MAURY USCG vessel records Sign in
← All vessels

HERCULES 207

HERCULES 207 is a 1981 mobile offshore drilling unit. The Coast Guard has recorded 17 inspections since 2000, most recently in January 2024, along with 67 deficiencies.

Records from 2000 to 2024. Most recent: inspection, 18 January 2024.

Built
1981
Last inspected
18 January 2024
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

8750003 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
493573
Flag
LIBERIA
—
Maury page id
psix-493573

Inspections, by type

…with no type recorded5
Years with a record 12 calendar years (2000–2024)
The 17 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Offshore class in Maury's sources begin in 1978.

Documentation record

Tonnage as PSIX records it5855 - Regulatory (Subpart C or D), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspected as a tow unit · 1

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

SEACOR BRAVE Offshore Supply Vessel · MISLE 1175701 · 12 January 2018 · activity 6338343

Inspection history · 17

18 January 2024 Administrative Inspection
Administrative · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7851098
12 January 2018 Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6338343
30 March 2009 COC-MODU Annual
Type not classified · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3442162
4 March 2008 MARPOL Annex V Examination · COC-MODU Renew
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3154580
10 September 2007 COC-MODU Annual
Type not classified · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3054330
13 March 2006 Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2601518
28 February 2006 COC-MODU Renew
Type not classified · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2580745
25 April 2005 Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 2342696
11 March 2005 COC-MODU Annual
Type not classified · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 2301987
4 May 2004 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2088371
5 January 2004 Certificate of Compliance · Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1975530
21 March 2003 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1775402
20 November 2002 Certificate of Compliance · Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1708573
6 September 2001 Letter of Compliance (Initial/Renewal)
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1453935
10 July 2001 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 48404
14 September 2000 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 822517
14 September 2000 Letter of Compliance (Initial/Renewal) · Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1449387

Deficiency record · 67

Engineering › Fuel Oil Service System › Vent Pipe
Issued 30 March 2009 Resolved
Flame screen in fuel vent for tank 5-S damaged
Due 30 April 2009
Resolved 21 April 2009
Fire Fighting › Structural - A Class Divisions › Doors
Issued 30 March 2009 Resolved
"A" boundary door from galley to mess deck missing.
Action required: 705 - Other - as specified
Due 8 June 2009
Resolved 19 April 2024
Resolution: Vessel owner/operator requested the vsl to be laid up and therefore the vsl is exempt from inspections.
Lifesaving › Lifeboat › Embarkation/Disembarkation Capabilities
Issued 30 March 2009 Resolved
Port lifeboat removed to be replaced prior to rig operation.
Action required: 705 - Other - as specified
Due 21 April 2009
Resolved 19 April 2024
Resolution: Owner/operator requested to place the vsl in laid up status so the vsl is exempt from inspection.
Accommodation/Occupational Safety › Sleeping Accommodations › Locker
Issued 15 April 2007 Resolved
Provide a locker in the bunk rooms for each person assigned to that room.
Condition: Unknown
Due 27 April 2007
Resolved 25 April 2007
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 15 April 2007 Resolved
Provide actual agent weights for portable CO2 extinguishers.
Condition: Improper/Lack of Maintenance
Due 29 April 2007
Resolved 26 April 2007
Fire Fighting › Fire Hoses › Condition
Issued 15 April 2007 Resolved
Complete pressure test of fire hose to actual fire main pressure.
Condition: Improper/Lack of Maintenance
Due 29 April 2007
Resolved 26 April 2007
Stability › Watertight Integrity › General
Issued 15 April 2007 Resolved
Provide proper watertight door gaskets in doors on and below the main deck. (soft open cell gaskets currently installed)
Condition: Improper/Lack of Maintenance
Due 29 April 2007
Resolved 26 April 2007
Pollution Prevention/Response › Prevention Equipment › Cargo Monitor/Control System
Issued 28 February 2006 Resolved
Renew or prove completion of annual pressure test of oil transfer hoses IAW 33CFR156.170 prior to fueling.
Condition: Improper/Lack of Maintenance
Action required: 703 - Prior to bunkering operations
Resolved 15 March 2007
Electrical › Lighting (service) › Lighting Fixture
Issued 11 March 2005 Resolved
Reposition lighting on helo deck to no more than 3 meters apart.
Action required: 705 - Other - as specified
Due 11 April 2005
Resolved 11 April 2005
Construction/Loadline › Structures › Superstructure
Issued 11 March 2005 Resolved
Remove owls from helodeck.
Action required: 705 - Other - as specified
Due 11 April 2005
Resolved 11 April 2005
Fire Fighting › Fixed CO2 Fire Extinguishing System › Nozzle
Issued 11 March 2005 Resolved
Repair or replace flex hose on fixed CO2 system in paint locker.
Action required: 705 - Other - as specified
Due 11 April 2005
Resolved 25 April 2005
Electrical › Lighting (service) › Lighting Fixture
Issued 11 March 2005 Resolved
Relocate light in paint locker to prevent accidental breakage.
Action required: 705 - Other - as specified
Due 11 April 2005
Resolved 11 April 2005
Fire Fighting › Structural - A Class Divisions › Doors
Issued 11 March 2005 Resolved
Adjust door to paint locker to provide proper seal for fire protection.
Action required: 705 - Other - as specified
Due 11 April 2005
Resolved 11 April 2005
Fire Fighting › Fire Hydrants › Condition
Issued 11 March 2005 Resolved
Repair fire hydrant valve on #6 fire station.
Action required: 705 - Other - as specified
Due 18 March 2005
Resolved 11 April 2005
Electrical › Electric Generation Source (emergency) › Metallic Enclosure/Frame
Issued 11 March 2005 Resolved
Provide means to close all ventilation openings and repair wasted areas on emergency generator enclosures.
Action required: 705 - Other - as specified
Due 11 April 2005
Resolved 25 April 2005
Fire Fighting › Fixed Halon Fire Extinguishing System › Operating Controls
Issued 11 March 2005 Resolved
Provide clear written instructions for halon system for generators.
Action required: 705 - Other - as specified
Due 11 April 2005
Resolved 11 April 2005
Electrical › Electric Generation Source (service) › Power Requirement
Issued 11 March 2005 Resolved
Prove proper operation of reverse power relay for #3 generator.
Action required: 705 - Other - as specified
Due 11 April 2005
Resolved 6 June 2005
Resolution: ABS Surveyor [name withheld] witnessed proper operation of reverse power relay for #3 generator.
Operations/Management › Lifesaving
Issued 10 March 2004 Resolved
Provide station bill (muster list) that designates Person in Charge and 2nd in Command of lifeboat stations. If muster list says "see POB sheet" then POB sheet must contain (list) current assignments. Currently 2 different muster list are being posted on rig. Decide on 1 only.
Due 24 March 2004
Resolved 23 April 2004
Operations/Management › Pollution › Control of Garbage
Issued 10 March 2004 Resolved
Provide proof of record keeping on a garbage log capturing the required elements contained in 33 CFR 151.55.
Due 24 March 2004
Resolved 26 March 2004
Operations/Management › Drills/Instruction
Issued 10 March 2004 Resolved
Current OIM must sign designated crane operators letter.
Due 24 March 2004
Resolved 23 April 2004
Operations/Management › Pollution
Issued 10 March 2004 Resolved
Maintain Oil Record Book in accordance with instructions for entries found in the Liberian Oil Record Book
Due 24 March 2004
Resolved 23 April 2004
Documentation › Certificates/Documents
Issued 10 March 2004 Resolved
Provide the following Liberian Documents: MODU Code Safety Cert. ; International Load Line; IOPP; and Radio Station.
Due 10 April 2004
Resolved 23 April 2004
Operations/Management › Equipment Service/Testing
Issued 10 March 2004 Resolved
Provide proof and properly log seperately the weekly E-Gen test and monthly E-Gen 2 hour load test.
Due 24 March 2004
Resolved 23 April 2004
Operations/Management › Drills/Instruction
Issued 10 March 2004 Resolved
Purge current inaccurate records for training required in 46 CFR 109.213(g)-(h) and prove training on accurate records. Current records show training for individuals on dates same individuals were not even attached or onboard the rig. (At least 2 documented).
Due 24 March 2004
Resolved 23 April 2004
Operations/Management › Drills/Instruction
Issued 10 March 2004 Resolved
Provide record of attendance (roster) logs for drills required in 46 CFR 109.213(c)-(f) to verify crew participation at required intervals.
Due 24 March 2004
Resolved 23 April 2004
Lifesaving › Lifeboat
Issued 10 March 2004 Resolved
Prove both boats operated in water and proper operation of sprinkler systems. There after boats must be operated in water and sprinklers tested at least once per 90 days. Boats last operated in water September 2003. 46 CFR 109.213(d)(3)-(4).
Due 24 March 2004
Resolved 23 April 2004
Operations/Management › Lifesaving
Issued 10 March 2004 Resolved
Prove boats lowered and started at each Abandoment drill in accordance with 46 CFR 109.213(d)(v)-(vii).
Due 24 March 2004
Resolved 23 April 2004
Operations/Management › Lifesaving
Issued 10 March 2004 Resolved
Provide proof of 5 yr hook load test for #2 lifeboat.
Due 24 March 2004
Resolved 23 April 2004
Operations/Management › FireFighting
Issued 10 March 2004 Resolved
Provide and prove onboard training for use of SCBA's. Crew has no familiarity with operation or characteristics of equipment.
Due 24 March 2004
Resolved 23 April 2004
Operations/Management › Drills/Instruction
Issued 10 March 2004 Resolved
Abandoment drills must incorporate assignments as designated on utilized muster list. Either change list to match abandoment practices or change practices to match muster list assignments.
Due 24 March 2004
Resolved 23 April 2004
Engineering › Generator (propulsion/auxiliary-electric)
Issued 10 March 2004 Resolved
Prove all reverse power relays, overspeeds, temperature alarms on all main generators.
Due 24 March 2004
Resolved 23 April 2004
Electrical › Electric Generation Source (emergency)
Issued 10 March 2004 Resolved
Prove auto start auto transfer, lube oil alarm and temperature alarms on E-Gen.
Due 24 March 2004
Resolved 23 April 2004
Construction/Loadline › Structures
Issued 10 March 2004 Resolved
Crop & Renew wasted door threshold passing from pit room to sack room.
Due 24 March 2004
Resolved 23 April 2004
Engineering › Bilge Water Management System
Issued 10 March 2004 Resolved
Prove proper operation of entire bilge system. System provided no suction at any location.
Due 24 March 2004
Resolved 23 April 2004
Engineering
Issued 10 March 2004 Resolved
Prove proper operation of machinery space ventilation shutdown. Would not trip.
Due 24 March 2004
Resolved 23 April 2004
Pollution Prevention/Response › Prevention Equipment
Issued 10 March 2004 Resolved
Prove proper operation by lab analysis of Marine Sanitation Device.
Due 24 March 2004
Resolved 30 April 2004
Fire Fighting › Nozzles
Issued 10 March 2004 Resolved
Replace fire hose nozzles at fire station #6 and #10.
Due 24 March 2004
Resolved 23 April 2004
Electrical › Lighting (emergency)
Issued 10 March 2004 Resolved
Prove all embarkation lights at all lifeboats are on E-bus and are working.
Due 24 March 2004
Resolved 23 April 2004
Lifesaving › Lifeboat
Issued 10 March 2004 Resolved
Renew retro reflective material on both lifeboats.
Due 24 March 2004
Resolved 23 April 2004
Lifesaving › Buoyant Smoke Signals
Issued 10 March 2004 Resolved
Prove expiration dates of both bouyant smokes.
Due 24 March 2004
Resolved 23 April 2004
Lifesaving › Lifeboat Equipment
Issued 10 March 2004 Resolved
Provide 2 ea. 60' bouyant heaving lines per lifeboat.
Due 24 March 2004
Resolved 23 April 2004
Lifesaving › Launching Appliances
Issued 10 March 2004 Resolved
Excercise, lubricate and prove proper operation of releasing mechanism on both lifeboats.
Due 24 March 2004
Resolved 23 April 2004
Lifesaving › Launching Appliances
Issued 10 March 2004 Resolved
Adjust and prove limit switches on #1 lifeboat.
Due 24 March 2004
Resolved 23 April 2004
Lifesaving › Lifeboat Equipment
Issued 10 March 2004 Resolved
Update lifeboat inventory checklist to reflect regulations.
Due 24 March 2004
Resolved 23 April 2004
Lifesaving › Lifeboat Equipment
Issued 10 March 2004 Resolved
Prove inventory of water meets required (1296 bags) and provide either food provisions or a Liberian Exemption Certificate for same.
Due 24 March 2004
Resolved 23 April 2004
Navigation › Collision/Grounding Avoidance
Issued 10 March 2004 Resolved
Prove sequencing of obstruction lights in accardance with 33 CFR 67.
Due 24 March 2004
Resolved 23 April 2004
Accommodation/Occupational Safety › Occupational Safety
Issued 10 March 2004 Resolved
Crop & Renew 5th support portside for helo deck safety net.
Due 24 March 2004
Resolved 23 April 2004
Deck/Cargo
Issued 10 March 2004 Resolved
Post hand signal charts at Port & Stbd cranes.
Due 24 March 2004
Resolved 23 April 2004
Deck/Cargo
Issued 10 March 2004 Resolved
Mark all controls on port crane.
Due 24 March 2004
Resolved 23 April 2004
Deck/Cargo
Issued 10 March 2004 Resolved
Replace glass on Stbd crane window.
Due 24 March 2004
Resolved 23 April 2004
Construction/Loadline › Penetrations
Issued 10 March 2004 Resolved
Adjust & chalk test all WTD's on main deck.
Due 24 March 2004
Resolved 23 April 2004
Electrical
Issued 10 March 2004 Resolved
Prove purge system and required alarms or shutdowns for Petron Drill Log and Tesco Top Drive Control panel.
Due 24 March 2004
Resolved 23 April 2004
Operations/Management
Issued 10 March 2004 Resolved
Make rig available for follow up visit.
Due 24 March 2004
Resolved 23 April 2004
Electrical › Electric Generation Source (service)
Issued 20 November 2002 Resolved
PROVE PROPER OPERATION OF THE #3 GENERATOR SHUTDOWNS. LEGACY COMPONENT DESC: Generator
Action required: 705 - Other - as specified
Resolved 3 December 2002
Resolution: ABS WITNESSED / CLEARED 02 REQUIREMENTS AND ALL WORKLIST ITEMS.
Construction/Loadline › Structures
Issued 20 November 2002 Resolved
CROP & RENEW THE WASTED SECTIONS OF THE MAIN DECK BULKHEAD LEGACY COMPONENT DESC: Superstructure
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 3 December 2002
Resolution: ABS APPROVED REPAIRS TO THE BULKHEAD
Electrical
Issued 6 September 2001 Resolved
PROVE PROPER OPERATION OF ALL GENERATOR TACHOMETERS. PROVE PROPER OPERATION OF #3 GENERATOR SAFETY SHUTDOWNS IN PRESENCE OF CLASS SURVEYOR.
Condition: Unknown
Due 11 October 2001
Resolved 11 October 2001
Construction/Loadline
Issued 6 September 2001 Resolved
HOSE TEST INSERT IN OVERHEAD OF MUD PIT ROOM AND HOSE TEST AND CHALK TEST WATERTIGHT DOOR IN MUD PIT ROOM IN PRESENCE OF CLASS SURVEYOR.
Condition: Unknown
Due 11 October 2001
Resolved 11 October 2001
Accommodation/Occupational Safety
Issued 6 September 2001 Resolved
COMPLETE ACCOMODATION REPAIRS INCLUDING GREY WATER HARD PIPING.
Condition: Unknown
Due 11 October 2001
Resolved 11 October 2001
Engineering
Issued 14 September 2000 Resolved
INSTALL FIRE BOWLS ON EMERGENCY GENERATOR FUEL OIL FILTER.
Condition: Unknown
Due 26 October 2000
Resolved 26 October 2000
Fire Fighting
Issued 14 September 2000 Resolved
INSTALL VENT GASKETS AND DOGS ON PAINT LOCKER.
Condition: Unknown
Due 26 October 2000
Resolved 26 October 2000
Construction/Loadline
Issued 14 September 2000 Resolved
REWORK AND CHALK TEST PORT AND FORWARD UPPER JACK HOUSE EMERGENCY ESCAPE HATCH.
Condition: Unknown
Due 14 September 2000
Resolved 14 September 2000
Documentation
Issued 14 September 2000 Resolved
PROVIDE UPDATED AND APPROVED FIRE CONTROL PLAN.
Condition: Unknown
Due 14 September 2000
Resolved 14 September 2000
Construction/Loadline
Issued 14 September 2000 Resolved
PROVE PROPER OPERATION OF BILGE ALARMS.
Condition: Unknown
Due 26 October 2000
Resolved 26 October 2000
Accommodation/Occupational Safety
Issued 14 September 2000 Resolved
INTALL RACK LIGHTS IN STATEROOM #17.
Condition: Unknown
Due 26 October 2000
Resolved 26 October 2000
Engineering
Issued 14 September 2000 Resolved
SECURE PORT FUEL OIL SUPPLY LINE.
Condition: Unknown
Due 26 October 2000
Resolved 26 October 2000
Accommodation/Occupational Safety
Issued 14 September 2000 Resolved
REMOVE AND CAP OFF OLD PLUMBING IN MAIN DECK HEAD.
Condition: Unknown
Due 14 September 2000
Resolved 14 September 2000
Accommodation/Occupational Safety
Issued 14 September 2000 Resolved
REPLACE AS NECESSARY OVERHEAD LIGHT COVERS IN ACCOMODATIONS.
Condition: Unknown
Due 26 October 2000
Resolved 26 October 2000

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.