MAURY USCG vessel records
← All vessels

ST PETER

Built
1999
Last inspected
30 April 2026
Documentation
Valid · NVDC file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 30 April 2026
…with no type recorded2
Operational controls None recorded without a removal date
Years with a record 11 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WCZ4476
491942
Flag
UNITED STATES
Maury page id
psix-491942

Documentation record

Registered dimensions (L × B × D)78.5 ft × 28.5 ft × 8.3 ft
Registered tonnagegross 91 / net 73
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderALLEN MARINE INC · SITKA, AK, UNITED STATES · built 1999
Hull materialAluminum
PropulsionJet Drive
Hull shapeUNSPECIFIED
Hull configurationTwin Hull
Hailing portSITKA, AK
Endorsements, as the file codes themcw_un, reg
DocumentationValid · issued 2 February 2026 · expires 31 January 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it91 - Simplified, Gross Ton
73 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel

Behind this panel: 53 inspections, each with its date, unit and type; 75 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; 1 other recorded name; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 53

30 April 2026 In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8360752
30 January 2026 Examination of Repairs · Deficiency Check · Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8303848
3 October 2025 Internal Structural Exam · COI Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8244033
6 September 2025 In-Service Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8243788
16 July 2025 In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8187597
4 October 2024 Annual Inspection · Deficiency Check · Internal Structural Exam
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8014549
25 May 2024 Examination of Repairs · In-Service Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7919592
20 November 2023 Internal Structural Exam · Plan Review "T" Boat · Examination of Repairs · Hull Examination
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7827868
7 November 2023 Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7822773
14 September 2023 Annual Inspection · Internal Structural Exam · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7775893
21 August 2023 In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7768206
29 March 2023 Liferaft Servicing
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7663517
24 March 2023 Liferaft Servicing
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7663535
27 February 2023 Deficiency Check · Examination of Repairs
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7642751
21 February 2023 Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7639977
2 February 2023 Liferaft Servicing
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7641617
20 September 2022 Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7562815
23 August 2022 Deficiency Check · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7541561
19 May 2022 Damage Survey · Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7457305
31 January 2022 Deficiency Check · Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7387483
17 November 2021 Liferaft Servicing
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7359812
22 September 2021 In-Service Inspection · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7318472
14 June 2021 Deficiency Check · Internal Structural Exam · COI Inspection · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7220733
16 June 2020 Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6978701
21 January 2020 Drydock Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6893506
4 December 2019 Internal Structural Exam · DAPI Audit · Annual Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6866783
22 October 2019 Administrative Inspection · Deficiency Check · In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6842209
11 September 2019 Deficiency Check · In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6810691
17 May 2019 Deficiency Check · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6690098
19 February 2019 Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6628563
1 February 2019 Liferaft Servicing
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6620623
27 December 2018 Liferaft Servicing
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6653717
30 November 2018 Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6591217
16 November 2018 Administrative Inspection
Administrative · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6582372
6 November 2018 In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6576025
28 September 2018 Administrative Inspection · Annual Inspection · Internal Structural Exam · DAPI Audit
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6549266
27 July 2018 Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6492734
9 July 2018 Administrative Inspection
Administrative · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6473688
5 July 2018 Examination of Repairs · Damage Survey
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6469831
23 June 2018 Damage Survey · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6453331
23 June 2018 Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6522044
22 May 2018 Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6420852
16 May 2018 Administrative Inspection · Deadweight Survey · Examination of Repairs
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6417890
15 February 2018 Liferaft Servicing
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6355878
24 January 2018 Liferaft Servicing
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6346429
12 January 2018 Hull Examination · Internal Structural Exam · Deficiency Check · Administrative Inspection · Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6337345
29 November 2017 Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6315830
2 November 2017 DAPI Audit · Annual Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6302055
11 October 2017 In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6285953
22 September 2016 Internal Structural Exam · Administrative Inspection · Annual Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5998804
8 July 2016 Deficiency Check · Damage Survey · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5934415
8 July 2016 Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6029462
28 January 2016 Internal Structural Exam · Deficiency Check · Hull Examination
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 5804585

Deficiency record · 75

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 3 October 2025 Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from fire or machinery failure. Port side main engine has a coolant leak. 46 CFR 182.100
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 3 October 2025
Resolution: Rectified
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 3 October 2025 Resolved
(d) Each nozzle must be of corrosion-resistant material and be capable of being changed between a solid stream and a spray pattern. A nozzle on a vessel of not more than 19.8 meters (65 feet) in length carrying more than 49 passengers, and on a vessel of more than 19.8 meters (65 feet) in length, must: (1) Be of a type approved in accordance with approval series 162.027; or (2) Be of a type recognized by the Commandant as being equivalent in performance. Vessel had a non-approved fire nozzle installed. 46 CFR 181.320(d)
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Resolved 3 October 2025
Resolution: Rectified
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 9 October 2024 Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from fire or machinery failure. Boiler space arrangement is not being used as designed. MI unable to observe closed ventilation on the boiler stack, which led to discovery of a missing pipe for boiler exhaust. 46 CFR 182.100
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 November 2024
Resolved 14 November 2024
Resolution: Missing boiler exhaust pipe was reinstalled.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 9 October 2024 Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from fire or machinery failure. Port aft MDE sporadically continues to run for a short period after shutdown. Find cause and conduct repairs to the satisfaction of USCG marine inspector. 46 CFR 182.100
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 November 2024
Resolved 23 October 2024
Resolution: Shutdown operated as intended in presence of Marine Inspector.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 14 September 2023 Resolved
Fixed gas extinguishing systems: System design and installation must be in accordance with the Marine Design, Installation, Operation, and Maintenance Manual approved for the system by the Commandant. Time delay on the port & stbd fixed CO2 extinguishing system is less than 30 seconds. Per the fire system servicing report, port side time delay is at 27.5 seconds while the stbd side time delay is at 29 seconds. Provide servicing report meeting the 30 seconds standard. 46CFR181.410
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 October 2023
Resolved 4 October 2024
Resolution: Egress drill conducted. Crew was able to escape engine room within 12 seconds.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 14 September 2023 Resolved
Each battery must be located as high above the bilge as practicable, secured to protect against shifting with the roll and pitch of the vessel, and free from exposure to water splash or spray. Battery banks in port and stbd engine room are not secured. Place batteries in designated area/trays and secure via a mechanism that prevents batteries from shifting. 46CFR183.350(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 7 November 2023
Resolution: Batteries were properly secured.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 14 September 2023 Resolved
Vessel must be equipped with at least two operable portable battery lights. One of these lights must be located at operating station and the other at the access to the propulsion machinery space. Portable light at the operating station is dead. Replace light or battery. 46CFR183.430
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 7 November 2023
Resolution: Portable light on bridge was replaced.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 14 September 2023 Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date: (1) Charts of large enough scale to make safe navigation possible. Onboard charts are dated from 2021. Provide new or up-to-date charts of operating area. 46CFR184.420i(a)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 7 November 2023
Resolution: Vessel updated digital nautical charts.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 14 September 2023 Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspection of lifesaving equipment and systems, including the following: Inspection of each inflatable liferaft to determine that it has been serviced as required by § 185.730 of this chapter. No servicing certificate was provided to attending MI. Provide liferaft servicing certificate no latter than 15SEP2023. 46CFR176.808(a)(4)
Action required: 705 - Other - as specified
Resolved 18 September 2023
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 14 September 2023 Resolved
A vessel with installed toilet facilities must have a marine sanitation device that complies with 33 CFR part 159. On-board sewage tanks are showing signs of being compromised on tank walls and weld seams. Provide satisfactory evidence attesting to tank integrity, or repair/replace tanks to satisfaction of attending MI. To be recified by next dry dock. 46CFR184.704
Action required: 705 - Other - as specified
Resolved 7 November 2023
Resolution: Cleared and added to DDX activity # 7827868 for tracking purposes.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 27 February 2023 Resolved
Piping, including valves, pipe fittings and flanges, conveying vapor, gas, or liquid, the temperature of which exceeds 65.5 °C (150 °F), must be suitably insulated where necessary to prevent injuries. Properly install missing exhaust lagging on both main diesel engines in the port engine room and the aft main diesel engine in the starboard engine room. 46 CFR 177.970
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 15 March 2023
Resolution: Maintenance crew replaced all worn or missing lagging with new exhaust lagging - all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 27 February 2023 Resolved
Gauges to indicate engine revolutions per minute (RPM), jacket water discharge temperature, and lubricating oil pressure must be provided for all propulsion engines installed in the vessel. The gauges must be readily visible at the operating station. Noted the jacket water temperature gauge on the port aft engine is out of commission and does not appear to be reading accurately. 46 CFR 182.410
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 15 March 2023
Resolution: Maintenance crew verified proper operation of the jacket water temp gauges and tested - all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 27 February 2023 Resolved
The starboard main diesel engines failed to stop from the bridge or in the engine room. Properly repair main engine shut down switches. All engines must have at least two means for stopping the engine(s) under any operating conditions. The fuel oil shutoff required at the engine by § 182.455(b)(4) will satisfy one means of stopping the engine. 46 CFR 182.200
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 March 2023
Resolution: Maintenance crew replaced a faulty stop controller and tested - all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 September 2022 Resolved
Unsafe practices. (a) At each inspection for certification and at every other vessel inspection all observed unsafe practices, fire hazards, and other hazardous situations must be corrected and all required guards and protective devices must be in satisfactory condition. Sight glass gauge on the starboard fuel tank is leaking diesel fuel from the lower valve assembly. Repair fuel oil leak to the satisfaction of the attending CG Marine Inspector. 46 CFR 176.830
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 October 2022
Resolved 27 September 2022
Resolution: Operator replaced the seal and tightened the packing gland on the sight glass valves tested - all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 20 September 2022 Resolved
Protection against hot piping. Piping, including valves, pipe fittings and flanges, conveying vapor, gas, or liquid, the temperature of which exceeds 65.5 °C (150 °F), must be suitably insulated where necessary to prevent injuries. The aft main diesel engine dry exhaust piping is missing sections of lagging. Properly repair or replace all missing, worn, or damaged exhaust lagging. 46 CFR 177.970 & 182.430
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 October 2022
Resolved 27 September 2022
Resolution: Operator repaired or replaced exhaust lagging in both engine rooms - all sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 20 September 2022 Resolved
Watertight bulkheads...The number of penetrations in a watertight bulkhead must be minimized. A penetration in a watertight bulkhead must be as high and as far inboard in the bulkhead as practicable, and made watertight. The watertight bulkhead between the starboard engine room and starboard jet room bulkhead penetration for the steering system is missing packing material. 46 CFR 179.320(c).
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 October 2022
Resolved 27 September 2022
Resolution: Operator sealed bulkhead penetration with 5200 marine sealant - all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 September 2022 Resolved
Where flexible nonmetallic hose is permitted for use in piping systems by this section, it must meet SAE standard J-1942. Marine Inspector observed cotton lined DOT approved air brake hose being utilized in the Port Fuel Void and Port E/R for fuel service. Install SAE J-1942 fuel hoses or install the correct fire sleeve over cotton lined fuel hoses.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 October 2022
Resolved 27 September 2022
Resolution: Operator replaced all hoses with SAE J1942 hoses and SAE J1475 fittings.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 20 September 2022 Resolved
An exposed hazard, such as gears or rotating machinery, must be properly protected by a cover, guard, or rail. Marine Inspector observed the Port Fwd engine's belt guard had a broken mounting bracket. Repair mounting bracket to original condition.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 October 2022
Resolved 27 September 2022
Resolution: Operator replaced mounting bracket with a brand new one - all sat.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 20 September 2022 Resolved
Each lighting fixture and lamp holder must be fixed. Marine inspector observed two lighting fixtures in the port E/R that were not mounted properly or diffuser was not firmly attached. Properly mount fixture and diffuser for lighting fixtures.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 October 2022
Resolved 27 September 2022
Resolution: Operator properly mounted the light and replaced the missing diffuser clips - all sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 20 September 2022 Resolved
Watertight integrity. (a) A hatch exposed to the weather must be watertight... The flush deck hatch for the starboard jet room does not dog down watertight. Properly repair quick closing hatch cover so it will dog down watertight. 46 CFR 179.360
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 October 2022
Resolved 27 September 2022
Resolution: Operator made adjustments to the hatch cover and relocated the captive cable tested - all sat.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 20 September 2022 Resolved
Each door, hatch or scuttle, used as a means of escape, must be capable of being opened by one person, from either side. The Marine Inspector observed the port fwd door on the main deck stuck and difficult to open. Repair door to original condition.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 October 2022
Resolved 27 September 2022
Resolution: Operator adjusted the door and closure mechanisms tested - all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 14 June 2021 Resolved
Vessel must be provided with a satisfactory arrangement for draining any watertight compartment. Bilge suction pipe between manifold and bilge pump was holed multiple times. Repair/renew bilge pipe to original condition.
Action required: 30 - Ship detained
Resolved 23 July 2021
Resolution: Wasted bilge pipe was replaced with new bilge pipe between the manifold and bilge pump.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 14 June 2021 Resolved
When repairs are made during an emergency, the owner, managing operator or master shall notify the OCMI as soon as practicle after such repairs are made. Electrical tape was used as a temporary repair to stop the leak on the above deficiency and the OCMI was not notified.
Action required: 30 - Ship detained
Resolved 23 July 2021
Resolution: Discussed reporting procedures with vessel management and crew. Management implementing new fleetwide electronic SMS to help track and report damaged equipment, operations and training.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 14 June 2021 Resolved
The following spaces must be equipped with a fire detecting system of an approved type: (i) A space containing propulsion machinery. The fire detection system did not operate when tested. Repair/renew to original condition.
Action required: 30 - Ship detained
Resolved 23 July 2021
Resolution: All fire detection systems tested and operated correctly.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 14 June 2021 Resolved
On a vessel of more than 65 feet in length the minimum capacity of the fire pump must be 50 gpm at a pressure not less than 60 psi at the pump outlet. The pump outlet must be fitted with a gauge. Gauge was not operational and pressure could not be determined. Renew gauge and prove proper operation to attending marine inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 July 2021
Resolution: New gauge installed at fire pump, operating pressure at 70 PSI. All sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 14 June 2021 Resolved
An adult lifejacket must be provided for each person carried on board a vessel. More than 35 life jackets were in unserviceable condition. Provide serviceable life jackets for all passengers on board.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 July 2021
Resolution: New lifejackets were placed on vessel, unserviceable lifejackets removed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 21 January 2020 Resolved
Reach rod for port forepeak bilge piping valve attached with plastic tie wraps. Make proper attachment.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 February 2020
Resolved 16 June 2020
Resolution: Satisfactorily witnessed bilge pumping from port fore-peak.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 4 December 2019 Resolved
Upper deck aft cabin door on the port side automatic door closer is bent and blocks door from being opened. Make permanent repairs to ensure the door cannot be blocked closed thus blocking the means of escape.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 June 2020
Resolution: Door closure properly fixed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 4 December 2019 Resolved
#1 MDE has an excessive oil leak on the aft inboard side. Make permanent repairs to stop leakage.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 June 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 4 December 2019 Resolved
#1 MDE electrical harness is currently suspended from overhead with a piece of rope. Make permanent repairs to properly secure wiring harness.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 June 2020
Resolution: Electrical harness properly routed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 4 December 2019 Resolved
#3 MDE missing a bold on a bracket on the forward inboard side of engine. Make permanent repairs to secure bracket.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 June 2020
Resolution: Bolt replaced.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 4 December 2019 Resolved
Engine room light fixture missing light bulbs and cover above #4 MDE. Replace bulbs and cover or remvoe light fixture from engine room.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 June 2020
Resolution: Cover replaced. Light bulbs left out due to light not needed.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 22 October 2019 Resolved
Replaced both port and starboard time delay bottles. Both trips at around 5-8 seconds on a 30 second bottle
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 July 2021
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 22 October 2019 Resolved
Install CO2 warning labels on both port and starboard engine room hatches.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 June 2020
Resolution: Placards installed on both doors.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 22 October 2019 Resolved
Install simple operation instructions at or near pull station on both port and starboard sides
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 June 2020
Resolution: Instructions posted.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 22 October 2019 Resolved
Prove port fwd ventilations closers close all the way.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 November 2019
Resolution: Vessel repaired port fwd ventilations closer, tested all sat.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 22 October 2019 Resolved
Install a fixed gas fire extinguishing system, in compliance with §181.410 for the fuel fire boiler space prior to using the boiler.
Action required: 705 - Other - as specified
Resolved 12 September 2022
Resolution: Operator installed a pre engineered fire boy system in the furnace space, tested shut down and alarms, remote fuel and air supply vent closure - all sat. Tested stand alone heat detection system installed in the space - all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 11 September 2019 Resolved
The Generator has a small raw water leak.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 September 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 September 2019 Resolved
The vessel's batteries need to be placed in a non conductive tray.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 September 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 September 2019 Resolved
The starboard aft main engine has an oil leak.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 September 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 September 2019 Resolved
The starboard aft engine has a small jacket water leak.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 September 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 September 2019 Resolved
Exhaust lagging needs to be adjusted on the rear starboard main engine.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 September 2019
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 11 September 2019 Resolved
There is excessive oil in the bilges.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 September 2019
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 28 September 2018 Resolved
Repair fuel oil leak on generator first stage fuel oil filter.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 September 2018
Resolution: Vessel replaced oil ring on filter, tested all sat
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 28 September 2018 Resolved
Replace all chaffed fuel oil hose on starboard side fwd. engine.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 November 2018
Resolution: Vessel has replaced chaffed fuel hoses.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 28 September 2018 Resolved
Find and repair exhaust cooling leak on port aft engine
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 November 2018
Resolution: Vessel has fixed cooling leak.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 28 September 2018 Resolved
Remove dead end wires in both jet rooms and in the port Side aft engine room.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 November 2018
Resolution: Vessel has removed all deadend wires
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 28 September 2018 Resolved
Repair exhaust leak on both port engines
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 November 2018
Resolution: Vessel has repaired exhuast leaks
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 28 September 2018 Resolved
Reattach port side engine room hatch gasket
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 November 2018
Resolution: Vessel has repaired gasket
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 28 September 2018 Resolved
Update vessel’s FCC Station License to display the correct Vessel’s name
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 17 May 2019
Resolution: Vessel has RCVD a update FCC Station License.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 28 September 2018 Resolved
Reinstall port inboard jet bucket prior to 01APR19
Action required: 705 - Other - as specified
Due 1 April 2019
Resolved 19 February 2019
Resolution: Verified bucket was installed.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 28 September 2018 Resolved
Repair 3 cracked weld in the #1 port void from the transverse frame to the main deck during the next dry dock
Action required: 705 - Other - as specified
Due 31 January 2020
Resolved 19 February 2019
Resolution: Conducted a satisfactory visual examination of picked up fillet welds.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 28 September 2018 Resolved
Repair 1 cracked weld in the #1 starboard void from the transverse frame to the main deck during the next dry dock
Action required: 705 - Other - as specified
Due 31 January 2020
Resolved 19 February 2019
Resolution: Conducted a satisfactory visual examination of picked up fillet welds.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 28 September 2018 Resolved
Make repairs to framing and cracked welds in the port side engine room outboard side just fwd. of engine exhaust port by 01APR18
Action required: 705 - Other - as specified
Due 1 April 2019
Resolved 19 February 2019
Resolution: Verified affected area was repaired with a 97" x 62" x 3/16" insert and affected frame was cropped and renewed. Conducted a satisfactory vacuum box test and visual exam of inserted plate.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 28 September 2018 Resolved
Install proper electrical box cover for toilet flush button boxes in all heads
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 November 2018
Resolution: Vessel has install proper electrical box covers
Fire Fighting › Fire Pumps › Power Source
Issued 23 June 2018 Resolved
07113 - A self priming, power driven fire pump must be installed on each vessel and may be driven by a propulsion engine. The vessel's fire pump is powered by the #1 engine, which was rendered inoperable. Restore the #1 engine to operational status and demonstrate the operation of the installed fire pump to the satisfaction of the attending marine inspector.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 June 2018
Resolution: Verified the #1 engine and fire pump were operating properly.
Fire Fighting › Fire Pumps › Pressure
Issued 22 May 2018 Resolved
Prove proper operation of the fire pump
Action required: 60 - Rectify deficiencies prior to movement
Resolved 22 May 2018
Resolution: Fire pump restored to operation and tested in presence of CG MI.
Construction/Loadline › Hull › Side Shell
Issued 12 January 2018 Resolved
Make permanent repairs to areas of hull plate removed on the STBD aft quarter.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 1 May 2018
Resolved 27 February 2018
Resolution: Verified damaged areas were cropped and renewed.
Construction/Loadline › Hull › Hull Plating
Issued 12 January 2018 Resolved
Repair all structures and bulkhead/side shell penetrations upset to facilitate main engine renewal.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 1 May 2018
Resolved 16 May 2018
Resolution: Witnessed satisfactory vacuum box testing of both port and starboard inserts.
Construction/Loadline › Penetrations › Pipe Flange
Issued 12 January 2018 Resolved
Provide valve on both sides of the fwd bulkhead of the port engine room for non-metallic potable water pipe penetration.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 May 2018
Resolved 22 May 2018
Resolution: vessel has installed valve on both sides of the bulkhead
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 2 November 2017 Resolved
Properly install water light to lifebuoy.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 November 2017
Resolution: Vessel has properlry attached water light
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 2 November 2017 Resolved
Fix top deck railing on starboard side aft.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 May 2018
Resolved 22 May 2018
Resolution: vessel has repaired hand rail
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Condition
Issued 2 November 2017 Resolved
Replace top deck aft portable fire extinguisher
Action required: 60 - Rectify deficiencies prior to movement
Resolved 29 November 2017
Resolution: Vessel has installed new portable fire extinguisher.
Fire Fighting › Fire Hoses › Condition
Issued 2 November 2017 Resolved
Replace both fire hoses.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 29 November 2017
Resolution: Vessel has replaced both fire hoses.
Accommodation/Occupational Safety › Ventilation › General
Issued 2 November 2017 Resolved
Prove proper operation of both port and starboard engine room ventilation fans.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 29 November 2017
Resolution: Vessel has repaired both engine room ventilation fans
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 2 November 2017 Resolved
Fix engine exhaust leak on port and starboard aft engines and insure proper installation of exhaust lagging on repair.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 29 November 2017
Resolution: Vessel has fixed engine exhaust leak on port and starboard aft engines and installed exhaust lagging.
Electrical › Electrical Distribution System (service) › Switch
Issued 2 November 2017 Resolved
Prove proper operation of all electrical switches in the port and starboard fiddle
Action required: 705 - Other - as specified
Due 16 November 2017
Resolved 29 November 2017
Resolution: vesssel has repaired all electrical switches in the port and starboard fiddle
Stability › Watertight Integrity › Weathertight Enclosure
Issued 2 November 2017 Resolved
Fix watertight gasket on starboard jet room hatch.
Action required: 705 - Other - as specified
Due 16 November 2017
Resolved 29 November 2017
Resolution: vessel has fixed watertight gasket on starboard jet room hatch.
Operations/Management › Drills/Instruction › Fire
Issued 2 November 2017 Resolved
Conduct drills with CG inspector prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 May 2018
Resolved 22 May 2018
Resolution: Conducted underway drills all sat
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 11 October 2017 Resolved
Ventilation closures released but did not drop to cover intake due to corrosion or lack of lubrication. Demonstrate operation of ventilation closures to the attending CG Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 May 2018
Resolved 22 May 2018
Resolution: Ventilation covers have been repaired and work properly
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 11 October 2017 Resolved
Engines and power ventilation were not operating at the time of the test. Demonstrate operation of the engine and power ventilation shutdowns to the attending CG Marine Inspector.
Action required: 705 - Other - as specified
Due 1 May 2018
Resolved 20 August 2018
Resolution: Witnessed operation of ventilation shutdowns.
Engineering › Diesel Engine (propulsion-reduction gear) › Seal
Issued 8 July 2016 Resolved
Properly repair the port forward MDE that has a major lube oil leak.
Action required: 705 - Other - as specified
Due 15 July 2016
Resolved 9 July 2016
Resolution: Company mechanics replaced the leaking lube oil pressure sending unit. Test ran the engine - SAT.
Accommodation/Occupational Safety › Occupational Safety › Smoking
Issued 28 January 2016 Resolved
Replace inop CO sensors in jet voids. Engine exhaust passes through space.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 28 January 2016
Resolved 28 January 2016
Construction/Loadline › Penetrations › Valve Flange
Issued 28 January 2016 Resolved
Replace plastic through hull fittings with metallic fittings. 46 CFR 182.720(d)(3)
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 May 2016
Resolved 15 March 2016
Resolution: The plastic through fittings were replaced with metal ones.
Construction/Loadline › Hull › Hull Plating
Issued 28 January 2016 Resolved
Remove sea chest screens on the bottom of the hull and remove marine growth. 46 CFR 182
Condition: Invalid
Action required: 705 - Other - as specified
Due 1 May 2016
Resolved 15 March 2016
Resolution: The raw water screens on the hull were cleaned.

Recorded names · 1

CAPE AIALIK (2005–2009). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.