with crew and [name withheld] to MSC. In accordance with 46 CFR 62.30-10.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 27 January 2017
Resolved 1 February 2017
Engineering › Diesel Engine (auxiliary) › Nozzle, Injection (fuel injection)
Issued 28 November 2016
Resolved
Both ship service generators fuel injection lines leak-off into the bilge and near hot surfaces. Install an approved safety system to collect excess fuel and an alarm to notify watch stander of issue. The alarm should be both visual and audible. Fire Hazard, 46 CFR 56.50-1(k).
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 2 February 2017
Resolved 24 January 2017
Communications › Public Address System › Amplifier
Issued 28 November 2016
Resolved
Repair the car deck public address system, 46 CFR 113.50-5.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 5 January 2017
Resolved 30 November 2016
Resolution: A loose card on the PA Electronic Module was the culprit, tested sat.
Fire Fighting › Structural - A Class Divisions › Doors
Issued 15 August 2016
Resolved
Double fire screen door #7 won't close properly from the bridge. Prove proper operation of door when actuated from bridge.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 August 2016
Resolved 19 August 2016
Resolution: Proper operation witnessed.
Communications › Alarms/Indicators › Lube Oil Low Pressure Alarm
Issued 15 August 2016
Resolved
Prove proper operation of low lube oil pressure shutdown on #2 SSDG.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 August 2016
Resolved 19 August 2016
Resolution: Witnessed satisfactory operation.
Engineering › Diesel Engine (propulsion-reduction gear) › Block
Issued 15 August 2016
Resolved
Make permanent repairs to cracks in starboard main engine block bed rails.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 September 2016
Resolved 22 November 2016
Engineering › Freshwater System (jacketwater cooling) › Piping
Issued 15 August 2016
Resolved
Port and Stbd main engine cooling lines are attached with modified "dresser" couplings. Provide suitable approved connections for each engine.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 September 2016
Resolved 16 November 2016
Lifesaving › Launching Appliances › Davit
Issued 2 April 2016
Resolved
Port side Lifeboat Davit is inoperable. Provide proper repair plan or tech report for port side lifeboat davit brake system. Provide plan for mitigating reduction of life saving capacity on the port side of vessel.
Action required: 17 - Rectify deficiencies prior to departure
Due 3 April 2016
Resolved 5 April 2016
Communications › Alarms/Indicators › General Alarm
Issued 25 February 2016
Resolved
Repair inoperable general emergency alarm light on the car deck and in the engine room.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 March 2016
Resolved 10 March 2016
Documentation › Manuals/Policy Documentation › Vessel Specific Watch Policy/Procedures
Issued 25 February 2016
Resolved
Amend automation test procedures to reflect proper psi for the clutch air alarm. Sumbit to MSU Valdez for approval
Condition: Invalid
Action required: 705 - Other - as specified
Due 25 April 2016
Resolved 18 March 2016
Resolution: Submitted revised PSTP
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 25 February 2016
Resolved
Replace all navigation lights with UL1104 certified lights.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 25 March 2016
Resolved 25 March 2016
Resolution: Replaced all navigation lights